CN212335915U - Planting concrete piece and ecosystem that river course restoration protected end was used - Google Patents

Planting concrete piece and ecosystem that river course restoration protected end was used Download PDF

Info

Publication number
CN212335915U
CN212335915U CN202020430988.6U CN202020430988U CN212335915U CN 212335915 U CN212335915 U CN 212335915U CN 202020430988 U CN202020430988 U CN 202020430988U CN 212335915 U CN212335915 U CN 212335915U
Authority
CN
China
Prior art keywords
planting
concrete
concrete block
riverway
river course
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020430988.6U
Other languages
Chinese (zh)
Inventor
李俊萱
姚廷涛
温浩
黄敏青
邱润宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guanghuiyuan Water Conservancy Building Engineering Co ltd
Original Assignee
Shenzhen Guanghuiyuan Water Conservancy Building Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guanghuiyuan Water Conservancy Building Engineering Co ltd filed Critical Shenzhen Guanghuiyuan Water Conservancy Building Engineering Co ltd
Priority to CN202020430988.6U priority Critical patent/CN212335915U/en
Application granted granted Critical
Publication of CN212335915U publication Critical patent/CN212335915U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources
    • Y02A20/402River restoration

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a planting concrete block and ecosystem for riverway restoration bottom protection, which belong to the field of riverway restoration, and comprise a geotextile layer, a broken stone cushion layer and a concrete bottom protection layer which are sequentially laid from bottom to top, wherein a plurality of planting holes are arranged in the planting concrete block in a rectangular array distribution, planting soil is filled in the planting holes, and the planting soil is used for planting green plants; the problem of the river course that current mode improved still can receive serious pollution again under the sand blown by the wind and the pollution in city after a plurality of years, need to spend manpower and materials again, cause the waste of resource and the improvement of cost is solved.

Description

Planting concrete piece and ecosystem that river course restoration protected end was used
Technical Field
The utility model relates to a river course restoration field especially relates to a planting concrete piece and ecosystem that bottom protection was used is restoreed in river course.
Background
At present, river ecological restoration refers to restoring biological groups and structures of damaged water ecological systems by using an ecological system principle and adopting various methods, reconstructing healthy aquatic ecological systems, restoring and strengthening main functions of the water ecological systems, and enabling the ecological systems to realize virtuous circle of overall coordination, self-maintenance and self-succession.
In the existing riverway ecological restoration process, water in a polluted riverway is usually pumped out in advance, then the polluted sludge at the bottom is dug out, and then a clear water source is introduced to preliminarily improve the riverway.
However, the river course improved in the above manner still suffers serious pollution again under wind sand and pollution in cities after several years, and manpower and material resources need to be expended again, so that resource waste and cost increase are caused, and improvement is needed.
Disclosure of Invention
Therefore, the utility model aims at providing a planting concrete piece and ecosystem that bottom protection was used is restoreed in river course to solve above-mentioned technical problem.
The above technical purpose of the present invention can be achieved by the following technical solutions:
the utility model provides a planting concrete piece that end was used is protected in riverway restoration, includes and protects the bottom layer by lower supreme geotechnological cloth layer, rubble bed course and the concrete of laying in proper order, plant the concrete piece and be a plurality of planting holes of having seted up with rectangular array distributes, plant downthehole packing planting soil, planting soil is used for planting green plant.
Through adopting above-mentioned technical scheme, the geotechnological cloth layer is used for keeping apart the silt of planting concrete block and green plant and river course bottom, avoid river course silt to mix with planting soil, the root of green plant can extend to in the clearance in the garrulous stone bed course, and consolidate the green plant, the concrete protects the bottom layer and is used for consolidating the structural strength of river course bottom, algae or pasture and water etc. can be chooseed for use to the green plant, plant in planting downthehole green plant can absorb and digest the partial residue in the river water, avoid the fermentation to cause river water to foul, can reduce the destroyed degree in river course from this, thereby improve the prosthetic cycle again in river course, reduce the waste of resource, reduce the river course repair cost.
Preferably, the length and the width of the planting concrete block are 4000 mm.
By adopting the technical scheme, the planting concrete blocks are square, which is beneficial to the uniform distribution of the planting holes.
Preferably, the spacing between any two adjacent planting holes in the same row or column is 1000 mm.
Through adopting above-mentioned technical scheme, if the interval between the adjacent planting hole is too intensive, then can lead to the river course bottom to purify the uneven condition that the nutrition absorption area of green plant is criss-cross.
Preferably, the thickness of the gravel cushion layer is 100mm, the concrete bottom protection layer is formed by filling C20 sand-free concrete, and the thickness of the gravel cushion layer is 200 mm.
By adopting the technical scheme, the thickness of each layer is determined by integrating various factors such as construction difficulty, green plant growth requirement and the like.
Preferably, the diameter of the planting hole is 100 mm.
The utility model provides a river course restores ecosystem, includes the river course, a plurality of along the setting of river course length direction and as in any one of above-mentioned technical scheme planting concrete piece to and set up the reinforced concrete frame grillage between two adjacent planting concrete pieces.
Through adopting above-mentioned technical scheme, reinforced concrete frame grillage can be cut apart two adjacent planting concrete pieces, is for construction convenience on the one hand, can be under construction one by one according to the size of planting concrete piece, and on the other hand avoids the layer structure interpenetration of two adjacent planting concrete pieces.
Preferably, the bottom of the reinforced concrete frame grillwork is also provided with a gravel cushion layer with the thickness of 100 mm.
Through adopting above-mentioned technical scheme, further consolidate the structural strength of reinforced concrete frame grillage.
Preferably, the length of the reinforced concrete frame grillwork is 400 mm.
Through adopting above-mentioned technical scheme, the reinforced concrete frame framework at same planting concrete piece both ends centre gripping together guarantees that layer structure is not destroyed to reinforced concrete frame framework should not the overlength, otherwise can lead to the proportion of planting concrete piece in the river course bottom to hang down excessively, and can't reach better lasting repair effect.
The utility model provides a pair of planting concrete block and ecosystem that bottom protection was used is restoreed in river course has following advantage:
1. the damage degree of the river channel can be reduced, so that the period of the river channel reparation is prolonged, the waste of resources is reduced, and the river channel reparation cost is reduced;
2. the geotechnique's cloth layer is used for keeping apart the silt of planting concrete block and green plant and river course bottom, avoids river course silt to mix with planting soil, and the root of green plant can extend to in the clearance in the garrulous stone bed course to consolidate the green plant.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a level structure diagram of concrete blocks planted in the utility model;
fig. 3 is the level structure diagram of the medium reinforced concrete frame grillwork and the broken stone cushion layer of the utility model.
The reference numerals in the figures are explained below:
1. planting concrete blocks; 2. a geotextile layer; 3. a gravel cushion layer; 4. a concrete bottom protection layer; 5. planting holes; 6. reinforced concrete frame grillwork.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the existing ecological restoration process, water in a polluted river channel is usually pumped out in advance, then the polluted sludge at the bottom is dug out, and then a clear water source is introduced to preliminarily improve the river channel.
Nevertheless be with the river course that above-mentioned mode was improved, still can receive serious pollution once more after a plurality of years under the sand blown by the wind in city and the pollution, need to spend manpower and materials again, cause the waste of resource and the improvement of cost, for solving this problem, the utility model provides a planting concrete block and a river course restoration ecosystem that river course restoration bottom protection was used respectively.
The utility model provides a planting concrete block that end was used is restoreed in river course, as shown in fig. 1 to fig. 3, includes geotechnological cloth layer 2, rubble bed course 3 and the concrete bottom layer 4 of protecting of laying in proper order by supreme down, planting concrete block 1 has been offered a plurality of planting holes 5 for rectangular array ground, the intussuseption in planting hole 5 is planted soil, planting soil is used for planting green plant, the diameter of planting hole 5 is 100 mm.
The specific working principle is as follows: geotechnological cloth layer 2 is used for keeping apart the silt of planting concrete block 1 and green plant and river course bottom, avoid river course silt to mix with planting soil, the root of green plant can extend to in the clearance in rubble bed course 3, and consolidate the green plant, concrete bottom protection layer 4 is used for consolidating the structural strength of river course bottom, algae or pasture and water etc. can be chooseed for use to the green plant, plant in planting the partial residue that the green plant in hole 5 can absorb and digest the river in, avoid the fermentation to cause river foul, can reduce the destroyed degree of river course from this, thereby improve the prosthetic cycle again of river course, reduce the waste of resource, reduce river course repair cost.
The length and the width of the planting concrete block 1 are 4000 mm; the square planting concrete blocks 1 are beneficial to the uniform distribution of the planting holes 5.
The distance between any two adjacent planting holes 5 in the same row or the same column is 1000 mm; if the spacing between adjacent planting holes 5 is too dense, the purification degree at the bottom of the river channel is uneven, and the nutrient absorption areas of the green plants are crossed.
The thickness of the gravel cushion layer 3 is 100mm, the concrete bottom protecting layer 4 is formed by filling C20 sand-free concrete, and the thickness of the concrete bottom protecting layer is 200 mm; the thickness of each layer is determined by combining various factors such as construction difficulty, green plant growth requirement and the like.
The utility model provides a river course repair ecosystem, includes the river course, a plurality of along the setting of river course length direction and as in above-mentioned technical scheme plant concrete piece 1 to and set up the reinforced concrete frame grillage 6 between two adjacent planting concrete pieces 1.
The reinforced concrete frame grillwork 6 can separate two adjacent planting concrete blocks 1, on one hand, the construction is convenient, the construction can be carried out one by one according to the sizes of the planting concrete blocks 1, and on the other hand, the layer structures of the two adjacent planting concrete blocks 1 are prevented from mutually permeating.
The bottom of the reinforced concrete frame grillwork 6 is also provided with a broken stone cushion layer 3 with the thickness of 100 mm; further reinforcing the structural strength of the reinforced concrete frame grillwork 6.
The length of the reinforced concrete frame grillwork 6 is 400 mm; the reinforced concrete frame grillage 6 at two ends of the same planting concrete block 1 is clamped together, the layer structure is not damaged, the reinforced concrete frame grillage 6 cannot be too long, otherwise, the ratio of planting the concrete block 1 at the bottom of the river channel is too low, and the better continuous repairing effect cannot be achieved.
The utility model discloses utilize and evenly lay planting concrete block 1 along length direction in the river course bottom to plant green plant on planting concrete block 1, let green plant absorb the residue in the river, with the ecological remediation that reaches the river, thereby let river course self have self-repairing ability, the extension is prosthetic cycle once more, reduces the wasting of resources.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications can be made without departing from the scope of the invention.

Claims (8)

1. The utility model provides a planting concrete block that end was used is protected in riverway restoration, its characterized in that includes and protects bottom course (4) by geotechnological cloth layer (2), rubble bed course (3) and the concrete of supreme laying in proper order down, planting concrete block (1) has been offered a plurality of planting holes (5) with rectangular array distributes, the intussuseption of planting hole (5) is filled with planting soil, planting soil is used for planting green plant.
2. The concrete block for repairing and protecting a river according to claim 1, wherein the length and width of the concrete block (1) are 4000 mm.
3. The concrete block for repairing and protecting river according to claim 1, wherein the distance between any two adjacent planting holes (5) in the same row or column is 1000 mm.
4. The concrete block for repairing and protecting bottom of riverway according to claim 1, wherein the thickness of the gravel cushion layer (3) is 100mm, the concrete bottom protecting layer (4) is formed by filling C20 sand-free concrete, and the thickness is 200 mm.
5. The concrete block for repairing and protecting river according to claim 1, wherein the diameter of the planting hole (5) is 100 mm.
6. An ecological system for riverway restoration, which is characterized by comprising a riverway, a plurality of planting concrete blocks (1) which are arranged along the length direction of the riverway and are as claimed in any one of claims 1 to 5, and a reinforced concrete frame grillwork (6) arranged between two adjacent planting concrete blocks (1).
7. The ecological system for riverway restoration according to claim 6, wherein the bottom of the reinforced concrete frame grillwork (6) is further provided with a gravel cushion layer (3) with the thickness of 100 mm.
8. The ecological system for riverway restoration according to claim 6, wherein the length of the reinforced concrete frame grillwork (6) is 400 mm.
CN202020430988.6U 2020-03-27 2020-03-27 Planting concrete piece and ecosystem that river course restoration protected end was used Active CN212335915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020430988.6U CN212335915U (en) 2020-03-27 2020-03-27 Planting concrete piece and ecosystem that river course restoration protected end was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020430988.6U CN212335915U (en) 2020-03-27 2020-03-27 Planting concrete piece and ecosystem that river course restoration protected end was used

Publications (1)

Publication Number Publication Date
CN212335915U true CN212335915U (en) 2021-01-12

Family

ID=74069772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020430988.6U Active CN212335915U (en) 2020-03-27 2020-03-27 Planting concrete piece and ecosystem that river course restoration protected end was used

Country Status (1)

Country Link
CN (1) CN212335915U (en)

Similar Documents

Publication Publication Date Title
CN103241893B (en) A kind of " serial-parallel " adjustable composite constructed wetland system
CN102139961B (en) Multilayer vegetation zone water quality in situ purification method for highly polluted tributary inlet
CN106088289A (en) A kind of water storage system for sponge Front river course road and construction method
CN104163550B (en) Cascading style ladder artificial wet land system and constructional method thereof
CN101713182A (en) Method for forming ecological embankment of vertical revetment live branch bundles
CN101705666A (en) Construction method of live branch frame type plane source retaining purified ecological revetment
CN209685411U (en) A kind of river corridor restoration system
CN108999174B (en) Ecological restoration system for preventing water and soil loss and construction method
CN108396771A (en) Raw earth-retaining wall construction method is planted from embedded reinforcement
CN107419703A (en) A kind of vegetation type water purification concrete segment shore protection and its construction method
CN110557997B (en) Construction method of slope ecological restoration system
CN104110009A (en) Water body purification seepage prevention structure and method
CN212335915U (en) Planting concrete piece and ecosystem that river course restoration protected end was used
CN112482411A (en) River course ecological slope protection and construction method thereof
CN211896276U (en) Ecological riparian zone combining river water purification and slope greenbelt maintenance
CN207211070U (en) Fish-scale pit biology protective slope structure
CN105544340A (en) Water permeable pavement
CN108301382A (en) One kind is planted raw purified water type concrete segment
CN213867615U (en) Ecological overflow dam
CN105756015A (en) Method for restoring biodiversity dynamic landscape ecological composite system
CN212316830U (en) Hydraulic engineering is with ecological slope protection brick of concatenation formula
CN210439228U (en) Combined ecological slope protection building block
CN106836128A (en) Ecological slope protection structure
CN113863335A (en) Method for treating quicksand stratum drainage channel slope collapse and purifying and recycling drainage water
CN112144469A (en) Bank slope water purification wetland structure combined with ecological revetment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant