CN212670466U - Steel hoop supporting structure for assembled pile foundation wharf - Google Patents

Steel hoop supporting structure for assembled pile foundation wharf Download PDF

Info

Publication number
CN212670466U
CN212670466U CN202021045682.5U CN202021045682U CN212670466U CN 212670466 U CN212670466 U CN 212670466U CN 202021045682 U CN202021045682 U CN 202021045682U CN 212670466 U CN212670466 U CN 212670466U
Authority
CN
China
Prior art keywords
steel
pile
steel hoop
anchor ear
wharf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021045682.5U
Other languages
Chinese (zh)
Inventor
顾晓彬
王哲
姜灵程
李凯
韦奋祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Original Assignee
No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd, CCCC Third Harbor Engineering Co Ltd filed Critical No3 Engineering Co Ltd Of Cccc Third Harbor Engineering Co ltd
Priority to CN202021045682.5U priority Critical patent/CN212670466U/en
Application granted granted Critical
Publication of CN212670466U publication Critical patent/CN212670466U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a steel hoop supporting structure for an assembled pile foundation wharf, which comprises a stay bar connecting plate, a stiffening plate, a sealing bottom plate, a high-strength bolt and a steel hoop body, wherein the steel hoop body is used as an integral die and connected with pile heads of pile foundations, the steel hoop body is connected through the high-strength bolt, the stiffening plate is longitudinally and uniformly distributed on the side surface of the steel hoop body, the stay bar connecting plate is transversely arranged on the side surface of the steel hoop body, and the sealing bottom plate is arranged at the top of the steel hoop. The invention is improved on the basis of the common steel anchor ear, has reasonable structure, light and handy components and strong practicability, integrates the functions of temporary support and pile stabilization, and reduces the workload of cast-in-place; meanwhile, the novel steel hoop is applied to the fabricated pile foundation wharf, so that the inherent defects in the traditional high-pile wharf construction process can be overcome, the integrated installation of a bottom template, a bearing support structure and a pile stabilizing structure is realized, the manual use in the field is reduced, and the construction efficiency is improved.

Description

Steel hoop supporting structure for assembled pile foundation wharf
Technical Field
The invention belongs to the field of water transport engineering, and particularly relates to a steel hoop supporting structure for an assembled pile foundation wharf and a construction method thereof, which can give consideration to both temporary supporting and pile stabilizing functions.
Background
At present, the construction and construction of the domestic hydraulic wharf are still labor-intensive industrial models, taking the construction of the traditional high-pile wharf as an example, a large amount of labor force needs to be invested on site from pile sinking, cast-in-place beams to component installation and the like, and meanwhile, large-scale water ship equipment needs to be used, so the construction and construction of the traditional hydraulic wharf face the following three serious problems:
1) the field workload of the traditional wharf is heavy, the investment of labor force and large-scale equipment is more, and the field construction difficulty is very high due to severe weather and unfavorable tide levels.
2) The labor shortage and the aging trend of the age structure of workers are realized, and the contradiction between the high standard and the high quality of construction and the shortage of the number and the quality of local professional workers is very prominent.
3) The informatization development of construction and construction is lagged, the technological progress cannot effectively improve the productivity level of enterprises, and the profit margin of the enterprises is decreasing year by year.
If the existing construction and construction process is not reformed, the development of future port construction business of China is bound to be restricted, the national guidance suggestion is to vigorously research and develop the assembly type pile foundation wharf, the assembly rate of the components is up to more than 85 percent and the volume assembly rate is not less than 50 percent by developing the assembly type pile foundation wharf, the field construction workload can be greatly reduced, the construction and construction efficiency of the wharf is improved, and the adverse effect of tidal water and weather on the field construction is reduced, the construction characteristics of the upper structure of the assembly type pile foundation are that the lightweight component installation and the node pouring are carried out, compared with the traditional high pile wharf, the construction of structures such as a large amount of cast-in-place beams or pile caps and the like is saved, but the first layer component installation and the node pouring of the upper structure of the wharf still need to be provided with a temporary support structure, and simultaneously, the sunk pile foundations, therefore, the installation of the temporary support structure and the pile stabilizing structure of the fabricated pile foundation wharf is the first step of constructing the superstructure and is also a key ring for the research of construction technology.
The steel anchor ear used in the traditional high-pile wharf only has a supporting function, and can meet the requirements of component installation, concrete pouring and pile stabilization only by matching with the use of profile steel, wood grids and a bottom template, wherein the pile stabilization is realized by erecting paired bearing profile steel on the steel anchor ear and clamping and connecting the pile foundations of a bent frame into a whole so as to ensure that the pile foundations are kept stable under the disturbance of water flow and waves; because the bottom template, the wood grating, the bearing section steel, the steel hoop and other support systems are mutually independent components, the traditional process can not realize the integrated installation of the components.
Disclosure of Invention
In order to solve the problems, the invention discloses a steel hoop supporting structure for an assembly type pile foundation wharf and a construction method thereof.
In order to achieve the purpose, the technical scheme of the invention is as follows:
the utility model provides a steel staple bolt bearing structure for assembled pile foundation pier, includes vaulting pole connecting plate, stiffener, back cover plate, high strength bolt, steel staple bolt body, and the steel staple bolt body is connected as the pile head of integral mould with the pile foundation, and the steel staple bolt body passes through high strength bolt and connects, the longitudinal evenly distributed of stiffener is in steel staple bolt body side, the vaulting pole connecting plate transversely sets up in steel staple bolt body side, the back cover plate sets up at steel staple bolt body top.
Further, the vaulting pole connecting plate is circular steel sheet, and the steel sheet sets up in the high position border of steel staple bolt body 1/3 and arranges, and the steel sheet round sets up the bolt hole, and the steel sheet is used for connecting telescopic link.
Furthermore, the stiffening plates, namely the rib plates, are rotationally and symmetrically distributed around the steel anchor ear at an angle of 30 degrees and are welded with the steel anchor ear, so that the self supporting rigidity of the steel anchor ear is improved, and the effective supporting area is enlarged.
Furthermore, the sealing bottom plate is welded on the top of the steel hoop body for a circle and is welded with the stiffening plate to be used as the support of the adjustable side template arranged on the sealing bottom plate.
The invention relates to a construction method of a steel hoop supporting structure for an assembly type pile foundation wharf, which comprises the following steps:
(1) mounting a steel hoop supporting structure on the finished wharf pile foundation, connecting the steel hoop bodies through steel telescopic connecting rods (bolt holes of a strut connecting plate are used for connecting the telescopic connecting rods), connecting the pile foundation into a stable whole, and forming a reliable supporting surface on the top of the pile foundation by a sealing bottom plate;
(2) sequentially mounting a prefabricated node component and a prefabricated thin-wall superposed beam on the supporting surface;
(3) carrying out steel bar construction on the cast-in-place part of the node steel bars and the thin-wall superposed beams;
(4) and (3) carrying out node concrete pouring and concrete pouring of the cast-in-place part of the thin-wall superposed beam to form a permanent structure system, and then dismantling the steel hoop supporting structure and the telescopic steel connecting rod.
Furthermore, each steel staple bolt body is connected to steel telescopic link, and its structural style is the steel pipe, and steel telescopic link's both ends set up high-strength screw, and the inboard length adjusting locking ware (0 ~60cm adjustment range) of interior screw mouth that connects of high-strength screw can effectively adapt to the condition of stake off normal.
The invention has the beneficial effects that:
the pier pile foundation integrated supporting structure realizes the integration of the bottom template and the supporting structure by the sealing bottom plate and the welded stiffening plate, and an effective supporting surface can be formed after the pier pile foundation is installed after construction, so that the pier pile foundation integrated supporting structure can be used as the bottom template for component installation and node concrete pouring; simultaneously, through the installation of supporting scalable steel connecting rod, interconnect between the pile foundation has ensured that the pile foundation is in relative stable state before not constructing the superstructure, has solved the problem of steady stake after the pile sinking construction, and one section length scalable regulation of connecting rod can effectively adapt to the circumstances of stake off normal in addition.
As long as in the construction of the fabricated wharf, no matter the pile sinking process is the pile sinking process of the piling ship on water or the pile sinking process of the piling ship propelled on land, the steel hoop supporting structure and the steel telescopic connecting rod can be used for a pile stabilizing structure system, and the installation efficiency of the pile stabilizing structure system can be greatly improved.
Drawings
Fig. 1 is a front view of the steel hoop support structure according to the present invention.
Fig. 2 is a top view of the steel hoop support structure according to the present invention.
FIG. 3 is a schematic view of the steel telescopic connecting rod of the present invention.
FIG. 4 is a schematic view of a first step of the construction method of the present invention.
FIG. 5 is a schematic diagram of a second step of the construction method according to the present invention.
FIG. 6 is a third schematic view of the construction method of the present invention.
FIG. 7 is a diagram illustrating a fourth step of the construction method according to the present invention.
List of reference numerals:
1: a stay bar connecting plate; 2: a high-strength bolt; 3: a stiffening plate; 4: sealing the bottom plate; 5: a steel hoop body; 6: the length of the telescopic connecting rod is adjusted to form a locking device; 7: telescopic connecting rod, 8: bolt hole, 9: lifting hole, 10: pile foundation.
Detailed Description
The present invention will be further illustrated with reference to the accompanying drawings and specific embodiments, which are to be understood as merely illustrative of the invention and not as limiting the scope of the invention. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in the figures, the steel hoop supporting structure for the assembled pile foundation wharf comprises a stay bar connecting plate 1, a high-strength bolt 2, a stiffening plate 3, a sealing bottom plate 4 and a steel hoop body 5, wherein the stay bar connecting plate 1 is connected with the stiffening plate 3 in a welding mode; the stiffening plate 3 is welded with the sealing bottom plate 4; the steel anchor ear 5 is arranged on the pile head of the pile sinking, and the steel anchor ear bodies 5 are mechanically connected with the telescopic connecting rod 7 through the high-strength bolt 2.
The stay bar connecting plate 1 is a circular steel plate, the steel plate is arranged on the periphery of the height position of the steel hoop body 1/3, and a bolt hole 8 is formed in one circle of the steel plate.
The stiffening plates 3, namely the ribbed plates, are rotationally and symmetrically distributed around the steel hoop body 5 at an angle of 30 degrees and are welded with the side face of the steel hoop body 5.
The sealing bottom plate 4 is welded on the top of the steel hoop body 5 for a circle and is fixedly connected with the stiffening plate 3.
During construction, if the light stable pile structure is constructed on water, a small crane ship can be adopted to match with a manual installation process. If the whole land propulsion pile sinking process is adopted, the platform can be used for hanging a hanging basket to install a pile stabilizing hoop and a support rod.
The specific construction method comprises the following steps:
1. installing a novel steel anchor ear and a telescopic steel connecting rod 7 on the driven wharf pile foundation 10, connecting the pile foundations into a stable whole, and forming a reliable supporting surface on the top of the pile foundation, as shown in fig. 4;
2. sequentially installing prefabricated node components and prefabricated thin-wall superposed beams on the supporting surface, as shown in fig. 5 and 6;
3. carrying out steel bar construction on the cast-in-place part of the node steel bars and the thin-wall superposed beams;
4. and (3) carrying out node concrete pouring and concrete pouring of the cast-in-place part of the thin-wall superposed beam to form a permanent structure system, and then removing the novel steel hoop and the telescopic steel connecting rod 7, as shown in figure 7.
The invention is improved on the basis of the common steel anchor ear, and has the functions of temporary support and pile stabilization, wherein
1. In order to realize the temporary supporting function of the novel steel hoop, the steel hoop is improved on the basis of a common steel hoop, and the vertical triangular stiffening plates are added on the whole body of the steel hoop, and the steel sealing bottom plates are added on the periphery of the top of the steel hoop and are welded with the stiffening plates, so that the rigidity of a supporting system of the steel hoop is greatly enhanced, a supporting surface with a considerable size is formed, and the requirements of mounting and supporting prefabricated parts and the requirements of pouring node concrete as a bottom template can be met. Compared with the conventional steel hoop for erecting the temporary supporting structure, the process of erecting supporting section steel, laying wood grids and wood bottom dies is omitted, the problem of construction of the temporary supporting structure of the fabricated pile foundation wharf is solved, the conventional process is improved, and the construction efficiency is improved.
2. In order to realize the pile stabilizing function of the novel steel anchor ear, the steel anchor ear is welded and connected with an annular steel plate additionally arranged on the whole body of the steel anchor ear, the annular steel plate is provided with bolt holes for connecting steel telescopic connecting rods, the steel connecting rods are of steel tube structures, the telescopic ends are of threaded telescopic structures so as to adjust the telescopic length of the steel connecting rods to adapt to the connection requirement, and the locking device is arranged for fixing the adjusted length. Compare traditional high pile pier steady stake measure, the tradition technology is that set up mated shaped steel on ordinary steel staple bolt, and the pile foundation that will become the framed bent through shaped steel clip pile links into whole and realizes steady stake, and the material that this kind of method used is heavy, need electric welding operation, the efficiency of construction is low, and the construction is influenced by water level easily, changes to use novel steel staple bolt and supporting steel connecting rod after, the lightweight of material realization, and the installation adopts the bolt installation to improve the efficiency of construction greatly.
The technical means disclosed in the invention scheme are not limited to the technical means disclosed in the above embodiments, but also include the technical scheme formed by any combination of the above technical features.

Claims (4)

1. The utility model provides a steel staple bolt bearing structure for assembled pile foundation pier which characterized in that: the pile head of pile foundation is connected with the steel anchor ear body as an integral die, the steel anchor ear body is connected with the high-strength bolt, the reinforcing plate is longitudinally and uniformly distributed on the side face of the steel anchor ear body, the stay bar connecting plate is transversely arranged on the side face of the steel anchor ear body, and the sealing bottom plate is arranged at the top of the steel anchor ear body.
2. The steel hoop support structure for the fabricated pile-based wharf of claim 1, wherein: the vaulting pole connecting plate is circular steel sheet, and the steel sheet sets up in the high position border of steel staple bolt body 1/3 and arranges, and the steel sheet round sets up the bolt hole.
3. The steel hoop support structure for the fabricated pile-based wharf of claim 1, wherein: the stiffening plates, namely the rib plates, are rotationally and symmetrically distributed on the whole body of the steel anchor ear body at an angle of 30 degrees and are welded with the side face of the steel anchor ear body.
4. The steel hoop support structure for the fabricated pile-based wharf of claim 1, wherein: and the sealing bottom plate is welded on the top of the steel hoop body for a circle and is fixedly connected with the stiffening plate.
CN202021045682.5U 2020-06-09 2020-06-09 Steel hoop supporting structure for assembled pile foundation wharf Active CN212670466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021045682.5U CN212670466U (en) 2020-06-09 2020-06-09 Steel hoop supporting structure for assembled pile foundation wharf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021045682.5U CN212670466U (en) 2020-06-09 2020-06-09 Steel hoop supporting structure for assembled pile foundation wharf

Publications (1)

Publication Number Publication Date
CN212670466U true CN212670466U (en) 2021-03-09

Family

ID=74822131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021045682.5U Active CN212670466U (en) 2020-06-09 2020-06-09 Steel hoop supporting structure for assembled pile foundation wharf

Country Status (1)

Country Link
CN (1) CN212670466U (en)

Similar Documents

Publication Publication Date Title
CN101824800B (en) Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam
CN109853353A (en) A kind of spacial special-shaped arch bridge and its construction method
CN112177036A (en) Height-adjustable modular prestressed fan foundation and construction method thereof
CN205653801U (en) Prefabricated double row pile and stagnant water curtain integration underground structure
CN207714108U (en) A kind of support system of the more arcading arched aqueducts of large span or bridge
CN201648978U (en) Tied arch support of bridge location cast-in-situ prestressed concrete continuous beam
CN212670466U (en) Steel hoop supporting structure for assembled pile foundation wharf
CN111560916A (en) Steel hoop supporting structure for assembly type pile foundation wharf and construction method of steel hoop supporting structure
CN215518380U (en) Bracket Bailey type support for construction of high pier cast-in-place beam in mountainous area
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN112127282B (en) Main pier steel structure of super bridge
CN211200264U (en) Sliding type cast-in-situ deep arc type wave wall formwork
CN210563435U (en) Slope supporting device for top rising of inclined heavy-load steel net rack
CN210766850U (en) Ring cylinder reinforced concrete combined foundation structure
CN207714150U (en) Assemble holder in adhesion type high-altitude
CN206736742U (en) Inter-tie and pier stud global formation falsework
CN201095721Y (en) Soft soil foundation porous double suspension arms arched bridge structure
CN220952970U (en) Suspension support system for concrete box sleeve construction installation
CN213625681U (en) Height-adjustable's modularization prestressing force fan basis
CN214459662U (en) A construction work platform for double column pier
CN218952167U (en) Civil engineering pile body reinforcing apparatus
CN115288149B (en) Auxiliary ring frame under assembled support system and construction method thereof
CN213806724U (en) Beam enlarging and reinforcing device for reconstruction engineering
CN217781737U (en) Single-column high-pier capping beam construction support
CN211007636U (en) Cast-in-place reinforced concrete pool top plate formwork system

Legal Events