CN212897450U - Pipeline installation auxiliary operation platform - Google Patents

Pipeline installation auxiliary operation platform Download PDF

Info

Publication number
CN212897450U
CN212897450U CN202020921736.3U CN202020921736U CN212897450U CN 212897450 U CN212897450 U CN 212897450U CN 202020921736 U CN202020921736 U CN 202020921736U CN 212897450 U CN212897450 U CN 212897450U
Authority
CN
China
Prior art keywords
platform
assembly
component
pipeline installation
ladder stand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020921736.3U
Other languages
Chinese (zh)
Inventor
高众
张海燕
崔建堂
李涛
朱万勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shanan Construction Engineering Co Ltd
Shanxi Installation Group Co Ltd
Original Assignee
Shanghai Shan'an Construction Engineering Co ltd
Shanxi Industrial Equipment Installation Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shan'an Construction Engineering Co ltd, Shanxi Industrial Equipment Installation Group Co Ltd filed Critical Shanghai Shan'an Construction Engineering Co ltd
Priority to CN202020921736.3U priority Critical patent/CN212897450U/en
Application granted granted Critical
Publication of CN212897450U publication Critical patent/CN212897450U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The invention provides a pipeline installation auxiliary operation platform which is characterized by comprising a platform component, a ladder stand component and a support component, wherein the ladder stand component is arranged on the platform component; the support assembly is connected with a ground track in a sliding mode and is respectively connected with the ladder stand assembly and the platform assembly; one end of the platform component slides along the wall of the tunnel, one end of the platform component is connected with the ladder stand component, and the supporting component supports the lower part of the platform component. The auxiliary operation platform for pipeline installation in the urban rail transit tunnel is safe and convenient to use, can shorten the construction period, and improves the construction efficiency. Meanwhile, the pipeline installation auxiliary operation platform can be used for the professional use of regional power lighting, also can be used for the installation and the use of professional pipelines such as regional fire control, communication signals and comprehensive monitoring, and greatly improves the working efficiency and the safety guarantee.

Description

Pipeline installation auxiliary operation platform
Technical Field
The invention relates to an auxiliary operation platform for pipeline installation in an urban rail transit tunnel, in particular to a movable and adjustable auxiliary operation platform for pipeline installation.
Background
In the urban rail transit electromechanical installation project, a construction ladder stand needs to be erected during the construction and installation of the interval low-voltage power distribution and illumination. In order to avoid safety accidents in ascending operation in construction, a ladder with welding characteristics of SC20-SC25 galvanized steel pipes is often used for construction and installation.
When the construction is carried out in the interval tunnel, the construction distance is usually 5-6 kilometers, and even the construction distance is increased due to the increase of the distance between stations. The steel ladder stand made of SC20-SC25 galvanized steel pipes by welding is heavy, and can be continuously constructed only by manually carrying to the next place after one place is installed in the construction process, and the heavy weight is inconvenient to move, so that the construction time is prolonged, and the construction risk is increased.
Disclosure of Invention
In order to overcome the defects in the prior art and reduce the lengthening of construction time and the increase of safety risk caused by the inconvenience of platform movement in the construction in the interval tunnel, the invention provides a pipeline installation auxiliary operation platform which is characterized by comprising a platform component, a ladder stand component and a support component; the support assembly is connected with a ground track in a sliding mode and is respectively connected with the ladder stand assembly and the platform assembly; one end of the platform component slides along the wall of the tunnel, one end of the platform component is connected with the ladder stand component, and the supporting component supports the lower part of the platform component.
The platform assembly comprises an operation platform, a protective fence, a side wall pulley and an adjustable inclined strut adjusting hole; the side wall pulley slides along the wall of the tunnel; the adjustable inclined strut adjusting hole is positioned below the operating platform and is connected with the supporting rod of the supporting component; the operation platform is sleeved with the ladder stand component through a sleeve.
Wherein, adjustable bracing regulation hole is a plurality of.
The ladder stand component is provided with a C-shaped pipe at the upper part and the lower part respectively, and the C-shaped pipes are used for being sleeved with the platform component and the supporting component.
Wherein, the cat ladder subassembly is scalable cat ladder.
Wherein the support assembly comprises a track sliding bracket and a support rod; the rail sliding support slides along the rail and is sleeved with the ladder stand assembly through a sleeve; the support bar supports the platform assembly.
The track sliding support comprises two groups of wheels which are perpendicular to each other, one group of wheels slides along the track, and the other group of wheels is perpendicular to the track and prevents the platform from sliding outwards.
Wherein, the track sliding support also comprises an anti-skid baffle.
The auxiliary operation platform for pipeline installation in the urban rail transit tunnel is safe and convenient to use, can shorten the construction period, and improves the construction efficiency. Meanwhile, the pipeline installation auxiliary operation platform can be used for the professional use of regional power lighting, also can be used for the installation and the use of professional pipelines such as regional fire control, communication signals and comprehensive monitoring, and greatly improves the working efficiency and the safety guarantee.
Drawings
FIG. 1 is a schematic structural diagram of an auxiliary work platform for pipeline installation according to the present invention;
FIG. 2 is a schematic structural diagram of a platform assembly according to the present invention;
FIG. 3 is a schematic view of a ladder assembly of the present invention;
FIG. 4 is a schematic structural view of a support assembly according to the present invention.
Detailed Description
As shown in fig. 1-4, the auxiliary work platform for installing pipelines in the urban rail transit tunnel comprises a platform assembly 1, a ladder stand assembly 2 and a support assembly 3. The platform assembly 1 comprises an operating platform 4, a protective fence 5, a side wall pulley 6 and an adjustable inclined strut adjusting hole 7. The side wall pulley 6 is in contact with the inner wall of the tunnel and can slide along the wall of the tunnel. The adjustable inclined strut adjusting holes 7 are arranged below the operating platform 4 and are a plurality of holes and are used for being connected with the supporting rods 10 of the supporting component 3. The height of the protective fence 5 is larger than 1m, and the protective fence is welded with three sides of the operating platform 4. The ladder stand component 2 is a telescopic ladder stand and is sleeved with the platform component 1 through a sleeve. The telescopic ladder stand 2 consists of a large ladder stand and a small ladder stand, wherein a C-shaped pipe is welded on each of two sides of the large ladder stand, the small ladder stand is arranged in the C-shaped pipe so as to realize the telescopic function, and the C-shaped pipe and the small ladder stand are provided with a pair of through holes 11 for fixing the ladder stand. The ladder stand component 2 is provided with a C-shaped pipe 12 respectively at the upper part and the lower part and is used for being sleeved with the platform component 1 and the supporting component 3. The support assembly 3 comprises a track running carriage and a support bar 10. The track sliding support comprises two sets of mutually perpendicular wheels 8 and 9, one set of wheels 8 slides along the track, and one set of wheels 9 is perpendicular to the track to prevent the platform from sliding outwards. The rail sliding support also comprises an anti-skid baffle 13. The rail sliding support slides along the rail and is sleeved with the ladder stand component 2. The support rods 10 support the platform assembly 1 through the adjustable bracing adjustment holes 7.
When the platform assembly 1 is used, a ladder stand assembly 2 and a support assembly 3 are connected to form a triangle when entering a regional tunnel for construction and erection, wheels 8 and 9 and side wall pulleys 6 of a rail sliding support are respectively arranged on a rail on one side to be constructed and the side wall of the regional tunnel, the ladder stand is fixed by bolts after the platform is lifted to be at a proper height by changing the height of the ladder stand according to the installation height of a pipeline on site, the platform is kept horizontal by adjusting the connecting hole positions of a support rod 10 and an adjustable inclined strut adjusting hole 7, and finally the platform can be fixed by using an anti-skid baffle 13 after the platform is adjusted.

Claims (8)

1. The pipeline installation auxiliary operation platform is characterized by comprising a platform assembly, a ladder stand assembly and a support assembly; the support assembly is connected with a ground track in a sliding mode and is respectively connected with the ladder stand assembly and the platform assembly; one end of the platform component slides along the wall of the tunnel, one end of the platform component is connected with the ladder stand component, and the supporting component supports the lower part of the platform component.
2. The pipeline installation auxiliary work platform of claim 1, wherein the platform assembly comprises an operation platform, a protective fence, a sidewall pulley and an adjustable diagonal bracing adjustment hole; the side wall pulley slides along the wall of the tunnel; the adjustable inclined strut adjusting hole is positioned below the operating platform and is connected with the supporting rod of the supporting component; the operation platform is sleeved with the ladder stand component through a sleeve.
3. The pipeline installation auxiliary work platform of claim 2 wherein the adjustable brace adjustment holes are plural.
4. The pipeline installation work support platform of claim 1, wherein the ladder assembly includes a C-shaped tube at each of the top and bottom for nesting with the platform assembly and the support assembly.
5. The pipeline installation assistance work platform of claim 4, wherein the ladder assembly is a retractable ladder.
6. The pipeline installation work aid platform of claim 1, wherein the support assembly comprises a track glide carriage and a support bar; the rail sliding support slides along the rail and is sleeved with the ladder stand assembly through a sleeve; the support bar supports the platform assembly.
7. The pipeline installation work aid platform of claim 6, wherein the track sliding support comprises two sets of wheels perpendicular to each other, one set sliding along the track, and one set perpendicular to the track preventing outward sliding of the platform.
8. The pipeline installation auxiliary work platform of claim 5 wherein the rail skid brackets further comprise anti-skid barriers.
CN202020921736.3U 2020-05-27 2020-05-27 Pipeline installation auxiliary operation platform Active CN212897450U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020921736.3U CN212897450U (en) 2020-05-27 2020-05-27 Pipeline installation auxiliary operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020921736.3U CN212897450U (en) 2020-05-27 2020-05-27 Pipeline installation auxiliary operation platform

Publications (1)

Publication Number Publication Date
CN212897450U true CN212897450U (en) 2021-04-06

Family

ID=75265915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020921736.3U Active CN212897450U (en) 2020-05-27 2020-05-27 Pipeline installation auxiliary operation platform

Country Status (1)

Country Link
CN (1) CN212897450U (en)

Similar Documents

Publication Publication Date Title
CN106882702B (en) Full landform urban sewage pipe is laid with lifting door machine over long distances
JP2809990B2 (en) Bridge girder erection equipment
CN201417657Y (en) Installation device of indoor transformer
CN107217836A (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN110656802A (en) Silo slipform removes gallows device
CN212897450U (en) Pipeline installation auxiliary operation platform
CN111677256A (en) Pipeline installation auxiliary operation platform
CN103171970B (en) A kind of aloft work track mounting system and installation method thereof
CN111337004A (en) Equipment fixing, moving, positioning and paying-off device in tunnel of urban rail transit section
CN217148358U (en) Linear steel structure lifting device for telescopic narrow space
CN214696959U (en) High-altitude large-caliber pipeline sliding device
CN112664235A (en) Walking type pipe gallery formwork supporting device
CN210767897U (en) Unit type curtain wall plate construction machine
CN112900891A (en) High-altitude large-caliber pipeline sliding device and sliding method
CN210263847U (en) Stride and establish portable construction platform on subway U type groove
CN110723643B (en) Method for changing track gauge of in-service crane
CN104088442B (en) Airduct erecting device and method
CN114352323A (en) Tunnel steel lining installation system and construction method
CN211897895U (en) Movable bridge cantilever arm bottom construction platform
CN218879315U (en) Pipeline auxiliary installation device for small operation space in rail engineering
CN215658593U (en) Pipe holding slidable trolley for high-altitude butt welding
CN221322416U (en) Movable multifunctional operation platform device in tunnel
CN210337912U (en) Electrified construction ladder car of adjustable level railway
CN221399733U (en) Tunnel construction support
CN219450426U (en) Hanging telescopic operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 030032 No. 8, Xinhua Road, Taiyuan Tanghuai Industrial Park, Shanxi transformation and comprehensive reform demonstration zone, Taiyuan City, Shanxi Province

Patentee after: Shanxi Installation Group Co.,Ltd.

Patentee after: Shanghai Shanan Construction Engineering Co., Ltd

Address before: 030026 No.8 Xinhua Road, Taiyuan demonstration area, Shanxi Province

Patentee before: SHANXI INDUSTRIAL EQUIPMENT INSTALLATION GROUP Co.,Ltd.

Patentee before: Shanghai Shanan Construction Engineering Co., Ltd

CP03 Change of name, title or address