CN215326633U - Hoisting device mounted on I-shaped steel beam - Google Patents

Hoisting device mounted on I-shaped steel beam Download PDF

Info

Publication number
CN215326633U
CN215326633U CN202121489938.6U CN202121489938U CN215326633U CN 215326633 U CN215326633 U CN 215326633U CN 202121489938 U CN202121489938 U CN 202121489938U CN 215326633 U CN215326633 U CN 215326633U
Authority
CN
China
Prior art keywords
section
steel
support arm
fixedly connected
roof beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121489938.6U
Other languages
Chinese (zh)
Inventor
王祥宝
王吉河
许晓煌
董镐
冯琳
赵文明
张代虎
冯小刚
宋玉海
肖乐冰
汪明
李炜兴
马世印
石明星
刘成
赵哲
孙自彬
韩存金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing International Construction Group Co ltd
Original Assignee
Beijing International Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing International Construction Group Co ltd filed Critical Beijing International Construction Group Co ltd
Priority to CN202121489938.6U priority Critical patent/CN215326633U/en
Application granted granted Critical
Publication of CN215326633U publication Critical patent/CN215326633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to an install hoisting apparatus on I-steel roof beam, it includes the support arm, the support arm bottom sets firmly the installation card that is used for being connected with the I-steel, the support arm other end is provided with the fixed pulley, wear to be equipped with wire rope on the fixed pulley, wire rope keeps away from the one end of support arm is connected with the hoist engine, the wire rope other end is connected with the steel sheet tongs, the installation card includes two relative diaphragms that set up, two the one end fixedly connected with riser of diaphragm, two go up flange plate card of I-steel roof beam is gone into two between the diaphragm. This application has the effect that improves the perpendicular conveying efficiency of material.

Description

Hoisting device mounted on I-shaped steel beam
Technical Field
The utility model relates to a field of hoist and mount especially relates to a install hoisting apparatus on I-steel roof beam.
Background
In the construction of steel structure fabricated buildings, there are a large number of operations such as welding and installation on the i-shaped steel beam.
At present, when the operation is carried out on the I-shaped steel beam, materials used in the transportation construction need to be manually transported or transported by using a crane, but the mode of manually transporting the materials is low in efficiency, manual labor is wasted, the materials are transported by using the crane, a large amount of mechanical expense is needed, and the construction cost is increased.
In view of the above-mentioned related art, the inventor believes that there is a drawback in that the efficiency of transporting materials used for transporting work on i-beams is low.
SUMMERY OF THE UTILITY MODEL
In order to improve the technical problem that the material conveying efficiency that the operation used is low on the transportation I-shaped steel beam, this application provides a hoisting apparatus who installs on I-shaped steel beam.
The application provides a pair of install hoisting apparatus on I-steel roof beam adopts following technical scheme:
the utility model provides an install hoisting apparatus on I-steel roof beam, includes the support arm, the support arm bottom sets firmly the installation card that is used for being connected with the I-steel, the support arm other end is provided with the fixed pulley, wear to be equipped with wire rope on the fixed pulley, wire rope keeps away from the one end of support arm is connected with the hoist engine, the wire rope other end is connected with the steel sheet tongs.
By adopting the technical scheme, the supporting arm is arranged on the flange plate of the I-shaped steel beam through the mounting clamp, the fixed pulley is arranged on the supporting arm, and materials or heavy objects used in construction are vertically and vertically transported through the winch, so that the transportation efficiency is improved, and the manpower is saved; in addition, the device replaces a crane to hoist heavy objects, so that the mechanical cost can be saved, and the construction cost can be saved.
Optionally, the installation card includes two relative diaphragms that set up, two the one end fixedly connected with riser of diaphragm, the upper flange board card of I-steel roof beam is gone into two between the diaphragm.
Through adopting above-mentioned technical scheme, installation card simple structure, the preparation of being convenient for to can be with the firm installation on the I-steel roof beam of support arm.
Optionally, the support arm includes vertical section and slope section, vertical section bottom with installation card fixed connection, vertical section top with slope section fixed connection, the slope section slope sets up, and to vertical section is kept away from the direction of I-steel roof beam extends.
Through adopting above-mentioned technical scheme, the slope section extends to the I-steel roof beam outside, is convenient for lift by crane material or heavy object.
Optionally, an installation piece is fixedly arranged at one end, far away from the vertical section, of the inclined section, an installation hole is formed in the installation piece, and the fixed pulley is connected in the installation hole.
Through adopting above-mentioned technical scheme, install the fixed pulley through the installation piece, mounting structure is simple, the equipment of being convenient for.
Optionally, the one end fixedly connected with spliced pole of vertical section is kept away from to the slope section, the vertical setting of spliced pole, the spliced pole is kept away from the one end fixedly connected with bearing of slope section, the bearing inner wall with spliced pole fixed connection, two connecting rods of bearing outer wall both sides fixedly connected with, fixedly connected with horizontal pole between two connecting rods, the fixed pulley cover is established on the horizontal pole.
Through adopting above-mentioned technical scheme, through connect the bearing on the spliced pole to connect the fixed pulley on the bearing, remove this device, when installing different positions on the I-steel roof beam, rotate through the bearing and can make the fixed pulley just to the hoist engine, thereby do not cause the influence to lifting by crane.
Optionally, an inclined strut is fixedly arranged between the vertical section and the inclined section.
Through adopting above-mentioned technical scheme, the bracing can play the supporting role to the slope section, strengthens the structural strength of support arm.
Optionally, the riser is kept away from fixedly connected with extension plate on the terminal surface of support arm, the extension plate is close to the one end fixedly connected with backup pad of I-shaped steel roof beam, the backup pad is kept away from the one end of extension plate is contradicted on the web of I-shaped steel roof beam.
Through adopting above-mentioned technical scheme, when using this device to lift by crane the heavy object, the support arm receives decurrent power, and the backup pad can be contradicted and play the supporting role on the web of I-steel roof beam, makes the support arm more firm.
Optionally, the backup pad is kept away from fixedly connected with steel sheet on the terminal surface of extension board, the vertical setting of steel sheet, the steel sheet is kept away from the one side conflict of backup pad is in on the web of I-shaped steel roof beam.
Through adopting above-mentioned technical scheme, the steel sheet can increase the area of contact of backup pad and I-steel beam web to make the backup pad play more firm supporting role to the support arm.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the supporting arm is arranged on the flange plate of the I-shaped steel beam through the mounting clamp, the fixed pulley is arranged on the supporting arm, and materials or heavy objects used in construction are vertically and vertically transported through the winch, so that the transportation efficiency is improved, and the manpower is saved; in addition, the device replaces a crane to hoist heavy objects, so that the mechanical cost and the construction cost can be saved;
2. the bearing is connected to the connecting column, the fixed pulley is connected to the bearing, when the device is moved and arranged at different positions on the I-shaped steel beam, the fixed pulley can be opposite to the winch through the rotation of the bearing, and therefore the hoisting is not influenced;
3. when the device is used for lifting a heavy object, the supporting arm bears downward force, and the supporting plate can be abutted to the web plate of the I-shaped steel beam to play a supporting role, so that the supporting arm is more stable.
Drawings
Fig. 1 is a schematic perspective view of embodiment 1 of the present application.
Fig. 2 is a schematic perspective view of embodiment 2 of the present application.
Fig. 3 is an enlarged view of a in fig. 2.
Description of reference numerals: 1. a support arm; 11. a vertical section; 12. an inclined section; 121. mounting a sheet; 122. connecting columns; 123. a bearing; 124. a connecting rod; 125. a cross bar; 13. bracing; 2. a winch; 3. a steel plate hanging tong; 4. a wire rope; 5. installing a card; 51. a transverse plate; 52. a vertical plate; 521. a lengthening plate; 522. a support plate; 523. a steel plate; 6. and a fixed pulley.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses install hoisting apparatus on I-steel roof beam.
Example 1
Referring to fig. 1, a lifting apparatus mounted on an i-steel beam includes a support arm 1 mounted on the i-steel beam, a hoist 2, and a steel plate tongs 3.
Support arm 1 includes vertical section 11 and slope section 12, the one end fixedly connected with installation card 5 of vertical section 11, installation card 5 includes the diaphragm 51 of two relative settings, the one end fixedly connected with riser 52 of two diaphragms 51, the one end fixed connection of vertical section 11 is in diaphragm 51 keep away from the one side of another diaphragm 51, go up the flange plate card with the I-steel roof beam and go into between two diaphragms 51 to install support arm 1 on the I-steel roof beam.
The one end of installation card 5 is kept away from to slope section 12 fixed connection in vertical section 11, and slope section 12 slope sets up, and slope section 12 inclines to the direction that I-steel roof beam was kept away from to vertical section 11 to the contained angle that forms between slope section 12 and the vertical section 11 is the obtuse angle. Bracing 13 has set firmly between vertical section 11 and slope section 12, the one end and the 11 fixed connection of vertical section of bracing 13, the other end and slope section 12 fixed connection, bracing 13 can play the supporting role to slope section 12, strengthens the intensity of support arm 1.
The one end of keeping away from vertical section 11 at slope section 12 is fixed with installation piece 121, has seted up the mounting hole on the installation piece 121, is connected with fixed pulley 6 in the mounting hole, wears to be equipped with wire rope 4 on fixed pulley 6, and wire rope 4 keeps away from the one end of support arm 1 and connects on hoist engine 2, and wire rope 4 is close to the one end fixedly connected with steel sheet tongs 3 that is used for lifting by crane the heavy object of I-steel roof beam.
Fixedly connected with extension plate 521 is kept away from on the terminal surface of support arm 1 at riser 52, the vertical setting of extension plate 521, backup pad 522 has set firmly on the one side that extension plate 521 is close to the I-shaped steel roof beam, backup pad 522 and extension plate 521 mutually perpendicular, the terminal surface conflict that extension plate 521 was kept away from to backup pad 522 is on the web of I-shaped steel roof beam, when this device lifted by crane the heavy object, support arm 1 received vertical decurrent pulling force, backup pad 522 conflicts on the web of I-shaped steel roof beam, can play the supporting role, make the installation of support arm 1 more firm.
Further, fixedly connected with steel sheet 523 on the terminal surface of extension board 521 is kept away from at backup pad 522, and steel sheet 523 is vertical to be set up, and with backup pad 522 mutually perpendicular, the one side of backup pad 522 is kept away from to steel sheet 523 is contradicted on the web of I-shaped steel roof beam, has increased the area of contact of backup pad 522 with the I-shaped steel roof beam web, makes backup pad 522 play more firm supporting role to support arm 1.
The implementation principle of the embodiment 1 of the application is as follows: the supporting arm 1 is installed on the I-shaped steel beam, the fixed pulley 6 is installed on the supporting arm 1, materials such as a steel plate 523, welding materials and welding wires used in construction are vertically transported to the I-shaped steel beam through the winch 2 and used by operators, manual carrying is replaced by the device, manpower can be saved, transportation efficiency is improved, transportation by a crane is replaced, and construction cost can be saved.
Example 2
The embodiment of the present application differs from embodiment 1 in that: referring to fig. 2 and 3, keep away from the one end fixedly connected with spliced pole 122 of vertical section 11 at slope section 12, spliced pole 122 is the cylinder, fixed cover is equipped with bearing 123 on spliced pole 122, the one end fixed connection of slope section 12 is kept away from to the inner wall of bearing 123 and junction, two connecting rods 124 have set firmly in the both sides of bearing 123 outer wall, fixedly connected with horizontal pole 125 between two connecting rods 124, and horizontal pole 125 sets up the one end of keeping away from bearing 123 at connecting rod 124, fixed pulley 6 covers is established on horizontal pole 125.
The implementation principle of embodiment 2 of the present application is as follows: the supporting arm 1 is moved, when the supporting arm 1 is arranged at different positions on the I-shaped steel beam, the bearing 123 can rotate, the fixed pulley 6 can just face the winch 2 without moving the winch 2, so that the heavy object is lifted without being influenced, the labor intensity of workers is reduced, and the construction efficiency is improved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an install hoisting apparatus on I-steel roof beam which characterized in that: including support arm (1), support arm (1) bottom sets firmly installation card (5) that are used for being connected with the I-steel, support arm (1) other end is provided with fixed pulley (6), wear to be equipped with wire rope (4) on fixed pulley (6), wire rope (4) are kept away from the one end of support arm (1) is connected with hoist engine (2), wire rope (4) other end is connected with steel sheet tongs (3).
2. A lifting device mounted on an i-section steel beam as claimed in claim 1, wherein: installation card (5) are including two relative diaphragm (51) that set up, two the one end fixedly connected with riser (52) of diaphragm (51), two are gone up the flange board card of I-steel roof beam into between diaphragm (51).
3. A lifting device mounted on an i-section steel beam as claimed in claim 1, wherein: support arm (1) includes vertical section (11) and slope section (12), vertical section (11) bottom with installation card (5) fixed connection, vertical section (11) top with slope section (12) fixed connection, slope section (12) slope sets up, and to vertical section (11) are kept away from the direction of I-shaped steel roof beam extends.
4. A lifting device mounted on an i-section steel beam as claimed in claim 3, wherein: the one end that vertical section (11) was kept away from in slope section (12) has set firmly installation piece (121), the mounting hole has been seted up on installation piece (121), fixed pulley (6) are connected in the mounting hole.
5. A lifting device mounted on an i-section steel beam as claimed in claim 3, wherein: keep away from slope section (12) one end fixedly connected with spliced pole (122) of vertical section (11), spliced pole (122) vertical setting, spliced pole (122) are kept away from the one end fixedly connected with bearing (123) of slope section (12), bearing (123) inner wall with spliced pole (122) fixed connection, two connecting rods (124) of bearing (123) outer wall both sides fixedly connected with, fixedly connected with horizontal pole (125) between two connecting rods (124), fixed pulley (6) cover is established on horizontal pole (125).
6. A lifting device mounted on an i-section steel beam as claimed in claim 3, wherein: an inclined strut (13) is fixedly arranged between the vertical section (11) and the inclined section (12).
7. A lifting device mounted on an i-section steel beam as claimed in claim 2, wherein: fixedly connected with extension plate (521) on the terminal surface that support arm (1) was kept away from in riser (52), extension plate (521) are close to the one end fixedly connected with backup pad (522) of I-steel roof beam, backup pad (522) keep away from the one end of extension plate (521) contradict on the web of I-steel roof beam.
8. A lifting device mounted on an I-section steel beam as claimed in claim 7, wherein: fixedly connected with steel sheet (523) on the terminal surface of backup pad (522) keep away from elongated plate (521), steel sheet (523) vertical setting, steel sheet (523) keep away from the one side of backup pad (522) is contradicted on the web of I-shaped steel roof beam.
CN202121489938.6U 2021-06-30 2021-06-30 Hoisting device mounted on I-shaped steel beam Active CN215326633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121489938.6U CN215326633U (en) 2021-06-30 2021-06-30 Hoisting device mounted on I-shaped steel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121489938.6U CN215326633U (en) 2021-06-30 2021-06-30 Hoisting device mounted on I-shaped steel beam

Publications (1)

Publication Number Publication Date
CN215326633U true CN215326633U (en) 2021-12-28

Family

ID=79563951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121489938.6U Active CN215326633U (en) 2021-06-30 2021-06-30 Hoisting device mounted on I-shaped steel beam

Country Status (1)

Country Link
CN (1) CN215326633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115010030A (en) * 2022-06-23 2022-09-06 中国五冶集团有限公司 High altitude lift system based on hoist engine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115010030A (en) * 2022-06-23 2022-09-06 中国五冶集团有限公司 High altitude lift system based on hoist engine

Similar Documents

Publication Publication Date Title
CN215326633U (en) Hoisting device mounted on I-shaped steel beam
CN205387439U (en) Mast hoisting accessory
CN213537032U (en) Special clamp crown block for carbon pre-roasting anode workshop
CN205442496U (en) High -rise building roof curtain lifting device
CN201952153U (en) Portable detachable hoisting equipment
CN204661163U (en) A kind of Multifunction transformer sleeve pipe lifting support
CN215248962U (en) Transfer device for building partition plate
CN209618648U (en) A kind of lifting lift hanger
CN214167159U (en) Hoisting system for installing anti-falling beam stop block in box girder
CN101723240B (en) Special fixture for hoisting rectangular section steel column and hoisting method by using same
CN211037773U (en) Hanging basket suspension device
CN210260897U (en) Hoisting device for prefabricated part
CN201380286Y (en) Special lifting tool for entirely hoisting bale rotary table
CN112499473A (en) Supporting and hanging device for installation and maintenance of electric hoist equipment and using method thereof
CN217229918U (en) Hoisting connecting device
CN218201880U (en) Material lifting device
CN219319011U (en) Supporting device for rotary kiln cylinder
CN220312209U (en) Frame type high pile construction operation platform
CN217350377U (en) Height and gravity center adjustable balance lifting appliance
CN217600268U (en) Equipment hoisting device
CN219156363U (en) Cantilever hanging frame of welding machine
CN213771174U (en) Steel truss lifting platform
CN217378638U (en) Splicing seam adjusting device for mounting prefabricated box channel and box culvert
CN212639768U (en) Pipeline unloading device
CN217051259U (en) Clamping type hoisting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant