CN206494679U - A kind of power transformer installation system - Google Patents
A kind of power transformer installation system Download PDFInfo
- Publication number
- CN206494679U CN206494679U CN201621332187.6U CN201621332187U CN206494679U CN 206494679 U CN206494679 U CN 206494679U CN 201621332187 U CN201621332187 U CN 201621332187U CN 206494679 U CN206494679 U CN 206494679U
- Authority
- CN
- China
- Prior art keywords
- plummer
- carrier bar
- transformer
- crossbeam
- vertical rods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 abstract description 5
- 239000008393 encapsulating agent Substances 0.000 abstract description 3
- 238000011900 installation process Methods 0.000 abstract description 3
- 102100023170 Nuclear receptor subfamily 1 group D member 1 Human genes 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a kind of power transformer installation system, including two vertical rods, crossbeam, plummer and two carrier bars;Crossbeam is arranged on the upper end of two vertical rods, and two carrier bars are separately fixed in two vertical rods by the second anchor ear, and the bottom of plummer is provided with hanging hole and support block;The two ends of carrier bar are threaded with screw rod, after plummer and transformer are fixed on ground, lifting rope has been fixed in hanging hole, by plummer and transformer integral lifting, then after carrier bar is fixed in vertical rod, by plummer and transformer entire lowering, carrier bar is set to support plummer and transformer entirety, then the position of plummer is adjusted by screw rod, encapsulant is finally irrigated in the groove of carrier bar, install simple, it is convenient, need not be by large scale equipments such as cranes in installation process, construction period can effectively be shortened, reduce construction cost.
Description
Technical field
The utility model is related to a kind of power equipment mounting platform, particularly a kind of double rod type mounting platform for transformer.
Background technology
The mounting means of double rod type transformer is in the prior art, first in double pole transformer carrying platforms, so
Transformer is installed on carrying platform afterwards, this mounting means needs the large-scale auxiliary installing device such as crane, on the one hand
Higher expense can be produced by purchasing or rent large-scale auxiliary installing device, on the other hand, be limited by installation site, crane
Tend not to reach some installation sites etc. large-scale auxiliary equipment, this makes troubles to the installation of transformer.
The content of the invention
In order to overcome the deficiencies in the prior art, the utility model provides one kind and need not set by the large-scale auxiliary such as crane
It is standby, facilitate the power transformer installation system of installation.
The utility model solves the technical scheme that its technical problem used:
A kind of power transformer installation system, including two vertical rods, crossbeam, plummer and two carrier bars;The crossbeam
Two ends the upper ends of two vertical rods is arranged on by the first anchor ear respectively, be provided with hook portion, the hook on the crossbeam
Extension is mounted with pulley in portion;Two carrier bars are separately fixed in two vertical rods by the second anchor ear, the carrier bar with
The beam vertical, the carrier bar opens wide for top, groove type closed at both ends;The bottom of the plummer sets and can be embedded in
Support block in the groove of the carrier bar;Being provided at both ends with of the carrier bar is provided with front end in nut, the nut and supported
Hanging hole has been provided with screw rod in the support block, the plummer.
The side wall of the carrier bar, which is provided with screw, the screw, is provided with the spiral shell that front end is against in the support block
Silk.
The beneficial effects of the utility model are:The utility model is provided with crossbeam, crossbeam in two vertical rods and is mounted with
Pulley for lifting by crane transformer, after fixing plummer and transformer on ground, hanging hole has been fixed on by lifting rope
In, by plummer and transformer integral lifting, after then carrier bar is fixed in vertical rod, by plummer and transformer integrally under
Drop, makes carrier bar support plummer and transformer entirety, the position of plummer is then adjusted by screw rod, finally in carrier bar
Groove in irrigate encapsulant, install simple, conveniently, in installation process need not by large scale equipments such as cranes,
Construction period can effectively be shortened, construction cost is reduced.
Brief description of the drawings
The utility model is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the sectional view at A-A in Fig. 1;
Fig. 3 is the structural representation of carrier bar.
Embodiment
Referring to figs. 1 to Fig. 3, a kind of power transformer installation system, including two vertical rods 8, crossbeam 2, plummer 6 and two
Carrier bar 9.The two ends of the crossbeam 2 are arranged on by the first anchor ear 1 on the upper end of two vertical rods 8, the crossbeam 2 respectively
It is provided with hook portion 3, the hook portion 3 and is mounted with pulley 4, two carrier bars 9 is separately fixed at by the second anchor ear 7
In two vertical rods 8, the carrier bar 9 is vertical with the crossbeam 2, and the carrier bar 9 opens wide for top, groove closed at both ends
Shape;The bottom of the plummer 6, which is set, can be embedded in the support block 11 in the groove of the carrier bar 9;The two ends of the carrier bar 9
It is provided with nut 12, the nut 12 and the screw rod 10 that front end is against in the support block 11 is installed;Set on the plummer 6
It has been equipped with hanging hole.The side wall of the carrier bar 9, which is provided with, to be provided with front end in screw 13, the screw 13 and is against the support
Screw on block 11.
After fixing plummer and transformer on ground, lifting rope has been fixed in hanging hole, will by pulley
Plummer and transformer integral lifting, the height of lifting are slightly above the height of installation, then carrier bar are fixed in vertical rod, so
Afterwards by plummer and transformer entire lowering, support block 11 is fallen into the groove of carrier bar 9, carrier bar is supported plummer
It is overall with transformer, the position of plummer is then adjusted and fixed by screw rod 10, makes carrier bar two ends uniform force, Ran Hou
Load screw in screw 13 and screw, screw rod 10 fixes the two ends of support block 11, and screw is fixed on the both sides of support block, finally
Encapsulant is irrigated in the groove of carrier bar(Such as cement, resin), after installation, lifting rope and pulley are taken down, is pacified
Dress simply, conveniently, can need not effectively shorten construction period, reduction is applied in installation process by large scale equipments such as cranes
Work cost.
Claims (2)
1. a kind of power transformer installation system, including two vertical rods(8), it is characterised in that it also includes crossbeam(2), plummer
(6)With two carrier bars(9);The crossbeam(2)Two ends pass through the first anchor ear respectively(1)Installed in two vertical rods(8)
Upper end, the crossbeam(2)On be provided with hook portion(3), the hook portion(3)On be mounted with pulley(4);Two carryings
Beam(9)Pass through the second anchor ear(7)It is separately fixed at two vertical rods(8)On, the carrier bar(9)With the crossbeam(2)Vertically, institute
State carrier bar(9)For top open wide, groove type closed at both ends;The plummer(6)Bottom set can be embedded in the carrying
Beam(9)Groove in support block(11);The carrier bar(9)Be provided at both ends with nut(12), the nut(12)Interior peace
The support block is against equipped with front end(11)On screw rod(10);The plummer(6)On be provided with hanging hole.
2. power transformer installation system according to claim 1, it is characterised in that the carrier bar(9)Side wall set
There is screw(13), the screw(13)Front end is inside installed and is against the support block(11)On screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621332187.6U CN206494679U (en) | 2016-12-07 | 2016-12-07 | A kind of power transformer installation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621332187.6U CN206494679U (en) | 2016-12-07 | 2016-12-07 | A kind of power transformer installation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206494679U true CN206494679U (en) | 2017-09-15 |
Family
ID=59800187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621332187.6U Expired - Fee Related CN206494679U (en) | 2016-12-07 | 2016-12-07 | A kind of power transformer installation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206494679U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111392643A (en) * | 2020-04-17 | 2020-07-10 | 国网河南省电力公司焦作供电公司 | Hydraulic lifting device and lifting method for distribution transformer |
-
2016
- 2016-12-07 CN CN201621332187.6U patent/CN206494679U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111392643A (en) * | 2020-04-17 | 2020-07-10 | 国网河南省电力公司焦作供电公司 | Hydraulic lifting device and lifting method for distribution transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207425529U (en) | A kind of liftable power transformer installation rack | |
CN201215876Y (en) | Assistant hanging rack for mounting top rack of electric pole | |
CN206494679U (en) | A kind of power transformer installation system | |
CN202963967U (en) | Hydraulic screw nut installing device for rudder horn | |
CN202220058U (en) | Lifting tool for mechanical equipment | |
CN207010043U (en) | A kind of JP cabinets inspection platform | |
CN106077518A (en) | For wind power hub high-strength combination energy saver | |
CN203571610U (en) | Multifunctional vertical rod for construction | |
CN207108299U (en) | A kind of loop wheel machine | |
CN105366559A (en) | Small hoisting machine fixed on channel steel framework | |
CN105257966A (en) | Rack of power transmission and distribution equipment | |
CN207458703U (en) | Shock-proof transformer stent and potential device | |
CN205791355U (en) | A kind of cable support bracket easy to use | |
CN204910543U (en) | Prevent high iron tower climbing device that weighs down | |
CN103138204A (en) | Multifunctional installing rack used for replacing tension cross arm | |
CN204532376U (en) | Split type lifting construction trolley | |
CN207330121U (en) | A kind of crane hook device for building | |
CN203545501U (en) | Auxiliary lifting device of inner crawl type tower crane in small space | |
CN206307932U (en) | A kind of hitch in lifting device | |
CN203624932U (en) | Portable indoor material lifter | |
CN205447177U (en) | Equipment for power transmission and distribution rack | |
CN105633888A (en) | Cross arm for transmission tower | |
CN221275082U (en) | Tower crane stabilising arrangement | |
CN203639105U (en) | Suspension type temporary hoisting operation platform | |
CN205104848U (en) | Cable corner hangs coaster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170915 Termination date: 20211207 |
|
CF01 | Termination of patent right due to non-payment of annual fee |