CN212671148U - Upper hanger structure - Google Patents

Upper hanger structure Download PDF

Info

Publication number
CN212671148U
CN212671148U CN202020810737.0U CN202020810737U CN212671148U CN 212671148 U CN212671148 U CN 212671148U CN 202020810737 U CN202020810737 U CN 202020810737U CN 212671148 U CN212671148 U CN 212671148U
Authority
CN
China
Prior art keywords
connecting plate
bracing pieces
rectangular pipe
adjusting bolt
square tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020810737.0U
Other languages
Chinese (zh)
Inventor
董增辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Hi Tech Zone Dongcheng Construction Technology Co ltd
Original Assignee
Ningbo Hi Tech Zone Dongcheng Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Hi Tech Zone Dongcheng Construction Technology Co ltd filed Critical Ningbo Hi Tech Zone Dongcheng Construction Technology Co ltd
Priority to CN202020810737.0U priority Critical patent/CN212671148U/en
Application granted granted Critical
Publication of CN212671148U publication Critical patent/CN212671148U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an go up gallows structure, including vertical connecting plate, the rectangular pipe and two bracing pieces of establishing between connecting plate and rectangular pipe that arrange of arranging of level, two bracing pieces are extended and are the symmetrical formula and arrange to the outside respectively along the upper and lower surface of rectangular pipe with the one end, form the acute angle contained angle between two bracing pieces, the other end and the connecting plate fixed connection of two bracing pieces, connecting plate and two bracing pieces are in same vertical plane, and the vertical plane at rectangular pipe perpendicular to connecting plate and two bracing pieces places installs adjusting bolt on the rectangular pipe, and adjusting bolt's lower extreme and electric block's last couple assembly is connected, the upper end cover is equipped with the pressure spring. The utility model discloses forming a stability higher triangle column structure through adopting connecting plate and two bracing pieces, improving the bearing capacity, stability is good, and factor of safety is high, can adjust the tensioning degree to the calabash chain very convenient through the pressure spring, guarantees the stability of promotion process, promotes electric block effectual.

Description

Upper hanger structure
Technical Field
The utility model relates to an attached lifting scaffold field especially goes up gallows structure.
Background
The attached lifting scaffold, commonly called climbing frame, is a new scaffold technology rapidly developed in the early century of this century, and has important influence on the building construction technology in China. The attached lifting scaffold is erected at a certain height and attached to an engineering structure, and can climb or descend layer by layer along with the engineering structure by depending on a lifting device of the attached lifting scaffold. The multifunctional hanging rack changes high-altitude operation into low-altitude operation and changes suspended operation into operation inside the rack body, and has the characteristics of overturn prevention, falling prevention, economy, safety, convenience and the like.
Go up the gallows and climb a promotion load component in the frame, it is fixed on the guide rail main frame, has hung lifting means such as calabash on it, and the current gallows of going up adopts a horizontal beam of fixing on the guide rail main frame to come the direct electric hoist that hangs mostly, and the bearing capacity is not strong, and poor stability has the potential safety hazard, the tensioning degree of regulation calabash chain that moreover can not be convenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the not enough of above-mentioned prior art and providing a bearing capacity is strong, and stability is good, and factor of safety is high, and the last gallows structure of the regulation calabash chain tensioning degree that can be convenient.
In order to realize the above-mentioned purpose, the utility model discloses an go up gallows structure, including vertical connecting plate, the square tube and two bracing pieces of establishing between connecting plate and square tube that arrange of arranging of level, two bracing pieces extend and are symmetrical formula arrangement to the outside respectively along the upper and lower surface of square tube with the one end, form the acute angle contained angle between two bracing pieces, the other end and the connecting plate fixed connection of two bracing pieces, connecting plate and two bracing pieces are in same vertical plane, the vertical plane at square tube perpendicular to connecting plate and two bracing pieces places vertically installs adjusting bolt on the square tube, and adjusting bolt's lower extreme and electric hoist's last couple assembly are connected, and the cover is equipped with the pressure spring in adjusting bolt's upper end.
In order to fix the mounting plate on the guide rail main frame, mounting holes are formed in two ends of the connecting plate, and bolt holes penetrating through the upper surface and the lower surface of the rectangular tube are formed in the rectangular tube in order to mount adjusting bolts.
The utility model discloses the last gallows structure that obtains, its technical effect forms a stable higher triangle-shaped structure through adopting connecting plate and two bracing pieces, improves the bearing capacity, and stability is good, and factor of safety is high, can adjust the tensioning degree to the calabash chain very convenient through the pressure spring, guarantees the stability of promotion process, and it is effectual to promote electric block.
Drawings
Fig. 1 is a schematic view of a structure of an upper hanger structure of embodiment 1 without an adjustment bolt installed;
fig. 2 is another structural schematic view of the upper hanger structure of embodiment 1 without the adjustment bolt installed;
fig. 3 is a schematic structural view of the upper hanger structure of embodiment 1.
In the figure: connecting plate 1, horizontal quarter bend 2, bracing piece 3, adjusting bolt 4, go up couple assembly 5, pressure spring 6, mounting hole 7, bolt hole 8.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
Example 1:
as shown in fig. 1-2, the upper hanger structure provided by this embodiment includes a connecting plate 1 vertically arranged, a rectangular tube 2 horizontally arranged, and two support rods 3 disposed between the connecting plate 1 and the rectangular tube 2, wherein the two support rods 3 extend outwards and are symmetrically disposed along the upper and lower surfaces of the same end of the rectangular tube 2, an acute included angle is formed between the two support rods 3, the other ends of the two support rods 3 are fixedly connected to the connecting plate 1, the connecting plate 1 and the two support rods 3 are located in the same vertical plane, the rectangular tube 2 is perpendicular to the vertical plane where the connecting plate 1 and the two support rods 3 are located, an adjusting bolt 4 is vertically mounted on the rectangular tube 2, the lower end of the adjusting bolt 4 is connected to an upper hook assembly 5 of the electric hoist, and a pressure spring 6 is sleeved on the upper end of the adjusting bolt 4.
Both ends of the connecting plate 1 are provided with mounting holes 7, the connecting plate 1 is fixed on the guide rail main frame through screws during mounting, the rectangular tube 2 is provided with bolt holes 8 penetrating through the upper surface and the lower surface of the rectangular tube 2, and the adjusting bolts 4 are mounted in the bolt holes 8.
The last gallows structure that this embodiment obtained forms a stable higher triangle-shaped structure through adopting connecting plate 1 and two bracing pieces 3, improves the bearing capacity, and stability is good, and factor of safety is high, can be very convenient adjust the tensioning degree of calabash chain through pressure spring 6, guarantees the stability of promotion process, promotes electric block effectual.

Claims (2)

1. The utility model provides an go up gallows structure which characterized in that: including vertical connecting plate (1) of arranging, the square tube (2) of horizontal arrangement and two bracing pieces (3) of establishing between connecting plate (1) and square tube (2), two bracing pieces (3) are along the square tube (2) with the upper and lower surface of one end respectively outside extend and be the symmetrical formula and arrange, form the acute angle contained angle between two bracing pieces (3), the other end and connecting plate (1) fixed connection of two bracing pieces (3), connecting plate (1) and two bracing pieces (3) are in same vertical plane, the vertical plane at square tube (2) perpendicular to connecting plate (1) and two bracing pieces (3) places is vertically installed adjusting bolt (4) on square tube (2), the lower extreme of adjusting bolt (4) is connected with last couple assembly (5) of electric hoist, is equipped with pressure spring (6) in the upper end cover of adjusting bolt (4).
2. The upper hanger structure of claim 1, wherein: both ends of the connecting plate (1) are provided with a mounting hole (7), and the rectangular tube (2) is provided with bolt holes (8) which penetrate through the upper surface and the lower surface of the rectangular tube (2).
CN202020810737.0U 2020-05-15 2020-05-15 Upper hanger structure Active CN212671148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020810737.0U CN212671148U (en) 2020-05-15 2020-05-15 Upper hanger structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020810737.0U CN212671148U (en) 2020-05-15 2020-05-15 Upper hanger structure

Publications (1)

Publication Number Publication Date
CN212671148U true CN212671148U (en) 2021-03-09

Family

ID=74814000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020810737.0U Active CN212671148U (en) 2020-05-15 2020-05-15 Upper hanger structure

Country Status (1)

Country Link
CN (1) CN212671148U (en)

Similar Documents

Publication Publication Date Title
CN201215876Y (en) Assistant hanging rack for mounting top rack of electric pole
CN212671148U (en) Upper hanger structure
CN108217429A (en) A kind of assemble type hanger and hanging method
CN215631503U (en) Hanging basket for mounting roof high parapet wall
CN207228591U (en) A kind of architectural engineering scaffold
CN215666760U (en) Sliding type horizontal wall-attached device for construction elevator
CN214785847U (en) Be applied to hanging flower basket device of single structure concrete beam
CN210530363U (en) Gradual change formula triangle-shaped curtain skeleton construction operation platform
CN209957286U (en) Liftable simple and easy installation device of jib
CN208844896U (en) A kind of scalable elevator hanging basket in four sides
CN111706060A (en) Steel wire rope inclined-pulling type hanging basket device
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN110155871A (en) Wall bushing hoisting tooling
CN206494679U (en) A kind of power transformer installation system
CN213015330U (en) Lower hanging seat for climbing frame lifting
CN215626237U (en) Hanging crane rail mounting mechanism for net rack roof
CN212957573U (en) Transverse connecting frame for scaffold
CN212773380U (en) Lower hanger structure for scaffold
CN216737208U (en) Electric block support structure for building construction climbing frame
CN110040618A (en) A kind of wall-mounted equipment mounting tool
CN214885646U (en) Material platform drawknot connecting piece
CN215255982U (en) Climbing ladder for installing and overhauling power cable
CN218149673U (en) Truss type lower hanging rack device for climbing frame
CN216809777U (en) Hanging basket hanging mechanism for maintenance construction of upstream dam face of concrete gravity dam
CN214169884U (en) Scaffold with reduced shaking

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant