CN212896447U - Structure of manual hole digging cast-in-place pile foundation underpinning raft foundation - Google Patents

Structure of manual hole digging cast-in-place pile foundation underpinning raft foundation Download PDF

Info

Publication number
CN212896447U
CN212896447U CN202021180324.5U CN202021180324U CN212896447U CN 212896447 U CN212896447 U CN 212896447U CN 202021180324 U CN202021180324 U CN 202021180324U CN 212896447 U CN212896447 U CN 212896447U
Authority
CN
China
Prior art keywords
hole
newly
foundation
bored concrete
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021180324.5U
Other languages
Chinese (zh)
Inventor
汪太珩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU ZHONGJIAN ARCHITECTURAL SCIENCE DESIGN INSTITUTE CO LTD
Guizhou China Construction Architecture Research and Design Institute Co Ltd
Original Assignee
GUIZHOU ZHONGJIAN ARCHITECTURAL SCIENCE DESIGN INSTITUTE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU ZHONGJIAN ARCHITECTURAL SCIENCE DESIGN INSTITUTE CO LTD filed Critical GUIZHOU ZHONGJIAN ARCHITECTURAL SCIENCE DESIGN INSTITUTE CO LTD
Priority to CN202021180324.5U priority Critical patent/CN212896447U/en
Application granted granted Critical
Publication of CN212896447U publication Critical patent/CN212896447U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a structure of artifical hole bored concrete pile basis underpins raft foundation that digs, dig hole bored concrete pile basis, artifical construction hole and newly-increased manual work including existing frame post and existing raft foundation, newly-increased manual work and dig hole bored concrete pile dado, set up artifical construction hole on existing raft foundation of existing frame post periphery, there is construction space in the bottom excavation of existing raft foundation simultaneously, construction space and manual construction hole intercommunication, be equipped with newly-increased manual work and dig hole bored concrete pile dado in the bottom of existing raft foundation, pour newly-increased manual work and dig hole bored concrete pile basis in newly-increased manual work is dug hole bored concrete pile dado. The utility model discloses add the artifical bored concrete pile basis that digs hole of newly-increased under existing frame post, directly transmit the upper portion load to on the better ground bearing layer, avoided the nondeterminacy of the reinforced inhomogeneity of traditional high-pressure slip casting and result, also can reduce the social negative effect to the maximum extent when reducing time limit for a project, investment.

Description

Structure of manual hole digging cast-in-place pile foundation underpinning raft foundation
Technical Field
The utility model relates to a structure of artifical hole bored concrete pile basis underpins raft foundation that digs belongs to foundation stabilization construction technical field.
Background
The raft foundation is a foundation form commonly used in the engineering construction of China at the present stage by virtue of good integrity and stability, but when the mechanical properties of the foundation rock soil under the raft foundation are different, the uneven settlement of a building is often caused, so that the house has undesirable consequences such as cracking, inclination and the like. At this time, the foundation is generally reinforced by high-pressure grouting, but due to the non-uniformity of high-pressure grouting and uncertainty of the result, the effect after the reinforcement treatment is not ideal, and if the foundation of the house is reinforced again, the social negative effect is further increased.
SUMMERY OF THE UTILITY MODEL
To the not enough among the prior art, the utility model provides a simple and safe and reliable's of principle structure of artifical hole bored concrete pile basis underpins raft foundation can ensure the consolidated validity of foundation, when reducing time limit for a project and investment, also can reduce social negative effect to the at utmost.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a structure of artifical bored concrete pile foundation underpins raft foundation, includes existing frame post and existing raft foundation, newly-increased artifical bored concrete pile foundation, manual construction hole and newly-increased artifical bored concrete pile dado of digging, sets up artifical construction hole on existing raft foundation of existing frame post periphery, excavates there is construction space in existing raft foundation's bottom simultaneously, construction space and manual construction hole intercommunication, be equipped with newly-increased artifical bored concrete pile dado in existing raft foundation's bottom, pour newly-increased artifical bored concrete pile foundation in newly-increased artifical bored concrete pile dado, and newly-increased artifical bored concrete pile arranges under existing frame post.
Furthermore, the manual construction holes are arranged on the existing raft foundation at the peripheral non-intercolumn strip positions of the existing frame columns, and the total number of the positions of the manual construction holes can be four.
Further, the centers of the newly added manual hole digging cast-in-place pile and the newly added manual hole digging cast-in-place pile retaining wall coincide with the center of the existing frame column.
Furthermore, the size of the opening of the manual construction hole is not less than 800mm, so that the requirement of construction space is met.
Since the technical scheme is used, the utility model discloses an advantage has below: the utility model discloses add the artifical bored concrete pile basis that digs hole of newly-increased under existing frame post, directly transmit the upper portion load to on the better ground bearing layer, avoided the reinforced inhomogeneities of traditional high-pressure slip casting and the uncertainty of result. Therefore, the utility model discloses can ensure foundation stabilization's validity, when reducing time limit for a project and investment, also can reduce the social negative effect in the at utmost.
Drawings
FIG. 1 is a top view of the schematic structural diagram of the present invention
Fig. 2 is a sectional view a-a of fig. 1.
Description of reference numerals: 1-existing frame columns, 2-existing raft foundations, 3-newly-added manual hole digging cast-in-place pile foundations, 4-manual construction holes, 5-newly-added manual hole digging cast-in-place pile retaining walls and 6-construction space.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
The embodiment of the utility model provides a: referring to fig. 1 and 2, a structure for underpinning a raft foundation by a manual hole digging cast-in-place pile foundation comprises an existing frame column 1, an existing raft foundation 2, a newly-added manual hole digging cast-in-place pile foundation 3, a manual construction hole 4 and a newly-added manual hole digging cast-in-place pile retaining wall 5, wherein the manual construction hole 4 is formed in the existing raft foundation 2 at the periphery of the existing frame column 1, a construction space 6 is dug at the bottom of the existing raft foundation 2, the construction space 6 is communicated with the manual construction hole 4, the newly-added manual hole digging cast-in-place pile retaining wall 5 is arranged at the bottom of the existing raft foundation 2, the newly-added manual hole digging cast-in-place pile retaining wall 5 is poured with the newly-added manual hole digging cast-in-place pile foundation 3, and the newly-added manual hole digging cast-in-place pile retaining wall 3 is arranged under the. The manual construction holes 4 are arranged on the existing raft foundation 2 at the peripheral non-intercolumn strip positions of the existing frame column 1, the manual construction holes 4 are provided with four positions in total, and during construction, one of the manual construction holes 4 is selected for hole opening construction. The centers of the newly added manually-excavated cast-in-place pile 3 and the newly added manually-excavated cast-in-place pile retaining wall 5 coincide with the center of the existing frame column 1. The diameter of the manual construction hole 4 is not less than 800 mm.
When the structure construction of the underpinning raft foundation of the manual hole digging cast-in-place pile foundation is carried out, firstly, manual construction holes 4 are formed in the existing raft foundation 2 at the positions of non-inter-column strips on the periphery of the existing frame column 1, meanwhile, a construction space 6 is dug at the bottom of the existing raft foundation 2, the construction space 6 is communicated with the manual construction holes 4, after the construction of the construction space 6 and the manual construction holes 4 is finished, a newly-increased manual hole digging cast-in-place pile protection wall 5 can be constructed under the existing frame column 1 in a manual mode, after the construction is carried out to a holding layer of design requirements, a newly-increased manual hole digging cast-in-place pile protection wall 5 is poured, the newly-increased manual hole digging cast-in-place pile 3 is supported at the bottom of the existing frame column 1, and therefore the purpose of underpinning the existing raft foundation 2 by the newly-increased manual hole digging cast-in-place.
And when the newly-added manual hole digging cast-in-place pile foundation 3 is poured, adopting commercial concrete doped with 10% of micro-expansion agent.
The newly-added manual hole digging cast-in-place pile protecting wall 5 is composed of more than two sections of single protecting walls, and the height of each section of single protecting wall is not more than 500 mm.
The bottom of the existing raft foundation 2 is chiseled at the position contacted with the newly-added manual hole digging cast-in-place pile foundation 3, so as to ensure the reliable connection of new and old concrete.
Pile body reinforcing steel bars of the newly-added manual hole digging cast-in-place pile foundation 3 are anchored into the existing raft foundation 2 by adopting a bar planting process, and the length of the planted bars is not less than 15 times of the diameter of the planted bars.
To sum up, the utility model discloses add the manual work of newly-increased and dig hole bored concrete pile basis 3 under existing frame post 1, directly transmit the upper portion load to better ground bearing layer on, avoided the reinforced non-uniformity of traditional high pressure slip casting and the uncertainty of result, consequently, the utility model discloses can ensure the reinforced (rfd) validity of ground basis, when reducing time limit for a project and investment, also can reduce the social negative effect to the maximum extent.

Claims (4)

1. The utility model provides a structure of artifical bored concrete pile foundation underpins raft foundation that digs hole, includes existing frame post (1) and existing raft foundation (2), newly-increased artifical bored concrete pile foundation (3), artifical construction hole (4) and newly-increased artifical bored concrete pile dado (5) of digging hole, its characterized in that: seted up artifical construction hole (4) on existing raft foundation (2) of existing frame post (1) periphery, excavated the bottom of existing raft foundation (2) simultaneously has construction space (6), construction space (6) and artifical construction hole (4) intercommunication, be equipped with newly-increased manual work and dig hole bored concrete pile dado (5) in the bottom of existing raft foundation (2), pour newly-increased manual work and dig hole bored concrete pile basis (3) in newly-increased manual hole bored concrete pile dado (5), and newly-increased manual hole bored concrete pile basis (3) arrange under existing frame post (1).
2. The structure of a manual hole digging cast-in-place pile foundation underpinning raft foundation of claim 1, wherein: the artificial construction holes (4) are arranged on the existing raft foundation (2) at the peripheral non-intercolumn strip positions of the existing frame columns (1), and the total number of the positions where the artificial construction holes (4) can be opened is four.
3. The structure of a manual hole digging cast-in-place pile foundation underpinning raft foundation of claim 1, wherein: the centers of the newly added manual hole digging cast-in-place pile foundation (3) and the newly added manual hole digging cast-in-place pile retaining wall (5) are coincided with the center of the existing frame column (1).
4. The structure of a manual hole digging cast-in-place pile foundation underpinning raft foundation of claim 1, wherein: the opening size of the manual construction hole (4) is not less than 800 mm.
CN202021180324.5U 2020-06-23 2020-06-23 Structure of manual hole digging cast-in-place pile foundation underpinning raft foundation Active CN212896447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021180324.5U CN212896447U (en) 2020-06-23 2020-06-23 Structure of manual hole digging cast-in-place pile foundation underpinning raft foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021180324.5U CN212896447U (en) 2020-06-23 2020-06-23 Structure of manual hole digging cast-in-place pile foundation underpinning raft foundation

Publications (1)

Publication Number Publication Date
CN212896447U true CN212896447U (en) 2021-04-06

Family

ID=75279611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021180324.5U Active CN212896447U (en) 2020-06-23 2020-06-23 Structure of manual hole digging cast-in-place pile foundation underpinning raft foundation

Country Status (1)

Country Link
CN (1) CN212896447U (en)

Similar Documents

Publication Publication Date Title
CN103074898B (en) Multi-row pile foundation pit support structure and construction method thereof
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN205314116U (en) Continuous type of combined type drilling cling compound structure
CN207597395U (en) The foundation pit enclosure structure system of steel pipe and the compound diagonal brace combination campshed of PHC pile piles
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN204590038U (en) A kind of permanent foundation pit supporting construction
CN108661073A (en) A kind of barrier wall structure and its construction method
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN208934002U (en) A kind of barrier wall structure
CN203096745U (en) Multi-row pile foundation pit supporting structure
CN108755702A (en) A kind of higher soft soil foundation foundation ditch strengthening processing method of level of ground water
CN212896447U (en) Structure of manual hole digging cast-in-place pile foundation underpinning raft foundation
CN111636470A (en) Structure and method for underpinning raft foundation by manually digging hole and pouring pile foundation
CN216515701U (en) Miniature stake raft board combination foundation structure
CN216739642U (en) Lower through hole directional drilling working well
CN206189447U (en) Partly strut formula retaining wall
CN212642730U (en) Collapsible loess area tunnel passes people's air defense structure
CN210482285U (en) Soft soil foundation manual hole digging pile structure
CN203603162U (en) Construction elevator load basic system based on foundation pit edge
CN112942377A (en) Novel support shear-resistant structure and construction method thereof
CN205399504U (en) Open section tunnel structure's anti structure of floating
CN108532611A (en) A kind of foundation pit supporting construction and construction method
CN215715234U (en) River bank foundation protection structure
CN217811130U (en) Hydraulic engineering's strenghthened type cofferdam