CN207260082U - Active service refutes bank revetment and increases structure - Google Patents

Active service refutes bank revetment and increases structure Download PDF

Info

Publication number
CN207260082U
CN207260082U CN201720744649.3U CN201720744649U CN207260082U CN 207260082 U CN207260082 U CN 207260082U CN 201720744649 U CN201720744649 U CN 201720744649U CN 207260082 U CN207260082 U CN 207260082U
Authority
CN
China
Prior art keywords
revetment
bank
newly
former
shore protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720744649.3U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an City Municipal Architecture Group Co ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201720744649.3U priority Critical patent/CN207260082U/en
Application granted granted Critical
Publication of CN207260082U publication Critical patent/CN207260082U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

It the utility model is related to a kind of active service and refute bank revetment and increase structure, including:Antiskid structure and newly-increased bank protection construction structure, foam concrete structure;Newly-increased bank protection construction structure includes bottom plate, former revetment, drainpipe and shore protection increase part newly, spreading drainpipe carries out spreading to former shore protection drainpipe, former revetment increases part reinforcing bar binding connection newly by bar planting and shore protection, bank side template is connected by screw rod with former revetment, and the side template that borders on the river mainly is made of sizing tripod, operating platform and steel plate;The side template side that borders on the river is provided with collapsible form, is connected with bank side template by screw rod;Top, which has poured, newly pours road surface.The beneficial effects of the utility model are:Increase by the regulation of active service revetment bar planting veneer and add prefabricated anti-skidding key-wall, and in bank side fill concrete, solve the problems, such as that bank shore protection wall construction is refuted in active service, secure context is insufficient.

Description

Active service refutes bank revetment and increases structure
Technical field
It the utility model is related to a kind of active service and refute bank revetment and increase structure.
Background technology
River waterway revetment engineering is to protect river bank from current, stormy waves invasion and attack and wash away taken engineering measure. A large amount of built Shore protection design standards are low, and constantly corroding and washing away by seawater for a long time, lose its enforcement gradually and support Imperial sudden and violent tide, wave, current invasion and attack, protect the effect of seashore inside and outside harbour.The active service shore protection so huge in face of quantity, all pushes away Neither science is rebuild to waste man power and money again.Therefore, it is necessary to be increased active service revetment, reinforced, it can meet structure safety And real requirement, such active service revetment is increased, reinforcing engineering is in recent years in growth trend year by year.
Processing to active service revetment at present mainly has reconstruction method in situ, bored concrete pile method for strengthening, mini pile method for strengthening etc., when When taking reconstruction method in situ, original disease barricade is removed, builds revetment again according to new specification, it is necessary to carry out large area Excavation, cutting depth is big, long construction period and cost is high;Bored concrete pile method for strengthening, i.e., directly use punching in bank side position Bored concrete pile is reinforced, and the disturbance in its punching operation to active service revetment is larger, and there are larger security risk in construction;It is miniature Stake method for strengthening is relatively new, and construction is convenient, but sexual valence is poor.
Utility model content
Increase the purpose of this utility model is to provide one kind with reference to the regulation of active service revetment bar planting veneer and add prefabricated anti- Slip teeth wall, refutes present situation bank revetment using integrally-lifting sliding punching block and is widened, increases, and will be protected by presstressed reinforcing steel Quaywall body and the cellular concrete of bank side backfill are linked to be an entirety.
To realize above-mentioned technical purpose, the utility model employs following technical scheme:
A kind of active service refutes bank revetment and increases structure, including antiskid structure and newly-increased bank protection construction structure, foam concrete Structure;Antiskid structure includes the precast square pile of injection before present situation revetment, and precast square pile top sets prefabricated anti-skidding key-wall, prefabricated anti- It is connected between slip teeth wall by tongue and groove, reinforced mesh is connected with reserving rib at the top of precast square pile, and concreting is integral, In the slide of design position Slip-reserved punching block;It is new that newly-increased bank protection construction structure includes bottom plate, former revetment, drainpipe and shore protection Increase part, spreading drainpipe carries out spreading to former shore protection drainpipe, and former revetment increases part reinforcing bar newly by bar planting and shore protection and ties up Connection is pricked, bank side template is connected by screw rod with former revetment, and the side template that borders on the river is mainly by sizing tripod, operating platform and steel Plate forms;The side template side that borders on the river is provided with collapsible form, is connected with bank side template by screw rod;Foam concrete structure includes The prefabricated ribbed plate stake of first injection on rear side of present situation revetment, sheet pile set floor, are reserved with preformed hole on floor, are classified excavation One layer of the steel pipe support supporting of each layer of the soil body, reducing Grouting Pipe is installed through preformed hole, and presstressed reinforcing steel is reserved to newly-increased shore protection Spreading is carried out, foam concrete reinforced mesh is installed and has poured foam concrete;Top, which has poured, newly pours road surface.
Further, plate jacking device is additionally provided with, plate jacking device is very heavy mainly by shaped steel reaction beam, steel shoe Top, running gear composition, running gear include bearing and roller, and lift steel pulley is fixed on shaped steel reaction beam, shaped steel Reaction beam is fixed on the sizing horizontal channel steel of tripod and is linked as entirety, while sets auxiliary jack auxiliary to provide jacking Power.
The utility model is that bank revetment rebuilding construction technology is refuted in comprehensive active service, whole with reference to active service revetment bar planting veneer Control and increase and add prefabricated anti-skidding key-wall, bank revetment refutes present situation using integrally-lifting sliding punching block and widened, increase, And the cellular concrete that wall body for revetment and bank side backfill is linked to be by an entirety by presstressed reinforcing steel.The utility model has following The characteristics of and
Beneficial effect:
(1) increase by the regulation of active service revetment bar planting veneer and add prefabricated anti-skidding key-wall, and in bank side fill concrete, Solve the problems, such as that bank shore protection wall construction is refuted in active service, secure context is insufficient.
(2) active service revetment bar planting veneer regulation increases and adds prefabricated anti-skidding key-wall.The prefabricated side of injection before present situation revetment Stake, precast square pile top set prefabricated anti-skidding key-wall, are connected, antiskid effect is good.
(3) present situation revetment wall body is with after basic bar planting, drainpipe spreading, installing integrally-lifting sliding punching block, pouring side Face is with increasing concrete.By overall punching block, sizing tripod, lift steel pulley composition, construct convenient, the duration sliding system It is short.
(4) design position first breaks sheet pile with ribbing after former present situation revetment, and sheet pile bottom pours bent cap and is linked as entirety, plate Stake embedded steel tube, it is new pour and former revetment wall on bar planting, draw hole built-in connection, stay bolt lever be installed when excavating, excavation After the completion of Grouting Pipe, and casting concrete are set, improve the bearing capacity and globality of structure.
(5) have the characteristics that light weight, intensity are high, speed of application is fast, in fact to being backfilled after wall using foam concrete Border application effect is good.
(6) increasing shore protection template, screw rod, nut etc. newly can fully reuse, and greatly improve construction efficiency, saved and applied Work cost.
Brief description of the drawings
Fig. 1 is that active service refutes bank revetment and increases structure diagram;
Fig. 2 is antiskid key-wall connection diagram figure;
Fig. 3 is template splicing schematic diagram;
Fig. 4 is foam concrete backfill structure diagram;
Fig. 5 is reducing Grouting Pipe connection diagram;
Fig. 6 is the utility model construction flow chart.
In figure:1- precast square piles, 2- antiskid key-walls, 3- precast square pile reserving ribs, 4- reinforced mesh, 5- bottom plates, the former shields of 6- Quaywall, 7- drainpipes, 8- spreading drainpipes, 9- bar plantings, 10- shore protections increase part reinforcing bar, 11- bank side templates, 12- screw rods, 13- newly Sizing tripod, 14- operating platforms, 15- shaped steel reaction beams, 16- steel shoes, 17- bearings, 18- rollers, 19- slides, 20- are adjacent Water side template, 21- jack, 22- auxiliary jack, 23- shore protections increase part newly, 24- collapsible forms, 25- tongue and grooves, and 26- is with ribbing Sheet pile, 27- floors, 28- presstressed reinforcing steels, 29- steel pipe supports, 30- foam concrete reinforced mesh, 31- reducing Grouting Pipes, 32- Foam concrete, 33- newly pour road surface.
Embodiment
The making requirement of precast square pile, prefabricated antiskid key-wall, reinforcing steel implant construction technology, prestressing force in present embodiment Constructing operation code etc. is drawn to repeat no more, emphasis illustrates that the embodiment party that bank revetment is increased is refuted in the active service that the utility model is related to Formula.
Fig. 1 is that active service refutes bank revetment and increases structure diagram;Fig. 2 is antiskid key-wall connection diagram figure;Fig. 3 is template Splice schematic diagram;Fig. 4 is foam concrete backfill structure diagram;Fig. 5 is reducing Grouting Pipe connection diagram;Fig. 6 is this reality With novel construction process flow chart.
As shown in Figs. 1-5, the active service of the utility model refutes bank revetment and increases structure, antiskid structure and newly-increased bank protection construction Structure, foam concrete structure etc.;Antiskid structure includes injection precast square pile 1 before present situation revetment, and precast square pile top sets pre- Anti-skidding key-wall 2 is made, is connected between prefabricated anti-skidding key-wall by tongue and groove 25, reserving rib 3 at the top of reinforced mesh 4 and precast square pile Connection, concreting is integral, in the slide 19 of design position Slip-reserved punching block;Newly-increased bank protection construction structure includes bottom plate 5th, former revetment 6, drainpipe 7, shore protection increase part 23 etc. newly, and spreading drainpipe 8 carries out spreading, former shore protection to former shore protection drainpipe Wall increases the binding connection of part reinforcing bar 10 newly by bar planting 9 and shore protection, and bank side template 11 is connected by screw rod 12 with former revetment, adjacent Water side template 20 is made of sizing tripod 13, operating platform 14, steel plate etc.;The side template side that borders on the river is provided with collapsible form 24, it is connected with bank side template by screw rod 12;Foam concrete structure include present situation revetment on rear side of place elder generation injection it is prefabricated with ribbing Sheet pile 26, sheet pile set floor 27, and preformed hole is reserved with floor 27, and the soil body is excavated in classification, excavate one layer with steel pipe support 29 One layer of supporting, through preformed hole installation reducing Grouting Pipe 31 after the completion of excavation, reserves presstressed reinforcing steel 28 to newly-increased shore protection and connects It is long, carry out pouring for foam concrete 32 after installing foam concrete reinforced mesh 30.Then reducing Grouting Pipe is noted Slurry, and tensioning, sealing off and covering anchorage are carried out to presstressed reinforcing steel.Finally pour and newly pour road surface 33.
Further, plate jacking device is made of shaped steel reaction beam 15, steel shoe 16, jack 21, running gear etc., Running gear includes bearing 17 and roller 18 forms, and lift steel pulley is fixed on shaped steel reaction beam, and shaped steel reaction beam is consolidated Due to sizing the horizontal channel steel of tripod on and be linked as entirety, while set auxiliary jack 22 auxiliary provide top lift.
As shown in fig. 6, the construction procedure that bank revetment heightening construction method is refuted in active service is as follows:
1) preparation of construction:Machinery that organizing construction needs, material, personnel etc. march into the arena, and former revetment surface is lacked Detection is fallen into, and uses the mode such as the cementation of fissures, outsourcing carbon cloth to repair former shore protection crack.
2) antiskid pile driving construction:The injection precast square pile 1 before present situation revetment, precast square pile stake footpath 1.2m, stake depth 4.5m, use The mode for planting stake is installed.Precast square pile top sets prefabricated anti-skidding key-wall 2, antiskid key-wall wide 1.5m, high 0.5m, prefabricated anti-slop serrations It is connected between wall by tongue and groove 25;Reinforced mesh 4 is installed, and is connected with reserving rib 3 at the top of precast square pile, concreting It is integral.When pouring, in the slide 19 of design position Slip-reserved punching block.
3) former shore protection bar planting, drainpipe spreading:Former shore protection includes bottom plate 5, former revetment 6, drainpipe 7 etc., is arranged with spreading Water pipe 8 carries out former shore protection drainpipe spreading, and bar planting 9 is carried out to former revetment, and shore protection increases the binding of part reinforcing bar 10 newly and connects Connect.
4) bank protection construction is increased newly:Bank side template 11 is installed, is connected by screw rod 12 with former revetment;It is subsequently mounted the side that borders on the river Template 20, is made of sizing tripod 13, operating platform 14, steel plate etc., and steel plate, channel steel use q235;The side template that borders on the river is pacified Collapsible form 24 is rotated after the completion of dress, is connected with bank side template by screw rod 12;Formwork erection completes after-pouring C30 concrete, is formed Shore protection increases part 23 newly.First pine collapsible form screw rod, then remove bank side template, jacks finally by plate jacking device during form removal Border on the river side template, demolition template, and template is slid onto next construction section after unclamping.Part is increased after form removal newly to shore protection to support in time Shield.Plate jacking device is made of shaped steel reaction beam 15, steel shoe 16, jack 21, running gear etc., and jack uses 10t, Shaped steel reaction beam uses 16a I-steel, and running gear includes bearing 17 and roller 18 forms, and lift steel pulley is fixed on type On steel reaction beam, a diameter of 20cm;Shaped steel reaction beam is fixed on the sizing horizontal channel steel of tripod and is linked as entirety, at the same time The auxiliary auxiliary of jack 22 is set to provide top lift.
5) foam concrete is constructed:In the prefabricated ribbed plate stake 26 of elder generation's injection at design position on rear side of present situation revetment, sheet pile is set Floor 27 is put, preformed hole is reserved with floor 27, the soil body is excavated in classification, excavates one layer with one layer of 29 supporting of steel pipe support, excavation After the completion of through preformed hole installation reducing Grouting Pipe 31, path 1mm, major diameter 3mm, presstressed reinforcing steel 28 is reserved to newly-increased shore protection and is carried out Spreading, pouring for foam concrete 32 is carried out after installing foam concrete reinforced mesh 30.Then reducing Grouting Pipe is carried out Slip casting, and tensioning, sealing off and covering anchorage are carried out to presstressed reinforcing steel.Finally pour and newly pour road surface 33, using C25 concrete.

Claims (2)

1. bank revetment is refuted in a kind of active service increases structure, it is characterised in that including antiskid structure and newly-increased bank protection construction structure, bubble Foam concrete structure;Antiskid structure includes the precast square pile (1) of injection before present situation revetment, and precast square pile top sets prefabricated anti-skidding Key-wall (2), is connected by tongue and groove (25) between prefabricated anti-skidding key-wall (2), at the top of reinforced mesh (4) and precast square pile (1) Reserving rib (3) connects, and concreting is integral, in the slide (19) of design position Slip-reserved punching block;Newly-increased bank protection construction Structure includes bottom plate (5), former revetment (6), drainpipe (7) and shore protection increase part (23) newly, and spreading drainpipe (8) is to former shore protection Drainpipe carries out spreading, and former revetment increases part reinforcing bar (10) binding connection, bank side template (11) newly by bar planting (9) and shore protection Be connected by screw rod (12) with former revetment, the side template that borders on the river (20) mainly by sizing tripod (13), operating platform (14) and Steel plate forms;Side template (20) side that borders on the river is provided with collapsible form (24), is connected with bank side template (11) by screw rod (12); Foam concrete structure includes the prefabricated ribbed plate stake (26) of first injection on rear side of present situation revetment, and sheet pile sets floor (27), rib Plate is reserved with preformed hole on (27), is classified one layer of steel pipe support (29) supporting of each layer of the soil body of excavation, pacifies through preformed hole Reducing Grouting Pipe (31) is filled, reserving presstressed reinforcing steel (28) to newly-increased shore protection carries out spreading, is provided with foam concrete reinforced mesh (30) and foam concrete (32) has been poured;Top, which has poured, newly pours road surface (33).
2. bank revetment is refuted in active service according to claim 1 increases structure, it is characterised in that is additionally provided with template jacking dress Put, plate jacking device is mainly by shaped steel reaction beam (15), steel shoe (16), jack (21), running gear composition, walking dress Put including bearing (17) and roller (18), lift steel pulley is fixed on shaped steel reaction beam (15), shaped steel reaction beam (15) It is fixed on sizing tripod (13) horizontal channel steel and is linked as entirety, while sets auxiliary jack (22) auxiliary to provide top Lift.
CN201720744649.3U 2017-06-23 2017-06-23 Active service refutes bank revetment and increases structure Expired - Fee Related CN207260082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720744649.3U CN207260082U (en) 2017-06-23 2017-06-23 Active service refutes bank revetment and increases structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720744649.3U CN207260082U (en) 2017-06-23 2017-06-23 Active service refutes bank revetment and increases structure

Publications (1)

Publication Number Publication Date
CN207260082U true CN207260082U (en) 2018-04-20

Family

ID=61915688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720744649.3U Expired - Fee Related CN207260082U (en) 2017-06-23 2017-06-23 Active service refutes bank revetment and increases structure

Country Status (1)

Country Link
CN (1) CN207260082U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827240A (en) * 2020-07-27 2020-10-27 曹灵涛 Reinforcing construction method for old revetment of ship lock engineering
CN114108560A (en) * 2021-12-07 2022-03-01 中煤第三建设(集团)有限责任公司 Reinforcing structure of existing river bank protection and construction process thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827240A (en) * 2020-07-27 2020-10-27 曹灵涛 Reinforcing construction method for old revetment of ship lock engineering
CN114108560A (en) * 2021-12-07 2022-03-01 中煤第三建设(集团)有限责任公司 Reinforcing structure of existing river bank protection and construction process thereof

Similar Documents

Publication Publication Date Title
CN102505695B (en) Construction method for deep foundation pit of three-dimensional garage
CN205999903U (en) Environment-friendly type grass planting Concrete Highway protective slope structure
CN105697021B (en) The prefabricated tunnel and construction method in the shallow earthing riverbed of shield crossing
CN103572765B (en) Treatment and construction method of bridge site river bank expansive soil landslide positions
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN104532957B (en) Existing building sets up basement reversed construction method
CN107401142B (en) Bank revetment heightening construction method is refuted in active service
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN114411756A (en) Construction method and construction device for water-rich sand layer subway station open excavation foundation pit without precipitation
CN207260082U (en) Active service refutes bank revetment and increases structure
CN206428707U (en) A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation
CN109025349B (en) Method for correcting inclination of brick-concrete structure building and adding underground layer
CN106592598A (en) Same-layer double-beam large-diameter steel pipe support and deep foundation pit combined inner support formed thereby
CN111155429A (en) Construction method for bridge sand blowing island building in still water deep water area
CN212272234U (en) High-strength combined template for open groove section of large-section inclined shaft
CN106638684B (en) A kind of piping lane backfill soil processing method of Collapsible Loess District
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
CN106988337A (en) Reinforcing method for reducing uneven settlement of strip-shaped shallow foundation house
CN114961336B (en) Protective demolition construction method for foundation pile of basement close to existing subway line
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge
CN208455387U (en) Mountain highway, which is filled out, digs intersection road structure
CN217839554U (en) Super high section drainage system of white plus black road surface of extension project
CN109811612A (en) Coombe processing is faced forever in conjunction with sidewalk structure and its construction method
CN206667263U (en) A kind of foundation pit supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180522

Address after: 710054 No. 20 central section of Ring Road south of Beilin District, Xi'an, Shaanxi

Patentee after: Xi'an City Municipal Architecture (Group) Co.,Ltd.

Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang.

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180420