CN213134987U - Preparation device of composite blank - Google Patents

Preparation device of composite blank Download PDF

Info

Publication number
CN213134987U
CN213134987U CN202021651690.4U CN202021651690U CN213134987U CN 213134987 U CN213134987 U CN 213134987U CN 202021651690 U CN202021651690 U CN 202021651690U CN 213134987 U CN213134987 U CN 213134987U
Authority
CN
China
Prior art keywords
outer layer
cavity
metal
core
composite blank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021651690.4U
Other languages
Chinese (zh)
Inventor
黄玲
向勇
曾麟芳
李聚良
谢昭昭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan 3t New Material Co ltd
Original Assignee
Hunan 3t New Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan 3t New Material Co ltd filed Critical Hunan 3t New Material Co ltd
Priority to CN202021651690.4U priority Critical patent/CN213134987U/en
Application granted granted Critical
Publication of CN213134987U publication Critical patent/CN213134987U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The utility model discloses a preparation device of composite blank, the composite blank comprises a core part and a metal outer layer coated on the core part, the preparation device comprises a crystallizer provided with a pipe cavity and a dummy bar head provided with a forming cavity, the forming cavity of the dummy bar head is used for being matched with the first end of the core part to cast and form the first end of the metal outer layer; the crystallizer is used for being sleeved outside the core so that the tube cavity is matched with the core to carry out casting forming of the metal outer layer from the first end to the second end of the core. The utility model discloses a preparation facilities of composite blank, it is outer directly through forming the metal with outer molten metal cladding on the core, the preparation step is simple, and the solidification shaping of outer molten metal is fast to improved production efficiency, and all be suitable for to the preparation of the composite blank of different radial dimension and different cross sectional shape, in addition, through adopting the utility model discloses a preparation facilities and through the same preparation method, fuse multilayer metal layer successive layer and cover on preceding one deck, thereby make multilayer composite blank.

Description

Preparation device of composite blank
Technical Field
The utility model relates to a metal composite prepares technical field, in particular to preparation facilities of composite blank.
Background
Composite materials such as composite steel, composite aluminum and the like have excellent performance, are important directions for new material development, and the nation strongly supports the research and development of high-performance composite materials.
In recent years, the development of bimetal composite materials is rapid, and patent document 2012100063158 discloses a stainless steel composite wire rod, the inside of which is plain carbon steel and the outside of which is coated with stainless steel. Patent documents 2010105262657, JPS61126944, JPS63126602 and JPS59212143 all disclose a stainless steel composite corrosion-resistant steel bar and a preparation method thereof, and typical processes thereof are as follows: surface treatment of stainless steel blank and carbon steel blank → penetration of the carbon steel blank into a stainless steel sleeve → end welding → heating and rolling to form a material. Patent documents 2015101884470, JPS55141315, and JPS5947080 disclose a process for manufacturing stainless steel/carbon steel composite bars by a drawing-brazing method, which generally use a stainless steel pipe, a carbon steel bar, and a brazing filler metal foil as raw materials, the brazing filler metal foil is wound on the surface of the carbon steel bar, and then the raw materials are inserted into the stainless steel pipe, then the assembly is drawn together through a wire drawing die to manufacture a bimetal composite blank, and the drawn stainless steel/carbon steel composite blank is heated to about 1150 ℃ for brazing and then cooled to manufacture the composite bar. Patent document 021207321 discloses a method for continuously casting a composite metal slab, billet and continuous casting machine thereof, in which a common carbon steel billet is continuously cast. And then a layer of stainless steel liquid is bonded on the outer surface of the common carbon steel billet to form a composite plate blank or a steel billet. Patent document WO2011048362 discloses a preparation method of a composite billet, which takes a common carbon billet as a core, takes cold-rolled stainless steel or nickel-based alloy steel as an external coating, adds brazing filler metal between the carbon steel core and the coating, and then performs coating rolling to finally obtain the required composite billet.
In summary, it can be seen that, in the current preparation method of the bimetal composite blank, the core material is basically penetrated into the outer layer metal tube for welding and then directly heated and rolled or cold drawn, and the method is similar to the laminated plate welding hot rolling process of the stainless steel composite plate, and the process is reliable, but the process steps are more complicated, the production efficiency is lower, and the specification, the size and the like of the composite blank are more limited.
SUMMERY OF THE UTILITY MODEL
The utility model provides a preparation facilities of composite blank to the preparation step of solving current composite blank is loaded down with trivial details, and production efficiency is low, and composite blank's shape and the limited technical problem of size.
According to an aspect of the present invention, there is provided a manufacturing apparatus for a composite blank, the composite blank includes a core and a metal outer layer coated on the core, the manufacturing apparatus includes a crystallizer provided with a tube cavity and a dummy bar head provided with a forming cavity, the forming cavity of the dummy bar head is used for cooperating with a first end of the core to perform casting forming of the first end of the metal outer layer; the crystallizer is used for sleeving the core part so that the tube cavity is matched with the core part to carry out casting forming on the metal outer layer from the first end to the second end of the core part; the dummy bar head 3 is movably arranged relative to the crystal cleaner.
Furthermore, the lower part of the tube cavity is used for being matched with the core part to carry out casting forming of the metal outer layer, and the upper part of the tube cavity is used for guiding the molten metal of the outer layer to the lower part of the tube cavity.
Further, the preparation device also comprises a cooling device which is arranged on the periphery of the lower part of the crystallizer and is used for cooling the lower part of the tube cavity.
Further, the cooling device includes a nozzle disposed at the periphery of the lower portion of the mold and connected to the cooling water line.
Further, the preparation device also comprises a heating device which is arranged on the periphery of the upper part of the crystallizer and is used for heating the upper part of the tube cavity.
Further, the heating device comprises an induction heating coil which is laid on the periphery of the upper part of the crystallizer.
Further, the surface of the pipe cavity and the surface of the forming cavity are brushed with refractory coatings.
Furthermore, the bottom surface of the molding cavity is provided with a positioning structure for positioning and placing the first end of the core part in the molding cavity, so that the gap between the side wall surface of the core part and the side wall surface of the molding cavity is equal to the designed thickness of the metal outer layer.
Furthermore, the bottom of the crystallizer and the top of the dummy bar head are provided with a positioning connection sealing structure which is matched with each other, so that when the first end of the metal outer layer is cast and formed, a tube cavity of the crystallizer is communicated with a forming cavity of the dummy bar head, and a gap between the inner wall surface of the lower part of the tube cavity and the outer wall surface of the core part is equal to the design thickness of the metal outer layer.
Furthermore, the preparation device also comprises a preparation frame, and a positioning and fixing mechanism for positioning and fixing the crystal cleaning device and a moving mechanism which is positioned below the positioning and fixing mechanism and used for driving the dummy head to move downwards are arranged on the preparation frame.
The utility model discloses following beneficial effect has:
the utility model discloses a preparation facilities of composite blank, the first end location of core is placed in the shaping intracavity of dummy bar head, make the clearance between the lateral wall face of core and the lateral wall face of shaping chamber equal the outer design thickness of metal, the crystallizer overlaps outside the core and laminates mutually with the dummy bar head, make the lumen of crystallizer and the shaping chamber of dummy bar head be linked together, and the clearance between the lateral wall face of core and the lateral wall face of lumen equals the outer design thickness of metal, through pouring molten outer metal into the shaping intracavity of lumen and dummy bar head earlier, solidify into the outer first end of metal and cladding on the lateral wall face of the first end of core with the outer metal liquid in the shaping intracavity of dummy bar head until the bottom of lumen; then continuously pouring the molten outer layer molten metal into the tube cavity, gradually moving the dummy bar head and the core part downwards according to the solidification speed of the outer layer molten metal so as to fix the crystal cleaner, so as to change the relative position of the tube cavity and the core part, the outer layer molten metal in the tube cavity is solidified into a metal outer layer from the first end to the second end of the core part and is coated on the side wall surface of the core part, thereby preparing the composite blank, forming the metal outer layer directly by cladding the outer layer metal liquid on the core part, having simple preparation steps and fast solidification and forming speed of the outer layer metal liquid, thereby improving the production efficiency, being applicable to the preparation of composite blanks with different radial sizes and different section shapes, and in addition, to the compound blank of multilayer, through adopting the utility model discloses a preparation facilities and through the same preparation method, fuse the multilayer metal level successive layer on preceding one deck to make the compound blank of multilayer.
In addition to the above-described objects, features and advantages, the present invention has other objects, features and advantages. The present invention will be described in further detail with reference to the drawings.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification. In the drawings:
fig. 1 is a schematic structural view of a composite blank manufacturing apparatus according to a preferred embodiment of the present invention;
fig. 2 is a schematic structural diagram of a composite blank manufacturing apparatus according to another embodiment of the present invention.
Illustration of the drawings:
1. a core; 2. a crystallizer; 3. a dummy bar head; 4. a heating device; 5. and a cooling device.
Detailed Description
The embodiments of the invention will be described in detail below with reference to the drawings, but the invention can be implemented in many different ways, which are defined and covered below.
Fig. 1 is a schematic structural view of a composite blank manufacturing apparatus according to a preferred embodiment of the present invention; fig. 2 is a schematic structural diagram of a composite blank manufacturing apparatus according to another embodiment of the present invention.
As shown in fig. 1, the apparatus for preparing a composite blank according to the present embodiment includes a core portion 1 and a metal outer layer coated on the core portion 1, the apparatus includes a mold 2 having a cavity and a dummy bar head 3 having a forming cavity, the forming cavity of the dummy bar head 3 is used for cooperating with a first end of the core portion 1 to perform casting forming of the first end of the metal outer layer; the crystallizer 2 is used for being sleeved outside the core part 1 so that the pipe cavity is matched with the core part 1 to carry out casting forming of a metal outer layer from the first end to the second end of the core part 1; the dummy bar head 3 is movably arranged with respect to the mould 2. The casting of the first end of the metal outer layer coated on the side wall surface of the first end of the core 1 is carried out by casting into the molding cavity of the dummy head 3. The core part 1 cast and formed through the first end of the dummy bar head 3 moves away from the crystallizer 2 along the axial direction of the crystallizer 2, and the casting is continuously carried out on the pipe cavity of the crystallizer 2, so that the casting and forming of the metal outer layer coated on the side wall surface of the core part 1 are realized. Alternatively, the lumen of the crystallizer 2 and the forming cavity of the dummy bar head 3 are circular, square, oval or other shapes to prepare composite blanks of different cross-sectional shapes.
The utility model discloses a preparation facilities of composite blank, the first end location of core 1 is placed in the shaping intracavity of dummy bar head 3, the clearance between the lateral wall face of messenger core 1 and the lateral wall face of shaping chamber equals the outer design thickness of metal, crystallizer 2 overlaps outside core 1 and is laminated with dummy bar head 3 mutually, make the lumen of crystallizer 2 and the shaping chamber of dummy bar head 3 be linked together, and the clearance between the lateral wall face of core 1 and the lateral wall face of lumen equals the outer design thickness of metal, through pouring molten outer molten metal into the shaping intracavity of lumen and dummy bar head 3 earlier, solidify into the outer first end of metal and cladding on the lateral wall face of the first end of core 1 with the outer molten metal in the shaping intracavity of dummy bar head 3 until the bottom of lumen; then continuously pouring the molten outer layer molten metal into the tube cavity, and making the dummy bar head 3 and the core part 1 gradually move downwards according to the solidification speed of the outer layer molten metal and fix the crystal cleaner, so as to change the relative position of the tube cavity and the core part 1, so that the outer layer molten metal in the tube cavity is solidified into a metal outer layer from the first end to the second end of the core part 1 and covers the metal outer layer on the side wall surface of the core part 1, thereby preparing the composite blank, directly forming the metal outer layer by cladding the outer layer molten metal on the core part 1, the preparation steps are simple, the solidification forming speed of the outer layer molten metal is high, thereby improving the production efficiency, and the composite blank is suitable for the preparation of composite blanks with different radial sizes and different cross-sectional shapes, in addition, for multilayer composite blanks, by adopting the preparation device of the utility model and through the same preparation method, multilayer metal layers are fused on the previous layer, thereby producing a multi-layered composite billet.
As shown in fig. 1, the lower part of the tube cavity is used for casting and molding the metal outer layer in cooperation with the core part 1, and the upper part of the tube cavity is used for guiding the molten metal of the outer layer to the lower part of the tube cavity. Optionally, the upper portion of the lumen is flared to direct the outer metal flow into the lower portion of the lumen. Optionally, the molten outer layer metal is injected into the cavity through a draft tube or trough.
As shown in fig. 1, the manufacturing apparatus further includes a cooling device 5 provided at the periphery of the lower portion of the mold 2 for cooling the lower portion of the tube cavity. In this embodiment, the cooling device 5 includes a nozzle arranged on the outer periphery of the lower portion of the mold 2 and connected to a cooling water line. Whether the nozzle is opened to spray cooling water is selected according to the solidification speed of the outer layer molten metal of the lower portion of the tube cavity, if the solidification speed of the outer layer molten metal of the lower portion of the tube cavity is too low, the nozzle is opened to spray cooling water, the water pressure and the flow of the cooling water sprayed by the nozzle are adjusted according to the solidification speed, and meanwhile the sprayed cooling water can be sprayed onto a composite ingot which is solidified and formed below, so that the outer layer molten metal is solidified and formed.
As shown in fig. 1, the preparation apparatus further includes a heating device 4 provided at the periphery of the upper portion of the mold 2 for heating the upper portion of the tube cavity. In this embodiment, the heating device 4 includes an induction heating coil laid on the periphery of the upper portion of the mold 2. The temperature of the outer layer molten metal at the upper part of the tube cavity is higher than the melting point by 50-200 ℃ through the heating device 4, so that the outer layer molten metal at the upper part of the tube cavity is prevented from being solidified, certain fluidity of the outer layer molten metal is ensured, and the outer layer molten metal flows to the lower part of the tube cavity to be solidified and molded.
As shown in fig. 1, the surface of the tube cavity and the surface of the molding cavity are brushed with a refractory coating. The refractory coating is mould sand or graphite paint. After the outer layer molten metal at the lower part of the pipe cavity is solidified and formed by brushing a refractory coating on the surface of the pipe cavity of the crystallizer 2, the core part 1 and the formed metal outer layer can smoothly move downwards, so that the outer layer molten metal is cast and melted on the core part 1 from the first end of the core part 1 to the second end of the core part 1. The surface of the forming cavity of the dummy bar head 3 is coated with a refractory coating so as to facilitate the demoulding of the dummy bar head 3 after the preparation of the composite blank is finished.
As shown in fig. 1, the bottom surface of the molding cavity is provided with a positioning structure for positioning the first end of the core 1 in the molding cavity, so that the gap between the side wall surface of the core 1 and the side wall surface of the molding cavity is equal to the designed thickness of the metal outer layer. In this embodiment, the positioning structure includes a metal pad laid on the bottom surface of the forming cavity, and the metal pad is made of the same metal material as the metal outer layer. The thickness of the metal cushion plate is the same as the design thickness of the metal outer layer, so as to form a metal end surface layer which is coated on the first end surface of the core part 1. Before the metal base plate is laid on the bottom surface of the forming cavity, the surface of the metal base plate is pretreated by turning, planning and milling and/or grinding and other physical methods, so that the surface of the metal base plate is smooth and clean, and/or boric acid is coated on the surface of the metal base plate to prevent oxidation. The metal backing plate is also engraved with a centering mark, and the first end of the core part 1 is placed in the forming cavity of the dummy bar head 3 according to the centering mark, so that the gap between the outer wall surface of the core part 1 and the inner wall surface of the forming cavity is equal to the designed thickness of the metal outer layer.
As shown in fig. 1, the bottom of the crystallizer 2 and the top of the dummy bar head 3 are provided with a positioning connection sealing structure matched with each other, so that a tube cavity of the crystallizer 2 is communicated with a forming cavity of the dummy bar head 3 when the first end of the metal outer layer is cast, and a gap between the inner wall surface of the lower part of the tube cavity and the outer wall surface of the core part 1 is equal to the design thickness of the metal outer layer. In this embodiment, the positioning connection sealing structure includes an asbestos layer sandwiched between the joint surfaces of the crystallizer 2 and the dummy bar head 3, so that the crystallizer 2 and the dummy bar head 3 are tightly jointed, thereby preventing the outer molten metal in the crystallizer 2 and the dummy bar head 3 from leaking. Optionally, the positioning connection sealing structure includes a boss and a groove which are arranged on the joint surface of the crystallizer 2 and the dummy bar head 3 and matched with each other, and a high-temperature-resistant sealing layer is laid between the boss and the groove. Optionally, the positioning connection sealing structure comprises a conical surface matching structure arranged on the joint surface of the crystallizer 2 and the dummy bar head 3, and a high-temperature-resistant sealing layer is laid between the joint surfaces.
The preparation device also comprises a preparation frame, wherein a positioning and fixing mechanism for positioning and fixing the crystal cleaner and a moving mechanism which is positioned below the positioning and fixing mechanism and used for driving the dummy head 3 to move downwards are arranged on the preparation frame. The dummy bar head 3 is fixed on the movable end of the moving mechanism, and the dummy bar head 3 and the core part 1 are driven by the moving mechanism to move downwards. Optionally, the moving mechanism is a lifting cylinder. Optionally, the moving mechanism includes a lifting screw rod arranged in the vertical direction, a lifting seat in threaded matching connection with the lifting screw rod, and a driving motor for driving the lifting screw rod to rotate.
In another embodiment, as shown in fig. 2, a plurality of ingot cleaners are mounted on the preparation frame, and a plurality of dummy bars 3 are in one-to-one correspondence with the plurality of crystallizers 2 to simultaneously prepare a plurality of composite blanks. Optionally, a plurality of tube cavities are arranged in the crystal cleaner, and a plurality of forming cavities corresponding to the tube cavities one to one are arranged in the dummy bar head 3, so as to prepare a plurality of composite blanks simultaneously. Optionally, the plurality of lumens are all the same shape and size to simultaneously produce a plurality of identical composite blanks. Optionally, the plurality of lumens are different in shape and/or size to simultaneously prepare a plurality of different composite blanks.
The preparation method of the composite blank according to the embodiment adopts the preparation device, and the preparation method comprises the following steps: positioning the first end of the core part 1 in a forming cavity of the dummy bar head 3, and enabling the gap between the side wall surface of the core part 1 and the side wall surface of the forming cavity to be equal to the designed thickness of the metal outer layer; sleeving a crystallizer 2 outside the core part 1 and attaching the crystallizer 2 to the dummy bar head 3, so that a tube cavity of the crystallizer 2 is communicated with a forming cavity of the dummy bar head 3, and a gap between the side wall surface of the lower part of the tube cavity and the side wall surface of the core part 1 is equal to the design thickness of the metal outer layer; pouring the molten outer-layer molten metal into the tube cavity and the forming cavity of the dummy bar head 3 until the bottom of the tube cavity and the outer-layer molten metal in the forming cavity of the dummy bar head 3 are solidified into a first end of a metal outer layer and coated on the side wall surface of the first end of the core part 1; and continuously pouring molten outer-layer molten metal into the pipe cavity, gradually moving the dummy bar head 3 and the core part 1 downwards according to the solidification speed of the outer-layer molten metal to fix the crystallizer 2, so that the outer-layer molten metal in the pipe cavity is solidified into a metal outer layer from the first end to the second end of the core part 1 and covers the side wall surface of the core part 1, and thus the composite blank is prepared. In this embodiment, the pouring of the outer layer molten metal is stopped when the surface of the outer layer molten metal in the mold 2 is 1cm to 10cm from the second end of the core portion 1. Optionally, the core 1 of the composite blank is carbon steel or low alloy steel. Optionally, the metal outer layer is stainless steel, copper nickel or nickel alloy.
The preparation method of the composite blank of the utility model comprises the steps of pouring molten outer layer molten metal into the tube cavity and the forming cavity of the dummy bar head 3 until the bottom of the tube cavity and the outer layer molten metal in the forming cavity of the dummy bar head 3 are solidified into a first end of a metal outer layer and coated on the first end of the core part 1; and then continuously pouring molten outer-layer molten metal into the tube cavity, enabling the dummy bar head 3 and the core part 1 to gradually move downwards according to the solidification speed of the outer-layer molten metal and enabling the crystallizer 2 to fix the relative position of the tube cavity and the core part to change, so that the outer-layer molten metal in the tube cavity is solidified into a metal outer layer from the first end to the second end of the core part 1 and is coated on the side wall surface of the core part 1, thereby preparing the composite blank, directly cladding the outer-layer molten metal on the core part 1 to form the metal outer layer, and having simple preparation steps and high solidification forming speed of the outer-layer molten metal, thereby improving the production efficiency, being applicable to the preparation of composite blanks with different radial sizes and different cross-sectional shapes, and in addition, for a multilayer composite blank, cladding multilayer metal layers on the previous layer by adopting the same preparation method, thereby preparing the multilayer composite.
When the outer layer molten metal is poured, the pouring speed of the outer layer molten metal, the solidification speed of the outer layer molten metal and the speed of the dummy bar head 3 driving the core part 1 to move downwards are matched. In this embodiment, the speed of the dummy bar head 3 moving the core 1 downward is 20mm/min-500 mm/min. When the design thickness of the metal outer layer is small and the solidification and forming speed of the metal liquid of the outer layer is high, the higher the speed that the dummy bar head 3 drives the core part 1 to move downwards, the higher the pouring speed of the metal liquid of the outer layer is. When the design thickness of the metal outer layer is large and the solidification forming speed of the metal liquid of the outer layer is slow, the lower the speed that the dummy bar head 3 drives the core part 1 to move downwards is, the lower the pouring speed of the metal liquid of the outer layer is.
Pouring molten outer layer molten metal into the tube cavity and the forming cavity of the dummy bar head 3, and further comprising the following steps: after the liquid level of the outer layer molten metal is 2-5 cm higher than the top edge of the forming cavity, the lower part of the tube cavity is cooled by a cooling device 5 according to the solidification speed of the outer layer molten metal at the lower part of the tube cavity. The lower part of the tube cavity is cooled, so that the solidification forming speed of the lower part of the tube cavity is improved. In the present embodiment, the cooling device 5 includes a nozzle provided at the periphery of the upper portion of the tube cavity, the nozzle being connected to a cooling water supply line. Whether the nozzle is opened to spray cooling water is selected according to the solidification speed of the outer layer molten metal of the lower portion of the tube cavity, if the solidification speed of the outer layer molten metal of the lower portion of the tube cavity is too low, the nozzle is opened to spray cooling water, the water pressure and the flow of the cooling water sprayed by the nozzle are adjusted according to the solidification speed, and meanwhile the sprayed cooling water can be sprayed onto a composite ingot which is solidified and formed below, so that the outer layer molten metal is solidified and formed. Continuously pouring molten outer layer molten metal into the forming section of the tube cavity, and further comprising the following steps of: when the liquid level of the outer layer molten metal is 3cm-5cm lower than the top edge of the tube cavity, the upper part of the tube cavity is heated by the heating device 4 according to the solidification speed of the outer layer molten metal on the upper part of the tube cavity. In this embodiment, the temperature of the outer layer molten metal at the upper part of the tube cavity is higher than the melting point by 50-200 ℃ by the heating device 4, so as to prevent the outer layer molten metal at the upper part of the tube cavity from solidifying, ensure that the outer layer molten metal has certain fluidity, and then flow to the lower part of the tube cavity to be solidified and molded. The heating device 4 includes an induction heating coil laid on the periphery of the upper part of the lumen.
Before the first end of the core 1 is placed in the dummy bar head 3, the method further comprises the following steps: the surface of the core 1 is pretreated by turning, planing and/or grinding; coating boric acid on the surface of the core part 1 to prevent oxidation; the first end of the core 1 is cut flat. The surface of the core part 1 is pretreated to be free of oxide, slag and pits, and the boric acid is coated on the surface of the core part 1 to prevent the surface of the core part 1 from being oxidized due to heat transfer during casting and molding of the metal outer layer, so that the outer layer molten metal is more tightly coated on the core part 1.
Before the first end of the core 1 is placed in the dummy bar head 3, the method further comprises the following steps: and paving a metal cushion plate on the bottom surface of the forming cavity of the dummy bar head 3, wherein the metal cushion plate is made of the same material as the metal outer layer, and the thickness of the metal cushion plate is the same as the design thickness of the metal outer layer so as to form a metal end surface layer coated on the first end surface of the core part 1. Before the metal base plate is laid on the bottom surface of the forming cavity, the surface of the metal base plate is pretreated by turning, planning and milling and/or grinding and other physical methods, so that the surface of the metal base plate is smooth and clean, and/or boric acid is coated on the surface of the metal base plate to prevent oxidation. In this embodiment, the metal shim plate is further engraved with a centering mark according to which the first end of the core 1 is placed in the molding cavity of the dummy head 3 so that the gap between the outer wall surface of the core 1 and the inner wall surface of the molding cavity is equal to the designed thickness of the metal outer layer.
Before the outer layer molten metal is poured, the method also comprises the following steps: and an asbestos layer is clamped on the joint surface of the crystallizer 2 and the dummy bar head 3, so that the crystallizer 2 and the dummy bar head 3 are tightly jointed, and the outer layer molten metal in the crystallizer 2 and the dummy bar head 3 is prevented from leaking. Optionally, a joint surface of the crystallizer 2 and the dummy bar head 3 is provided with a boss and a groove which are matched with each other, and a high-temperature-resistant sealing layer is laid between the boss and the groove. Optionally, the joint surfaces of the crystallizer 2 and the dummy bar head 3 are in conical surface fit, and a high-temperature-resistant sealing layer is laid between the joint surfaces.
Before the outer layer molten metal is poured, the method also comprises the following steps: the surface of the pipe cavity of the crystallizer 2 and the surface of the forming cavity of the dummy bar head 3 are coated with refractory coatings. The refractory coating is mould sand or graphite paint. After the outer layer molten metal at the lower part of the pipe cavity is solidified and formed by brushing a refractory coating on the surface of the pipe cavity of the crystallizer 2, the core part 1 and the formed metal outer layer can smoothly move downwards, so that the outer layer molten metal is cast and melted on the core part 1 from the first end of the core part 1 to the second end of the core part 1. The surface of the forming cavity of the dummy bar head 3 is coated with a refractory coating so as to facilitate the demoulding of the dummy bar head 3 after the preparation of the composite blank is finished.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A device for preparing a composite blank, the composite blank comprising a core (1) and a metal outer layer coated on the core (1),
the preparation device comprises a crystallizer (2) provided with a tube cavity and a dummy bar head (3) provided with a forming cavity,
the forming cavity of the dummy bar head (3) is used for being matched with the first end of the core part (1) to carry out casting forming on the first end of the metal outer layer;
the crystallizer (2) is used for being sleeved outside the core part (1) so that the pipe cavity is matched with the core part (1) to carry out casting forming on the metal outer layer from the first end to the second end of the core part (1);
the dummy bar head (3) is movably arranged relative to the crystallizer (2).
2. The apparatus for preparing a composite blank according to claim 1,
the lower part of the tube cavity is used for being matched with the core part (1) to carry out casting forming of the metal outer layer, and the upper part of the tube cavity is used for guiding molten outer layer molten metal to the lower part of the tube cavity.
3. The apparatus for preparing a composite blank according to claim 1,
the preparation device also comprises a cooling device (5) which is arranged at the periphery of the lower part of the crystallizer (2) and is used for cooling the lower part of the tube cavity.
4. The apparatus for preparing a composite blank according to claim 3,
the cooling device (5) comprises a nozzle which is arranged at the periphery of the lower part of the crystallizer (2) and is connected with a cooling water pipeline.
5. The apparatus for preparing a composite blank according to claim 1,
the preparation device also comprises a heating device (4) which is arranged on the periphery of the upper part of the crystallizer (2) and is used for heating the upper part of the tube cavity.
6. The apparatus for preparing a composite blank according to claim 5,
the heating device (4) comprises an induction heating coil which is laid on the periphery of the upper part of the crystallizer (2).
7. The apparatus for preparing a composite blank according to claim 1,
the surface of the pipe cavity and the surface of the forming cavity are brushed with refractory coatings.
8. The apparatus for preparing a composite blank according to claim 1,
the bottom surface of the molding cavity is provided with a positioning structure for positioning and placing the first end of the core part (1) in the molding cavity, so that the gap between the side wall surface of the core part (1) and the side wall surface of the molding cavity is equal to the designed thickness of the metal outer layer.
9. The apparatus for preparing a composite blank according to claim 8,
the bottom of the crystallizer (2) and the top of the dummy bar head (3) are provided with a positioning connection sealing structure which is matched with each other, so that when the first end of the metal outer layer is cast and formed, a tube cavity of the crystallizer (2) is communicated with a forming cavity of the dummy bar head (3), and a gap between the inner wall surface of the lower part of the tube cavity and the outer wall surface of the core part (1) is equal to the design thickness of the metal outer layer.
10. The apparatus for preparing a composite blank according to claim 1,
the preparation device also comprises a preparation frame, wherein a positioning and fixing mechanism for positioning and fixing the crystal cleaner and a moving mechanism which is positioned below the positioning and fixing mechanism and used for driving the dummy bar head (3) to move downwards are arranged on the preparation frame.
CN202021651690.4U 2020-08-11 2020-08-11 Preparation device of composite blank Active CN213134987U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021651690.4U CN213134987U (en) 2020-08-11 2020-08-11 Preparation device of composite blank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021651690.4U CN213134987U (en) 2020-08-11 2020-08-11 Preparation device of composite blank

Publications (1)

Publication Number Publication Date
CN213134987U true CN213134987U (en) 2021-05-07

Family

ID=75736938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021651690.4U Active CN213134987U (en) 2020-08-11 2020-08-11 Preparation device of composite blank

Country Status (1)

Country Link
CN (1) CN213134987U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115365467A (en) * 2021-05-21 2022-11-22 宝山钢铁股份有限公司 Production device and production method of composite long material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115365467A (en) * 2021-05-21 2022-11-22 宝山钢铁股份有限公司 Production device and production method of composite long material

Similar Documents

Publication Publication Date Title
US5875830A (en) Metallic articles having heat transfer channels and method of making
CN103203445B (en) A kind of preparation method of cast copper cage rotor
CN101254529A (en) Production method of large-sized duplex metal composite board and device thereof
CN105170947A (en) Preparation method of double-layer or multi-layer metal composite pipe blank
CN101554649B (en) Fine forming equipment of coating material which is pressed, ejected, core-filled and continuously casting, and technique therefor
CN213134987U (en) Preparation device of composite blank
JP4014232B2 (en) Electromagnetic induction heating mold for resin molding
CN111716084B (en) Manufacturing method of copper/steel composite injection mold with honeycomb and embedded nail interface structure
CN1229703A (en) One-step cast shaping appts. and tech. for multi-layer composite material
CN1120068C (en) Apparatus and technology for one-step casting and continuously shaping wrapping material
CN108927493B (en) Casting molding process of inner cooling motor casing for aluminum alloy electric automobile
CN107282909A (en) A kind of running gate system and centre spinning method for tube shape component
CN112008063B (en) Preparation method and preparation device of composite blank
JP4484390B2 (en) Manufacturing method of composite cylinder / column
CN110303157B (en) Method for supporting additive manufacturing and printing metal part by prefabricated sand mold
CN102069162A (en) Continuous casting forming equipment and process method for electromagnetic ejection filling core of cladding material
CN209918861U (en) Composite graphite chill
CN206677156U (en) The mould with conformal cooling water route based on direct metal laser sintering and Founding moldability technology
CN102689155B (en) Liquid die forging and rolling compound formation method for aluminum alloy irregular-section large ring piece
CN109795130A (en) A kind of isometrical tubular molding component tooling of big L/D ratio carbon fibre composite
CN102554191B (en) Aluminum-magnesium alloy composite casting device
CN115609804A (en) Manufacturing method of die part with conformal waterway
CN109047727B (en) Method for manufacturing metallurgical composite metal blank
CN102689152B (en) Liquid die forging rolling compound forming method for 2014 aluminium alloy large ring member with different cross sections
JP6964266B2 (en) Spur bush

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant