CN1632233A - Pile forming operation method for bi-directional stirring piles - Google Patents

Pile forming operation method for bi-directional stirring piles Download PDF

Info

Publication number
CN1632233A
CN1632233A CN 200410065862 CN200410065862A CN1632233A CN 1632233 A CN1632233 A CN 1632233A CN 200410065862 CN200410065862 CN 200410065862 CN 200410065862 A CN200410065862 A CN 200410065862A CN 1632233 A CN1632233 A CN 1632233A
Authority
CN
China
Prior art keywords
stirring
pile
bidirectional
pile machine
bidirectional stirring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410065862
Other languages
Chinese (zh)
Other versions
CN1274912C (en
Inventor
刘松玉
宫能和
冯锦林
储海岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Luding Stirring Pile Special Technology Co., Ltd.
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34846556&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1632233(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Southeast University filed Critical Southeast University
Priority to CN 200410065862 priority Critical patent/CN1274912C/en
Publication of CN1632233A publication Critical patent/CN1632233A/en
Application granted granted Critical
Publication of CN1274912C publication Critical patent/CN1274912C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A pile forming operation method for bidirectional stirring piles is a ground foundation processing method and is adapted for soft ground foundation treatment. The operation method is that: a: leveling ground; b: the position of a bidirectional stirring pile machine: a hoisting machine suspends the stirring pile machine to a defined pile position and moves it to the center; c: stirring sinkage: starting the bidirectional stirring pile machine to make the drill rod cut soil from up to down along a guide frame, starting a slurry feeding pump to inject cement slurry to the ground, the vanes that rotate in normal and reverse directions on the drill rod of the bidirectional stirring pile machine are rotating together to stir the cement soil; d: the drill rod of the bidirectional stirring pile machine will continue moving down and stirring cement soil till to a designed depth; e: the vanes that rotate in normal and reverse directions on the drill rod of the bidirectional stirring pile machine will continue stirring the cement soil while stirring and hoisting ; f: hoisting and stirring to ground surface or designed elevation more than 50 cm to complete the construction of the bidirectional stirring cement soil stirring pile (1). The cement soil stirring piles (1) are disposed in the form of quincunx or square shape in order to ensure the pile quality and pile body quality.

Description

The one-tenth pile operation method of bidirectional stirring pile
Technical field
The present invention is a kind of method for processing foundation, is applicable to Soft Ground, belongs to technical field of civil engineering.
Background technology
Cement mixing method is succeeded in developing as far back as Sweden, and domestic 1977 have been undertaken by Metallurgical Research Institute, Department of Architecture and Water Planning And Design Institute Of Traffic Ministry is laboratory experiment and mechanical development work.In the reinforced soft soil ground engineering, succeedd first in 1980.After this in national reinforced soft soil ground engineering, promote and come, particularly the Soft Ground in highway construction.
Soft Ground in the highway construction is to guarantee the key of project link, and occupies larger proportion in the engineering total price.A large amount of engineering practices show that it is simple that the cement mixing method method has construction, fast, vibrates advantages such as little, can improve the stability of soft foundation effectively, reduce and the control settling amount.Cement mixing method has now developed into a kind of soft foundation processing method commonly used, mainly is applicable to reinforce the saturated soft clay ground.This method is to utilize cement materials such as (or lime) as curing compound, by special Mixing Machine, in the ground depths, on the spot weak soil and curing compound are forced to stir, by producing series of physical and chemical reaction between curing compound and weak soil, weak soil is hardened the cement mixing method that becomes to have globality, water stability and certain intensity.This cement mixing method is formed composite foundation with all soil of stake, thereby improves bearing capacity of foundation soil, reduces foundation settlement.
But also there are more following problems in cement mixing method in Soft Ground:
(1) cement mixing method ubiquity cement-soil stirring in Soft Ground is inhomogeneous, influences pile quality.
(2) cement mixing method ubiquity cement paste skewness in pile body in Soft Ground does not reach due requirement at 6m to the following cement paste incorporation of 7m especially.
(3) cement mixing method ubiquity in work progress is serious emits slurry phenomenon, a large amount of cement pastes ground of emerging, and influences cement paste incorporation in the pile body.
(4) conventional soil cement mixing pile construction method generally needs four to stir two sprays, and work efficiency is low.
Owing to the existence of last genus problem, influenced the quality of cement mixing method; Also restricted simultaneously the range of application of cement mixing method.
Summary of the invention
Technical problem; The present invention is primarily aimed at the problem that exists in the above-mentioned construction, and the construction technology of cement mixing method is improved, and has proposed a kind of one-tenth pile operation method of bidirectional stirring pile, makes the problems referred to above be resolved.
Technical scheme: the present invention is according to concentric twin shaft drilling rod, on interior drilling rod, be provided with and be rotated in the forward blade and mouth spray is set, the reverse rotation blade is installed on the drilling rod outside, by crushing in the outer bar blade reverse rotation process and the effect of two-way stirring concrete earth simultaneously of forward and reverse rotating vane, emit approach on the blocking-up cement paste, the assurance cement paste evenly distributes in pile body and stirs, and protects pile quality.
This invention mainly is that the unidirectional stirring construction method of existing cement mixing method is changed over two-way stirring construction method, forms the new construction of a cover, and the concrete operations step is as follows:
A: leveling place;
B: bidirectional stirring pile machine location: crane suspention mixer is to specifying stake position and centering;
C: stir: start bidirectional stirring pile machine, make the bidirectional stirring pile machine drilling rod along leading truck to incision soil, open and send stock pump, to soil body water spray mud, on the bidirectional stirring pile machine drilling rod respectively the blade of forward and reverse rotation rotate stirring concrete earth simultaneously;
D: the bidirectional stirring pile machine drilling rod continues to sink and stirring concrete earth, up to projected depth;
E: stir when promoting, the blade of forward and reverse rotation continues stirring concrete earth on the bidirectional stirring pile machine drilling rod;
F: promote, be stirred to the above 50cm of the face of land or design elevation, finish the construction of two-way stirring concrete earth agitation pile.
Cement mixing method adopts quincunx or square arrangement (quincunx is that any adjacent three piles constitute equilateral triangle).
Beneficial effect: this method easy construction, simple to operate, its advantage mainly contains:
(1) can guarantee that cement paste is evenly distributed in pile body;
(2) can guarantee the incorporation of cement paste in pile body, the slurry phenomenon can not occur emitting;
(3) can guarantee that the pile body cement-soil stirs, and guarantees pile quality and pile quality;
(4) owing to solved and emit the slurry problem in the work progress, the range of application of cement mixing method is enlarged;
(5) because forward and reverse blade rotates, cut, stirs the soil body simultaneously, four stir two to what have worker's method now and spray and change into two of this worker's method and stir a spray, work efficiency is enhanced about more than once.
Description of drawings
Fig. 1 is square piling plan.
Fig. 2 is quincunx piling plan.
Fig. 3 is the bidirectional stirring pile construction flow chart.
Wherein have: cement mixing method 1; Construction plant 2; Outer drilling rod 3; Be installed in the stirring vane 4 on the outer drilling rod; Stirring vane 5 in being installed on the drilling rod; Interior drilling rod 6; Bidirectional stirring pile pile body 7; Power set 8; Actuating unit 9.
The specific embodiment
The present invention is designed to the concentric drilling rod of twin shaft to the drilling rod of cement mixing method, installs on interior drilling rod and is rotated in the forward blade, and the reverse rotation blade is installed on the drilling rod outside.Utilize forward and reverse crushing of rotation simultaneously of two groups of blades, cement grout is controlled between two groups of blades of forward and reverse rotation, make cement grout can not go upward to ground along drilling rod, cement grout can not occur and run off, thereby can guarantee that incorporation and the cement paste of cement paste in pile body is evenly distributed in pile body; Because forward and reverse rotation of drilling rod drives two groups of forward and reverse rotations simultaneously of blade, makes that the stirring of cement-soil is more full and uniform.
The test site is positioned at a certain construction section.Site operation experiment is with 8 of wet shot stakes, wherein with 4 of the cement mixing methods of two-way Beater operator method construction, and 4 of the cement mixing methods of constructing with traditional worker's method.Be: stake is long 10 meters, mixes gray scale 15%, and stake is through 500mm.
The construction of test pile:
(1) smooth place;
(2) square arrangement is adopted in test pile stake position;
(3) bidirectional stirring pile machine location: crane suspention mixer is to specifying stake position and centering;
(4) stir: open two-way dynamical system, start mixing pile machine, make the mixing pile machine drilling rod along leading truck to incision soil, open and send stock pump to continue to sink, up to 10 meters degree of depth to spray water mud, the positive and negative rotation stirring concrete earth of stirring vane, mixer of the soil body;
(5) promote stirring: close and send stock pump, the mixing pile machine drilling rod promotes, continues simultaneously stirring concrete earth, to the face of land, finishes the pile body construction.
Result through field trial and laboratory test research shows: (1) the slurry phenomenon do not occur emitting fully with the cement mixing method of two-way Beater operator method construction in work progress; And with the cement mixing method that traditional worker's method is constructed, the slurry phenomenon then appears emitting in work progress.(2) core boring sampling is observed: the stirring of starching incorporation and cement-soil with the cement mixing method integral cement of two-way Beater operator method construction is all very even; The stirring non-uniform phenomenon that the pile body integral cement is starched incorporation and cement-soil then appears in the cement mixing method with traditional worker's method construction, and particularly hypomere pile body cement paste incorporation is on the low side.(3) pile quality is observed in the excavation back: the cement mixing method pile quality with two-way Beater operator method construction is fine; And it is general with the cement mixing method pile quality of traditional worker's method construction, relatively poor at natural below ground 1.5m pile quality in the layer of sand of 3.0m scope especially.

Claims (2)

1, a kind of one-tenth pile operation method of bidirectional stirring pile is characterized in that method of operating is:
A: leveling place;
B: bidirectional stirring pile machine location: crane suspention mixer is to specifying stake position and centering;
C: stir: start bidirectional stirring pile machine, make the bidirectional stirring pile machine drilling rod along leading truck to incision soil, open and send stock pump, to soil body water spray mud, on the bidirectional stirring pile machine drilling rod respectively the blade of forward and reverse rotation rotate stirring concrete earth simultaneously;
D: the bidirectional stirring pile machine drilling rod continues to sink and stirring concrete earth, up to projected depth;
E: stir when promoting, the blade of forward and reverse rotation continues stirring concrete earth on the bidirectional stirring pile machine drilling rod;
F: promote, be stirred to the above 50cm of the face of land or design elevation, finish the construction of two-way stirring concrete earth agitation pile (1).
2, the one-tenth pile operation method of the bidirectional stirring pile of narrating according to claim 1 is characterized in that cement mixing method (1) adopts quincunx or square arrangement.
CN 200410065862 2004-12-23 2004-12-23 Pile forming operation method for bi-directional stirring piles Active CN1274912C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410065862 CN1274912C (en) 2004-12-23 2004-12-23 Pile forming operation method for bi-directional stirring piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410065862 CN1274912C (en) 2004-12-23 2004-12-23 Pile forming operation method for bi-directional stirring piles

Publications (2)

Publication Number Publication Date
CN1632233A true CN1632233A (en) 2005-06-29
CN1274912C CN1274912C (en) 2006-09-13

Family

ID=34846556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410065862 Active CN1274912C (en) 2004-12-23 2004-12-23 Pile forming operation method for bi-directional stirring piles

Country Status (1)

Country Link
CN (1) CN1274912C (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100366828C (en) * 2005-12-22 2008-02-06 上海交通大学 Method for construction of deep layer rotating spraying mixture pile with diffusion preventing plate
CN101245594B (en) * 2008-03-13 2010-06-09 刘松玉 Bidirectional stirring pile machine
CN101514549B (en) * 2009-04-01 2011-05-11 东南大学 Method using intermediate mixing piles for treating three-layer soft foundation
CN102561332A (en) * 2012-02-09 2012-07-11 东南大学 Continuous variable-diameter cement-soil mixed pile forming method
CN103774644A (en) * 2014-01-13 2014-05-07 东南大学 Construction method for drainage cement mixing pile
CN104624629A (en) * 2014-12-26 2015-05-20 东南大学 Method for remedying organism contaminated field by using bidirectional stirring injection method
CN104624632A (en) * 2015-01-26 2015-05-20 东南大学 Remediation method for hexavalent chromium polluted soil and underground water
CN104863127A (en) * 2014-04-29 2015-08-26 周兆弟 Polygonal boring pile and formation method thereof
CN104863125A (en) * 2014-04-29 2015-08-26 周兆弟 Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof
CN105714774A (en) * 2014-12-04 2016-06-29 宫能和 Reducing mixing pile machine and pile forming construction method and drill pipe thereof
CN105926597A (en) * 2016-04-26 2016-09-07 浙江水利水电学院 Cement mixing pile treatment method suitable for reclamation projects
CN105926598A (en) * 2016-04-26 2016-09-07 浙江水利水电学院 Construction method for bi-direction cement mixing piles and slurry producing system thereof
CN105951670A (en) * 2016-04-26 2016-09-21 浙江水利水电学院 Construction method for improving bearing capacity of seawall armor foundation
CN105970922A (en) * 2016-05-16 2016-09-28 浙江工业大学 Method for treating soft coastal salty foundations by jetting industrial waste residues to bi-direction T-shaped deep mixing columns
CN108951623A (en) * 2018-07-25 2018-12-07 许校舟 A kind of three axis high-pressure rotary-spray two-way stirring pile construction methods
CN113445933A (en) * 2021-07-01 2021-09-28 山东省建筑科学研究院有限公司 Combined pile drill rod, drilling tool and combined pile manufacturing method

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100366828C (en) * 2005-12-22 2008-02-06 上海交通大学 Method for construction of deep layer rotating spraying mixture pile with diffusion preventing plate
CN101245594B (en) * 2008-03-13 2010-06-09 刘松玉 Bidirectional stirring pile machine
CN101514549B (en) * 2009-04-01 2011-05-11 东南大学 Method using intermediate mixing piles for treating three-layer soft foundation
CN102561332A (en) * 2012-02-09 2012-07-11 东南大学 Continuous variable-diameter cement-soil mixed pile forming method
CN102561332B (en) * 2012-02-09 2014-01-22 东南大学 Continuous variable-diameter cement-soil mixed pile forming method
CN103774644B (en) * 2014-01-13 2015-08-26 东南大学 A kind of construction method of drainage cement mixing method
CN103774644A (en) * 2014-01-13 2014-05-07 东南大学 Construction method for drainage cement mixing pile
CN104863125A (en) * 2014-04-29 2015-08-26 周兆弟 Bougainvillea spectabilis willd-shaped drilling pile and shaping method thereof
CN104863127A (en) * 2014-04-29 2015-08-26 周兆弟 Polygonal boring pile and formation method thereof
CN105714774A (en) * 2014-12-04 2016-06-29 宫能和 Reducing mixing pile machine and pile forming construction method and drill pipe thereof
CN105714774B (en) * 2014-12-04 2018-07-03 宫能和 Diameter changeable agitation machine and its bore forming method, drilling rod
CN104624629A (en) * 2014-12-26 2015-05-20 东南大学 Method for remedying organism contaminated field by using bidirectional stirring injection method
CN104624632A (en) * 2015-01-26 2015-05-20 东南大学 Remediation method for hexavalent chromium polluted soil and underground water
CN105926597A (en) * 2016-04-26 2016-09-07 浙江水利水电学院 Cement mixing pile treatment method suitable for reclamation projects
CN105926598A (en) * 2016-04-26 2016-09-07 浙江水利水电学院 Construction method for bi-direction cement mixing piles and slurry producing system thereof
CN105951670A (en) * 2016-04-26 2016-09-21 浙江水利水电学院 Construction method for improving bearing capacity of seawall armor foundation
CN105926598B (en) * 2016-04-26 2019-05-24 浙江水利水电学院 A kind of construction method of two-way cement mixing pile
CN105970922A (en) * 2016-05-16 2016-09-28 浙江工业大学 Method for treating soft coastal salty foundations by jetting industrial waste residues to bi-direction T-shaped deep mixing columns
CN108951623A (en) * 2018-07-25 2018-12-07 许校舟 A kind of three axis high-pressure rotary-spray two-way stirring pile construction methods
CN113445933A (en) * 2021-07-01 2021-09-28 山东省建筑科学研究院有限公司 Combined pile drill rod, drilling tool and combined pile manufacturing method

Also Published As

Publication number Publication date
CN1274912C (en) 2006-09-13

Similar Documents

Publication Publication Date Title
CN1274912C (en) Pile forming operation method for bi-directional stirring piles
CN103556631B (en) The one-tenth pile operation method of agitation pile
CN104988910A (en) Reducing swing-injected agitating pile
CN102808408B (en) Bidirectional reducing stirring pile machine and pile formation construction method thereof
CN106368214A (en) Pile forming operation method for protection barrel type cement soil mixing pile
CN1718937A (en) Technology of non soil taking hole guiding prestressed pipe pile or premade square sunk pile
CN104863132A (en) Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof
CN205242387U (en) Two -way cement mixing method
CN100336982C (en) Nail type cement soil stirring pile operation method
CN105970946A (en) Basalt fiber reinforced cement soil mixing pile and construction method thereof
CN1274911C (en) Bi-directional cement soil mixing pile machine
CN104153381A (en) Waterproof curtain pile, waterproof curtain and construction method of waterproof curtain pile
CN112854239B (en) Reinforcing construction method for ultra-deep mucky soil layer triaxial mixing pile
CN101838987A (en) Operation method of piles with variable cross section for reinforcing shield end soil body
CN102330426A (en) Transversely rotating type deep mixing pile machine
CN1786351A (en) Non taking soil drawing hole method for construction of sinking pile for prestressed pipe pile or prefabricated square pile
CN104480932A (en) Saline alkali muddy soil ground cement mixing pile construction method
CN100374657C (en) Construction method employing threaded stirring shaft to decrease ambient foundation deformation
CN110409435A (en) A kind of novel concrete mixing pile construction method
CN207828960U (en) A kind of mixing pile construction device of soft foundation processing
CN206815410U (en) A kind of experimental rig of indoor full automatic simulation cement mixing method
CN108086915A (en) A kind of major diameter jet mixing drill bit
CN210637029U (en) Electric-drive ultra-deep cement mixing pile machine
CN201785752U (en) Transverse rotation type deep-mixing pile driver
CN1143032C (en) Dry construction composite filling pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANJING LUDING MIXING PILE SPECIAL TECHNOLOGY CO.,

Free format text: FORMER OWNER: DONGNAN UNIV.

Effective date: 20090508

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090508

Address after: Baixia District of Nanjing province Ruijin village 322

Patentee after: Nanjing Luding Stirring Pile Special Technology Co., Ltd.

Address before: No. four arch 2, Nanjing City, Jiangsu Province

Patentee before: Southeast University