CN105421470B - Assembled anchor pole arched framework combined type ecological revetment construction method - Google Patents

Assembled anchor pole arched framework combined type ecological revetment construction method Download PDF

Info

Publication number
CN105421470B
CN105421470B CN201510794517.7A CN201510794517A CN105421470B CN 105421470 B CN105421470 B CN 105421470B CN 201510794517 A CN201510794517 A CN 201510794517A CN 105421470 B CN105421470 B CN 105421470B
Authority
CN
China
Prior art keywords
anchor pole
prefabricated
arched framework
counterfort
arch ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510794517.7A
Other languages
Chinese (zh)
Other versions
CN105421470A (en
Inventor
徐申
胡彪
黄赞旭
胡仲强
涂文军
张文华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Shuangde Building Engineering Co Ltd
Original Assignee
Jiangxi Shuangde Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Shuangde Building Engineering Co Ltd filed Critical Jiangxi Shuangde Building Engineering Co Ltd
Priority to CN201510794517.7A priority Critical patent/CN105421470B/en
Publication of CN105421470A publication Critical patent/CN105421470A/en
Application granted granted Critical
Publication of CN105421470B publication Critical patent/CN105421470B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/20Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of assembled anchor pole arched framework combined type ecological revetment construction method, mainly include the following steps that:Anchor bolt construction, foundation trench are excavated, arched framework is installed, connect band is poured, anchor pole tensioning and careless blanket are transplanted.The characteristics of present invention has following and beneficial effect:The arch ring of arched framework is prefabricated in advance with counterfort, prefabricated counterfort reserves bolthole and reserved dowel with arch ring, the reserved dowel of prefabricated counterfort and prefabricated arch ring welds together and sets anchor pole, connect band casting concrete both ensure that the globality and stability of arched framework, the assembled in situ of arched framework and anchor pole is realized again, stability is strong, and efficiency of construction is high.Built-in three-dimensional subgrade drainage system is formed, drainage effect is good.Soil body exposed part sets ecological grass mat in arch ring, and ecological grass mat presses solid by the outer male structure of arched framework, is conducive to the protection and water and soil conservation of ecological environment.

Description

Assembled anchor pole arched framework combined type ecological revetment construction method
Technical field
The present invention relates to a kind of combined type ecological revetment construction method, more particularly to assembled anchor pole arched framework combined type Ecological revetment construction method.
Technical background
Under the fast development of China's communication, high-fill roadbed Quantity is continuously increased.Due to high-fill roadbed The particularity of itself, roadbed is easy to the situation for occurring coming down, and the safety traffic to vehicle causes strong influence.Therefore, Higher requirement is proposed to high earth roadbed side slope protection.
Traditional bank protecting method is general using hard materials such as cement, building stones, concrete as main building materials, in design with power Angle goes to think deeply stability of slope.Traditional bank protection is broadly divided into shallow-layer protection class bank protection, stone-laying class bank protection, sash shield Slope, facing wall bank protection and the mixed class bank protection of spray.There are many shortcomings in traditional bank protecting method, such as:High-fill roadbed difficulty of construction is big, Engineering time is long, and safety and stability is difficult to ensure that, the protection of high slope supporting and retaining system and pumping equipment are unsound, and tall earth fill bank protection is easy There are the quality problems such as deformation, depression, and one-time investment is big, it is difficult to recover natural vegetation, be unfavorable for the guarantor of ecological environment Shield and water and soil conservation.More dull stiff in appearance, the landscape in most cases with periphery is uncoordinated, with focusing on protecting at present The development trend of ecological environment is disagreed.Although traditional anchor pole arched framework bank protection be conducive to improve soil layer safety coefficient and Strengthen the stability of rock slope, this technology mitigates the deadweight of works, saves engineering material and ensures the peace of engineering significantly Entirely and stably, while absorbing the advantage that is handsome in appearance, being easy to greening of mortar flag stone (concrete block) skeleton grass planting protection again, But traditional arched framework bank protection is all cast-in-place, drainage system is also unsound, for high-fill roadbed difficulty of construction, bank protection Easy impeded drainage and cause bank protection unstability.
In consideration of it, needing a kind of easy construction of invention badly at present, stability is strong, shortens the engineering time, and anchor pole and arch can be achieved The assembled anchor pole arched framework combined type ecological revetment construction method of shape skeleton assembled in situ and built-in three-dimensional drainage system.
The content of the invention
It is an object of the invention to provide a kind of easy construction, stability is strong, shortens the engineering time, and anchor pole and arch can be achieved The assembled anchor pole arched framework combined type ecology shield for the features such as drainage system is set inside shape skeleton assembled in situ, arched framework Slope construction method.
To achieve the above object, present invention employs following technical scheme:
This assembled anchor pole arched framework combined type ecological revetment construction method, is mainly included the following steps that:
1) anchor bolt construction:Bolthole is drilled with using anhydrous dry drill method in side slope of embankment specified location, scaffold building it is good with Afterwards, machinery according to the hole position set in advance, by bottom, progress by rows drills, and plays what a drilling, is laying anchor pole Before, aperture must be blocked with material.When rig is drilled, drilling direction must be perpendicular to side slope face, uniform speed slow Drilling rod is squeezed into embankment.Bolthole is drilled to after type, carries out borehole cleaning.Anchor pole positioning bar is set in the specified location of anchor pole, to protect Card anchor pole is fixed on hole position center, and anchor pole manually inserts anchor pole in bolthole after making, and then carries out bolthole note Slurry.
2) foundation trench is excavated:The method that arch form skeleton foundation trench uses hand excavation, foundation trench should be noted that physical dimension position when excavating That puts is accurate, and anti-skidding step together is excavated every 2~3m in vertical skeleton foundation trench.For opening for arch ring circular arc portion foundation trench Dig, answer the instrument of selection of small to be excavated to ensure that arch section is natural, smooth.
3) arched framework is installed:Sough sets pin wall after excavating, and then carries out prefabricated counterfort and prefabricated arch ring Install, prefabricated counterfort A and prefabricated arch ring A are temporarily fixed in the arched framework foundation trench dug in advance, then to prefabricated counterfort A Welded, built-in PVC drain pipe linked together with prefabricated arch ring A reserved arched framework cage bar using branch sleeve, Anchor pole is linked together by anchor pole positioning bar with arched framework cage bar;L-type pvc pipe exposed parts set anti-blocking filter screen;Bank protection The prefabricated counterfort B in top reserved thin PVC drain pipe outer wall applies one layer of marine glue, is then inserted into PVC drainings inside prefabricated arch ring B In pipe, the prefabricated counterfort B in top and prefabricated arch ring A is connected and fixed by screw rod faulting of slab ends.
4) belt construction is connected:The anchor pole positioning bar of anchor pole and arched framework cage bar are welded for the part for reserving bolthole Then the casting concrete into the reserved bolthole of prefabricated arched framework, is installed for prefabricated counterfort A with prefabricated arch ring A junctions Template, then casting concrete.
5) anchor pole tensioning:After anchor pole tensioning, anchor pole is fixed with anchorage.
6) careless blanket transplanting:Careless blanket is snapped using arched framework and coordinates wooden peg to consolidate careless blanket.
The characteristics of present invention has following and beneficial effect:
(1) arch ring of arched framework is prefabricated in advance with counterfort, and prefabricated counterfort is reserved bolthole and reserved and is connected with arch ring Muscle, the reserved dowel of prefabricated counterfort and prefabricated arch ring welds together and sets anchor pole, and connect band casting concrete both ensured The globality and stability of arched framework, realizes the assembled in situ of arched framework and anchor pole again, and stability is strong, efficiency of construction It is high.
(2) pre-buried drainpipe inside arched framework, drainpipe is connected by positioning steel ring and positioning bar with arched framework cage bar Fixation is connect, the reserved drainpipe of prefabricated counterfort and arch ring is linked together by branch sleeve, form built-in three-dimensional roadbed row Water system, drainage effect is good.
(3) soil body exposed part sets ecological grass mat in arch ring, and ecological grass mat presses solid by the outer male structure of arched framework, Be conducive to the protection and water and soil conservation of ecological environment.
Brief description of the drawings
Fig. 1 is assembled anchor pole arched framework combined type ecological revetment schematic diagram of the present invention;
Fig. 2 is assembled anchor pole arched framework combined type ecological revetment detail side elevation;
Fig. 3 is delay-pour joint band detail side elevation;
Fig. 4 is faulting of slab ends connection and anchor pole detail side elevation;
Fig. 5 is PVC drain pipe positioning detail drawing inside arched framework;
Fig. 6 is the solid ecological grass mat detail drawing of arched framework pressure;
Fig. 7 delay-pour joints band arched framework cage bar, PVC drain pipe, anchor pole connection detail drawing;
The anchor pole that Fig. 8 is reserved in bolthole is connected detail drawing with arched framework cage bar;
Fig. 9 is construction flow chart of the present invention;
In figure:1. pin wall;2. gutter;3. prefabricated counterfort A;4. prefabricated arch ring A;5. anchor pole;6. reserved bolthole; 7.PVC drainpipes;8. branch sleeve;9.L type PVC drain pipes;10. sleeve pipe three-dimensional joint;11. screw rod;12. delay-pour joint band; 13. careless blanket;14. movement joint;15. curb;16. reserved screw hole;17. bolthole;18. pavement structure;19. embankment;20. anchor pole Positioning bar;21. arched framework cage bar;The thin drainpipes of 22.PVC;23. position steel ring;24. spacer bar;25. outer row tank; 26. filter screen;27. wooden peg;28. mark time;29. prefabricated counterfort B;30. prefabricated arch ring B.
Embodiment
Fig. 1 is assembled anchor pole arched framework combined type ecological revetment schematic diagram of the present invention.Shown in reference picture 1, the present invention High-fill roadbed assembled anchor pole arched framework combined type ecological revetment mainly includes:Prefabricated counterfort A 3, prefabricated counterfort B 29, Prefabricated arch ring A 4, prefabricated arch ring B 30, anchor pole 5, reserved bolthole 6, PVC drain pipe 7, branch sleeve 8, L-type PVC drain pipe 9th, three joints 10 of sleeve pipe, careless blanket 13, screw rod 11.
Drilled first in side slope specified location according to design requirement, carry out anchor pole 5 and construct, then roadbed is slotted, install pre- Counterfort A 3 processed and prefabricated arch ring A 4, arched framework cage bar 21, reserved PVC drain pipe 7 are carried out at delay-pour joint band 12 and is connected And casting concrete, then tensioning is carried out to anchor pole 5, careless blanket 13 is pressed solid finally by arched framework.
Shown in reference picture 1, prefabricated arch ring A4 centre positions set anchor pole 5, and the prefabricated two ends of counterfort A 3 set anchor pole 5;It is prefabricated Counterfort is divided into two kinds of connection types with prefabricated arch ring:PVC drain pipe 7 is connected by branch sleeve built at delay-pour joint band 12, Prefabricated counterfort B 29 is connected and fixed with prefabricated arch ring B 30 by the faulting of slab ends of screw rod 11.
Shown in reference picture 2, the prefabricated counterfort B 29 of the superiors and prefabricated arch ring B 30 is connected and fixed by screw rod 11; Remaining prefabricated counterfort 3 is together with prefabricated arch ring A4 and the one-piece casting of anchor pole 5;Gutter 2 is led in the built-in bottom of drainpipe 7.
Shown in reference picture 3 and Fig. 7, the arched framework cage bar 21 at delay-pour joint band 12 welds together;Built-in drainpipe 7 Linked together by branch sleeve 8;Anchor pole 5 is positioned in bolthole 17 by anchor pole positioning bar 20;Anchor pole 5 is fixed by anchor pole Position muscle 20 welds together with arched framework cage bar 21.
Shown in reference picture 4, the reserved built-in thin drainpipes 22 of PVC of the prefabricated counterfort B 29 of the superiors are interspersed in prefabricated arch ring A4 Put in PVC drain pipe 7, prefabricated counterfort B 29 is linked together with the prefabricated faulting of slab ends of arch ring B 30 by screw rod 11.
Shown in reference picture 5, built-in PVC drain pipe 7 is by positioning steel ring 23 and spacer bar 24 and arched framework cage bar 21 Weld together.
Shown in reference picture 6, ecological grass mat 13 is snapped and coordinates wooden peg 27 to fix by prefabricated counterfort.
As shown in figure 9, the construction method of assembled anchor pole arched framework combined type ecological revetment, mainly including following step Suddenly:
1) anchor bolt construction:Bolthole 17 is drilled with using anhydrous dry drill method in side slope of embankment specified location, scaffold building is good After, machinery according to the hole position set in advance, by bottom, progress by rows drills, and plays what a drilling, is laying anchor Before bar, aperture must be blocked with material.When rig is drilled, drilling direction must be perpendicular to side slope face, uniform speed slow Ground squeezes into drilling rod in embankment.Bolthole is drilled to after type, carries out borehole cleaning.In the specified location of anchor pole, anchor pole positioning bar 20 is set, To ensure that anchor pole 5 is fixed on the center of bolthole 17, anchor pole 5 manually inserts anchor pole 5 in bolthole 17 after making, then Carry out the slip casting of bolthole 17.
2) road excavation:The method that arch form skeleton foundation trench uses hand excavation, foundation trench should be noted that physical dimension position when excavating That puts is accurate, and anti-skidding step together is excavated every 2~3m in vertical skeleton foundation trench.For opening for arch ring circular arc portion foundation trench Dig, answer the instrument of selection of small to be excavated to ensure that arch section is natural, smooth.
3) arched framework is installed:Sough sets pin wall 1 after excavating, and then carries out prefabricated counterfort A3 and Prefabricated arch Enclose A4 to install, prefabricated counterfort A3 and prefabricated arch ring A4 are temporarily fixed in the arched framework foundation trench dug in advance, then to pre- Counterfort A3 processed and prefabricated arch ring A4 arched framework cage bar 21 are welded, and are connected built-in PVC drain pipe 7 using branch sleeve 8 It is connected together, anchor pole 5 is linked together by anchor pole positioning bar 20 with arched framework cage bar 21;The exposed portion of L-type PVC drain pipe 9 Set up separately and put anti-blocking filter screen 26;The thin outer walls of drainpipe 22 of prefabricated counterfort B 29 reserved PVC apply one layer of marine glue at the top of bank protection, then It is inserted into the thick PVC drain pipe 7 that the prefabricated inside of arch ring B 30 is set, the prefabricated counterfort B 29 in top and prefabricated arch ring B 30 passes through The faulting of slab ends of screw rod 11 is connected and fixed.
4) connect band is poured:Part for reserving bolthole 6, by the spacer bar 24 of anchor pole 5 and arched framework cage bar 21 welding and then the casting concrete into the reserved bolthole 6 of prefabricated arched framework, for prefabricated counterfort A3 and prefabricated arch ring A4 Junction supporting module, then casting concrete.
5) anchor pole tensioning:After the tensioning of anchor pole 5, anchor pole 5 is fixed with anchorage.
6) careless blanket transplanting:Careless blanket 13 is snapped using arched framework and coordinates wooden peg 27 to fix.

Claims (1)

1. assembled anchor pole arched framework combined type ecological revetment construction method, it is characterised in that mainly include the following steps that:
1) anchor bolt construction:Bolthole (17) is drilled with using anhydrous dry drill method in side slope of embankment specified location, scaffold building it is good with Afterwards, machinery according to the hole position set in advance, by bottom, progress by rows drills, and plays what a drilling, is laying anchor pole (5) before, aperture must be blocked with material;When rig is drilled, drilling direction must be perpendicular to side slope face, uniform speed slow Ground squeezes into drilling rod in embankment;Bolthole (17) is drilled to after type, carries out borehole cleaning;Anchor pole is set to determine in the specified location of anchor pole (5) Position muscle (20), to ensure that anchor pole (5) is fixed on bolthole (17) center, after anchor pole (5) is made, anchor is inserted by anchor pole (5) In rod aperture (17), bolthole (17) slip casting is then carried out;
2) foundation trench is excavated:Arch form skeleton foundation trench is excavated, and vertically one of Antiskid platform is excavated every 2~3m in arched framework foundation trench Rank;
3) arched framework is installed:Sough sets pin wall (1) after excavating, and then carries out prefabricated counterfort A (3) and Prefabricated arch Enclose A (4) to install, prefabricated counterfort A (3) and prefabricated arch ring A (4) are temporarily fixed in the arched framework foundation trench dug in advance, so The arched framework cage bar (21) and the arched framework cage bar (21) of prefabricated arch ring A (4) to prefabricated counterfort A (3) are welded afterwards, profit Built-in PVC drain pipe (7) is linked together with branch sleeve (8), anchor pole (5) passes through anchor pole positioning bar (20) and arched framework Cage bar (21) links together;L-type PVC drain pipe (9) exposed parts set anti-blocking filter screen (26);Prefabricated counterfort B at the top of bank protection (29) the thin drainpipes of reserved PVC (22) outer wall applies one layer of marine glue, is then inserted into what is set inside prefabricated arch ring B (30) In PVC drain pipe (7), the prefabricated counterfort A (3) in top is connected and fixed with prefabricated arch ring A (4) by screw rod (11) faulting of slab ends;
4) connect band is poured:Then the spacer bar (24) of anchor pole (5) and arched framework cage bar (21) is welded to prefabricated arch Reserved bolthole (6) interior casting concrete of skeleton, for prefabricated counterfort A (3) and prefabricated arch ring A (4) junction supporting module, Then casting concrete;
5) anchor pole tensioning:It is with anchorage that anchor pole (5) is fixed after anchor pole (5) tensioning;
6) careless blanket transplanting:Careless blanket (13) is snapped using arched framework cage bar (21) and coordinates wooden peg (27) that careless blanket (13) is steady Gu.
CN201510794517.7A 2015-11-18 2015-11-18 Assembled anchor pole arched framework combined type ecological revetment construction method Active CN105421470B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510794517.7A CN105421470B (en) 2015-11-18 2015-11-18 Assembled anchor pole arched framework combined type ecological revetment construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510794517.7A CN105421470B (en) 2015-11-18 2015-11-18 Assembled anchor pole arched framework combined type ecological revetment construction method

Publications (2)

Publication Number Publication Date
CN105421470A CN105421470A (en) 2016-03-23
CN105421470B true CN105421470B (en) 2017-09-08

Family

ID=55499981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510794517.7A Active CN105421470B (en) 2015-11-18 2015-11-18 Assembled anchor pole arched framework combined type ecological revetment construction method

Country Status (1)

Country Link
CN (1) CN105421470B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105649093B (en) * 2016-04-05 2017-03-08 山东净金新能源有限公司 A kind of manufacture method for encircleing solid frame for public, railway tunnel
CN105839651A (en) * 2016-05-16 2016-08-10 中交第公路勘察设计研究院有限公司 Roadbed slope assembly type deformation self-adaptive protective framework and splicing method thereof
CN106869146A (en) * 2017-02-22 2017-06-20 安徽省交通建设股份有限公司 A kind of careless blanket ecoscape slope protection system and construction method
CN108532662A (en) * 2018-05-30 2018-09-14 田振刚 A kind of subgrade protection construction equipment and its application method
CN108487266A (en) * 2018-06-01 2018-09-04 宁夏力丰农机制造有限公司 A kind of cutting arched framework beam forms
CN108643205A (en) * 2018-06-25 2018-10-12 成都市市政工程(集团)有限责任公司 Arched framework slope protection construction method
CN110144906A (en) * 2019-06-04 2019-08-20 中铁三局集团第二工程有限公司 A kind of mechanical slotting method in railway slope protection construction
CN110409471A (en) * 2019-08-27 2019-11-05 中水北方勘测设计研究有限责任公司 Prefabricated supporting and retaining system guard assembly for soil-slope
CN110565659A (en) * 2019-08-31 2019-12-13 安徽省交通规划设计研究总院股份有限公司 Tenon-and-mortise type prefabricated interlocking block arched slope protection
CN111794184B (en) * 2020-07-17 2021-03-05 中水生态勘测设计研究(广东)有限公司 River course slope protection construction method
CN112376588A (en) * 2020-11-28 2021-02-19 辽宁大学 Stock ground beam adds grout rubble lattice slope protection integrated configuration
CN113463668A (en) * 2021-07-21 2021-10-01 中信国安建工集团有限公司 Highway slope stability protection structure and construction operation method
CN114108662B (en) * 2021-11-16 2023-06-30 洛阳城市建设勘察设计院有限公司 Novel roadbed precast block arch skeleton slope protection structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004084402A (en) * 2002-08-29 2004-03-18 Ohbayashi Corp Fixing plate for greening, fixing structure for greening and method of construction
KR20050079706A (en) * 2004-02-06 2005-08-11 최제인 Slope protection structure and reinforcement method of construction attached to pressure shotsoils or soilcement
CN202164615U (en) * 2011-07-26 2012-03-14 王建军 Structure of ecological slope protection
CN102691306B (en) * 2012-06-06 2014-07-09 中国科学院地质与地球物理研究所 Environment-friendly and energy-saving slope protection bamboo-wood lattice beam for mountain highway

Also Published As

Publication number Publication date
CN105421470A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN105421470B (en) Assembled anchor pole arched framework combined type ecological revetment construction method
CN106013191B (en) Environment-friendly type grass planting Concrete Highway protective slope structure and construction method
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN107762535B (en) Cut-and-cover tunnel secretly does construction technology under complicated geological environment
CN104989425B (en) A kind of tunneling is into hole supporting construction and its method for protecting support
CN205999903U (en) Environment-friendly type grass planting Concrete Highway protective slope structure
CN105887898A (en) Swell-shrink characteristic rock-soil cut slope protection method and structure
CN107503257A (en) One kind is close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN106948340B (en) Construction method of artificial digging pile structure protected by high polymer grouting
CN201027311Y (en) Drainage Anchor Frame Beams for Slope Reinforcement
CN106703044B (en) One kind stream modeling shape rinse fill soft stratum slope combination supporting method
CN108716219A (en) side slope ecological protection structure and its construction method
CN102758458B (en) Underground continuous wall repairing method
CN104878719B (en) Mutual embedding reinforcement formula Ecological Retaining Wall construction method
CN111042053A (en) Permanent temporary combined retaining wall structure in urban hydraulic engineering and construction method thereof
CN103758139A (en) Vegetation type anchor rod ecological bag and slope protection method thereof
CN105569051A (en) Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN106120822B (en) A kind of method for protecting support and device that prevent mud stone from coming down
CN103628489B (en) Highway side slope reinforced structure
CN204125850U (en) A kind of cantilever shed tunnel being provided with steel tube concrete pile and prestress anchorage cable
CN207512777U (en) Assembled underground pipe gallery
CN203334301U (en) Cave slope strengthening protection structure
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN209324377U (en) Ledge method tunneling subway station arch springing ruggedized construction
CN108104141A (en) A kind of highway Rock High Slope anchor pole pregroove marks safeguard structure and its engineering method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Xu Shen

Inventor after: Hu Biao

Inventor after: Huang Zanxu

Inventor after: Hu Zhongqiang

Inventor after: Tu Wenjun

Inventor after: Zhang Wenhua

Inventor before: Hu Biao

Inventor before: Huang Zanxu

Inventor before: Hu Zhongqiang

Inventor before: Tu Wenjun

Inventor before: Zhang Wenhua