CN206494679U - A kind of power transformer installation system - Google Patents

A kind of power transformer installation system Download PDF

Info

Publication number
CN206494679U
CN206494679U CN201621332187.6U CN201621332187U CN206494679U CN 206494679 U CN206494679 U CN 206494679U CN 201621332187 U CN201621332187 U CN 201621332187U CN 206494679 U CN206494679 U CN 206494679U
Authority
CN
China
Prior art keywords
plummer
carrier bar
transformer
crossbeam
vertical rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621332187.6U
Other languages
Chinese (zh)
Inventor
曹学年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Harmony Electrical Engineering Co Ltd
Original Assignee
Guangdong Harmony Electrical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Harmony Electrical Engineering Co Ltd filed Critical Guangdong Harmony Electrical Engineering Co Ltd
Priority to CN201621332187.6U priority Critical patent/CN206494679U/en
Application granted granted Critical
Publication of CN206494679U publication Critical patent/CN206494679U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a kind of power transformer installation system, including two vertical rods, crossbeam, plummer and two carrier bars;Crossbeam is arranged on the upper end of two vertical rods, and two carrier bars are separately fixed in two vertical rods by the second anchor ear, and the bottom of plummer is provided with hanging hole and support block;The two ends of carrier bar are threaded with screw rod, after plummer and transformer are fixed on ground, lifting rope has been fixed in hanging hole, by plummer and transformer integral lifting, then after carrier bar is fixed in vertical rod, by plummer and transformer entire lowering, carrier bar is set to support plummer and transformer entirety, then the position of plummer is adjusted by screw rod, encapsulant is finally irrigated in the groove of carrier bar, install simple, it is convenient, need not be by large scale equipments such as cranes in installation process, construction period can effectively be shortened, reduce construction cost.

Description

A kind of power transformer installation system
Technical field
The utility model is related to a kind of power equipment mounting platform, particularly a kind of double rod type mounting platform for transformer.
Background technology
The mounting means of double rod type transformer is in the prior art, first in double pole transformer carrying platforms, so Transformer is installed on carrying platform afterwards, this mounting means needs the large-scale auxiliary installing device such as crane, on the one hand Higher expense can be produced by purchasing or rent large-scale auxiliary installing device, on the other hand, be limited by installation site, crane Tend not to reach some installation sites etc. large-scale auxiliary equipment, this makes troubles to the installation of transformer.
The content of the invention
In order to overcome the deficiencies in the prior art, the utility model provides one kind and need not set by the large-scale auxiliary such as crane It is standby, facilitate the power transformer installation system of installation.
The utility model solves the technical scheme that its technical problem used:
A kind of power transformer installation system, including two vertical rods, crossbeam, plummer and two carrier bars;The crossbeam Two ends the upper ends of two vertical rods is arranged on by the first anchor ear respectively, be provided with hook portion, the hook on the crossbeam Extension is mounted with pulley in portion;Two carrier bars are separately fixed in two vertical rods by the second anchor ear, the carrier bar with The beam vertical, the carrier bar opens wide for top, groove type closed at both ends;The bottom of the plummer sets and can be embedded in Support block in the groove of the carrier bar;Being provided at both ends with of the carrier bar is provided with front end in nut, the nut and supported Hanging hole has been provided with screw rod in the support block, the plummer.
The side wall of the carrier bar, which is provided with screw, the screw, is provided with the spiral shell that front end is against in the support block Silk.
The beneficial effects of the utility model are:The utility model is provided with crossbeam, crossbeam in two vertical rods and is mounted with Pulley for lifting by crane transformer, after fixing plummer and transformer on ground, hanging hole has been fixed on by lifting rope In, by plummer and transformer integral lifting, after then carrier bar is fixed in vertical rod, by plummer and transformer integrally under Drop, makes carrier bar support plummer and transformer entirety, the position of plummer is then adjusted by screw rod, finally in carrier bar Groove in irrigate encapsulant, install simple, conveniently, in installation process need not by large scale equipments such as cranes, Construction period can effectively be shortened, construction cost is reduced.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the sectional view at A-A in Fig. 1;
Fig. 3 is the structural representation of carrier bar.
Embodiment
Referring to figs. 1 to Fig. 3, a kind of power transformer installation system, including two vertical rods 8, crossbeam 2, plummer 6 and two Carrier bar 9.The two ends of the crossbeam 2 are arranged on by the first anchor ear 1 on the upper end of two vertical rods 8, the crossbeam 2 respectively It is provided with hook portion 3, the hook portion 3 and is mounted with pulley 4, two carrier bars 9 is separately fixed at by the second anchor ear 7 In two vertical rods 8, the carrier bar 9 is vertical with the crossbeam 2, and the carrier bar 9 opens wide for top, groove closed at both ends Shape;The bottom of the plummer 6, which is set, can be embedded in the support block 11 in the groove of the carrier bar 9;The two ends of the carrier bar 9 It is provided with nut 12, the nut 12 and the screw rod 10 that front end is against in the support block 11 is installed;Set on the plummer 6 It has been equipped with hanging hole.The side wall of the carrier bar 9, which is provided with, to be provided with front end in screw 13, the screw 13 and is against the support Screw on block 11.
After fixing plummer and transformer on ground, lifting rope has been fixed in hanging hole, will by pulley Plummer and transformer integral lifting, the height of lifting are slightly above the height of installation, then carrier bar are fixed in vertical rod, so Afterwards by plummer and transformer entire lowering, support block 11 is fallen into the groove of carrier bar 9, carrier bar is supported plummer It is overall with transformer, the position of plummer is then adjusted and fixed by screw rod 10, makes carrier bar two ends uniform force, Ran Hou Load screw in screw 13 and screw, screw rod 10 fixes the two ends of support block 11, and screw is fixed on the both sides of support block, finally Encapsulant is irrigated in the groove of carrier bar(Such as cement, resin), after installation, lifting rope and pulley are taken down, is pacified Dress simply, conveniently, can need not effectively shorten construction period, reduction is applied in installation process by large scale equipments such as cranes Work cost.

Claims (2)

1. a kind of power transformer installation system, including two vertical rods(8), it is characterised in that it also includes crossbeam(2), plummer (6)With two carrier bars(9);The crossbeam(2)Two ends pass through the first anchor ear respectively(1)Installed in two vertical rods(8) Upper end, the crossbeam(2)On be provided with hook portion(3), the hook portion(3)On be mounted with pulley(4);Two carryings Beam(9)Pass through the second anchor ear(7)It is separately fixed at two vertical rods(8)On, the carrier bar(9)With the crossbeam(2)Vertically, institute State carrier bar(9)For top open wide, groove type closed at both ends;The plummer(6)Bottom set can be embedded in the carrying Beam(9)Groove in support block(11);The carrier bar(9)Be provided at both ends with nut(12), the nut(12)Interior peace The support block is against equipped with front end(11)On screw rod(10);The plummer(6)On be provided with hanging hole.
2. power transformer installation system according to claim 1, it is characterised in that the carrier bar(9)Side wall set There is screw(13), the screw(13)Front end is inside installed and is against the support block(11)On screw.
CN201621332187.6U 2016-12-07 2016-12-07 A kind of power transformer installation system Expired - Fee Related CN206494679U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621332187.6U CN206494679U (en) 2016-12-07 2016-12-07 A kind of power transformer installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621332187.6U CN206494679U (en) 2016-12-07 2016-12-07 A kind of power transformer installation system

Publications (1)

Publication Number Publication Date
CN206494679U true CN206494679U (en) 2017-09-15

Family

ID=59800187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621332187.6U Expired - Fee Related CN206494679U (en) 2016-12-07 2016-12-07 A kind of power transformer installation system

Country Status (1)

Country Link
CN (1) CN206494679U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111392643A (en) * 2020-04-17 2020-07-10 国网河南省电力公司焦作供电公司 Hydraulic lifting device and lifting method for distribution transformer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111392643A (en) * 2020-04-17 2020-07-10 国网河南省电力公司焦作供电公司 Hydraulic lifting device and lifting method for distribution transformer

Similar Documents

Publication Publication Date Title
CN207425529U (en) A kind of liftable power transformer installation rack
CN201215876Y (en) Assistant hanging rack for mounting top rack of electric pole
CN206494679U (en) A kind of power transformer installation system
CN202963967U (en) Hydraulic screw nut installing device for rudder horn
CN202220058U (en) Lifting tool for mechanical equipment
CN207010043U (en) A kind of JP cabinets inspection platform
CN106077518A (en) For wind power hub high-strength combination energy saver
CN203571610U (en) Multifunctional vertical rod for construction
CN207108299U (en) A kind of loop wheel machine
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN105257966A (en) Rack of power transmission and distribution equipment
CN207458703U (en) Shock-proof transformer stent and potential device
CN205791355U (en) A kind of cable support bracket easy to use
CN204910543U (en) Prevent high iron tower climbing device that weighs down
CN103138204A (en) Multifunctional installing rack used for replacing tension cross arm
CN204532376U (en) Split type lifting construction trolley
CN207330121U (en) A kind of crane hook device for building
CN203545501U (en) Auxiliary lifting device of inner crawl type tower crane in small space
CN206307932U (en) A kind of hitch in lifting device
CN203624932U (en) Portable indoor material lifter
CN205447177U (en) Equipment for power transmission and distribution rack
CN105633888A (en) Cross arm for transmission tower
CN221275082U (en) Tower crane stabilising arrangement
CN203639105U (en) Suspension type temporary hoisting operation platform
CN205104848U (en) Cable corner hangs coaster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170915

Termination date: 20211207

CF01 Termination of patent right due to non-payment of annual fee