CN212176485U - Steel construction building construction assists strutting arrangement - Google Patents

Steel construction building construction assists strutting arrangement Download PDF

Info

Publication number
CN212176485U
CN212176485U CN202020587282.0U CN202020587282U CN212176485U CN 212176485 U CN212176485 U CN 212176485U CN 202020587282 U CN202020587282 U CN 202020587282U CN 212176485 U CN212176485 U CN 212176485U
Authority
CN
China
Prior art keywords
rod
gear
lead screw
sleeve
lifter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020587282.0U
Other languages
Chinese (zh)
Inventor
李岩
张朋
王进
白格琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Excellence Construction Management Co ltd
Original Assignee
China Construction Excellence Construction Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Excellence Construction Management Co ltd filed Critical China Construction Excellence Construction Management Co ltd
Priority to CN202020587282.0U priority Critical patent/CN212176485U/en
Application granted granted Critical
Publication of CN212176485U publication Critical patent/CN212176485U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel construction building construction auxiliary stay device, wherein the gear shaft makes first gear pole and second gear pole move in opposite directions through meshing tooth mutually supporting when rotating, be equipped with the lifter that can reciprocate in the lifter sleeve, the top of lifter is equipped with the gag lever post, the gag lever post can move in the spacing groove on the backup pad through the removal of first gear pole and second gear pole, the upper surface of control box is equipped with the bearing frame, be equipped with the lead screw on the bearing frame, the lead screw rotates makes the lead screw sleeve rise, make the backup pad rise in the lifter sleeve through the lifter when the lead screw sleeve rises; this novel steel construction auxiliary stay device stable in structure simple to use, can quick adjustment holding height, and can adjust the width and be convenient for increase support strength, convenient to use is fit for using widely.

Description

Steel construction building construction assists strutting arrangement
Technical Field
The utility model relates to a strutting arrangement technical field especially relates to a steel construction building construction assists strutting arrangement.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. The components or parts are typically joined by welds, bolts or rivets. Because of its light dead weight, and construction is simple and convenient, widely apply to fields such as large-scale factory building, venue, superelevation layer. The existing steel structure supporting device is complex in structure and complex in use steps, the height and the supporting width cannot be easily adjusted, and the use is inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the above problem and providing a stable in structure simple to use, can quick adjustment support height, and can adjust the width and be convenient for increase support intensity, convenient to use's steel construction building construction auxiliary stay device.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a steel structure building construction auxiliary supporting device comprises a control box, a gear shaft, a lead screw, a lifting rod sleeve and a lifting rod, wherein a first gear rod and a second gear rod are arranged in the control box, the gear shaft is arranged between the first gear rod and the second gear rod in the control box, the first gear rod and the second gear rod move oppositely through the mutual matching of meshing teeth when the gear shaft rotates, the end parts of the first gear rod and the second gear rod are fixed on a bottom plate on one side of the lifting rod sleeve through pins, the lifting rod capable of moving up and down is arranged in the lifting rod sleeve, a limiting rod is arranged at the top of the lifting rod, the limiting rod can move in a limiting groove on a supporting plate through the movement of the first gear rod and the second gear rod, a bearing seat is arranged on the upper surface of the control box, the lead screw is arranged on the bearing seat, and can rotate through a bearing, the top of lead screw is equipped with the lead screw sleeve, the bottom at the backup pad is fixed at the telescopic top of lead screw, be equipped with in the lead screw sleeve with lead screw external screw thread assorted internal thread, the lead screw rotates and makes the lead screw sleeve rise, make the backup pad pass through the lifter and rise in the lifter sleeve when the lead screw sleeve rises.
Preferably, when the first gear rod and the second gear rod move outwards through the torsion gear shaft, the lifting rod sleeve and the lifting rod can move in the limiting groove of the supporting plate through the limiting rod.
Preferably, the lead screw is provided with a rotating rod convenient to rotate.
Preferably, the gear shaft extends out of the upper surface of the control box and is provided with a rotating handle.
Preferably, the lifting rod is fixed at the positioning holes on the lifting rod and the lifting rod sleeve through the positioning bolts when the lifting rod is lifted in the lifting rod sleeve.
Preferably, the supporting plate is fixedly connected with the lifting rod through a fixing bolt at a fixing hole at the top of the lifting rod.
Preferably, the first gear rod and the second gear rod are L-shaped.
The utility model discloses a steel construction building construction auxiliary stay device, wherein the gear shaft makes first gear pole and second gear pole move in opposite directions through meshing tooth mutually supporting when rotating, be equipped with the lifter that can reciprocate in the lifter sleeve, the top of lifter is equipped with the gag lever post, the gag lever post can move in the spacing groove on the backup pad through the removal of first gear pole and second gear pole, the upper surface of control box is equipped with the bearing frame, be equipped with the lead screw on the bearing frame, the lead screw rotates and makes the lead screw sleeve rise, make the backup pad rise in the lifter sleeve through the lifter when the lead screw sleeve rises; this novel steel construction auxiliary stay device stable in structure simple to use, can quick adjustment holding height, and can adjust the width and be convenient for increase support strength, convenient to use is fit for using widely.
Drawings
Fig. 1 is the utility model relates to a steel construction auxiliary stay device's structural schematic.
Fig. 2 is the connection structure diagram of the first gear rod, the second gear rod and the gear shaft of the present invention.
Fig. 3 is a schematic view of a partial structure of a middle lifter sleeve according to the present invention.
Fig. 4 is a schematic view of a partial structure of the middle lifting rod of the present invention.
In the figure: 1. a control box; 2. a first gear lever; 3. a second gear lever; 4. a gear shaft; 5. rotating the handle; 6. a bearing seat; 7. a bearing; 8. a lead screw; 9. a lead screw sleeve; 10. rotating the rod; 11. a support plate; 12. a lifter sleeve; 13. a base plate; 14. a lifting rod; 15. a limiting rod; 16. a limiting groove; 17. fixing the bolt; 18. a fixing hole; 19. a pin; 20. and (6) positioning the bolt.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-4, an auxiliary supporting device for steel structure building construction includes a control box 1, a gear shaft 4, a screw 8, a lifting rod sleeve 12 and a lifting rod 14, wherein a first gear rod 2 and a second gear rod 3 are arranged in the control box 1, a gear shaft 4 is arranged between the first gear rod 2 and the second gear rod 3 in the control box 1, the first gear rod 2 and the second gear rod 3 are provided with engaging teeth at one side close to the gear shaft 4, the first gear rod 2 and the second gear rod 3 have the same specification and size, when the gear shaft 4 rotates, the first gear rod 2 and the second gear rod 3 move oppositely through the mutual cooperation of the engaging teeth, the end portions of the first gear rod 2 and the second gear rod 3 are fixed on a bottom plate 13 at one side of the lifting rod sleeve 12 through a pin 19, wherein the base 13 and the lifting rod sleeve 12 are integrated, the lifting rod 14 capable of moving up and down is arranged in the lifting rod sleeve 12, the top of the lifting rod 14 is provided with a limiting rod 15, the limiting rod 15 can move in a limiting groove 16 on the support plate 11 through the movement of the first gear rod 2 and the second gear rod 3, the upper surface of the control box 1 is provided with a bearing seat 6, the bearing seat 6 is provided with a lead screw 8, the lead screw 8 can rotate through a bearing 7, the top of the lead screw 8 is provided with a lead screw sleeve 9, the top of the lead screw sleeve 9 is fixed at the bottom of the support plate 11, an internal thread matched with the external thread of the lead screw 8 is arranged in the lead screw sleeve 9, the lead screw 8 rotates to enable the lead screw sleeve 9 to ascend, the support plate 11 is enabled to ascend in the lifting rod sleeve 12 through the lifting rod 14 when the lead screw sleeve 9 ascends, the first gear rod 2 and the second gear rod 3 can enable the lifting rod sleeve 12 and the lifting rod 14 to move in the limiting groove 16 of the support plate 11 through the limiting, be equipped with the dwang 10 of being convenient for to rotate on the lead screw 8, gear shaft 4 stretches out the upper surface of control box 1 and is equipped with rotation handle 5, it is fixed in locating hole department on lifter 14 and lifter sleeve 12 through positioning bolt 20 when lifter 14 goes up and down in lifter sleeve 12, backup pad 11 passes through fixing bolt 17 fixed orifices 18 department and lifter 14 fixed connection at lifter 14 top, first gear pole 2 is "L" shape with second gear pole 3.
When the novel steel structure building construction auxiliary supporting device is used, the rotating rod 10 is twisted, the screw 8 rotates to enable the screw sleeve 9 to move upwards, the lifting rods 14 on two sides of the supporting plate 11 ascend in the lifting rod sleeve 12 at the moment, and the lifting rods 14 are fixed through the positioning bolts 20 after ascending to proper positions, so that the lifting rods 14 are prevented from sinking, and the overall height adjustment of the device is completed; twist reverse rotation handle 5 this moment, gear shaft 4 rotates and makes first gear pole 2 and the outside removal of second gear pole 3 this moment, because first gear pole 2 and second gear pole 3 and the base 13 fixed connection of lifter sleeve 12 bottom, consequently lifter sleeve 12 moves to the outside, gag lever post 15 at the top of lifter 14 this moment removes in spacing slotted hole 16, after lifter sleeve 12 moved to suitable position through first gear pole 2 and second gear pole 3, pass the backup pad 11 through fixing bolt 17 and fix in fixed orifices 18 at the top of lifter 14 for the adjustment supports the width, increase support strength.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications can be made without departing from the scope of the invention.

Claims (7)

1. The utility model provides a steel construction auxiliary stay device, includes control box (1), gear shaft (4), lead screw (8), lifter sleeve (12) and lifter (14), its characterized in that: a first gear rod (2) and a second gear rod (3) are arranged in the control box (1), a gear shaft (4) is arranged in the control box (1) between the first gear rod (2) and the second gear rod (3), the gear shaft (4) is matched with each other through meshing teeth when rotating to enable the first gear rod (2) and the second gear rod (3) to move in opposite directions, the end parts of the first gear rod (2) and the second gear rod (3) are fixed on a bottom plate (13) on one side of a lifting rod sleeve (12) through pins (19), a lifting rod (14) capable of moving up and down is arranged in the lifting rod sleeve (12), a limiting rod (15) is arranged at the top of the lifting rod (14), the limiting rod (15) can move in a limiting groove (16) on the support plate (11) through the movement of the first gear rod (2) and the second gear rod (3), a bearing seat (6) is arranged on the upper surface of the control box (1), be equipped with lead screw (8) on bearing frame (6), lead screw (8) accessible bearing (7) rotate, the top of lead screw (8) is equipped with lead screw sleeve (9), the bottom at backup pad (11) is fixed at the top of lead screw sleeve (9), be equipped with in lead screw sleeve (9) with lead screw (8) external screw thread assorted internal thread, lead screw (8) rotate and make lead screw sleeve (9) rise, lead screw sleeve (9) rise when rising makes backup pad (11) rise in lifter sleeve (12) through lifter (14).
2. The auxiliary supporting device for the steel structure building construction according to claim 1, characterized in that: when the first gear rod (2) and the second gear rod (3) move outwards through the torsion gear shaft (4), the lifting rod sleeve (12) and the lifting rod (14) can move in the limiting groove (16) of the supporting plate (11) through the limiting rod (15).
3. The auxiliary supporting device for the steel structure building construction according to claim 1, characterized in that: the lead screw (8) is provided with a rotating rod (10) convenient to rotate.
4. The auxiliary supporting device for the steel structure building construction according to claim 2, characterized in that: the gear shaft (4) extends out of the upper surface of the control box (1) and is provided with a rotating handle (5).
5. The auxiliary supporting device for the steel structure building construction according to claim 1, characterized in that: the lifting rod (14) is fixed at the positioning holes on the lifting rod (14) and the lifting rod sleeve (12) through the positioning bolts (20) when the lifting rod (14) is lifted in the lifting rod sleeve (12).
6. The auxiliary supporting device for the steel structure building construction according to claim 1, characterized in that: the supporting plate (11) is fixedly connected with the lifting rod (14) at a fixing hole (18) at the top of the lifting rod (14) through a fixing bolt (17).
7. The auxiliary supporting device for the steel structure building construction according to claim 2, characterized in that: the first gear rod (2) and the second gear rod (3) are L-shaped.
CN202020587282.0U 2020-04-18 2020-04-18 Steel construction building construction assists strutting arrangement Expired - Fee Related CN212176485U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020587282.0U CN212176485U (en) 2020-04-18 2020-04-18 Steel construction building construction assists strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020587282.0U CN212176485U (en) 2020-04-18 2020-04-18 Steel construction building construction assists strutting arrangement

Publications (1)

Publication Number Publication Date
CN212176485U true CN212176485U (en) 2020-12-18

Family

ID=73766655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020587282.0U Expired - Fee Related CN212176485U (en) 2020-04-18 2020-04-18 Steel construction building construction assists strutting arrangement

Country Status (1)

Country Link
CN (1) CN212176485U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116220395A (en) * 2023-02-07 2023-06-06 浙江东南绿建集成科技有限公司 Rod piece positioning equipment and method for space nodes of steel net shell

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116220395A (en) * 2023-02-07 2023-06-06 浙江东南绿建集成科技有限公司 Rod piece positioning equipment and method for space nodes of steel net shell
CN116220395B (en) * 2023-02-07 2024-03-19 浙江东南绿建集成科技有限公司 Rod piece positioning equipment and method for space nodes of steel net shell

Similar Documents

Publication Publication Date Title
CN212176485U (en) Steel construction building construction assists strutting arrangement
CN113266159A (en) Prefabricated post installation device that installation accuracy is high
CN215854907U (en) Detachable foundation back jacking device for construction elevator
CN214141411U (en) Steel frame construction is assisted in steel construction factory building installation
CN201334770Y (en) Wall-attached supporting seat
CN211644476U (en) Earth anchor dismounting device for electric power engineering
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN214935136U (en) Special lift of tower crane
CN212531976U (en) Device for hoisting steel structure
CN211496680U (en) Building site hoist
CN212656578U (en) Wind power generation basis crab-bolt cage stock mounting tool
CN214828640U (en) Hoisting accessory is used in steel construction
CN211257753U (en) Scaffold for building engineering
CN219231268U (en) Safety belt hangs mount
CN213197452U (en) Positioner is used in electromechanical device maintenance
CN216587719U (en) Template support auxiliary structure for building engineering
CN214995724U (en) Construction scaffold and construction bear frame
CN114777743B (en) Monitoring device and method for integral lifting of steel structure
CN219217286U (en) Lifting equipment for corridor
CN217972359U (en) Multifunctional climbing hoisting mechanism
CN219622298U (en) Assembled building fixing device for building engineering
CN217627270U (en) Hoisting equipment for building construction based on narrow space
CN109607414B (en) Device for assembling large ball screw pair
CN217925067U (en) Assembled steel structure support
CN219730441U (en) Building construction support column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201218