CN213087395U - Construction hanging flower basket elevating gear - Google Patents
Construction hanging flower basket elevating gear Download PDFInfo
- Publication number
- CN213087395U CN213087395U CN202021289017.0U CN202021289017U CN213087395U CN 213087395 U CN213087395 U CN 213087395U CN 202021289017 U CN202021289017 U CN 202021289017U CN 213087395 U CN213087395 U CN 213087395U
- Authority
- CN
- China
- Prior art keywords
- hanging
- basket
- flower basket
- construction
- hanging flower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a construction hanging flower basket elevating gear is fixed in on the steel structure roof beam of building, include suspended structure stand, girder, bury board, first hanging flower basket, second hanging flower basket, angle steel and wire rope, the suspended structure stand sets up and passes through the bolt fastening along vertical direction on the steel structure roof beam, the girder level to set up and set firmly in the top of suspended structure stand, bury the board and be located the below of suspended structure stand set firmly in on the steel structure roof beam, first hanging flower basket and second hanging flower basket interval hang on the girder, angle steel one end with the girder connection, the other end with bury board fixed connection, wire rope one end with the girder connection, the other end is fixed in the bottom of steel structure roof beam. The utility model has the advantages of as follows: by hanging the two hanging baskets on the main beam, the construction of the inner side and the outer side of the building extension structure can be simultaneously realized; simple and stable structure and large bearing capacity.
Description
[ technical field ] A method for producing a semiconductor device
The utility model relates to a hanging flower basket lift technical field especially relates to a construction hanging flower basket elevating gear.
[ background of the invention ]
A lifting device for a hanging basket in building construction is a construction machine for high-altitude operation in building engineering, acts on curtain wall installation, cleans an outer wall, is erected on a building or a structure, utilizes a lifting mechanism to drive a hanging platform, and is a construction facility which runs up and down along the vertical surface of the building or the structure through a steel wire rope and also an operation platform arranged for operators.
[ Utility model ] content
An object of the utility model is to provide a construction hanging flower basket elevating gear, it can solve the technical problem who relates to in the background art.
In order to achieve the above purpose, the technical solution of the present invention is as follows:
the utility model provides a construction hanging flower basket elevating gear, is fixed in on the steel construction roof beam of building, its characterized in that: including suspended structure stand, girder, buried plate, first hanging flower basket, second hanging flower basket, angle steel and wire rope, the suspended structure stand sets up and passes through the bolt fastening along vertical direction on the steel structure roof beam, the girder level to setting up and set firmly in the upper portion of suspended structure stand, buried plate is located the below of suspended structure stand and set firmly in on the steel structure roof beam, first hanging flower basket hang in the one end of girder, the second hanging flower basket hang in the girder and be located the suspended structure stand with between the first hanging flower basket, angle steel one end with the girder is kept away from the one end fixed connection of first hanging flower basket, the other end with buried plate fixed connection, wire rope one end with the girder is kept away from the one end fixed connection of first hanging flower basket, the other end is fixed in the bottom of steel structure roof beam.
Preferably: the bolt is an M24U type bolt.
Preferably: the angle steel is 60# angle steel.
Preferably: the distance between a lifting point of the main beam for hanging the first hanging basket and the suspension structure upright is 2.5 meters, and the distance between a lifting point of the main beam for hanging the second hanging basket and the suspension structure upright is 1.4 meters; the distance from one end of the main beam, which is used for connecting the angle steel, to the suspension structure upright post is 1 meter.
Preferably: the steel wire rope is a phi 8.3 double-fiber-drawing steel wire rope.
Preferably: the suspended structure upright post comprises a support column positioned above the main beam, and the height of the support column is 0.9 meter.
Preferably: the supporting column is characterized by further comprising a reinforcing steel wire rope, the two ends of the reinforcing steel wire rope are respectively connected with the two ends of the main beam, and the middle of the reinforcing steel wire rope is abutted to the top end of the supporting column.
Preferably: the first hanging basket and the second hanging basket are both ZLP630 type standard hanging baskets.
Compared with the prior art, the utility model provides a construction hanging flower basket elevating gear has following advantage: by hanging the two hanging baskets on the main beam, the construction of the inner side and the outer side of the building extension structure can be simultaneously realized; simple and stable structure and large bearing capacity.
[ description of the drawings ]
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained without inventive work, wherein:
figure 1 is the utility model discloses construction hanging flower basket elevating gear is fixed in the structure sketch map on the steel construction roof beam.
[ detailed description ] embodiments
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Please refer to fig. 1, the utility model provides a construction hanging basket lifting device, which is fixed on a steel structure beam 1 of a building, and comprises a hanging structure upright post 2, a main beam 3, a buried plate 4, a first hanging basket 5, a second hanging basket 6, angle steel 7 and a steel wire rope 8. The suspension structure upright post 2 is arranged along the vertical direction and is fixed on the steel structure beam 1 through a bolt 9, and specifically, the bolt is an M24U type bolt. The girder 3 level to setting up and set firmly in the upper portion of suspended structure stand 2, buried plate 4 is located the below of suspended structure stand 2 sets firmly in on the steel structural beam 1, first hanging flower basket 5 hang in the one end of girder 3, second hanging flower basket 6 hang in girder 3 and lie in suspended structure stand 2 with between the first hanging flower basket 5, specifically, first hanging flower basket 5 with second hanging flower basket 6 is ZLP630 type standard hanging flower basket. The angle steel 7 one end with girder 3 keeps away from the one end fixed connection of first hanging flower basket 5, the other end with bury board 4 fixed connection, it is specific, the angle steel is 60# angle steel. One end of the steel wire rope 8 is fixedly connected with one end of the main beam 3 far away from the first hanging basket 5, the other end of the steel wire rope is fixed at the bottom of the steel structure beam 1, and the steel wire rope 8 is a phi 8.3 double-fiber steel wire rope.
The distance from the lifting point of the main beam 3 for hanging the first hanging basket 5 to the suspension structure upright post 2 is 2.5 meters, and the distance from the lifting point of the main beam 3 for hanging the second hanging basket 6 to the suspension structure upright post 2 is 1.4 meters; the distance from one end of the main beam 3, which is used for connecting the angle steel 7, to the suspension structure upright 2 is 1 meter.
The suspension structure column 2 comprises a support column 21 located above the main beam 3, the height of the support column 21 being 0.9 m.
The lifting device for the construction hanging basket further comprises a reinforced steel wire rope 10, two ends of the reinforced steel wire rope 10 are respectively connected with two ends of the main beam 3, and the middle of the reinforced steel wire rope 10 abuts against the top end of the supporting column 21.
Compared with the prior art, the utility model provides a construction hanging flower basket elevating gear has following advantage: by hanging the two hanging baskets on the main beam, the construction of the inner side and the outer side of the building extension structure can be simultaneously realized; simple and stable structure and large bearing capacity.
While the embodiments of the invention have been disclosed above, it is not limited to the applications set forth in the description and embodiments, but is capable of being applied in all kinds of fields adapted to the invention, and further modifications may readily be made by those skilled in the art, and the invention is therefore not limited to the details shown and described herein, without departing from the general concept defined by the claims and their equivalents.
Claims (8)
1. The utility model provides a construction hanging flower basket elevating gear, is fixed in on the steel construction roof beam of building, its characterized in that: including suspended structure stand, girder, buried plate, first hanging flower basket, second hanging flower basket, angle steel and wire rope, the suspended structure stand sets up and passes through the bolt fastening along vertical direction on the steel structure roof beam, the girder level to setting up and set firmly in the upper portion of suspended structure stand, buried plate is located the below of suspended structure stand and set firmly in on the steel structure roof beam, first hanging flower basket hang in the one end of girder, the second hanging flower basket hang in the girder and be located the suspended structure stand with between the first hanging flower basket, angle steel one end with the girder is kept away from the one end fixed connection of first hanging flower basket, the other end with buried plate fixed connection, wire rope one end with the girder is kept away from the one end fixed connection of first hanging flower basket, the other end is fixed in the bottom of steel structure roof beam.
2. A construction basket lifting device according to claim 1, wherein: the bolt is an M24U type bolt.
3. A construction basket lifting device according to claim 1, wherein: the angle steel is 60# angle steel.
4. A construction basket lifting device according to claim 1, wherein: the distance between a lifting point of the main beam for hanging the first hanging basket and the suspension structure upright is 2.5 meters, and the distance between a lifting point of the main beam for hanging the second hanging basket and the suspension structure upright is 1.4 meters; the distance from one end of the main beam, which is used for connecting the angle steel, to the suspension structure upright post is 1 meter.
5. A construction basket lifting device according to claim 1, wherein: the steel wire rope is a phi 8.3 double-fiber-drawing steel wire rope.
6. A construction basket lifting device according to claim 1, wherein: the suspended structure upright post comprises a support column positioned above the main beam, and the height of the support column is 0.9 meter.
7. A construction basket lifting device according to claim 6, wherein: the supporting column is characterized by further comprising a reinforcing steel wire rope, the two ends of the reinforcing steel wire rope are respectively connected with the two ends of the main beam, and the middle of the reinforcing steel wire rope is abutted to the top end of the supporting column.
8. A construction basket lifting device according to claim 1, wherein: the first hanging basket and the second hanging basket are both ZLP630 type standard hanging baskets.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021289017.0U CN213087395U (en) | 2020-07-06 | 2020-07-06 | Construction hanging flower basket elevating gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021289017.0U CN213087395U (en) | 2020-07-06 | 2020-07-06 | Construction hanging flower basket elevating gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213087395U true CN213087395U (en) | 2021-04-30 |
Family
ID=75623595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021289017.0U Active CN213087395U (en) | 2020-07-06 | 2020-07-06 | Construction hanging flower basket elevating gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213087395U (en) |
-
2020
- 2020-07-06 CN CN202021289017.0U patent/CN213087395U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109081247A (en) | A kind of hanging method of vestibule large-span steel girder | |
CN105672642A (en) | Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof | |
CN114753611A (en) | Curtain wall construction platform | |
CN213087395U (en) | Construction hanging flower basket elevating gear | |
CN210736024U (en) | Sump pit apron is propped up and is established device | |
CN105520681B (en) | Flexion-extension formula folding arm window cleaning equipment | |
CN217500985U (en) | Curtain wall construction platform | |
CN215631503U (en) | Hanging basket for mounting roof high parapet wall | |
CN206693641U (en) | The irregular alien invasion glass curtain wall positioning apparatus of high-rise building | |
CN205575534U (en) | Lattice formula groined type support body lifting means | |
CN215326633U (en) | Hoisting device mounted on I-shaped steel beam | |
CN107675892A (en) | A kind of glass curtain wall monorail hoisting structure | |
CN1113876A (en) | Working method for large steel net frame integral hoisting | |
CN209179519U (en) | Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top | |
CN209244236U (en) | A kind of attachment type raise scaffold support device for high Stilt layer structure | |
CN203201127U (en) | Temporary support system for steel truss | |
CN207484991U (en) | A kind of glass curtain wall monorail hoisting structure | |
CN220485156U (en) | Hanging basket support in narrow space | |
CN212334450U (en) | Installation device for main steel structure in narrow site | |
CN219620675U (en) | Hoisting auxiliary device for prefabricated curtain wall component | |
CN2713057Y (en) | Suspended mounting rack | |
CN215631510U (en) | Steel construction canopy construction platform | |
CN221095798U (en) | Hanging basket mounting structure | |
CN219906818U (en) | Hoisting pulley device for flexible photovoltaic bracket construction and mounting structure thereof | |
CN209602010U (en) | A kind of Integral lifting system for basic top truss principal structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |