CN212656578U - A kind of wind power generation foundation anchor bolt cage bolt installation tool - Google Patents

A kind of wind power generation foundation anchor bolt cage bolt installation tool Download PDF

Info

Publication number
CN212656578U
CN212656578U CN202021345727.0U CN202021345727U CN212656578U CN 212656578 U CN212656578 U CN 212656578U CN 202021345727 U CN202021345727 U CN 202021345727U CN 212656578 U CN212656578 U CN 212656578U
Authority
CN
China
Prior art keywords
fixedly connected
base
power generation
wind power
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021345727.0U
Other languages
Chinese (zh)
Inventor
吴增奎
王彬存
孙磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Ningxia Engineering Corp Ltd
Original Assignee
PowerChina Ningxia Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Ningxia Engineering Corp Ltd filed Critical PowerChina Ningxia Engineering Corp Ltd
Priority to CN202021345727.0U priority Critical patent/CN212656578U/en
Application granted granted Critical
Publication of CN212656578U publication Critical patent/CN212656578U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

本实用新型公开了一种风力发电基础锚栓笼锚杆安装工具,包括底座,所述底座的顶部固定连接有升降装置,所述升降装置的侧壁固定连接有挂钩,所述升降装置的顶部固定连接有导正杆,本实用新型涉及电力设备技术领域。该一种风力发电基础锚栓笼锚杆安装工具,达到了底座、升降装置、挂钩、导正杆、挡块与滑块组成一个整体,利用挂钩对锚栓笼进行勾起,利用升降装置,带动挂钩向上运动,在锚栓笼的周围设置多个整体相配合,便于将锚栓笼抬起,方便工作人员进行安装,设置支撑装置,便于对地面进行支撑,在进行使用时,调整整体的高度,方便使用,设置凹槽,便于加装配重块,提高整体稳定性,便于锚栓笼的安装,节省劳动力,满足使用需求目的。

Figure 202021345727

The utility model discloses a wind power generation foundation anchor bolt cage bolt installation tool, which comprises a base, a lifting device is fixedly connected to the top of the base, a hook is fixedly connected to a side wall of the lifting device, and a top of the lifting device is fixedly connected with a hook. A guide rod is fixedly connected, and the utility model relates to the technical field of electric equipment. The utility model relates to a tool for installing an anchor bolt cage for a wind power generation foundation. Drive the hook to move upward, and set up multiple wholes around the anchor cage to cooperate, which is convenient for lifting the anchor cage and convenient for the staff to install. The supporting device is set to facilitate the ground support. When using, adjust the overall High height, easy to use, set grooves, easy to add and assemble weights, improve the overall stability, easy to install the anchor bolt cage, save labor, and meet the purpose of use.

Figure 202021345727

Description

Wind power generation basis crab-bolt cage stock mounting tool
Technical Field
The utility model relates to a power equipment field, more specifically say, relate to a wind power generation basis crab-bolt cage stock mounting tool.
Background
At present, the anchor bolt cage is widely applied to wind power generation foundation engineering, the number of anchor bolts of the anchor bolt cage is large, the weight is large, the traditional construction method mainly depends on manpower to lift the anchor bolts for installation, a constructor holds the rod body of the anchor bolt by hands and lifts the anchor bolt upwards, the anchor bolt cage is extremely easy to fatigue, potential safety hazards exist, the distance between the anchor bolts is small, and construction is difficult. At present, the patent names are disclosed as follows: wind power generation basis crab-bolt cage stock mounting tool, patent application number is: CN201920678962.0, a patent that discloses, instrument replace the staff to carry and carry crab-bolt cage stock to in workman's hand need not will deepening the crab-bolt cage, constructor can accomplish the installation to the stock outside the crab-bolt cage in the stock installation, but the device, at the in-process that uses, still need the workman to lift up, intensity of labour is big, wastes time and energy, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems of high labor intensity, time and labor waste and incapability of meeting the use requirement of the existing anchor rod mounting tool for the anchor rod cage of the wind power generation foundation in the prior art, the utility model aims to provide an anchor rod mounting tool for the anchor rod cage of the wind power generation foundation, which can realize that a base, a lifting device, a hook, a guide rod, a stop block and a sliding block form a whole, the anchor rod cage is hooked by the hook, the lifting device is utilized to drive the hook to move upwards, a plurality of whole bodies are arranged around the anchor rod cage to be matched with each other so as to be convenient for lifting the anchor rod cage, the mounting of workers is convenient, a supporting device is arranged to support the ground, when in use, the height of the whole body is adjusted, the use is convenient, a groove is arranged, the additional arrangement of a balancing weight is convenient, the overall stability is improved, and the mounting of the anchor rod cage is convenient, save the labour, satisfy the user demand.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a wind power generation basis crab-bolt cage stock mounting tool, includes the base, the top fixedly connected with elevating gear of base, elevating gear's lateral wall fixedly connected with couple, positive pole is led to elevating gear's top fixedly connected with, lead the top fixedly connected with dog of positive pole, lead positive pole sliding connection and have the slider, slider and couple fixed connection.
Preferably, the lifting device comprises a stand column, the stand column is fixedly connected with the base, a fixed plate is fixedly connected with the top of the stand column, a fixed frame is fixedly connected with the top of the fixed plate, a rotating disc is arranged on the side wall of the fixed frame, a handle is fixedly connected with the surface of the rotating disc, a rotating shaft is fixedly connected with the axis of the rotating disc and is rotatably connected with the fixed frame, a main gear is fixedly connected with one end of the rotating shaft, which is positioned inside the fixed frame, and is meshed with a pinion, a rotating lead screw is fixedly connected with the axis of the pinion and is rotatably connected with the fixed plate, a lead screw sliding block is connected with the rotating lead screw through threads, the lead screw sliding block is fixedly connected with a hook, the lead screw sliding block is slidably connected with the stand column, a limit frame is arranged inside the base, the rotary screw rod is rotatably connected with the limiting frame and fixedly connected with the limiting block.
Preferably, the bottom fixedly connected with strutting arrangement of base, strutting arrangement includes the bottom plate, the top fixedly connected with threaded rod of bottom plate, the top fixedly connected with baffle of threaded rod, threaded rod sliding connection has the motion board, the top and bottom of motion board are provided with first adjusting nut, second adjusting nut respectively, first adjusting nut, second adjusting nut all with threaded rod threaded connection, the top fixedly connected with bracing piece of motion board, the top of bracing piece and the bottom fixed connection of base.
Preferably, the side wall of the bottom plate is provided with a groove.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of: the anchor bolt cage is hooked by the hook, the lifting device is utilized to drive the hook to move upwards, a plurality of integral parts are arranged around the anchor bolt cage to be matched with each other so as to be convenient for lifting the anchor bolt cage and be convenient for workers to install, the hook extends into the anchor bolt cage, the rotating disc is rotated to drive the rotating shaft to rotate, the main gear is driven to rotate and the auxiliary gear is driven to rotate, the screw rod slider is driven to move, the hook is driven to move upwards so as to lift the anchor bolt cage, the workers can install the anchor bolt cage conveniently, the supporting device is arranged so as to support the ground conveniently, the integral stability is improved, the first adjusting nut and the second adjusting nut are respectively rotated before the whole anchor bolt cage is used, the height of the moving plate is adjusted, and then the height of the supporting rod is adjusted so as to support the base, make things convenient for the couple to use, set up the recess, be convenient for install the balancing weight additional, improve overall stability, the installation of the crab-bolt cage of being convenient for, save the labour, the base has been reached, elevating gear, the couple, lead positive pole, the dog is whole with the sliding block set-up, utilize the couple to collude the crab-bolt cage, utilize elevating gear, drive couple upward movement, set up a plurality of whole cooperations around the crab-bolt cage, be convenient for lift up the crab-bolt cage, make things convenient for the staff to install, set up strutting arrangement, be convenient for support ground, when using, adjust holistic height, facilitate the use, set up the recess, be convenient for install the balancing weight additional, improve overall stability, the installation of the crab-bolt cage of being convenient for, save the labour, satisfy user.
Drawings
Fig. 1 is a schematic view of the overall external structure of the present invention;
FIG. 2 is a schematic view of the overall internal structure of the present invention;
fig. 3 is a schematic structural view of the supporting device of the present invention.
The reference numbers in the figures illustrate:
1. a base; 2. a lifting device; 21. a column; 22. a fixing plate; 23. a fixing frame; 24. rotating the disc; 25. a handle; 26. a rotating shaft; 27. a main gear; 28. a pinion gear; 29. rotating the screw rod; 210. a lead screw slider; 211. a limiting frame; 212. a limiting block; 3. hooking; 4. a guide rod; 5. a stopper; 6. a slider; 7. a support device; 71. a base plate; 72. a threaded rod; 73. a baffle plate; 74. a motion plate; 75. a first adjusting nut; 76. a second adjusting nut; 77. a support bar; 78. and (4) a groove.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
Example 1:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a wind power generation basis crab-bolt cage stock mounting tool, includes base 1, and base 1's top fixedly connected with elevating gear 2, elevating gear 2's lateral wall fixedly connected with couple 3, elevating gear 2's top fixedly connected with lead positive pole 4, lead positive pole 4's top fixedly connected with dog 5, lead positive pole 4 sliding connection and have slider 6, slider 6 and couple 3 fixed connection. Base 1, elevating gear 2, couple 3, lead positive pole 4, dog 5 and slider 6 and constitute a whole, utilize couple 3 to collude the crab-bolt cage, utilize elevating gear 2 to put, drive 3 upward movements of couple, set up a plurality of whole cooperations around the crab-bolt cage, be convenient for lift up the crab-bolt cage, make things convenient for the staff to install.
Example 2:
referring to fig. 2, a wind power generation foundation anchor bolt cage anchor bolt installation tool is substantially the same as that of embodiment 1, and further, a lifting device 2 includes an upright post 21, the upright post 21 is fixedly connected with a base 1, a fixing plate 22 is fixedly connected with the top of the upright post 21, a fixing frame 23 is fixedly connected with the top of the fixing plate 22, a rotating disc 24 is arranged on the side wall of the fixing frame 23, a handle 25 is fixedly connected with the surface of the rotating disc 24, a rotating shaft 26 is fixedly connected with the axis of the rotating disc 24, the rotating shaft 26 is rotatably connected with the fixing frame 23, a main gear 27 is fixedly connected with one end of the rotating shaft 26 located inside the fixing frame 23, the main gear 27 is engaged with a pinion 28, a rotating lead screw 29 is fixedly connected with the axis of the pinion 28, the rotating lead screw 29 is rotatably connected with the fixing plate 22, a lead screw slider 210, the screw rod sliding block 210 is connected with the upright column 21 in a sliding manner, the limiting frame 211 is arranged inside the base 1, the limiting block 212 is arranged inside the limiting frame 211, the screw rod 29 is rotatably connected with the limiting frame 211, and the screw rod 29 is fixedly connected with the limiting block 212. The hook 3 is stretched into the anchor bolt cage, the rotating disc 24 is rotated to drive the rotating shaft 26 to rotate, the main gear 27 is driven to rotate, the pinion 28 is driven to rotate, the rotating lead screw 29 is driven to rotate, the lead screw sliding block 210 is driven to move, the hook 3 is driven to move upwards, the anchor bolt cage is lifted, and installation by workers is facilitated.
Example 3:
referring to fig. 3, a wind power generation foundation anchor bolt cage anchor bolt installation tool is substantially the same as that of embodiment 1, and further, a supporting device 7 is fixedly connected to the bottom of the base 1, the supporting device 7 includes a bottom plate 71, a threaded rod 72 is fixedly connected to the top of the bottom plate 71, a baffle 73 is fixedly connected to the top of the threaded rod 72, the threaded rod 72 is slidably connected to a moving plate 74, a first adjusting nut 75 and a second adjusting nut 76 are respectively disposed above and below the moving plate 74, the first adjusting nut 75 and the second adjusting nut 76 are both in threaded connection with the threaded rod 72, a supporting rod 77 is fixedly connected to the top of the moving plate 74, and the top of the supporting rod 77 is fixedly connected to the bottom of the base 1. Set up strutting arrangement 7, be convenient for support ground, improve overall stability, whole before using, rotate first adjusting nut 75, second adjusting nut 76 respectively, the height of adjustment motion board 74, and then the height of adjustment bracing piece 77 supports base 1, makes things convenient for couple 3 to arrange anchor bolt cage below in, uses.
Example 4:
referring to fig. 3, a wind power generation foundation anchor bolt cage anchor bolt installation tool is substantially the same as that of embodiment 3, and further, a groove 78 is formed on a side wall of a bottom plate 71. Set up recess 78, be convenient for install the balancing weight additional, improve overall stability, be convenient for lift up the crab-bolt cage and install, replace the workman to lift up, save the labour.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.

Claims (4)

1.一种风力发电基础锚栓笼锚杆安装工具,包括底座(1),其特征在于:所述底座(1)的顶部固定连接有升降装置(2),所述升降装置(2)的侧壁固定连接有挂钩(3),所述升降装置(2)的顶部固定连接有导正杆(4),所述导正杆(4)的顶部固定连接有挡块(5),所述导正杆(4)滑动连接有滑块(6),所述滑块(6)与挂钩(3)固定连接。1. A wind power generation foundation anchor bolt cage bolt installation tool, comprising a base (1), characterized in that: a lifting device (2) is fixedly connected to the top of the base (1), and the lifting device (2) is A hook (3) is fixedly connected to the side wall, a guide rod (4) is fixedly connected to the top of the lifting device (2), and a stopper (5) is fixedly connected to the top of the guide rod (4). The guide rod (4) is slidably connected with a sliding block (6), and the sliding block (6) is fixedly connected with the hook (3). 2.根据权利要求1所述的一种风力发电基础锚栓笼锚杆安装工具,其特征在于:所述升降装置(2)包括立柱(21),所述立柱(21)与底座(1)固定连接,所述立柱(21)的顶部固定连接有固定板(22),所述固定板(22)的顶部固定连接有固定框(23),所述固定框(23)的侧壁设置有转动盘(24),所述转动盘(24)的表面固定连接有手柄(25),所述转动盘(24)的轴心处固定连接有转动轴(26),所述转动轴(26)与固定框(23)转动连接,所述转动轴(26)位于固定框(23)内部的一端固定连接有主齿轮(27),所述主齿轮(27)啮合传动有副齿轮(28),所述副齿轮(28)的轴心处固定连接有转动丝杆(29),所述转动丝杆(29)与固定板(22)转动连接,所述转动丝杆(29)螺纹连接有丝杠滑块(210),所述丝杠滑块(210)与挂钩(3)固定连接,所述丝杠滑块(210)与立柱(21)滑动连接,所述底座(1)的内部设置有限位框(211),所述限位框(211)的内部设置有限位块(212),所述转动丝杆(29)与限位框(211)转动连接,所述转动丝杆(29)与限位块(212)固定连接。2. A wind power generation foundation anchor bolt cage bolt installation tool according to claim 1, characterized in that: the lifting device (2) comprises a column (21), the column (21) and the base (1) Fixed connection, a fixing plate (22) is fixedly connected to the top of the column (21), a fixing frame (23) is fixedly connected to the top of the fixing plate (22), and the side wall of the fixing frame (23) is provided with A rotating disk (24), a handle (25) is fixedly connected to the surface of the rotating disk (24), a rotating shaft (26) is fixedly connected to the axis of the rotating disk (24), and the rotating shaft (26) It is rotatably connected with the fixed frame (23), and one end of the rotating shaft (26) located inside the fixed frame (23) is fixedly connected with a main gear (27), and the main gear (27) engages and drives a secondary gear (28), A rotating screw rod (29) is fixedly connected to the axis of the auxiliary gear (28), the rotating screw rod (29) is rotatably connected with the fixing plate (22), and the rotating screw rod (29) is threadedly connected with a screw A screw slider (210), the screw slider (210) is fixedly connected with the hook (3), the screw slider (210) is slidably connected with the column (21), and the interior of the base (1) is provided A limiting frame (211), a limiting block (212) is arranged inside the limiting frame (211), the rotating screw (29) is rotatably connected with the limiting frame (211), and the rotating screw (29) ) is fixedly connected with the limit block (212). 3.根据权利要求1所述的一种风力发电基础锚栓笼锚杆安装工具,其特征在于:所述底座(1)的底部固定连接有支撑装置(7),所述支撑装置(7)包括底板(71),所述底板(71)的顶部固定连接有螺纹杆(72),所述螺纹杆(72)的顶部固定连接有挡板(73),所述螺纹杆(72)滑动连接有运动板(74),所述运动板(74)的上下方分别设置有第一调节螺母(75)、第二调节螺母(76),所述第一调节螺母(75)、第二调节螺母(76)均与螺纹杆(72)螺纹连接,所述运动板(74)的顶部固定连接有支撑杆(77),所述支撑杆(77)的顶部与底座(1)的底部固定连接。3. A wind power generation foundation anchor cage bolt installation tool according to claim 1, characterized in that: a support device (7) is fixedly connected to the bottom of the base (1), and the support device (7) A bottom plate (71) is included, a threaded rod (72) is fixedly connected to the top of the bottom plate (71), a baffle plate (73) is fixedly connected to the top of the threaded rod (72), and the threaded rod (72) is slidably connected There is a movement plate (74), the upper and lower parts of the movement plate (74) are respectively provided with a first adjustment nut (75) and a second adjustment nut (76), the first adjustment nut (75), the second adjustment nut (76) are all threadedly connected with the threaded rod (72), the top of the motion plate (74) is fixedly connected with a support rod (77), and the top of the support rod (77) is fixedly connected with the bottom of the base (1). 4.根据权利要求3所述的一种风力发电基础锚栓笼锚杆安装工具,其特征在于:所述底板(71)的侧壁设置有凹槽(78)。4. A wind power generation foundation anchor cage bolt installation tool according to claim 3, characterized in that a groove (78) is provided on the side wall of the bottom plate (71).
CN202021345727.0U 2020-07-10 2020-07-10 A kind of wind power generation foundation anchor bolt cage bolt installation tool Expired - Fee Related CN212656578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021345727.0U CN212656578U (en) 2020-07-10 2020-07-10 A kind of wind power generation foundation anchor bolt cage bolt installation tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021345727.0U CN212656578U (en) 2020-07-10 2020-07-10 A kind of wind power generation foundation anchor bolt cage bolt installation tool

Publications (1)

Publication Number Publication Date
CN212656578U true CN212656578U (en) 2021-03-05

Family

ID=74760868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021345727.0U Expired - Fee Related CN212656578U (en) 2020-07-10 2020-07-10 A kind of wind power generation foundation anchor bolt cage bolt installation tool

Country Status (1)

Country Link
CN (1) CN212656578U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113370133A (en) * 2021-06-15 2021-09-10 中国水利水电第九工程局有限公司 Tool for mounting anchor rod and mounting method of prestressed anchor bolt cage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113370133A (en) * 2021-06-15 2021-09-10 中国水利水电第九工程局有限公司 Tool for mounting anchor rod and mounting method of prestressed anchor bolt cage

Similar Documents

Publication Publication Date Title
CN207863425U (en) A kind of Lifting scaffold for architectural engineering
CN116163538B (en) Movable ALC light partition board installation device and use method
CN212656578U (en) A kind of wind power generation foundation anchor bolt cage bolt installation tool
CN209600748U (en) A kind of offshore wind turbine cushion cap Active Compensation steps on quadrupler
CN208982954U (en) A kind of mechanical and electric equipment installation regulating device
CN219063780U (en) A kind of boiler equipment with safety maintenance platform structure
CN207361737U (en) A kind of lifting gear of maintenance of equipment
CN211439747U (en) Adjustable bolt tightening device for elevator installation
CN211496680U (en) Building site hoist
CN210216578U (en) Supporting device for secondary water supply equipment
CN220226284U (en) Auxiliary installation device for welding ball net rack
CN221971162U (en) A construction hoist fixing device
CN217867868U (en) Well lid is maintained and is used hoisting frame
CN223608142U (en) Construction bench for steel structure factory building construction
CN221682397U (en) An assembled building construction platform
CN214144870U (en) Temporary supporting device based on building engineering construction
CN224032311U (en) A type of support bracket for power transmission poles
CN220539164U (en) Scaffold supporting mechanism
CN215411076U (en) Electromechanical device's installation bears uses regulation bed hedgehopping device
CN215592550U (en) Lifting platform for working at heights
CN221422881U (en) Building engineering management construction safety fence
CN222525801U (en) Construction device of view barricade
CN221253830U (en) Auxiliary tool for installing electric meter box
CN222161920U (en) A retractable and movable building scaffold
CN218912173U (en) Building installation anti-falling platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210305