CN105951670A - Construction method for improving bearing capacity of seawall armor foundation - Google Patents

Construction method for improving bearing capacity of seawall armor foundation Download PDF

Info

Publication number
CN105951670A
CN105951670A CN201610269381.2A CN201610269381A CN105951670A CN 105951670 A CN105951670 A CN 105951670A CN 201610269381 A CN201610269381 A CN 201610269381A CN 105951670 A CN105951670 A CN 105951670A
Authority
CN
China
Prior art keywords
construction
mixing pile
steel pipe
sea wall
bearing capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610269381.2A
Other languages
Chinese (zh)
Other versions
CN105951670B (en
Inventor
刘学应
徐振兴
金芳方
周昌臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Water Resources and Electric Power
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201610269381.2A priority Critical patent/CN105951670B/en
Publication of CN105951670A publication Critical patent/CN105951670A/en
Application granted granted Critical
Publication of CN105951670B publication Critical patent/CN105951670B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Abstract

The invention discloses a construction method for improving the bearing capacity of a seawall armor foundation. The method comprises the following steps of construction preparation, construction measurement, cleaning of the foundation of an outer wall of a seawall, positioning of mixing piles, construction of the mixing piles, construction of fixing assemblies, mounting of connecting assemblies, construction of a wet masonry stone wall, laying of turfs and checks of construction conditions to complete reinforcing construction of the seawall. Under the condition that an original seawall is not dismantled, the outer wall of the original seawall is treated and reinforced, the mixing piles are constructed in a bidirectional mixing mode and are fixedly connected by constructing the fixing assemblies and mounting the connecting assemblies, and a composite foundation is formed by the cement mixing piles and sea mud on the sides of the piles, so that the bearing capacity of the foundation is improved, and settlement and lateral displacement amount of the foundation are reduced. The construction method is easy and feasible to operate, the construction cost is reduced, construction is convenient, the construction efficiency is high, project construction cost can be reduced, and the project construction period can be shortened, so that the project investment benefits are increased.

Description

A kind of raising sea wall mask foundation bearing capacity construction method
Technical field
The present invention relates to a kind of raising sea wall mask foundation bearing capacity construction method.
Background technology
Polder is firstly the need of building sea wall, and soft base common technique difficult problem of running into during to be sea wall build, and the self property of soft base determines that it needs could be as the ground of engineering construction after consolidation process.Currently mainly by the consolidation process of the soft base that has been in the milk again after jackstone, but on the one hand big due to sea wall length, therefore need the plant equipment of input and earthwork huge during highway on soft ground, cause construction costs high;On the other hand, sea wall density requires height, and relatively low owing to being thrown into the effective rate of utilization of the marine cubic metre of earth and stone and serosity, it is thus possible to there is spillage, and this can cause the density of sea wall poor, thus causes the poor stability of sea wall.
In China's many polders area, cubic metre of earth and stone source is more nervous, and the environmental requirement that China improves constantly in addition, a large amount of excavations of the cubic metre of earth and stone do not meet fundamental state policy requirement yet.For reducing a large amount of excavations of the cubic metre of earth and stone, employing steel sheet-pile cofferdam is currently also had to carry out sea wall construction, although this method speed of application is very fast, but for reducing cost, and for avoiding steel sheet pile to become through hole and the stability of strong influence sea wall after rotting, usually require that recovery steel sheet pile, but steel sheet pile is removed very inconvenient.
Summary of the invention
Present invention aim at solving above-mentioned technical problem present in prior art, a kind of raising sea wall mask foundation bearing capacity construction method, in the case of not removing former sea wall, carry out processing reinforcing to the exterior wall of former sea wall, use two-way stirring construction mixing pile, then connect assembly by construction fixation kit and installation, mixing pile is fixedly connected into a piece of, cement mixing pile forms composite foundation together with the tidal land mud of stake limit, thus improves foundation bearing capacity, reduces settlement of foundation and lateral displacement amount.Operation is simple and feasible for this construction, reduces construction cost, easy construction, and efficiency of construction is high, both can reduce engineering construction cost, and can shorten again the engineering construction cycle, improves the returns of investment of engineering.
In order to solve above-mentioned technical problem, adopt the following technical scheme that
A kind of raising sea wall mask foundation bearing capacity construction method, comprises the following steps:
(1) preparation of construction.
(2) construction survey: use polygon control survey, measurement control point according to former sea wall and elevation water level point, set up construction bench mark and auxiliary construction baseline, and the main line along former sea wall moves towards to lay traverse net, and draw engineering drawing, after checking computations are checked, determine construction area.
(3) cleaning sea wall exterior wall ground: the foreign material on the base surface of sea wall exterior wall ground earth's surface and surface dust are removed clean with excavator.
(4) mixing pile location: carry out setting-out according to design working drawing, uses equilateral triangle to lay mode, and the spacing of each mixing pile controls as 3m, each mixing pile point is carried out repetition measurement and location, and determine that the stake of each mixing pile is deep, finally each mixing pile point is numbered, convenient stirring construction.
(5) construction mixing pile: bidirectional stirring pile machine is positioned on the rubble surface layer after ebb by the first step, mixing pile uses single drill bit two-way stirring construction, and stake machine moves on to specify mixing pile centering, and guarantees that mixing pile machine is in place firm;Second step first configures cement mortar, restart mixing pile machine, make mixing pile machine along leading truck to incision soil, opening simultaneously and send stock pump to soil body water-spray type slurry, two groups of the most forward and reverse circumgyration incisions of blade, stirring soil bodys, mixing pile machine persistently sinks, until projected depth, stirring-head, while stirring is sunk, is whitewashed, is made mortar mix and stir with the soil body;Blender is first promoted by the 3rd step, turns off and send stock pump, two groups of blade the most forward and reverse Stirring soil cements, until earth's surface;4th step blender is again native to incision along leading truck, opens simultaneously and send stock pump to soil body water-spray type slurry, two groups of the most forward and reverse circumgyration incisions of blade, stirring soil bodys, and blender persistently sinks, until projected depth;After 5th step stirring-head second time sinks to projected depth, close and send stock pump, two groups of blade the most forward and reverse Stirring soil cements, until earth's surface;6th step closes blender, completes first mixing pile construction;7th step: complete mixing pile in a manner mentioned above.
(6) construction fixation kit: first with intubation machine, prefabricated hollow steel pipe is inserted in mixing pile, control insertion depth is 0.4-0.6 times that mixing pile stake is deep, again fixing steel pipe is inserted in hollow steel pipe, control insertion depth is 0.4-0.6 times that mixing pile stake is deep, then in hollow steel pipe, add cement mortar, finally tighten with stirrup between joint steel pipe, complete the construction working of a fixation kit;In a manner mentioned above, the construction working of ensuing fixation kit is completed.
(7) connection assembly is installed: a joint steel pipe will be installed between the fixing steel pipe of adjacent two fixation kits, and on fixation kit, lay wire gauze.
(8) construction grouts stone walling: first all covered by fixing steel pipe with cement mortar, forms cement mortar bed course;Then with cement mortar by stone block building on cement mortar bed course, formed grout stone walling.
(9) turf is laid: first domatic and end face are repaired, complete planting soil, then drench soil, last lay down in grass with water, complete showering curing.
(10) check condition of construction, complete Sea dike reinforcement and build.
Further, in step (1), the particular content of preparation of construction: workmen grasps design idea, by the equipment needed for construction working and materials handling to job site, carry out preparation of construction;Preparation of construction includes being familiar with correlation technique design data, construction drawing and the technical standard modular working of sea wall mask foundation stabilization.
Further, in step (3), the scope of cleaning sea wall exterior wall ground exceedes the 60cm in construction sideline.
Further, in step (5), the cement mixed weight of the cement mortar of configuration is 17%.
Further, in step (5), two groups of blades are connected to outer drilling rod and interior drilling rod, and outer drilling rod rotates counterclockwise, and interior drilling rod turns clockwise, interior rod rotation speed >=50r/min, outer rod rotation speed >=70r/min.
Further, in step (6), in each fixation kit, the quantity of the fixing steel pipe being inserted in hollow steel pipe is 6.
Further, in step (7), fixing steel pipe and the mounting means of joint steel pipe: first both ends are linked together by the way of welding, and adapter is fixed between both junction pipes.
Further, in step (7), wire gauze is arranged on the mode of fixation kit: is first linked together with joint steel pipe by wire gauze by the mode of spot welding, and carries out colligation by thin wire.
Further, in step (8), stone block building specific works process on cement mortar bed course: by cement mortar as binding material, first tile on cement mortar bed course one layer of cement mortar, again block stone block-by-block seat is starched, be laid in cement mortar, and tap stone face with iron hammer, then carry out perps grouting, thus complete the laying of ground floor block stone;In a manner mentioned above, the laying of following block stone is completed.
Further, the thickness 6-8cm of the cement mortar that tiles.The thickness of perps is 5-8cm.
Owing to using technique scheme, have the advantages that
The present invention is a kind of raising sea wall mask foundation bearing capacity construction method, in the case of not removing former sea wall, carry out processing reinforcing to the exterior wall of former sea wall, use two-way stirring construction mixing pile, connecting assembly by construction fixation kit and installation again, be fixedly connected into by mixing pile a piece of, cement mixing pile forms composite foundation together with the tidal land mud of stake limit, thus improve foundation bearing capacity, reduce settlement of foundation and lateral displacement amount.Operation is simple and feasible for this construction, reduces construction cost, easy construction, and efficiency of construction is high, both can reduce engineering construction cost, and can shorten again the engineering construction cycle, improves the returns of investment of engineering.
Mixing pile of the present invention uses equilateral triangle to lay mode, meeting quincuncial arrangement, connect into a piece of by fixing for mixing pile by fixation kit and connection assembly, cement mixing pile forms composite foundation together with the tidal land mud of stake limit, thus improve foundation bearing capacity, reduce settlement of foundation and lateral displacement amount.
Present invention bidirectional stirring pile head replaces unidirectional mixing pile head, uses two groups of the most forward and reverse rotations of blade, stirs sea mud, and pile-forming speed is fast, work efficiency is high, improves the degree of compaction of soil cement simultaneously.As long as telephone-moving arranges the most rationally, to be greatly shortened the duration in construction of pile groups, decrease machinery expense and construction cost.Use two-way stirring technology, overcome the difficult problem that traditional unidirectional cement mixing method pile intensity is low, pile quality is difficult to ensure that, effective the stake degree of depth is limited, pile-forming speed is slow.Cement mixing method be improve soil cement density, can repeatedly stir, stirring number of times the most, soil cement is the most closely knit, and soil cement intensity is the highest, than concrete vibrate construction repetitive operation strong.
After complete stirring-head second time sinks to projected depth, fixation kit of constructing can be carried out at once, when cement mortar condenses the most completely, utilize intubation machine to be inserted in mixing pile by prefabricated hollow steel pipe.Fixing steel pipe it is inserted in hollow steel pipe, the quantity fixing steel pipe in each hollow steel pipe is the six roots of sensation, every fixing steel pipe connects adjacent mixing pile respectively, connected by joint steel pipe, and fixed by wire gauze, all of mixing pile is connected into a piece of, thus improves sea wall mask foundation bearing capacity, reduce settlement of foundation and lateral displacement amount.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is a kind of construction process figure improving sea wall mask foundation bearing capacity construction method in the present invention;
Fig. 2 is a kind of schematic cross-section improving sea wall mask foundation bearing capacity construction method in the present invention;
Fig. 3 is the floor map that in the present invention, fixation kit and connection assembly connect;
Fig. 4 is the structural representation of fixation kit in the present invention;
Fig. 5 is the structural representation of two-way stirring blade in the present invention.
In figure: 1-sea wall exterior wall ground;2-cement mortar bed course;3-grouts stone walling;4-turf;5-mixing pile;6-hollow steel pipe;7-fixes steel pipe;8-joint steel pipe;The outer drilling rod of 9-;Drilling rod in 10-;11-blade;12-wire gauze.
Detailed description of the invention
As shown in Figures 1 to 5, a kind of raising sea wall mask foundation bearing capacity construction method, comprise the following steps:
(1) preparation of construction: the particular content of preparation of construction: workmen grasps design idea, by the equipment needed for construction working and materials handling to job site, carries out preparation of construction;Preparation of construction includes being familiar with correlation technique design data, construction drawing and the technical standard modular working of sea wall mask foundation stabilization.
(2) construction survey: use polygon control survey, measurement control point according to former sea wall and elevation water level point, set up construction bench mark and auxiliary construction baseline, and the main line along former sea wall moves towards to lay traverse net, and draw engineering drawing, after checking computations are checked, determine construction area.
(3) cleaning sea wall exterior wall ground: remove clean by the foreign material on the base surface of sea wall exterior wall ground earth's surface and surface dust with excavator, the scope of cleaning sea wall exterior wall ground exceedes the 60cm in construction sideline.
(4) mixing pile location: carry out setting-out according to design working drawing, uses equilateral triangle to lay mode, and the spacing of each mixing pile controls as 3m, each mixing pile point is carried out repetition measurement and location, and determine that the stake of each mixing pile is deep, finally each mixing pile point is numbered, convenient stirring construction.
(5) construction mixing pile: bidirectional stirring pile machine is positioned on the rubble surface layer after ebb by the first step, mixing pile uses single drill bit two-way stirring construction, and stake machine moves on to specify mixing pile centering, and guarantees that mixing pile machine is in place firm;Second step first configures cement mortar, the cement mixed weight of the cement mortar of configuration is 17%, restart mixing pile machine, make mixing pile machine along leading truck to incision soil, open send stock pump to soil body water-spray type slurry simultaneously, two groups of blades are the most just, reversely rotate cutting, (two groups of blades are connected to outer drilling rod and interior drilling rod to the stirring soil body, outer drilling rod rotates counterclockwise, interior drilling rod turns clockwise, interior rod rotation speed >=50r/min, outer rod rotation speed >=70r/min), mixing pile machine persistently sinks, until projected depth, stirring-head is while stirring is sunk, while whitewashing, mortar is made to mix and stir with the soil body;Blender is first promoted by the 3rd step, turns off and send stock pump, two groups of blade the most forward and reverse Stirring soil cements, until earth's surface;4th step blender is again native to incision along leading truck, opens simultaneously and send stock pump to soil body water-spray type slurry, two groups of the most forward and reverse circumgyration incisions of blade, stirring soil bodys, and blender persistently sinks, until projected depth;After 5th step stirring-head second time sinks to projected depth, close and send stock pump, two groups of blade the most forward and reverse Stirring soil cements, until earth's surface;6th step closes blender, completes first mixing pile construction;7th step: complete mixing pile in a manner mentioned above.
(6) construction fixation kit: first with intubation machine, prefabricated hollow steel pipe is inserted in mixing pile, control insertion depth is 0.4-0.6 times that mixing pile stake is deep, again fixing steel pipe is inserted in hollow steel pipe, control insertion depth is 0.4-0.6 times that mixing pile stake is deep, then in hollow steel pipe, add cement mortar, finally tighten with stirrup between joint steel pipe, complete the construction working of a fixation kit;In a manner mentioned above, the construction working of ensuing fixation kit is completed.In each fixation kit, the quantity of the fixing steel pipe being inserted in hollow steel pipe is 6.
(7) connection assembly is installed: a joint steel pipe will be installed between the fixing steel pipe of adjacent two fixation kits, and on fixation kit, lay wire gauze.Fixing steel pipe and the mounting means of joint steel pipe: first both ends are linked together by the way of welding, and adapter is fixed between both junction pipes.Wire gauze is arranged on the mode of fixation kit: is first linked together with joint steel pipe by wire gauze by the mode of spot welding, and carries out colligation by thin wire.
(8) construction grouts stone walling: first all covered by fixing steel pipe with cement mortar, forms cement mortar bed course;Then with cement mortar by stone block building on cement mortar bed course, formed grout stone walling.Stone block building specific works process on cement mortar bed course: by cement mortar as binding material, first tile on cement mortar bed course one layer of cement mortar, the thickness 6-8cm of tiling cement mortar, again block stone block-by-block seat is starched, it is laid in cement mortar, and taps stone face with iron hammer, then carry out perps grouting, the thickness of perps is 5-8cm, thus completes the laying of ground floor block stone;In a manner mentioned above, the laying of following block stone is completed.
(9) turf is laid: first domatic and end face are repaired, complete planting soil, then drench soil, last lay down in grass with water, complete showering curing.
(10) check condition of construction, complete Sea dike reinforcement and build.
The present invention is a kind of raising sea wall mask foundation bearing capacity construction method, in the case of not removing former sea wall, carry out processing reinforcing to the exterior wall of former sea wall, use two-way stirring construction mixing pile, connecting assembly by construction fixation kit and installation again, be fixedly connected into by mixing pile a piece of, cement mixing pile forms composite foundation together with the tidal land mud of stake limit, thus improve foundation bearing capacity, reduce settlement of foundation and lateral displacement amount.Operation is simple and feasible for this construction, reduces construction cost, easy construction, and efficiency of construction is high, both can reduce engineering construction cost, and can shorten again the engineering construction cycle, improves the returns of investment of engineering.
Mixing pile of the present invention uses equilateral triangle to lay mode, meeting quincuncial arrangement, connect into a piece of by fixing for mixing pile by fixation kit and connection assembly, cement mixing pile forms composite foundation together with the tidal land mud of stake limit, thus improve foundation bearing capacity, reduce settlement of foundation and lateral displacement amount.
Present invention bidirectional stirring pile head replaces unidirectional mixing pile head, uses two groups of the most forward and reverse rotations of blade, stirs sea mud, and pile-forming speed is fast, work efficiency is high, improves the degree of compaction of soil cement simultaneously.As long as telephone-moving arranges the most rationally, to be greatly shortened the duration in construction of pile groups, decrease machinery expense and construction cost.Use two-way stirring technology, overcome the difficult problem that traditional unidirectional cement mixing method pile intensity is low, pile quality is difficult to ensure that, effective the stake degree of depth is limited, pile-forming speed is slow.Cement mixing method be improve soil cement density, can repeatedly stir, stirring number of times the most, soil cement is the most closely knit, and soil cement intensity is the highest, than concrete vibrate construction repetitive operation strong.
After complete stirring-head second time sinks to projected depth, fixation kit of constructing can be carried out at once, when cement mortar condenses the most completely, utilize intubation machine to be inserted in mixing pile by prefabricated hollow steel pipe.Fixing steel pipe it is inserted in hollow steel pipe, the quantity fixing steel pipe in each hollow steel pipe is the six roots of sensation, every fixing steel pipe connects adjacent mixing pile respectively, connected by joint steel pipe, and fixed by wire gauze, all of mixing pile is connected into a piece of, thus improves sea wall mask foundation bearing capacity, reduce settlement of foundation and lateral displacement amount.
Mixing pile quality inspection tolerance should meet the regulation of table 1, and checks construction note in work progress at any time, lays equal stress on and to check that a cement consumption, stake are long, with or without pile breaking phenomenon and stir the lifting time during stake processed, stirs number of times again and stirs length etc. again.Mixing pile quality inspection tolerance is as shown in table 1:
Table 1
These are only the specific embodiment of the present invention, but the technical characteristic of the present invention is not limited thereto.Any based on the present invention, for solving essentially identical technical problem, it is achieved essentially identical technique effect, done ground simple change, equivalent or modification etc., all it is covered by among protection scope of the present invention.

Claims (10)

1. a raising sea wall mask foundation bearing capacity construction method, it is characterised in that comprise the following steps:
(1) preparation of construction;
(2) construction survey: use polygon control survey, according to measurement control point and the elevation water level point of former sea wall, Setting up construction bench mark and auxiliary construction baseline, the main line along former sea wall moves towards to lay traverse net, and paints Engineering drawing processed, determines construction area after checking computations are checked;
(3) cleaning sea wall exterior wall ground: with excavator by the foreign material on the base surface of sea wall exterior wall ground earth's surface and Surface dust is removed clean;
(4) mixing pile location: carry out setting-out according to design working drawing, uses equilateral triangle to lay mode, often The spacing of individual mixing pile controls to be 3m, each mixing pile point carries out repetition measurement and location, and determines each stirring The stake mixing stake is deep, is finally numbered each mixing pile point, convenient stirring construction;
(5) construction mixing pile: bidirectional stirring pile machine is positioned on the rubble surface layer after ebb by the first step, stirs Mixing stake and use single drill bit two-way stirring construction, stake machine moves on to specify mixing pile centering, and guarantees mixing pile Machine is in place firm;Second step first configures cement mortar, restarts mixing pile machine, makes mixing pile machine along guiding Frame, to incision soil, is opened simultaneously and is sent stock pump to soil body water-spray type slurry, two groups of the most forward and reverse rotations of blade Turning cutting, the stirring soil body, mixing pile machine persistently sinks, until projected depth, stirring-head stirs Sink, whitewashing, make mortar mix and stir with the soil body;Blender is first promoted by the 3rd step, turns off and send Stock pump, two groups of blade the most forward and reverse Stirring soil cements, until earth's surface;4th step blender is again Secondary along leading truck to incision soil, open simultaneously send stock pump to soil body water-spray type slurry, two groups of blades the most just, Reversely rotating cutting, the stirring soil body, blender persistently sinks, until projected depth;5th step stirring After head second time sinks to projected depth, closing and send stock pump, two groups of the most forward and reverse rotations of blade are stirred Mix soil cement, until earth's surface;6th step closes blender, completes first mixing pile construction;
7th step: complete mixing pile in a manner mentioned above;
(6) construction fixation kit: first with intubation machine, prefabricated hollow steel pipe is inserted in mixing pile, control Insertion depth processed is 0.4-0.6 times that mixing pile stake is deep, then is inserted in hollow steel pipe by fixing steel pipe, Control insertion depth is 0.4-0.6 times that mixing pile stake is deep, then adds described cement in hollow steel pipe Slurry, finally tightens with stirrup between joint steel pipe, completes the construction working of a fixation kit;Press According to above-mentioned mode, complete the construction working of ensuing fixation kit;
(7) connection assembly is installed: one will be installed between the fixing steel pipe of adjacent two fixation kits and connect steel Pipe, and on fixation kit, lay wire gauze;
(8) construction grouts stone walling: first all covered by fixing steel pipe with cement mortar, forms cement mortar bed course; Then with cement mortar by stone block building on cement mortar bed course, formed grout stone walling;
(9) turf is laid: first domatic and end face are repaired, complete planting soil, then drench soil with water, Last lay down in grass, completes showering curing;
(10) check condition of construction, complete Sea dike reinforcement and build.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
In described step (1), the particular content of described preparation of construction: workmen grasps design idea, By the equipment needed for construction working and materials handling to job site, carry out preparation of construction;Preparation of construction Advise including the technical standard being familiar with correlation technique design data, construction drawing and sea wall mask foundation stabilization Model works.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
In described step (3), the scope of cleaning sea wall exterior wall ground exceedes the 60cm in construction sideline.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
In described step (5), the cement mixed weight of the cement mortar of configuration is 17%.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
In described step (5), two groups of blades are connected to outer drilling rod and interior drilling rod, and outer drilling rod is counterclockwise Rotating, interior drilling rod turns clockwise, interior rod rotation speed >=50r/min, outer rod rotation speed >=70r/min.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
In described step (6), in each fixation kit, the fixing steel pipe being inserted in hollow steel pipe Quantity is 6.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
In described step (7), fixing steel pipe and the mounting means of joint steel pipe: first both ends are led to The mode crossing welding links together, and adapter is fixed between both junction pipes.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
In described step (7), wire gauze is arranged on the mode of fixation kit: first by the mode of spot welding by ferrum Silk screen links together with joint steel pipe, and carries out colligation by thin wire.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
In described step (8), described stone block building specific works process on cement mortar bed course: use water Cement mortar is as binding material, and first tile on cement mortar bed course one layer of cement mortar, then by block stone by Block is starched, and is laid in cement mortar, and taps stone face with iron hammer, then carries out perps grouting, by This completes the laying of ground floor block stone;In a manner mentioned above, the laying of following block stone is completed.
A kind of raising sea wall mask foundation bearing capacity construction method, it is characterised in that:
The thickness 6-8cm of tiling cement mortar.The thickness of perps is 5-8cm.
CN201610269381.2A 2016-04-26 2016-04-26 A kind of raising sea wall mask foundation bearing capacity construction method Active CN105951670B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610269381.2A CN105951670B (en) 2016-04-26 2016-04-26 A kind of raising sea wall mask foundation bearing capacity construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610269381.2A CN105951670B (en) 2016-04-26 2016-04-26 A kind of raising sea wall mask foundation bearing capacity construction method

Publications (2)

Publication Number Publication Date
CN105951670A true CN105951670A (en) 2016-09-21
CN105951670B CN105951670B (en) 2019-08-06

Family

ID=56915968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610269381.2A Active CN105951670B (en) 2016-04-26 2016-04-26 A kind of raising sea wall mask foundation bearing capacity construction method

Country Status (1)

Country Link
CN (1) CN105951670B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930231A (en) * 2017-02-21 2017-07-07 浙江水利水电学院 A kind of construction method of the engineering flood bank reinforcing that is applied to pass the flood period
CN106948309A (en) * 2017-02-21 2017-07-14 浙江水利水电学院 It is a kind of applied to sea wall pass the flood period protection in foundation stabilization construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1011953A4 (en) * 1997-09-25 2000-03-07 Cit Alcatel Piles of protection arrangement of wooden anchors deep water bodies against aggressive attack against wood.
CN1632233A (en) * 2004-12-23 2005-06-29 东南大学 Pile forming operation method for bi-directional stirring piles
CN203129131U (en) * 2013-04-03 2013-08-14 福建岩土工程勘察研究院 Cement-soil mixing pile for foundation reinforcement
CN103422497A (en) * 2013-08-21 2013-12-04 国家电网公司 Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN205116156U (en) * 2015-10-22 2016-03-30 大成科创基础建设股份有限公司 Cement mud agitating pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1011953A4 (en) * 1997-09-25 2000-03-07 Cit Alcatel Piles of protection arrangement of wooden anchors deep water bodies against aggressive attack against wood.
CN1632233A (en) * 2004-12-23 2005-06-29 东南大学 Pile forming operation method for bi-directional stirring piles
CN203129131U (en) * 2013-04-03 2013-08-14 福建岩土工程勘察研究院 Cement-soil mixing pile for foundation reinforcement
CN103422497A (en) * 2013-08-21 2013-12-04 国家电网公司 Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN205116156U (en) * 2015-10-22 2016-03-30 大成科创基础建设股份有限公司 Cement mud agitating pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930231A (en) * 2017-02-21 2017-07-07 浙江水利水电学院 A kind of construction method of the engineering flood bank reinforcing that is applied to pass the flood period
CN106948309A (en) * 2017-02-21 2017-07-14 浙江水利水电学院 It is a kind of applied to sea wall pass the flood period protection in foundation stabilization construction method
CN106930231B (en) * 2017-02-21 2019-01-15 浙江水利水电学院 A kind of construction method applied to engineering flood bank reinforcing of passing the flood period
CN106948309B (en) * 2017-02-21 2019-09-17 浙江水利水电学院 It is a kind of applied to sea wall pass the flood period protection in foundation stabilization construction method

Also Published As

Publication number Publication date
CN105951670B (en) 2019-08-06

Similar Documents

Publication Publication Date Title
CN106013191B (en) Environment-friendly type grass planting Concrete Highway protective slope structure and construction method
CN101736760B (en) Construction method of prestressed anti-floating anchor rod
CN103422501B (en) Anti-floating anchor rod structure in sand seam geology and construction method thereof
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN103422497A (en) Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN104863131A (en) Polygonal cement-soil stirring pile and formation method thereof
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN102628267A (en) Casing-less, long-spiral concrete secant pile construction method
CN108842764B (en) Rotary stirring type anchor pipe construction method
CN206070508U (en) Device for reinforcing foundation
CN104863132A (en) Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof
CN103437340A (en) Method for strengthening soft foundation through high-pressure jet grouting
CN102877470A (en) Combined soil nailing construction method
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN100386483C (en) High-performance cement soil continuous wall construction method
CN105951670B (en) A kind of raising sea wall mask foundation bearing capacity construction method
CN104695417B (en) A kind of manufacture method of grouting behind shaft or drift lining broken stone pile
CN207862925U (en) A kind of slip casting casing device
CN108755671A (en) A kind of rich water gravel layer three axes agitating pile construction method
CN202430723U (en) Horizontal jacking pipe and rigid pile composite supporting structure
CN110318392A (en) A kind of major diameter cement earth pile method of construction
KR20130090596A (en) Eco-composite type steel temporary construction and construction method thereof
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN110409434A (en) A kind of the high-pressure rotary jet grouting pile technique and its drill bit of combination pvc pipe
CN105672329A (en) Deep foundation pit large-size prefabricated envelop enclosure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Liu Xueying

Inventor after: Xu Zhenxing

Inventor after: Jin Fangyi

Inventor after: Zhou Changchen

Inventor before: Liu Xueying

Inventor before: Xu Zhenxing

Inventor before: Jin Fangfang

Inventor before: Zhou Changchen

COR Change of bibliographic data
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant