CN205653801U - Prefabricated double row pile and stagnant water curtain integration underground structure - Google Patents
Prefabricated double row pile and stagnant water curtain integration underground structure Download PDFInfo
- Publication number
- CN205653801U CN205653801U CN201620406393.0U CN201620406393U CN205653801U CN 205653801 U CN205653801 U CN 205653801U CN 201620406393 U CN201620406393 U CN 201620406393U CN 205653801 U CN205653801 U CN 205653801U
- Authority
- CN
- China
- Prior art keywords
- pile
- truss
- double
- steel beam
- concrete tubular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 230000010354 integration Effects 0.000 title abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title abstract 3
- 239000004567 concrete Substances 0.000 claims abstract description 64
- 238000010276 construction Methods 0.000 claims abstract description 30
- 239000004568 cement Substances 0.000 claims abstract description 18
- 238000000034 method Methods 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 68
- 239000010959 steel Substances 0.000 claims description 68
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 8
- 125000006850 spacer group Chemical group 0.000 claims description 7
- 239000011148 porous material Substances 0.000 claims description 5
- 239000011513 prestressed concrete Substances 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 230000007246 mechanism Effects 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 6
- 238000009412 basement excavation Methods 0.000 abstract description 3
- 238000003912 environmental pollution Methods 0.000 abstract description 3
- 230000006872 improvement Effects 0.000 abstract description 2
- 239000002689 soil Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 238000012407 engineering method Methods 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- 230000007812 deficiency Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 210000005069 ears Anatomy 0.000 description 1
- 238000002513 implantation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a prefabricated double row pile and stagnant water curtain integration underground structure, it includes double row pile, steelframe roof beam, guan liang, cement mixing method, it is the unit that double row pile is the concrete pipe pile of two piece former, back intervals setting to this unit forms preceding, two campsheds of back, the steelframe roof beam of fixed connection detachable between two concrete pipe pile's of each unit the top along the foundation ditch limit align to grid of portion, the guan liang of fixed connection detachable between double row pile's the adjacent steelframe roof beam, between double row pile's the front -seat concrete pipe pile to set up cement mixing method before reaching and between the back row, form the stagnant water curtain promptly. The utility model discloses have better economic nature, left out interior support and arranged, make things convenient for the foundation ditch excavation, steelframe roof beam, guan liang are the prefabricationization structure, to job site no environmental pollution problem, but and the equal recycle of guanliang, rigid -frame beam, material saving. Be fit for using as the underground structure of construction, or the improvement of homogeneous structure.
Description
Technical field
This utility model relates to the realm of building construction, is a kind of prefabricated double-row pile foundation pit supporting construction integrated with water-stop curtain.
Background technology
The type of foundation pit supporting construction system is more, is respectively arranged with its scope of application.In terms of version, more employing campshed (wall)+inner support system (or outer anchor pole) in soft clay area.Wherein, what campshed was conventional is cast-in-situ bored pile, and inner support system mostly is monolithic reinforced concrete structure.Environment all can be caused large effect in work progress kind by these structures, and raw materials consumption is more, especially inner support system, in succession to remove and to clear up with construction progress, the series of processes such as the building waste of increase and cleaning.The gear soil then grown up and the shaped steel cement diaphragm wall (SMW engineering method) of water-stop curtain integration, canal formula cutting cement diaphragm wall (TRD engineering method) and derivative implantation prefabricated reinforced concrete I shape fender post wall technology (SCPW engineering method) etc. are all by inserting H profile steel in three axle cement mixing piles (for sealing), or the form of prefabricated reinforced concrete h pile reaches to keep off soil function.Due to by cement mixing pile machine operation, the soil disturbance in the range of stake footpath, so the concrete-pile inserting H profile steel or i shaped steel is just easier to, soil compaction phenomenon is the most weak, pile saving of labor saves material, wherein the most recyclable recycling of H profile steel, has certain economy.But these versions the most also need inner support system to support the use, and, although H profile steel can recycle and reuse, but when soil cement intensity is higher, Shaped steel recovery difficulty increases, and cost recovery also increases;In view of shaped steel one-time investment is relatively big, utilization rate is the highest, and existing market not yet forms charter business, so its economy inconspicuous.And prefabricated i shaped steel reinforced concrete does not reclaims, but production cost is much greater relative to prestressed concrete pipe pile, there is also economy problems.
And traditional Double-row-piles Structure form, owing to rigidity is big, it is little, as long as being with enough places outside foundation ditch to deform, during for deep basal pit, large area excavation, using this support form the most reasonable, but be the most often still to use inner support system, economy is not so good as campshed+inner support;And the way of pile is still based on cast-in-situ bored pile, so there is also economy and to deficiencies such as the adverse effects of environment.To this end, need existing foundation pit supporting construction and construction method are improved.
Summary of the invention
For overcoming above-mentioned deficiency, the purpose of this utility model is to provide a kind of prefabricated double-row pile foundation pit supporting construction integrated with water-stop curtain to this area, make it solve existing foundation pit supporting construction input cost relatively big, easily cause environmental pollution, and reclaim the technical problem of inconvenience.Its objective is to be achieved through the following technical solutions.
A kind of prefabricated double-row pile foundation pit supporting construction integrated with water-stop curtain, this foundation pit supporting construction includes double-row pile, truss-steel beam, Guan Liang, cement mixing method, wherein double-row pile refers to forward and backward two piles as unit, with this unit along forward and backward two campsheds of the evenly distributed formation of foundation ditch edge, and front campshed is positioned at the border of foundation ditch scope, rear campshed is positioned at the outside of foundation ditch scope;It is characterized in that the unit of described double-row pile refers to forward and backward two spaced concrete tubular piles, the described truss-steel beam of fixing connection between the top of two concrete tubular piles of each unit, and be connected for dismountable type between truss-steel beam with concrete tubular pile;The adjacent steel of described double-row pile is fixing between setting a roof beam in place connects described Guan Liang, and is connected for dismountable type between Guan Liang with truss-steel beam;Between the front-seat concrete tubular pile of described double-row pile, and between front-seat concrete tubular pile and heel row concrete tubular pile, described cement mixing method is set, i.e. forms water-stop curtain.Said structure is compared with prior art, major advantage is: double-row pile have employed concrete tubular pile, compare the solid concrete double-row pile that existing employing is precoated, or directly use prefabricated drum steel or insert the foundation pit supporting construction that the concrete-pile of H profile steel is formed, cost is relatively low, and truss-steel beam, the Guan Liang used is demountable structure design, thus detachable recovery after having constructed, recycle, it is substantially reduced construction cost, and dismounting assembles more convenient, reduce labor strength and difficulty of construction.
It is connected for hood type between described truss-steel beam and concrete tubular pile, i.e. truss-steel beam is formed by bolt locking by two parts, and be provided with inside truss-steel beam and the cranse of two concrete tubular pile corresponding anchor ear lockings in described unit, cranse is locked with two parts of described truss-steel beam and is locked with described concrete tubular pile.Or, it being provided with inside truss-steel beam and the cranse of two concrete tubular pile corresponding anchor ear lockings in described unit, cranse is provided with the bolt of regulation cranse coupling mechanism force.Hood type structure connects more reliable, and installing/dismounting is more convenient.
Described Guan Liang is truss structure, is bolted between Guan Liang and truss-steel beam.The assembly and disassembly of Guan Liang, truss-steel beam is facilitated by this structure.
Between each concrete tubular pile of front campshed of described double-row pile, and all it is independently arranged the Guan Liang fixing with described truss-steel beam between the rear each concrete tubular pile of campshed.This structure is conducive to improving the stability in the large of pattern foundation pit supporting structure.
Described concrete tubular pile is pretensioned prestressed concrete pipe pile, and concrete tubular pile pore in the pre-buried spacer bar in position flushed bottom described truss-steel beam, spacer bar upper support concrete bottom supporting plate.By this structure, the convenient pore to concrete tubular pile supplements and pours, to improve concrete tubular pile support strength and shear resistant capacity.
Between the two ends of the truss-steel beam that described double-row pile each unit is corresponding by presstressed reinforcing steel, anchorage, steering block formed prestressing force, the two ends of truss-steel beam arrange between front campshed and rear campshed in referring to double-row pile to two ends;Prestressing force is formed by presstressed reinforcing steel, anchorage, steering gear in described double-row pile between same row all truss-steel beams upwards.By Shi Hanzhang, and adjust prestressing force, make foundation pit supporting construction entirety more stable, firm.
This utility model has preferable economy, eliminates inner support and arranges, facilitates excavation of foundation pit;Truss-steel beam, Guan Liang are prefabricated structure, to job site non-environmental-pollution problem, and Guan Liang, the equal recoverable of rigit-frame beam, save material.Meanwhile, external prestressing adjustable, make foundation pit supporting construction deformation, stress more coordinate, it is safer, reasonable to use;The foundation pit supporting construction being suitable as construction uses, or the improvement of homogeneous structure.
Accompanying drawing explanation
Fig. 1 is the top surface structure schematic diagram of this utility model Double-row-piles Structure.
Fig. 2 is the Facad structure schematic diagram of this utility model double-row pile.
Fig. 3 is the top surface structure schematic diagram of this utility model double-row pile arrangement
Fig. 4 is the arrangement architecture schematic diagram that this utility model forms water-stop curtain.
Fig. 5 be this utility model concrete tubular pile management and control in casting concrete structural representation.
Sequence number and entitled in figure: 1, concrete tubular pile, 2, truss-steel beam, 201, cranse, 3, Guan Liang, 4, presstressed reinforcing steel, 5, cement mixing method, 6, spacer bar, 7, concrete bottom supporting plate.
Detailed description of the invention
In conjunction with accompanying drawing, this utility model is further described.
As Figure 1-4, this prefabricated double-row pile foundation pit supporting construction integrated with water-stop curtain includes double-row pile, truss-steel beam 2, hat beam 3, cement mixing method 5, wherein double-row pile uses pretensioned prestressed concrete pipe pile 1, with forward and backward two spaced concrete tubular piles as unit, with this unit along the forward and backward two row's concrete tubular piles of the evenly distributed formation of foundation ditch edge, and front row concrete tubular pile is positioned at the border of foundation ditch scope, heel row concrete tubular pile is positioned at the outside of foundation ditch scope.Fixing connection truss-steel beam between the top of two concrete tubular piles of double-row pile each unit, and be connected for hood type between truss-steel beam with concrete tubular pile, i.e. truss-steel beam is formed by bolt locking by two parts, and be provided with inside truss-steel beam and the cranse 201 of two concrete tubular pile corresponding anchor ear lockings in unit, cranse is locked with two parts of truss-steel beam and is locked with concrete tubular pile.The adjacent steel of double-row pile fixes connection Guan Liang, Guan Liang between setting a roof beam in place be to cross bolt between truss structure, and Guan Liang and truss-steel beam to fix, and forms dismountable type and connects.In order to improve the overall structural stability of pattern foundation pit supporting structure and reliability, between the two ends of the truss-steel beam that double-row pile each unit is corresponding by presstressed reinforcing steel 4, anchorage, steering block formed prestressing force, the two ends of truss-steel beam arrange between front campshed and rear campshed in referring to double-row pile to two ends;Prestressing force is formed by presstressed reinforcing steel, anchorage, steering gear in double-row pile between same row all truss-steel beams upwards.Between the front-seat concrete tubular pile of double-row pile, and between front-seat concrete tubular pile and heel row concrete tubular pile, engaging type triaxial cement mixing pile is set, i.e. forms water-stop curtain.
Above-mentioned truss-steel beam and the hood type of concrete tubular pile connect and also may be designed as: truss-steel beam 2 is internal to be provided with and the cranse 201 of two concrete tubular pile 1 corresponding anchor ears lockings in double-row pile unit, and cranse is provided with the bolt regulating cranse coupling mechanism force.
Spacing between and heel row front-seat in view of double-row pile be according to actual foundation ditch scope depending on, when spacing is bigger, between each concrete tubular pile of front campshed of double-row pile, all it is independently arranged between each concrete tubular pile of campshed 1 after and and the fixing hat beam 3 of truss-steel beam 2, it is ensured that the structural stability that Guan Liang connects.
The most broken with truss-steel beam 2 junction in order to ensure concrete tubular pile 1, as it is shown in figure 5, spacer bar 6 pre-buried with the position flushed bottom truss-steel beam, spacer bar upper support concrete bottom supporting plate 7 in the pore of concrete tubular pile.So, just concrete can be injected in the pore of concrete tubular pile according to bonding strength needs, to improve overall intensity and shear resistant capacity.
Construction method of the present utility model is: according to the scope of pattern foundation pit supporting structure, the stake position of double-row pile and the cement mixing method 5 constituting water-stop curtain is divided and drives piles, cement earth material is poured into after having driven piles, before treating the solidification of cement earth material, prefabricated concrete tubular pile 1 is inserted in corresponding double-row pile stake position, fixing connection truss-steel beam 2 between two concrete tubular piles of each unit in double-row pile, between each truss-steel beam, fixing connection is preced with beam 3, and between the two ends of the truss-steel beam of double-row pile each unit, and in double-row pile between same row all truss-steel beams upwards by presstressed reinforcing steel 4, anchorage, steering gear forms prestressing force, after cement earth material solidifies, i.e. complete the construction of this foundation pit supporting construction.
Above content is intended to illustrate technological means of the present utility model, and unrestricted technical scope of the present utility model.Those skilled in the art combine existing common knowledge and do this utility model conspicuously improved, within also falling into this utility model scope of the claims.
Claims (7)
1. a prefabricated double-row pile foundation pit supporting construction integrated with water-stop curtain, this foundation pit supporting construction includes double-row pile, truss-steel beam (2), Guan Liang (3), cement mixing method (5), wherein double-row pile refers to forward and backward two piles as unit, with this unit along forward and backward two campsheds of the evenly distributed formation of foundation ditch edge, and front campshed is positioned at the border of foundation ditch scope, rear campshed is positioned at the outside of foundation ditch scope;It is characterized in that the unit of described double-row pile refers to forward and backward two spaced concrete tubular piles (1), the described truss-steel beam of fixing connection (2) between the top of two concrete tubular piles of each unit, and be connected for dismountable type between truss-steel beam with concrete tubular pile;The adjacent steel of described double-row pile is fixing between setting a roof beam in place connects described Guan Liang (3), and is connected for dismountable type between Guan Liang with truss-steel beam;Between the front-seat concrete tubular pile of described double-row pile, and between front-seat concrete tubular pile and heel row concrete tubular pile, described cement mixing method (5) is set, i.e. forms water-stop curtain.
Prefabricated double-row pile the most according to claim 1 foundation pit supporting construction integrated with water-stop curtain, it is characterized in that being connected for hood type between described truss-steel beam (2) with concrete tubular pile (1), i.e. truss-steel beam is formed by bolt locking by two parts, and be provided with inside truss-steel beam and the cranse (201) of two concrete tubular pile corresponding anchor ear lockings in described unit, cranse is locked with two parts of described truss-steel beam and is locked with described concrete tubular pile.
Prefabricated double-row pile the most according to claim 1 foundation pit supporting construction integrated with water-stop curtain, it is characterized in that being connected for hood type between described truss-steel beam (2) with concrete tubular pile (1), i.e. being provided with inside truss-steel beam and the cranse (201) of two concrete tubular pile corresponding anchor ear lockings in described unit, cranse is provided with the bolt of regulation cranse coupling mechanism force.
Prefabricated double-row pile the most according to claim 1 foundation pit supporting construction integrated with water-stop curtain, it is characterised in that described Guan Liang (3) is truss structure, is bolted between Guan Liang and truss-steel beam (2).
5. according to the foundation pit supporting construction integrated with water-stop curtain of the prefabricated double-row pile described in claim 1 or 4, it is characterized in that between each concrete tubular pile of the front campshed (1) of described double-row pile, and be all independently arranged the Guan Liang (3) fixing with described truss-steel beam (2) between the rear each concrete tubular pile of campshed.
Prefabricated double-row pile the most according to claim 1 foundation pit supporting construction integrated with water-stop curtain, it is characterized in that described concrete tubular pile (1) is pretensioned prestressed concrete pipe pile, and the pre-buried spacer bar in the position (6) flushed with described truss-steel beam (2) bottom in the pore of concrete tubular pile, spacer bar upper support concrete bottom supporting plate (7).
Prefabricated double-row pile the most according to claim 1 foundation pit supporting construction integrated with water-stop curtain, it is characterized in that forming prestressing force by presstressed reinforcing steel (4), anchorage, steering block between the two ends of truss-steel beam (2) corresponding to described double-row pile each unit, the two ends of truss-steel beam arrange between front campshed and rear campshed in referring to double-row pile to two ends;Prestressing force is formed by presstressed reinforcing steel, anchorage, steering gear in described double-row pile between same row all truss-steel beams upwards.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620406393.0U CN205653801U (en) | 2016-05-05 | 2016-05-05 | Prefabricated double row pile and stagnant water curtain integration underground structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620406393.0U CN205653801U (en) | 2016-05-05 | 2016-05-05 | Prefabricated double row pile and stagnant water curtain integration underground structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205653801U true CN205653801U (en) | 2016-10-19 |
Family
ID=57401641
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620406393.0U Withdrawn - After Issue CN205653801U (en) | 2016-05-05 | 2016-05-05 | Prefabricated double row pile and stagnant water curtain integration underground structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205653801U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105804093A (en) * | 2016-05-05 | 2016-07-27 | 宁波建工工程集团有限公司 | Prefabricated double-row pile and water-stop curtain integrated foundation pit supporting structure and construction method thereof |
| CN109403347A (en) * | 2018-11-26 | 2019-03-01 | 中建局集团建设发展有限公司 | A kind of frame-type double-row pile cement soil wall foundation pit enclosure structure and its construction method |
| CN109403346A (en) * | 2018-11-26 | 2019-03-01 | 中建局集团建设发展有限公司 | A kind of frame-type double-row pile foundation pit enclosure structure and its construction method |
| CN114016514A (en) * | 2021-06-18 | 2022-02-08 | 中国建筑第二工程局有限公司 | Fabricated foundation pit support structure and construction method thereof |
-
2016
- 2016-05-05 CN CN201620406393.0U patent/CN205653801U/en not_active Withdrawn - After Issue
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105804093A (en) * | 2016-05-05 | 2016-07-27 | 宁波建工工程集团有限公司 | Prefabricated double-row pile and water-stop curtain integrated foundation pit supporting structure and construction method thereof |
| CN109403347A (en) * | 2018-11-26 | 2019-03-01 | 中建局集团建设发展有限公司 | A kind of frame-type double-row pile cement soil wall foundation pit enclosure structure and its construction method |
| CN109403346A (en) * | 2018-11-26 | 2019-03-01 | 中建局集团建设发展有限公司 | A kind of frame-type double-row pile foundation pit enclosure structure and its construction method |
| CN109403347B (en) * | 2018-11-26 | 2024-01-23 | 中建一局集团建设发展有限公司 | A frame-type double-row pile cement-soil wall foundation pit enclosure structure and its construction method |
| CN109403346B (en) * | 2018-11-26 | 2024-01-23 | 中建一局集团建设发展有限公司 | A frame-type double-row pile foundation pit enclosure structure and its construction method |
| CN114016514A (en) * | 2021-06-18 | 2022-02-08 | 中国建筑第二工程局有限公司 | Fabricated foundation pit support structure and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105804093B (en) | Prefabricated double-row pile foundation pit supporting construction integrated with water-stop curtain and its construction method | |
| CN205653801U (en) | Prefabricated double row pile and stagnant water curtain integration underground structure | |
| CN102733827A (en) | Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction | |
| CN208219366U (en) | Cast-in-place concrete gutter rail gliding style formwork system | |
| CN112575771B (en) | Environment-friendly construction method for vertical support system of reverse-acting underground engineering steel concrete with piles and columns | |
| CN216617534U (en) | Tunnel concrete monolithic pouring support system | |
| CN202673305U (en) | Construction structure for use in tunnel arch changing construction | |
| CN110004942A (en) | A kind of large span integral supporting structure and its construction method | |
| CN212506301U (en) | Support system in combination assembled forever | |
| CN116479907B (en) | A type of inclined-pile support structure and its construction method | |
| CN112302007B (en) | Pile bearing frame for pile foundation and construction method | |
| CN219710492U (en) | Can dismantle prefabricated drain ditch of assembling | |
| CN208280038U (en) | A kind of arch culvert template system | |
| CN208251112U (en) | A kind of detachable structural steel combination crown beam | |
| CN212670466U (en) | A steel hoop support structure for prefabricated pile foundation wharf | |
| CN207244633U (en) | Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam | |
| CN106013014A (en) | Small-section tunnel side wall lining formwork erecting construction device | |
| CN215211069U (en) | Double-row pile supporting structure with waterproof curtain function | |
| CN214740329U (en) | Full underground sewage treatment plant pool wall unilateral formwork structure | |
| CN103572762B (en) | The bracket of the oblique inner support lower end of foundation pit supporting construction and fabrication tool and construction method | |
| CN214272069U (en) | A revolvable staged fertilizer trough backfill retaining wall support frame assembly | |
| CN203821398U (en) | Bracket and manufacturing tool of inner inclined support lower end of ground pit supporting structure | |
| CN211690207U (en) | Crack control water conservancy slope protection structure | |
| CN203654297U (en) | Cylinder reinforcing steel bar connecting structure in reverse building method | |
| CN218255755U (en) | GRC cement board prefabricated moulding bed structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20161019 Effective date of abandoning: 20171003 |