CN212316576U - Municipal works ground preprocessing device - Google Patents

Municipal works ground preprocessing device Download PDF

Info

Publication number
CN212316576U
CN212316576U CN202020701675.XU CN202020701675U CN212316576U CN 212316576 U CN212316576 U CN 212316576U CN 202020701675 U CN202020701675 U CN 202020701675U CN 212316576 U CN212316576 U CN 212316576U
Authority
CN
China
Prior art keywords
layer
foundation
gravel
powder
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020701675.XU
Other languages
Chinese (zh)
Inventor
张雪峰
王冬英
王健
文永华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Huahe Construction Engineering Management Co ltd
Original Assignee
Hunan Huahe Construction Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Huahe Construction Engineering Management Co ltd filed Critical Hunan Huahe Construction Engineering Management Co ltd
Priority to CN202020701675.XU priority Critical patent/CN212316576U/en
Application granted granted Critical
Publication of CN212316576U publication Critical patent/CN212316576U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses a municipal works ground preprocessing device, a serial communication port, include: the upper surface of the foundation is sequentially provided with a pavement layer, a lime soil improvement layer, a clay layer and a gravel bearing layer from top to bottom; a gravel layer, a clay layer, a fine sand layer and a clay layer are sequentially arranged on the lower surface of the foundation from bottom to top; wherein, the lower end of the gravel layer is provided with a plurality of CFG piles and powder-spraying piles in a staggered manner; the upper parts of the CFG piles and the powder spraying piles are the foundations; a plurality of drainage ditches are arranged on two sides of the foundation; the drainage ditch is connected with a drainage pipeline. The utility model discloses utilize CFG construction and powder to spout stake and gravel layer, muck layer, fine sand layer, powder muck layer and combine together, can handle to the soil foundation effectively, the powder spouts stake reinforcement technology rationally, and the construction is simple, the technique is reliable, low cost, the construction is fast, do not have vibration, noiselessness, time limit for a project short, area is little, and is pollution-free to the environment, does not have the influence to building on every side, consolidates effectually.

Description

Municipal works ground preprocessing device
Technical Field
The utility model relates to a ground treatment technical field, more specifically the utility model relates to a municipal works ground preprocessing device that says so.
Background
Along with the implementation of national strategies such as the plan of sea and west, the construction of a Shandong peninsula blue economic area, the high-efficiency ecological economic area of the yellow river delta and the like, the construction and development of coastal, coastal and coastal areas such as the Bohai Bay, the Yangtze river delta, the Zhujiang delta and the like are rapid. A large amount of soft soil is distributed in the districts of Shandong, Jiangsu, Zhejiang and Shanghai, and the soil quality needs to be improved and the foundation needs to be reinforced by a soft soil foundation treatment technology, so that the use requirement is met.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a municipal works ground preprocessing device of characteristics such as reasonable in design, economical and practical, reinforcement effect are good.
In order to achieve the above object, the utility model provides a following technical scheme:
municipal works ground preprocessing device, its characterized in that includes: the upper surface of the foundation is sequentially provided with a pavement layer, a lime soil improvement layer, a clay layer and a gravel bearing layer from top to bottom; a gravel layer, a clay layer, a fine sand layer and a clay layer are sequentially arranged on the lower surface of the foundation from bottom to top; wherein, the lower end of the gravel layer is provided with a plurality of CFG piles and powder-spraying piles in a staggered manner; the upper parts of the CFG piles and the powder spraying piles are the foundations; a plurality of drainage ditches are arranged on two sides of the foundation; the drainage ditch is connected with a drainage pipeline.
Preferably, in the above one of the municipal engineering foundation pretreatment devices, the gravel support layer has a thickness of 25 cm.
Preferably, in the above one municipal engineering ground pretreatment device, the thickness of the gravel layer is 3 m.
Preferably, in the municipal engineering foundation pretreatment device, the thickness of the clay layer is 1 m.
Preferably, in the municipal engineering foundation pretreatment device, the thickness of the fine sand layer is 1.5 m.
Preferably, in the municipal engineering foundation pretreatment device, the thickness of the clay layer is 2 m.
Preferably, in the municipal engineering foundation pretreatment device, the thickness of the lime soil improvement layer is 25 cm.
Preferably, in the municipal engineering ground pretreatment device, the thickness of the pavement layer is 12 cm.
Preferably, in the municipal engineering foundation pretreatment device, the lime soil improvement layer is flush with a ground water level line.
Known from the above technical scheme, compare with prior art, the utility model has the following characteristics:
the powder spraying pile is used to reinforce foundation and has high pressure air sprayed to the solidified soft soil and mechanically made bit blade rotated to mix the solidified agent with the soft soil in situ; after absorbing water, the curing agent performs a series of physical and chemical reactions to enable the original soil of the pile position to be hardened from soft to hard, so as to form a new pile body with good integrity, strong water stability and high bearing capacity; the interaction between the pile body and the soil between the piles forms a composite foundation with greatly improved bearing capacity compared with the natural soft soil foundation. The anti-deformation capability of the composite foundation of the site is definitely improved, and the composite foundation has a certain water-proof function;
the CFG pile and the powder spray pile are combined with a gravel layer, a clay layer, a fine sand layer and a clay layer, so that the high bearing capacity of the CFG pile can be exerted, and the side limit constraint effect of the powder spray pile is enhanced due to the insertion of the CFG pile. Meanwhile, due to the arrangement of the powder spraying piles, the deformation capacity of the upper foundation soil is improved, the shear strength of the soil body is improved, and the CFG piles are prevented from being pierced and damaged;
the lime is added to improve soil, the design elevation of the road is reduced, the stability is ensured, and the engineering investment is reduced;
the clay layer is arranged, so that the clay layer can be well fused with lime improved soil, the integral bearing capacity can be enhanced, and the integral strength and the stability can be improved; the utility model relates to a soft soil foundation processing apparatus has set up the escape canal, can effectively reduce the ground water level elevation to can be used for subsequent pipeline construction, shorten work load, improve work efficiency.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1, for the utility model discloses a municipal works ground preprocessing device, specifically include:
the foundation comprises a foundation 1, wherein a road surface layer 2, a lime soil improvement layer 3, a clay layer 4 and a gravel supporting layer 5 are sequentially arranged on the upper surface of the foundation 1 from top to bottom; a gravel layer 6, a clay layer 7, a fine sand layer 8 and a clay layer 4 are sequentially arranged on the lower surface of the foundation 1 from bottom to top; wherein, the lower end of the gravel layer 6 is provided with a plurality of CFG piles 9 and powder-spraying piles 10 in a staggered manner; the foundation 1 is arranged above the CFG piles 9 and the powder spraying piles 10; a plurality of drainage ditches 11 are arranged on two sides of the foundation 1; the drainage ditch 11 is connected with a drainage pipeline 12.
In order to further optimize the above technical solution, the thickness of the gravel supporting layer is 25 cm.
In order to further optimize the above solution, the thickness of the gravel layer is 3 m.
In order to further optimize the technical scheme, the thickness of the clay layer is 1 m.
In order to further optimize the technical scheme, the thickness of the fine sand layer is 1.5 m.
In order to further optimize the technical scheme, the thickness of the clay layer is 2 m.
In order to further optimize the technical scheme, the thickness of the limestone soil improvement layer is 25 cm.
In order to further optimize the technical scheme, the thickness of the road surface layer is 12 cm.
In order to further optimize the technical scheme, the lime soil improvement layer is flush with the underground water line.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (9)

1. Municipal works ground preprocessing device, its characterized in that includes: the upper surface of the foundation is sequentially provided with a pavement layer, a lime soil improvement layer, a clay layer and a gravel bearing layer from top to bottom; a gravel layer, a clay layer, a fine sand layer and a clay layer are sequentially arranged on the lower surface of the foundation from bottom to top; wherein, the lower end of the gravel layer is provided with a plurality of CFG piles and powder-spraying piles in a staggered manner; the upper parts of the CFG piles and the powder spraying piles are the foundations; a plurality of drainage ditches are arranged on two sides of the foundation; the drainage ditch is connected with a drainage pipeline.
2. The municipal engineering foundation pretreatment device of claim 1, wherein the gravel support layer is 25cm thick.
3. The municipal engineering foundation pretreatment device of claim 1, wherein the gravel layer is 3m thick.
4. The municipal engineering foundation pretreatment device of claim 1, wherein the clay layer is 1m thick.
5. The municipal engineering foundation pretreatment device of claim 1, wherein the fine sand layer is 1.5m thick.
6. The municipal engineering foundation pretreatment device of claim 1, wherein the clay layer is 2m thick.
7. The municipal engineering foundation pretreatment device of claim 1, wherein the thickness of the limestone soil improvement layer is 25 cm.
8. The municipal engineering foundation pretreatment device of claim 1, wherein the pavement layer is 12cm thick.
9. The municipal engineering foundation pretreatment device of claim 1, wherein the limestone soil improvement layer is flush with a ground water line.
CN202020701675.XU 2020-04-30 2020-04-30 Municipal works ground preprocessing device Expired - Fee Related CN212316576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020701675.XU CN212316576U (en) 2020-04-30 2020-04-30 Municipal works ground preprocessing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020701675.XU CN212316576U (en) 2020-04-30 2020-04-30 Municipal works ground preprocessing device

Publications (1)

Publication Number Publication Date
CN212316576U true CN212316576U (en) 2021-01-08

Family

ID=74032870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020701675.XU Expired - Fee Related CN212316576U (en) 2020-04-30 2020-04-30 Municipal works ground preprocessing device

Country Status (1)

Country Link
CN (1) CN212316576U (en)

Similar Documents

Publication Publication Date Title
CN202559376U (en) Near-river municipal administration road structure below viaduct bridge
CN203174616U (en) Clay foundation rain falling and water saving system
CN101666083A (en) Soft soil foundation treatment reinforcement method and device thereof
KR101169023B1 (en) Method for installing soil nailing and tunnel prevent hole for tidal plant
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN109083100B (en) River channel excavation construction process after mud blowing and landing
CN212316576U (en) Municipal works ground preprocessing device
CN105839653B (en) A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN108755721A (en) A kind of novel cofferdam method for protecting support for crossing piping lane construction in water river
CN206800436U (en) A kind of open caisson supporting construction
CN207260082U (en) Active service refutes bank revetment and increases structure
CN105951670B (en) A kind of raising sea wall mask foundation bearing capacity construction method
CN211421139U (en) Shield constructs well crown beam bearing structure
CN212000674U (en) Novel reverse construction method assembly type non-pressure culvert
CN210887289U (en) Soil retaining structure suitable for electric power building built on soft geology
CN112575730A (en) High-strength comprehensive function breakwater with breakwater core prepared from urban waste soil resources
CN108643132B (en) Rolled concrete structure with composite slurry injected into stone slag material and construction method thereof
CN208949825U (en) A kind of gantry type bank protection structure
CN206916688U (en) A kind of new rammed earth retaining wall
CN110158547A (en) A kind of cement sand and gravel buttress dam
CN111962632A (en) Rainwater sewer and construction method thereof
CN111979983A (en) Sand geological water retaining dam solidified by using construction waste
CN201738324U (en) Project pile deflection prevention structure used on soft soil foundation
CN110965488A (en) Novel reverse construction method assembly type non-pressure culvert and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210108