CN216737208U - Electric block support structure for building construction climbing frame - Google Patents
Electric block support structure for building construction climbing frame Download PDFInfo
- Publication number
- CN216737208U CN216737208U CN202123223844.7U CN202123223844U CN216737208U CN 216737208 U CN216737208 U CN 216737208U CN 202123223844 U CN202123223844 U CN 202123223844U CN 216737208 U CN216737208 U CN 216737208U
- Authority
- CN
- China
- Prior art keywords
- fixed plate
- upper beam
- lifting lugs
- middle beam
- support structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an electric block support structure for building construction climbing frame, which relates to the technical field of building construction, and comprises a fixing plate, bolt holes are arranged at intervals on the fixing plate, an upper beam, a middle beam and a lower beam are respectively and fixedly arranged on the right side of the fixing plate from top to bottom, the middle beam is horizontally arranged, the right ends of the upper beam and the lower beam are fixedly connected with the right ends of the middle beam, lifting lugs arranged in parallel are arranged on the front sides of the right ends of the middle beam, and the lifting lugs are simultaneously and fixedly arranged on the upper beam, the middle beam and the lower beam; the beneficial effects are that: the lifting lugs are simultaneously fixed on the upper beam, the middle beam and the lower beam, so that the torsion resistance of the lifting lugs after being pulled is improved; the sleeve is arranged in the position, corresponding to the bolt hole, in the fixed plate, so that the fixed plate is prevented from deforming under stress when the fixed plate is fixed by the bolt; set up fixed plate, upper beam, centre sill and underbeam and be square tubular construction, reduce the consumptive material when guaranteeing support intensity, alleviate the support dead weight.
Description
Technical Field
The utility model relates to a construction technical field especially relates to an electric block support structure for frame is climbed in construction.
Background
At present, an attached lifting scaffold (called a climbing frame for short) is widely used in high-rise building construction, and is used for building structure construction and decoration construction facade protection, the scaffold with a certain height is attached to beams, shear walls and plates on the periphery of a building structure through self lifting equipment, and the scaffold is an auxiliary construction outer scaffold which is used for outer wall decoration operation by utilizing a tower crane to be dismantled or descend after climbing to a structure capping layer by layer along with engineering structure construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a building construction climbs frame and uses electric block support structure just in order to solve above-mentioned problem.
The utility model discloses a following technical scheme realizes above-mentioned purpose:
the utility model provides a frame is climbed in construction uses electric block support structure, which comprises a fixing plate and i, the interval is provided with the bolt hole on the fixed plate, fixed plate right side from the top down respectively fixed mounting have upper beam, well roof beam and underbeam, well roof beam level sets up, the upper beam with the equal fixed connection of underbeam right-hand member is in well roof beam right-hand member, well roof beam right-hand member front side is provided with parallel arrangement's lug, lug while fixed mounting be in the upper beam well roof beam with on the underbeam, set up the lifting eye of being convenient for to hang on the lug.
Preferably: the fixed plate the upper beam the centre sill with the underbeam is square tubular construction, both ends correspond respectively about the fixed plate is inside bolt hole rigidity is provided with the sleeve pipe, the sleeve pipe with the bolt hole sets up with the axle center.
Preferably: the sleeve is welded on the fixed plate, the left ends of the upper beam, the middle beam and the lower beam are welded on the fixed plate, the right ends of the upper beam and the lower beam are welded on the right end of the middle beam, and the lifting lugs are welded on the upper beam, the middle beam and the lower beam at the same time.
Compared with the prior art, the beneficial effects of the utility model reside in that: the lifting lugs are simultaneously fixed on the upper beam, the middle beam and the lower beam, so that the torsion resistance of the lifting lugs after being pulled is improved; the sleeve is arranged in the position, corresponding to the bolt hole, in the fixed plate, so that the fixed plate is prevented from deforming under stress when the fixed plate is fixed by the bolt; set up fixed plate, upper beam, centre sill and underbeam and be square tubular construction, reduce the consumptive material when guaranteeing support intensity, alleviate the support dead weight.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a construction climbs frame with electric block support structure's main view structure sketch.
Fig. 2 is the utility model relates to a construction climbs frame and uses electric block support structure's right side view.
Fig. 3 is a top view of the electric block support structure for the building construction climbing frame.
The reference numerals are explained below:
1. bolt holes; 2. a fixing plate; 3. a sleeve; 4. an upper beam; 5. a center sill; 6. lifting lugs; 7. a lower beam; 8. and (4) hoisting holes.
Detailed Description
In the description of the present invention, it is to be understood that the terms "central", "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing and simplifying the description, but not for indicating or implying that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus are not to be construed as limiting the invention, and further that the terms "first", "second", etc., are used only for descriptive purposes and are not to indicate or imply relative importance or imply the number of technical features being referred to, whereby the features defined as "first", "second", etc., may explicitly or implicitly include one or more such features, in the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; the two elements may be directly connected or indirectly connected through an intermediate medium, or the two elements may be connected through an intermediate medium, and the specific meaning of the above terms in the present invention can be understood by those skilled in the art through specific situations.
The present invention will be further explained with reference to the accompanying drawings:
as shown in fig. 1-3, an electric hoist support structure for climbing frame in building construction comprises a fixing plate 2, bolt holes 1 are arranged on the fixing plate 2 at intervals, the bolt holes 1 are used for fixing, an upper beam 4, a middle beam 5 and a lower beam 7 are respectively and fixedly arranged on the right side of the fixing plate 2 from top to bottom, the middle beam 5 is horizontally arranged, the right ends of the upper beam 4 and the lower beam 7 are fixedly connected to the right end of the middle beam 5, a lifting lug 6 arranged in parallel is arranged on the front side of the right end of the middle beam 5, the lifting lug 6 is used for pulling, the lifting lug 6 is simultaneously and fixedly arranged on the upper beam 4, the middle beam 5 and the lower beam 7, and a lifting hole 8 convenient for hanging is arranged on the lifting lug 6; the fixed plate 2, the upper beam 4, the middle beam 5 and the lower beam 7 are all of square tube structures, the upper end and the lower end of the inside of the fixed plate 2 are respectively fixedly provided with a sleeve 3 corresponding to the bolt hole 1, the sleeve 3 is used for supporting, and the sleeve 3 and the bolt hole 1 are coaxially arranged; the sleeve pipe 3 welds on fixed plate 2, and upper beam 4, well roof beam 5 and 7 left ends of underbeam all weld on fixed plate 2, and upper beam 4 and 7 right-hand members of underbeam all weld at 5 right-hand members of well roof beam, and lug 6 welds simultaneously on upper beam 4, well roof beam 5 and underbeam 7.
The working principle is as follows: when the lifting device is used, the fixing plate 2 is fixedly installed on the vertical rod of the climbing frame through the bolt, the chain of the electric hoist is fixed in the lifting hole 8 of the lifting lug 6, the climbing frame can be lifted by pulling the lifting lug 6 through the electric hoist, and the lifting lug 6 is simultaneously fixed on the upper beam 4, the middle beam 5 and the lower beam 7, so that the torsion resistance of the lifting lug 6 after being pulled is improved; the sleeve 3 is arranged at the position corresponding to the bolt hole 1 inside the fixing plate 2, so that the fixing plate 2 is prevented from deforming due to stress when the fixing plate 2 is fixed by bolts.
Having shown and described the basic principles, essential features and advantages of the invention, it should be understood by those skilled in the art that the present invention is not limited by the foregoing embodiments, which are merely illustrative, but rather are intended to cover various changes and modifications within the spirit and scope of the invention as defined by the appended claims.
Claims (3)
1. The utility model provides a frame is climbed in construction uses electric block support structure, includes fixed plate (2), its characterized in that: the novel hanging bracket is characterized in that bolt holes (1) are formed in the fixed plate (2) at intervals, an upper beam (4), a middle beam (5) and a lower beam (7) are respectively and fixedly mounted on the right side of the fixed plate (2) from top to bottom, the middle beam (5) is horizontally arranged, the right ends of the upper beam (4) and the lower beam (7) are fixedly connected to the right end of the middle beam (5), lifting lugs (6) which are arranged in parallel are arranged on the front side of the right end of the middle beam (5), the lifting lugs (6) are simultaneously and fixedly mounted on the upper beam (4), the middle beam (5) and the lower beam (7), and lifting holes (8) convenient to hang are formed in the lifting lugs (6).
2. The electric hoist support structure for the building construction climbing frame according to claim 1, characterized in that: the fixed plate (2), put the beams in place (4), well roof beam (5) with underbeam (7) are square tubular construction, fixed plate (2) are inside about both ends correspond respectively bolt hole (1) rigidity is provided with sleeve pipe (3), sleeve pipe (3) with bolt hole (1) sets up with the axle center.
3. The electric hoist support structure for the building construction climbing frame according to claim 2, characterized in that: the sleeve (3) is welded on the fixing plate (2), the left ends of the upper beam (4), the middle beam (5) and the lower beam (7) are welded on the fixing plate (2), the right ends of the upper beam (4) and the lower beam (7) are welded on the right end of the middle beam (5), and the lifting lugs (6) are welded on the upper beam (4), the middle beam (5) and the lower beam (7) at the same time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123223844.7U CN216737208U (en) | 2021-12-21 | 2021-12-21 | Electric block support structure for building construction climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123223844.7U CN216737208U (en) | 2021-12-21 | 2021-12-21 | Electric block support structure for building construction climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216737208U true CN216737208U (en) | 2022-06-14 |
Family
ID=81936623
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123223844.7U Active CN216737208U (en) | 2021-12-21 | 2021-12-21 | Electric block support structure for building construction climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216737208U (en) |
-
2021
- 2021-12-21 CN CN202123223844.7U patent/CN216737208U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088565B (en) | Attachment type raise scaffold tiltedly climbs method and attachment type raise scaffold | |
CN216737208U (en) | Electric block support structure for building construction climbing frame | |
CN212836630U (en) | All-steel integrated operation scaffold | |
CN216587570U (en) | Viscous damper's mounting platform | |
CN217323175U (en) | Auxiliary device for converting hoisting points of reinforcement cage of underground continuous wall | |
CN216196494U (en) | Climb a bracing piece and climb frame | |
CN213139095U (en) | Adjustable cage hanging scaffold operation tool for ship construction | |
CN214531835U (en) | External hanging type operation device for large storage tank | |
CN214785847U (en) | Be applied to hanging flower basket device of single structure concrete beam | |
CN101143689B (en) | Internal climbing tower crane double-beam shape internal climbing foundation and internal climbing jacket frame | |
CN211499699U (en) | Ladder-climbing type operation rack for hanging cage | |
CN220954834U (en) | Beam bracket with pressure sensing function | |
CN201087080Y (en) | Double-beam inner climbing base plate and sleeve rack for inner climbing tower crane | |
CN216663858U (en) | Hang anti-hanging beam of entablature before basket suitable for under high tension transmission line | |
CN215407307U (en) | Stereotyped elevator shaft operation platform | |
CN217453745U (en) | Shore bridge girder installation frock | |
CN217232654U (en) | Guide rail for building construction climbing frame | |
CN216616844U (en) | Auxiliary supporting device for hydraulic climbing formwork frame body of super high-rise building | |
CN217420432U (en) | Multifunctional hoisting point truss | |
CN220888323U (en) | Liftable formula steel bar binding platform for high mound of rectangle is applicable to | |
CN219794604U (en) | Safety protection hanging basket | |
CN215441540U (en) | Subway sound barrier installation is with operation platform that can fast assembly remove | |
CN217782775U (en) | Scaffold for civil engineering construction | |
CN212773380U (en) | Lower hanger structure for scaffold | |
CN212671148U (en) | Upper hanger structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |