CN212358318U CN202020212939.5U CN202020212939U CN212358318U CN 212358318 U CN212358318 U CN 212358318U CN 202020212939 U CN202020212939 U CN 202020212939U CN 212358318 U CN212358318 U CN 212358318U
Authority
CN
China
Prior art keywords
slope protection
fixing
bank protection
slope
mainboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020212939.5U
Other languages
Chinese (zh)
Inventor
杨彦霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huijin Technology Holding Group Co ltd
Original Assignee
Huijin Technology Holding Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huijin Technology Holding Group Co ltd filed Critical Huijin Technology Holding Group Co ltd
Priority to CN202020212939.5U priority Critical patent/CN212358318U/en
Application granted granted Critical
Publication of CN212358318U publication Critical patent/CN212358318U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a water and soil loss prevention slope protection for mine ecological restoration, which comprises a slope protection device, a fixing column and a fixing brick; the bank protection device passes through the steel-pipe pile to be fixed on the slope body, fixing device closely installs the bank protection mainboard, the inside slope protection mainboard that evenly installs of fixing device, the fixed column closely welds at the bank protection mainboard, and the staple goes into on the slope body, the fixed brick is located the below of bank protection device, the utility model discloses install fixing device, can cooperate with splint through the valve at both ends, then through the cooperation between the lead screw, consolidate the bank protection mainboard, play stability, through the cooperation between every bank protection piece, strengthen fixedly to the bank protection, play not let soil erosion and water loss's effect.

Description

Mine ecological remediation is with soil erosion and water loss bank protection
Technical Field
The utility model relates to a restoration is with preventing soil erosion and water loss technical field, concretely relates to mine ecological remediation is with preventing soil erosion and water loss bank protection.
Background
In recent years, the ecological environment of many areas is damaged by road building, mining and other projects in China, so that the problem of serious water and soil loss is caused. At present, the existing mountain slope protection has a certain effect on preventing and treating water and soil loss and debris flow, but is only limited to the situation of small to medium rain and the situation of heavy to heavy rain, and due to poor water drainage, the soil is saturated with water in a short time, so that surface flowing water is formed, and the problems of soil erosion, debris flow and the like are caused. Further, in this case, the mountain slope loses its most fundamental function. Therefore, the water and soil loss prevention slope protection for mine ecological restoration is provided to solve the existing problems.
The existing device has the defects that:
1. when the prior art is used for installing the slope protection, the joints between the slope protection blocks are not tight enough, and no fixing device is arranged in the installation process, so that the joints between the slope protection blocks are not tight, and the joints between the slope protection blocks are loosened after a long time.
2. The prior art plants the plant on the bank protection, just on the surface with the plant with the slope protection in earth go on firmly, not very dark, still can cause soil erosion and water loss like this.
3. The prior art is not outstanding enough in the stability of bank protection mainboard, does not have higher stability on fixed device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mine is soil erosion and water loss prevention bank protection for ecological remediation to solve the problem that provides in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a water and soil loss prevention slope protection for mine ecological restoration comprises a slope protection device, a fixing device, fixing columns and fixing bricks; the slope protection device is fixed on a slope body through a steel pipe pile, the slope protection main board is tightly installed on the fixing device, the slope protection main board is uniformly installed inside the fixing device, the fixing column is tightly welded on the slope protection main board, and the fixing brick is located below the slope protection device.
Preferably, the top end of the fixed column is fixedly installed on the slope protection main board, the bottom end of the fixed column is tightly welded with the movable column, the outer peripheral wall of the movable column is connected with a straightening ring in a nested mode, and the bottom end of the straightening ring is fixedly connected with a soil loosening head.
Preferably, the valve is installed on the top of fixing device, and the inseparable welding of valve below has the lead screw, and the lead screw runs through to be installed on splint, the bottom of fixing device has the steel-pipe pile through inseparable welding.
Preferably, the top welding of bank protection mainboard is installed and is planted the groove, plants the inside welding in groove and installs first filter screen, and the inseparable welding in bottom of first filter screen has the second filter screen.
Preferably, the bank protection mainboard surface is equipped with the guiding gutter, and concatenation formula guiding gutter is installed to guiding gutter one side, the dop is installed through the welding in one side of bank protection mainboard, and the joint groove is installed to the opposite side of dop.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an installation dop and joint interface can carry out the gomphosis through every dop and joint interface, are difficult to the mistake appearing, lead to hindering the delay of engineering, and dop and buckle can be inseparabler with the cooperation between the slope protection piece.
2. The utility model discloses an install first filter screen and second filter screen, can carry out the seeding to the plant through planting the groove, then through sprouting to the plant, through growing out first filter screen, then the root further consolidates through the second filter screen, has guaranteed the locking of plant and bank protection to earth.
3. The utility model discloses install fixing device, can cooperate with splint through the valve at both ends, then through the cooperation between the lead screw, consolidate the bank protection mainboard, play stability, through the cooperation between every bank protection piece, strengthen fixedly to the bank protection, play the effect that does not let soil erosion and water loss.
Drawings
FIG. 1 is a side view of the main body of the present invention;
FIG. 2 is a front view of the main body of the present invention;
fig. 3 is a front view of the slope protection main board of the present invention;
fig. 4 is a side view of the slope protection main board of the present invention;
fig. 5 is a cross-sectional view of the fixing device of the present invention;
fig. 6 the utility model discloses a bank protection mainboard stereogram.
In the figure: 1. a slope protection main board; 2. clamping a head; 3. a clamping groove; 4. planting grooves; 5. a water chute; 6. splicing type water guiding grooves; 7. fixing a column; 701. a movable post; 702. a straightening ring; 703. a soil loosening head; 8. a first filter screen; 9. a second filter screen; 10. a fixing device; 101. a screw rod; 102. steel pipe piles; 103. a valve; 104. a splint; 11. fixing the bricks; 12. a slope body; 13. slope protection device.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides an embodiment: a water and soil loss prevention slope protection for mine ecological restoration comprises a slope protection device 13, a fixing device 10, a fixing column 7 and a fixing brick 11; the slope protection device 13 is fixed on the slope body 12 through the steel pipe pile 102, the steel pipe pile 102 fixes the whole slope protection, the fixing device 10 is closely installed with a slope protection mainboard 1, the fixing device 10 fixes the slope protection mainboard 1 to prevent the slope protection mainboard 1 from falling off, the slope protection mainboard 1 is evenly installed inside the fixing device 10, the fixing column 7 is closely welded on the slope protection mainboard 1, the fixing column 7 is that the slope protection mainboard 1 fixes earth, the fixing brick 11 is located below the slope protection device 13, and the fixing brick 11 plays a role in blocking the whole slope protection.
Further, the top of fixed column 7 is fixed mounting on slope protection mainboard 1, the bottom of fixed column 7 has movable post 701 in close welding, the outer wall nested connection of movable post 701 has just to put ring 702, and the bottom fixedly connected with of just putting ring 702 loosens soil head 703, fixed column 7 is through welding installation in the bottom of slope protection mainboard 1, then will loosen soil head 703 through the movable post 701 of bottom and beat into soil, then carry out the stability to the soil through just putting ring 702, make slope protection mainboard 1 be difficult to drop or extract to play a fixed effect to slope protection mainboard 1.
Further, the valve 103 is installed on the top of the fixing device 10, the lead screw 101 is tightly welded below the valve 103, the lead screw 101 is installed on the clamping plate 104 in a penetrating mode, the steel pipe pile 102 is tightly welded at the bottom end of the fixing device 10, the fixing device 10 drives the lead screw 101 below through twisting of the valve 103, then the lead screw 101 extrudes the clamping plate 104 to shrink the space of the clamping plate 104, and the slope protection main plate 1 is fixed.
Further, the top welding of bank protection mainboard 1 installs and plants groove 4, and the inside welding of planting groove 4 installs first filter screen 8, and the bottom of first filter screen 8 has second filter screen 9 in close welding, bank protection mainboard 1 is sowed through planting groove 4 on top, then grows out from first filter screen 8, later through the root of plant, pierces through second filter screen 9, carries out further reinforcement to the bank protection to there is further reinforcing effect to the massif, prevents massif landslide.
Further, 1 surface of bank protection mainboard is equipped with guiding gutter 5, and concatenation formula guiding gutter 6 is installed to 5 one sides of guiding gutter, one side of bank protection mainboard 1 is through welding installation dop 2, and joint groove 3 is installed to the opposite side of dop 2, 1 surface mounting of bank protection mainboard has guiding gutter 5, and guiding gutter 5 can carry out the guidance quality to rivers in the time of rainy, avoids the further injury to the massif that produces because of rivers erode soil, then bank protection mainboard 1 carries out the concatenation of a plurality of bank protection mainboards 1 through concatenation formula guiding gutter 6 to carry out the water guide fast.
The working principle is as follows: at first, with bank protection mainboard 1 nail massif 13, then piece together through dop 2 and joint groove 3 on the bank protection mainboard 1, make a plurality of bank protection mainboards 1 link together, fixing device 10 at rethread both ends is fixed, then twist lead screw 101 that moves valve 103 and drive the below, extrude the space that splint 104 shrink splint 104 through lead screw 101, reach the purpose fixed to bank protection mainboard 1, then fixed brick 11 has been laid in the below of the slope body 12, sow through planting groove 4 on bank protection mainboard 1, thereby avoid the problem of the back soil erosion and water loss of raining, the probability that the mud-rock flow takes place has also been reduced simultaneously.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (5)

1. A water and soil loss prevention slope protection for mine ecological restoration comprises a slope protection device (13), a fixing device (10), a fixing column (7) and a fixing brick (11); the slope protection device is characterized in that the slope protection device (13) is fixed on a slope body (12) through a steel pipe pile (102), a slope protection main board (1) is tightly installed on the fixing device (10), the slope protection main board (1) is uniformly installed inside the fixing device (10), the fixing columns (7) are tightly welded on the slope protection main board (1), and the fixing bricks (11) are located below the slope protection device (13).
2. The mine ecological remediation water and soil loss prevention revetment according to claim 1, wherein: the top end of the fixed column (7) is fixedly installed on the slope protection main board (1), the bottom end of the fixed column (7) is tightly welded with the movable column (701), the outer peripheral wall of the movable column (701) is connected with a straightening ring (702) in an embedded mode, and the bottom end of the straightening ring (702) is fixedly connected with a soil loosening head (703).
3. The mine ecological remediation water and soil loss prevention revetment according to claim 1, wherein: the valve (103) is installed on the top end of the fixing device (10), a lead screw (101) is tightly welded below the valve (103), the lead screw (101) is installed on a clamping plate (104) in a penetrating mode, and a steel pipe pile (102) is tightly welded at the bottom end of the fixing device (10).
4. The mine ecological remediation water and soil loss prevention revetment according to claim 1, wherein: the top welding of bank protection mainboard (1) is installed and is planted groove (4), and the inside welding of planting groove (4) installs first filter screen (8), and the inseparable welding in bottom of first filter screen (8) has second filter screen (9).
5. The mine ecological remediation water and soil loss prevention revetment according to claim 1, wherein: slope protection mainboard (1) surface is equipped with guiding gutter (5), and concatenation formula guiding gutter (6) are installed to guiding gutter (5) one side, dop (2) are installed through the welding in one side of slope protection mainboard (1), and joint groove (3) are installed to the opposite side of dop (2).
CN202020212939.5U 2020-02-26 2020-02-26 Mine ecological remediation is with soil erosion and water loss bank protection Active CN212358318U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020212939.5U CN212358318U (en) 2020-02-26 2020-02-26 Mine ecological remediation is with soil erosion and water loss bank protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020212939.5U CN212358318U (en) 2020-02-26 2020-02-26 Mine ecological remediation is with soil erosion and water loss bank protection

Publications (1)

Publication Number Publication Date
CN212358318U true CN212358318U (en) 2021-01-15

Family

ID=74145032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020212939.5U Active CN212358318U (en) 2020-02-26 2020-02-26 Mine ecological remediation is with soil erosion and water loss bank protection

Country Status (1)

Country Link
CN (1) CN212358318U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113196982A (en) * 2021-04-30 2021-08-03 中国矿业大学 Water and soil conservation system for ecological restoration

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113196982A (en) * 2021-04-30 2021-08-03 中国矿业大学 Water and soil conservation system for ecological restoration

Similar Documents

Publication Publication Date Title
CN111501798B (en) Assembled frame beam slope protection construction method
CN105421470B (en) Assembled anchor pole arched framework combined type ecological revetment construction method
CN111021375A (en) Recovery and treatment method for mine geological environment
CN105862887A (en) Ecological slope protection structure for ion rare earth mine
CN110984189A (en) Slope ecological restoration system and method
CN212358318U (en) Mine ecological remediation is with soil erosion and water loss bank protection
CN105239530A (en) Externally bonded landscape flood prevention wall structure
CN208346836U (en) A kind of hidden drainage system
CN213508530U (en) Earth work structure beneficial to drainage
CN218813500U (en) Ecological bank protection of environment-friendly restores structure
CN211973518U (en) Use ecological lattice at soil property side slope protection
CN205530299U (en) Ecological slope protection structure in ion type rare earth mine mountain
CN114059566B (en) Soft rock slope semi-rigid supporting and retaining structure and construction method thereof
CN211793190U (en) Seedling raising device suitable for greening of vertical land slope
CN208934005U (en) A kind of vertical curved baffle landscape pile plate wall
CN114250744A (en) Novel ecological combined river slope retaining wall revetment
CN206956656U (en) T-shaped mixture of piles and concrete wall formula retaining wall and channel revetment
CN111997009A (en) Lining method of farmland ecological drainage ditch
CN217601469U (en) Rhombic water guide and water retaining groove ecological greening device for high and steep rocky slope
CN220685957U (en) Ecological slope protection
CN210695124U (en) A toughened glass anchor structure for mine greening
CN219508605U (en) Ecological structure that gives attention to drainage of restoring green of rock side slope
CN218813515U (en) Ecological restoration structure for river bank slope
CN217078806U (en) Ecological stake of ecological bank protection of cliff side slope
CN108517836A (en) Detachable mud-rock flow is blocked system and its method of blocking

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant