CN105951670B - A kind of raising sea wall mask foundation bearing capacity construction method - Google Patents
A kind of raising sea wall mask foundation bearing capacity construction method Download PDFInfo
- Publication number
- CN105951670B CN105951670B CN201610269381.2A CN201610269381A CN105951670B CN 105951670 B CN105951670 B CN 105951670B CN 201610269381 A CN201610269381 A CN 201610269381A CN 105951670 B CN105951670 B CN 105951670B
- Authority
- CN
- China
- Prior art keywords
- construction
- mixing pile
- sea wall
- steel pipe
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of raising sea wall mask foundation bearing capacity construction methods, the following steps are included: preparation of construction → construction survey → cleaning sea wall exterior wall ground → mixing pile positions → is constructed, mixing pile → construction fixation kit → installation connection component → construction grouts stone walling → laying turf → inspection condition of construction, completes Sea dike reinforcement and builds.In the case where not removing former sea wall, processing reinforcing is carried out to the exterior wall of former sea wall, using two-way stirring construction mixing pile, pass through construction fixation kit and installation connection component again, mixing pile is fixedly connected into a piece of, cement mixing pile forms composite foundation together with the tidal land mud of stake side, to improve foundation bearing capacity, reduces settlement of foundation and lateral displacement amount.Operation is simple and feasible for the construction, reduces construction cost, and easy for construction, construction efficiency is high, can not only reduce engineering construction cost, but also can be shortened the engineering construction period, improve the returns of investment of engineering.
Description
Technical field
The present invention relates to a kind of raising sea wall mask foundation bearing capacity construction methods.
Background technique
Polder is firstly the need of construction sea wall, and soft base is the common technique problem encountered during sea wall is built, soft base
Self property determines that it is needed could be as the ground of engineering construction after consolidation process.At present mainly by after jackstone
It is in the milk again and completes the consolidation process of soft base, but on the one hand since sea wall length is big, need to throw during highway on soft ground
The mechanical equipment and earthwork entered is huge, causes project cost height;On the other hand, sea wall density requires high, and due to throwing
The effective rate of utilization for entering the marine cubic metre of earth and stone and slurries is lower, it is thus possible to and there are spillages, and the density that this will lead to sea wall is poor,
It is poor so as to cause the stability of sea wall.
In many polder areas in China, cubic metre of earth and stone source is more nervous, the environmental requirement that China is continuously improved in addition, soil
A large amount of excavations of the cubic meter of stone do not meet fundamental state policy requirement yet.For a large amount of excavations for reducing the cubic metre of earth and stone, also have using steel sheet pile at present
Cofferdam carries out sea wall construction, although this method speed of application is very fast, to reduce cost, and to avoid becoming after steel sheet pile is rotten
The stability of strong influence sea wall at through-hole usually requires that recycling steel sheet pile, however steel sheet pile dismounting is very inconvenient.
Summary of the invention
Above-mentioned technical problem present in present invention aims to solve the prior art, a kind of raising sea wall mask ground are held
Power construction method is carried to carry out processing reinforcing in the case where not removing former sea wall to the exterior wall of former sea wall, apply using two-way stirring
Work mixing pile, then by construction fixation kit and installation connection component, mixing pile is fixedly connected into it is a piece of, cement mixing pile with
Stake side tidal land mud forms composite foundation together, to improve foundation bearing capacity, reduces settlement of foundation and lateral displacement amount.The construction
Operation is simple and feasible for engineering method, reduces construction cost, and easy for construction, construction efficiency is high, can not only reduce engineering construction cost, but also can contract
Casual labourer's journey construction period, improve the returns of investment of engineering.
In order to solve the above-mentioned technical problem, it adopts the following technical scheme that
A kind of raising sea wall mask foundation bearing capacity construction method, comprising the following steps:
(1) preparation of construction.
(2) construction construction survey: is set up according to the measurement control point of former sea wall and elevation water level point using polygon control survey
Bench mark and auxiliary construction baseline move towards to lay traverse net along the main line of former sea wall, and draw engineering drawing, after checking computations review really
Determine construction area.
(3) clear up sea wall exterior wall ground: with excavator by sea wall exterior wall ground earth's surface base surface sundries and surface dust it is clear
Except clean.
(4) mixing pile positions: carrying out setting-out according to design working drawing, lays mode, each mixing pile using equilateral triangle
Spacing control be 3m, repetition measurement and positioning are carried out to each mixing pile point, and determine that the stake of each mixing pile is deep, finally stirred each
It mixes stake point to be numbered, stirring is facilitated to construct.
(5) construction mixing pile: by the rubble surface layer after bidirectional stirring pile machine positioning on the ebb, mixing pile uses the first step
Single drill bit two-way stirring construction, stake machine moves on to specified mixing pile centering, and ensures that mixing pile machine consolidates in place;Second step first configures
Cement slurry restarts mixing pile machine, makes mixing pile machine along leading truck to incision soil, while opening and sending stock pump to soil body spraying cement
Slurry, two groups of blades while forward and reverse circumgyration incision, the stirring soil body, mixing pile machine persistently sinks, until projected depth, stirring-head
Stirring is sunk on one side, is whitewashed on one side, is mixed and stirred mortar with the soil body;Third step first promotes blender, turns off and send stock pump, and two groups
Blade while forward and reverse rotation stirring concrete earth, until earth's surface;4th step blender is opened simultaneously again along leading truck to incision soil
It opens and send stock pump to soil body water-spray type slurry, forward and reverse circumgyration incision, the stirring soil body, blender persistently sink two groups of blades simultaneously, directly
To projected depth;5th step stirring-head is sunk to for the second time after projected depth, and stock pump is sent in closing, and two groups of blades are forward and reverse simultaneously
Stirring soil cement, until earth's surface;6th step closes blender, completes first mixing pile construction;Step 7: according to above-mentioned
Mode complete mixing pile.
(6) prefabricated hollow steel pipe: being first inserted into mixing pile with intubation machine by construction fixation kit, and control insertion is deep
Degree is deep 0.4-0.6 times of mixing pile stake, then fixed steel pipe is inserted into hollow steel pipe that control insertion depth is mixing pile stake
Deep 0.4-0.6 times, cement slurry is then added in hollow steel pipe, is finally tightened between joint steel pipe with stirrup, completes one
The construction working of a fixation kit;In a manner mentioned above, the construction working of next fixation kit is completed.
(7) install connection component: will between the fixation steel pipe of two neighboring fixation kit install a joint steel pipe, and
Upper wire netting is laid on fixation kit.
(8) construction grouts stone walling: first all covering fixed steel pipe with cement slurry, forms cement slurry bed course;Then with
For cement mortar by stone block building on cement slurry bed course, formation grouts stone walling.
(9) it is laid with turf: first slope surface and top surface being modified, planting soil is completed, then drench soil with water, finally spreads grass
Skin completes showering curing.
(10) it checks condition of construction, completes Sea dike reinforcement and build.
Further, in step (1), the particular content of preparation of construction: construction personnel grasps design idea, by construction working
Required equipment and materials handling carries out preparation of construction to construction site;Preparation of construction include be familiar with the relevant technologies design data,
Construction drawing and the technical standard modular working of sea wall mask foundation stabilization.
Further, in step (3), the range of cleaning sea wall exterior wall ground is more than the 60cm in construction sideline.
Further, in step (5), the cement mixed weight of the cement slurry of configuration is 17%.
Further, in step (5), two groups of blades are connected separately with outer drilling rod and interior drilling rod, and outer drilling rod rotates counterclockwise,
Interior drilling rod rotates clockwise, interior rod rotation speed >=50r/min, outer rod rotation speed >=70r/min.
Further, in step (6), in each fixation kit, it is inserted into the quantity of the fixation steel pipe in hollow steel pipe
It is 6.
Further, in step (7), the end of the two first the mounting means of fixed steel pipe and joint steel pipe: is passed through into weldering
The mode connect links together, and is fixed in the junction of the two with connector between pipe.
Further, in step (7), wire netting is mounted on the mode of fixation kit: first using the mode of spot welding by wire netting
It links together with joint steel pipe, and is bound by thin wire.
Further, in step (8), specific work process of the stone block building on cement slurry bed course: made with cement mortar
For binding material, first tile on cement slurry bed course one layer of cement mortar, then block stone block-by-block seat is starched, and is laid in cement mortar
On, and stone face is tapped with iron hammer, perps grouting is then carried out, the laying of first layer block stone is thus completed;In a manner mentioned above,
Complete the laying of following block stone.
Further, the thickness 6-8cm for the cement mortar that tiles.Perps with a thickness of 5-8cm.
As a result of the above technical solution, the following beneficial effects are obtained:
The present invention is a kind of raising sea wall mask foundation bearing capacity construction method, right in the case where not removing former sea wall
The exterior wall of former sea wall carries out processing reinforcing, connects using two-way stirring construction mixing pile, then by construction fixation kit and installation
Component, mixing pile is fixedly connected into a piece of, and cement mixing pile forms composite foundation together with the tidal land mud of stake side, to improve ground
Base bearing capacity reduces settlement of foundation and lateral displacement amount.Operation is simple and feasible for the construction, reduces construction cost, construction party
Just, construction efficiency is high, can not only reduce engineering construction cost, but also can be shortened the engineering construction period, improve the returns of investment of engineering.
Mixing pile of the present invention lays mode using equilateral triangle, meets quincuncial arrangement, and mixing pile fixation is passed through fixation
Component and connection component connect into a piece of, and cement mixing pile forms composite foundation together with the tidal land mud of stake side, to improve ground
Bearing capacity reduces settlement of foundation and lateral displacement amount.
The present invention replaces unidirectional mixing pile head with bidirectional stirring pile head, using two groups of blades simultaneously forward and reverse rotation,
Ooze is stirred, pile-forming speed is fast, work efficiency is high, while improving the compactness of soil cement.As long as there is telephone-moving arrangement in construction of pile groups
Sequence is reasonable, can greatly shorten the duration, reduce machinery cost and construction cost.Using two-way stirring technology, overcome traditional single
To the problem that cement mixing method pile intensity is low, pile quality is difficult to ensure, effective stake depth is limited, pile-forming speed is slow.Water
Soil mixing pile is the density for improving soil cement, can be stirred repeatedly, and stirring number is more, and soil cement is more closely knit, soil cement
Intensity is higher, and the repetitive operation of constructing of vibrating than concrete is strong.
After complete stirring-head sinks to projected depth for the second time, construction fixation kit can be carried out at once, cement slurry not
When condensing completely, prefabricated hollow steel pipe is inserted into mixing pile using intubation machine.Fixed steel is inserted into hollow steel pipe
It manages, the quantity that steel pipe is fixed in each hollow steel pipe is the six roots of sensation, and every fixed steel pipe is separately connected adjacent mixing pile, passes through company
Connect steel pipe connection, and fixed by wire netting, all mixing piles are connected into it is a piece of, to improve sea wall mask foundation bearing
Power reduces settlement of foundation and lateral displacement amount.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is a kind of construction process figure for improving sea wall mask foundation bearing capacity construction method in the present invention;
Fig. 2 is a kind of schematic cross-section for improving sea wall mask foundation bearing capacity construction method in the present invention;
Fig. 3 is the floor map that fixation kit is connected with connection component in the present invention;
Fig. 4 is the structural schematic diagram of fixation kit in the present invention;
Fig. 5 is the structural schematic diagram of two-way stirring blade in the present invention.
In figure: 1- sea wall exterior wall ground;2- cement slurry bed course;3- grouts stone walling;4- turf;5- mixing pile;6- hollow steel
Pipe;7- fixes steel pipe;8- joint steel pipe;The outer drilling rod of 9-;Drilling rod in 10-;11- blade;12- wire netting.
Specific embodiment
As shown in Figures 1 to 5, a kind of raising sea wall mask foundation bearing capacity construction method, comprising the following steps:
(1) preparation of construction: the particular content of preparation of construction: construction personnel grasps design idea, will be needed for construction working
Equipment and materials handling carry out preparation of construction to construction site;Preparation of construction includes being familiar with the relevant technologies design data, construction drawing
Paper and the technical standard modular working of sea wall mask foundation stabilization.
(2) construction construction survey: is set up according to the measurement control point of former sea wall and elevation water level point using polygon control survey
Bench mark and auxiliary construction baseline move towards to lay traverse net along the main line of former sea wall, and draw engineering drawing, after checking computations review really
Determine construction area.
(3) clear up sea wall exterior wall ground: with excavator by sea wall exterior wall ground earth's surface base surface sundries and surface dust it is clear
Except clean, the range of cleaning sea wall exterior wall ground is more than the 60cm in construction sideline.
(4) mixing pile positions: carrying out setting-out according to design working drawing, lays mode, each mixing pile using equilateral triangle
Spacing control be 3m, repetition measurement and positioning are carried out to each mixing pile point, and determine that the stake of each mixing pile is deep, finally stirred each
It mixes stake point to be numbered, stirring is facilitated to construct.
(5) construction mixing pile: by the rubble surface layer after bidirectional stirring pile machine positioning on the ebb, mixing pile uses the first step
Single drill bit two-way stirring construction, stake machine moves on to specified mixing pile centering, and ensures that mixing pile machine consolidates in place;Second step first configures
Cement slurry, the cement mixed weight of the cement slurry of configuration are 17%, restart mixing pile machine, make mixing pile machine along leading truck to incision
Soil, while opening and giving stock pump to soil body water-spray type slurry, two groups of blades while forward and reverse circumgyration incision, the stirring soil body (two groups of blades
It is connected separately with outer drilling rod and interior drilling rod, outer drilling rod rotates counterclockwise, and interior drilling rod rotates clockwise, interior rod rotation speed >=50r/
Min, outer rod rotation speed >=70r/min), mixing pile machine persistently sinks, and until projected depth, stirring-head stirs sinking on one side, and one
Side whitewashing, mixes and stirs mortar with the soil body;Third step first promotes blender, turns off and send stock pump, and two groups of blades are forward and reverse simultaneously
Stirring soil cement, until earth's surface;4th step blender is opened again along leading truck to incision soil and send stock pump to the soil body
Water-spray type slurry, two groups of blades while forward and reverse circumgyration incision, the stirring soil body, blender persistently sinks, until projected depth;The
Five step stirring-heads are sunk to after projected depth for the second time, and stock pump is sent in closing, and forward and reverse rotation mixes cement two groups of blades simultaneously
Soil, until earth's surface;6th step closes blender, completes first mixing pile construction;Step 7: completing to stir in a manner mentioned above
Mix stake.
(6) prefabricated hollow steel pipe: being first inserted into mixing pile with intubation machine by construction fixation kit, and control insertion is deep
Degree is deep 0.4-0.6 times of mixing pile stake, then fixed steel pipe is inserted into hollow steel pipe that control insertion depth is mixing pile stake
Deep 0.4-0.6 times, cement slurry is then added in hollow steel pipe, is finally tightened between joint steel pipe with stirrup, completes one
The construction working of a fixation kit;In a manner mentioned above, the construction working of next fixation kit is completed.In each fixation
In component, the quantity for being inserted into the fixation steel pipe in hollow steel pipe is 6.
(7) install connection component: will between the fixation steel pipe of two neighboring fixation kit install a joint steel pipe, and
Upper wire netting is laid on fixation kit.The mounting means of fixed steel pipe and joint steel pipe: the end of the two is first passed through into welding
Mode links together, and is fixed in the junction of the two with connector between pipe.Wire netting is mounted on the side of fixation kit
First wire netting and joint steel pipe are linked together with the mode of spot welding, and bound by thin wire likes:.
(8) construction grouts stone walling: first all covering fixed steel pipe with cement slurry, forms cement slurry bed course;Then with
For cement mortar by stone block building on cement slurry bed course, formation grouts stone walling.Specific work of the stone block building on cement slurry bed course
Make process: using cement mortar as binding material, first tile on cement slurry bed course one layer of cement mortar, and tile cement mortar
Thickness 6-8cm, then block stone block-by-block seat is starched, it is laid in cement mortar, and tap stone face with iron hammer, then carries out perps filling
Slurry, perps with a thickness of 5-8cm, thus complete the laying of first layer block stone;In a manner mentioned above, following block stone is completed
It is laid with.
(9) it is laid with turf: first slope surface and top surface being modified, planting soil is completed, then drench soil with water, finally spreads grass
Skin completes showering curing.
(10) it checks condition of construction, completes Sea dike reinforcement and build.
The present invention is a kind of raising sea wall mask foundation bearing capacity construction method, right in the case where not removing former sea wall
The exterior wall of former sea wall carries out processing reinforcing, connects using two-way stirring construction mixing pile, then by construction fixation kit and installation
Component, mixing pile is fixedly connected into a piece of, and cement mixing pile forms composite foundation together with the tidal land mud of stake side, to improve ground
Base bearing capacity reduces settlement of foundation and lateral displacement amount.Operation is simple and feasible for the construction, reduces construction cost, construction party
Just, construction efficiency is high, can not only reduce engineering construction cost, but also can be shortened the engineering construction period, improve the returns of investment of engineering.
Mixing pile of the present invention lays mode using equilateral triangle, meets quincuncial arrangement, and mixing pile fixation is passed through fixation
Component and connection component connect into a piece of, and cement mixing pile forms composite foundation together with the tidal land mud of stake side, to improve ground
Bearing capacity reduces settlement of foundation and lateral displacement amount.
The present invention replaces unidirectional mixing pile head with bidirectional stirring pile head, using two groups of blades simultaneously forward and reverse rotation,
Ooze is stirred, pile-forming speed is fast, work efficiency is high, while improving the compactness of soil cement.As long as there is telephone-moving arrangement in construction of pile groups
Sequence is reasonable, can greatly shorten the duration, reduce machinery cost and construction cost.Using two-way stirring technology, overcome traditional single
To the problem that cement mixing method pile intensity is low, pile quality is difficult to ensure, effective stake depth is limited, pile-forming speed is slow.Water
Soil mixing pile is the density for improving soil cement, can be stirred repeatedly, and stirring number is more, and soil cement is more closely knit, soil cement
Intensity is higher, and the repetitive operation of constructing of vibrating than concrete is strong.
After complete stirring-head sinks to projected depth for the second time, construction fixation kit can be carried out at once, cement slurry not
When condensing completely, prefabricated hollow steel pipe is inserted into mixing pile using intubation machine.Fixed steel is inserted into hollow steel pipe
It manages, the quantity that steel pipe is fixed in each hollow steel pipe is the six roots of sensation, and every fixed steel pipe is separately connected adjacent mixing pile, passes through company
Connect steel pipe connection, and fixed by wire netting, all mixing piles are connected into it is a piece of, to improve sea wall mask foundation bearing
Power reduces settlement of foundation and lateral displacement amount.
Mixing pile quality inspection tolerance should meet the regulation of table 1, and construction note check at any time in the construction process,
And emphasis checks that cement consumption, stake are long, whether there is or not pile breaking phenomenons and stirring to promote the time during stake processed, stirs number again and stirs again
Length etc..Mixing pile quality inspection tolerance is as shown in table 1:
Table 1
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair
Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made ground simple change, etc.
With replacement or modification etc., all it is covered by among protection scope of the present invention.
Claims (9)
1. a kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that the following steps are included:
(1) preparation of construction;
(2) construction level construction survey: is set up according to the measurement control point of former sea wall and elevation water level point using polygon control survey
Point and auxiliary construction baseline move towards to lay traverse net along the main line of former sea wall, and draw engineering drawing, and determination is applied after checking computations review
Work area domain;
(3) clear up sea wall exterior wall ground: with excavator by sea wall exterior wall ground earth's surface base surface sundries and surface dust remove it is dry
Only;
(4) mixing pile positions: carrying out setting-out according to design working drawing, mode is laid using equilateral triangle, between each mixing pile
It is 3m away from control, repetition measurement and positioning is carried out to each mixing pile point, and determine that the stake of each mixing pile is deep, finally to each mixing pile
Point is numbered, and stirring is facilitated to construct;
(5) construction mixing pile: by the sea wall exterior wall ground after bidirectional stirring pile machine positioning on the ebb, mixing pile uses the first step
Single drill bit two-way stirring construction, stake machine moves on to mixing pile centering, and ensures that mixing pile machine consolidates in place;Second step first configures cement
Slurry, restarts mixing pile machine, makes mixing pile machine along leading truck to incision soil, while opening and sending stock pump to soil body water-spray type slurry, and two
Forward and reverse circumgyration incision, the stirring soil body, mixing pile machine persistently sink group blade simultaneously, and until projected depth, stirring-head stirs on one side
Sinking is mixed, is whitewashed on one side, mixes and stirs mortar with the soil body;Third step first promotes blender, turns off and send stock pump, and two groups of blades are same
When forward and reverse rotation stirring concrete earth, until earth's surface;4th step blender is opened again along leading truck to incision soil and send slurry
It pumps to soil body water-spray type slurry, two groups of blades while forward and reverse circumgyration incision, the stirring soil body, blender persistently sinks, until design
Depth;5th step stirring-head is sunk to for the second time after projected depth, and stock pump is sent in closing, and two groups of blades simultaneously stir by forward and reverse rotation
Soil cement is mixed, until earth's surface;6th step closes blender, completes first mixing pile construction;Step 7: in a manner mentioned above
Complete mixing pile;
(6) prefabricated hollow steel pipe: being first inserted into mixing pile with intubation machine by construction fixation kit, and control insertion depth is
0.4-0.6 times of mixing pile stake depth, then fixed steel pipe is inserted into hollow steel pipe, control insertion depth is that mixing pile stake is deep
0.4-0.6 times, the cement slurry is then added in hollow steel pipe, is finally tightened between fixed steel pipe with stirrup, completes one
The construction working of a fixation kit;In a manner mentioned above, the construction working of next fixation kit is completed;
(7) connection component is installed: a joint steel pipe will be installed between the fixation steel pipe of two neighboring fixation kit, and in fixation
Upper wire netting, the mounting means of fixed steel pipe and joint steel pipe: first by welding by the end of the two are laid on component
It links together, and is fixed in the junction of the two with connector between pipe;
(8) construction grouts stone walling: first all covering fixed steel pipe with cement slurry, forms cement slurry bed course;Then with cement
For mortar by stone block building on cement slurry bed course, formation grouts stone walling;
(9) it is laid with turf: first slope surface and top surface being modified, complete planting soil, then drench soil with water, last lay down in grass,
Complete showering curing;
(10) it checks condition of construction, completes Sea dike reinforcement and build.
2. a kind of raising sea wall mask foundation bearing capacity construction method according to claim 1, it is characterised in that: in the step
Suddenly in (1), the particular content of the preparation of construction: construction personnel grasps design idea, by equipment and material needed for construction working
Material is carried to construction site, carries out preparation of construction;Preparation of construction includes being familiar with the relevant technologies design data, construction drawing and sea wall
The technical standard modular working of mask foundation stabilization.
3. a kind of raising sea wall mask foundation bearing capacity construction method according to claim 1, it is characterised in that: in the step
Suddenly in (3), the range of cleaning sea wall exterior wall ground is more than the 60cm in construction sideline.
4. a kind of raising sea wall mask foundation bearing capacity construction method according to claim 1, it is characterised in that: in the step
Suddenly in (5), the cement mixed weight of the cement slurry of configuration is 17%.
5. a kind of raising sea wall mask foundation bearing capacity construction method according to claim 1, it is characterised in that: in the step
Suddenly in (5), two groups of blades are connected separately with outer drilling rod and interior drilling rod, and outer drilling rod rotates counterclockwise, and interior drilling rod rotates clockwise, interior
Rod rotation speed >=50r/min, outer rod rotation speed >=70r/min.
6. a kind of raising sea wall mask foundation bearing capacity construction method according to claim 1, it is characterised in that: in the step
Suddenly in (6), in each fixation kit, the quantity for being inserted into the fixation steel pipe in hollow steel pipe is 6.
7. a kind of raising sea wall mask foundation bearing capacity construction method according to claim 1, it is characterised in that: in the step
Suddenly in (7), wire netting is mounted on the mode of fixation kit: wire netting and joint steel pipe being first connected to one with the mode of spot welding
It rises, and is bound by thin wire.
8. a kind of raising sea wall mask foundation bearing capacity construction method according to claim 1, it is characterised in that: in the step
Suddenly it in (8), specific work process of the stone block building on cement slurry bed course: uses cement mortar as binding material, first exists
Tile one layer of cement mortar on cement slurry bed course, then block stone block-by-block seat is starched, and is laid in cement mortar, and taps stone with iron hammer
Face then carries out perps grouting, thus completes the laying of first layer block stone;In a manner mentioned above, following block stone is completed
It is laid with.
9. a kind of raising sea wall mask foundation bearing capacity construction method according to claim 8, it is characterised in that: tiling cement
The thickness 6-8cm of mortar, perps with a thickness of 5-8cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610269381.2A CN105951670B (en) | 2016-04-26 | 2016-04-26 | A kind of raising sea wall mask foundation bearing capacity construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610269381.2A CN105951670B (en) | 2016-04-26 | 2016-04-26 | A kind of raising sea wall mask foundation bearing capacity construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105951670A CN105951670A (en) | 2016-09-21 |
CN105951670B true CN105951670B (en) | 2019-08-06 |
Family
ID=56915968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610269381.2A Active CN105951670B (en) | 2016-04-26 | 2016-04-26 | A kind of raising sea wall mask foundation bearing capacity construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105951670B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948309B (en) * | 2017-02-21 | 2019-09-17 | 浙江水利水电学院 | It is a kind of applied to sea wall pass the flood period protection in foundation stabilization construction method |
CN106930231B (en) * | 2017-02-21 | 2019-01-15 | 浙江水利水电学院 | A kind of construction method applied to engineering flood bank reinforcing of passing the flood period |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1011953A4 (en) * | 1997-09-25 | 2000-03-07 | Cit Alcatel | Piles of protection arrangement of wooden anchors deep water bodies against aggressive attack against wood. |
CN1274912C (en) * | 2004-12-23 | 2006-09-13 | 东南大学 | Pile forming operation method for bi-directional stirring piles |
CN203129131U (en) * | 2013-04-03 | 2013-08-14 | 福建岩土工程勘察研究院 | Cement-soil mixing pile for foundation reinforcement |
CN103422497A (en) * | 2013-08-21 | 2013-12-04 | 国家电网公司 | Method for reinforcing soft soil foundation by using cement-soil mixing pile |
CN205116156U (en) * | 2015-10-22 | 2016-03-30 | 大成科创基础建设股份有限公司 | Cement mud agitating pile |
-
2016
- 2016-04-26 CN CN201610269381.2A patent/CN105951670B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105951670A (en) | 2016-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013191B (en) | Environment-friendly type grass planting Concrete Highway protective slope structure and construction method | |
CN102444142B (en) | Pile group column replacement expanded basement and construction method of same | |
CN103422501B (en) | Anti-floating anchor rod structure in sand seam geology and construction method thereof | |
CN201245846Y (en) | Clamshell excavator stirring concrete enclosure wall | |
CN103422497A (en) | Method for reinforcing soft soil foundation by using cement-soil mixing pile | |
CN101634143A (en) | Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay | |
CN105464074B (en) | A kind of artificial digging pile high polymer grouting safeguard structure and its construction method | |
CN102877470B (en) | Combined soil nailing construction method for supporting | |
CN104153371A (en) | Grouting-to-stop-water construction method of underwater rubble bed | |
CN206070508U (en) | Device for reinforcing foundation | |
CN108571000A (en) | The construction method of underground water cutting when wearing existing railway under a kind of road of location along the river | |
CN105569071A (en) | Cement-based material underwater grouting or mud-jack rock block foundation construction method | |
CN104895111B (en) | The construction method of integrated pipe canal in weak soil ground | |
CN105386610A (en) | Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit | |
CN101008178B (en) | Soft base processing construction process using excavating and stirring method | |
CN105951670B (en) | A kind of raising sea wall mask foundation bearing capacity construction method | |
CN111676987A (en) | Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method | |
CN108842764B (en) | Rotary stirring type anchor pipe construction method | |
CN106087880A (en) | Dam that a kind of 300 meter levels are high and construction technology thereof | |
CN212335976U (en) | Construction waste regeneration drainage CFG pile foundation | |
CN104695417A (en) | Post-grouting gravel pile composite foundation, post-grouting gravel pile and manufacturing method of post-grouting gravel pile | |
CN101886385B (en) | Construction process of long-auger jet-grouting mixing curtain pile | |
CN104213553A (en) | Construction technology for seamless impervious wall in vibration blunt caissons | |
CN110318392A (en) | A kind of major diameter cement earth pile method of construction | |
CN108316237B (en) | Revetment retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Xueying Inventor after: Xu Zhenxing Inventor after: Jin Fangyi Inventor after: Zhou Changchen Inventor before: Liu Xueying Inventor before: Xu Zhenxing Inventor before: Jin Fangfang Inventor before: Zhou Changchen |
|
COR | Change of bibliographic data | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |