CN212173411U - Fixing device is deposited to reinforcing bar for construction - Google Patents
Fixing device is deposited to reinforcing bar for construction Download PDFInfo
- Publication number
- CN212173411U CN212173411U CN202020479372.8U CN202020479372U CN212173411U CN 212173411 U CN212173411 U CN 212173411U CN 202020479372 U CN202020479372 U CN 202020479372U CN 212173411 U CN212173411 U CN 212173411U
- Authority
- CN
- China
- Prior art keywords
- shaped frame
- band conveyer
- belt conveyor
- reinforcing bar
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 18
- 230000005540 biological transmission Effects 0.000 claims description 24
- 238000004804 winding Methods 0.000 claims description 15
- 238000000034 method Methods 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 16
- 239000010959 steel Substances 0.000 description 16
- 239000000463 material Substances 0.000 description 9
- 238000009435 building construction Methods 0.000 description 5
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000004566 building material Substances 0.000 description 1
- 244000309464 bull Species 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a fixing device is deposited to reinforcing bar for construction, including the U-shaped frame, U-shaped frame opening is equipped with lift band conveyer and band conveyer forward, lift band conveyer is located band conveyer's front side, and lift band conveyer is at the inside vertical lift of U-shaped frame, the fixed mounting panel that is equipped with on the upside inner wall of U-shaped frame, U-shaped frame upside are equipped with hoisting accessory, and band conveyer's number is a plurality of and follows U-shaped frame from the bottom up evenly distributed, all places on lift band conveyer and the band conveyer and places the case. Compared with the prior art, the method has the advantages that: the utility model discloses the more efficient has utilized the area that can occupy on the building site. No matter place or take, all adopted semi-mechanized process, convenient and labour saving and time saving, and the mode of placing through the multilayer still can be used to classify and place different types of reinforcing bar, also convenient categorised taking simultaneously.
Description
Technical Field
The utility model relates to a fixed technical field is deposited to the building site reinforcing bar, specifically indicates a fixing device is deposited to reinforcing bar for construction.
Background
The steel bar storage fixing device for the building construction needs a large amount of steel bar materials during the construction of the reinforced concrete building, the steel bar building materials cannot be used immediately, so a large amount of steel bar materials are often stored on the site of the building construction so as to be used in the construction, at present, because the steel bar storage fixing device is lacked, most construction sites stack steel bars together after bundling for storage, when the steel bar materials are stacked too much, the steel bar stacks too high, once the steel bar stacks, a serious safety accident can be caused, and the stacked steel bars can make lower-layer steel bars difficult to take out, and when the steel bars of required types are pressed on the bottom of the steel bar stacks, the construction efficiency can be seriously influenced, so that the steel bar storage fixing device for the building construction is provided.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome above technical difficulty, provide one kind can conveniently place reinforced material and place also can be very convenient after the very convenient reinforcing bar of taking deposit fixing device for construction.
In order to solve the technical problem, the utility model provides a technical scheme does: a reinforcing steel bar storage fixing device for building construction comprises a U-shaped frame, wherein an opening of the U-shaped frame faces forwards, a lifting belt conveyor and a belt conveyor are arranged on the inner side of the U-shaped frame, the lifting belt conveyor is located on the front side of the belt conveyor and vertically ascends and descends in the U-shaped frame, a mounting plate is fixedly arranged on the inner wall of the upper side of the U-shaped frame, a lifting device is arranged on the upper side of the U-shaped frame and comprises a transmission shaft and a winding post, the transmission shaft is mounted on the upper side of the mounting plate through a bearing seat, the winding post is mounted on the U-shaped frame through a bearing seat, the winding post is located right above the lifting belt conveyor and is connected with the lifting belt conveyor through a rope, the transmission shaft is connected with the winding post through gear transmission, and the belt conveyor is fixedly arranged on the inner side of the, the number of band conveyer is a plurality of and along U-shaped frame from the bottom up evenly distributed, all placed on lift band conveyer and the band conveyer and placed the case.
As an improvement, the lifting device further comprises a lifting motor, the lifting motor is fixedly arranged on the upper side of the mounting plate, an output shaft of the lifting motor is in transmission connection with the middle of the transmission shaft through a conveyor belt, the number of the winding posts is two, the two winding posts are respectively arranged on left and right side plates of the U-shaped frame, the lifting belt conveyors are lifted from the left and right sides through ropes, lifting is more stable, dumping occurs, a first conical gear is fixedly arranged at the rear end of each winding post, two ends of the transmission shaft are respectively provided with a second conical gear, and the first conical gear is matched with the second conical gear.
As an improvement, the lifting belt conveyor comprises a frame and a motor, sliding blocks are respectively arranged on the left side and the right side of the frame, sliding grooves are formed in the inner wall of the U-shaped frame and matched with the sliding blocks, so that the lifting belt conveyor is vertically lifted, the lower end of a rope is fixedly connected to the frame, and the motor is fixedly installed at the bottom of the frame.
As an improvement, the motor of the belt conveyor is fixedly arranged on the outer wall of the U-shaped frame.
As an improvement, the bottom of the placing box is provided with universal wheels with brakes, so that the placing box is convenient to move.
Compared with the prior art, the utility model the advantage lie in: the utility model discloses when placing reinforced material, not only utilized the horizontal area occupied on the building site, also utilized the vertical space area occupied on the building site, more the efficient utilized the area occupied on the building site. No matter place or take, all adopted semi-mechanized process, convenient and fast, labour saving and time saving, and the mode of placing through the multilayer still can be used to classify and place different types of reinforcing bar, also convenient classification simultaneously takes.
Drawings
Fig. 1 is the utility model relates to a fixing device is deposited to reinforcing bar for construction looks sideways at partial structure schematic diagram of direction.
Fig. 2 is the utility model relates to a fixing device lift band conveyer part is deposited to reinforcing bar for construction's structural schematic diagram.
Fig. 3 is the utility model relates to a fixing device is deposited to reinforcing bar for construction overlooks partial structure schematic diagram of direction.
As shown in the figure: 1. u-shaped frame, 2, lift band conveyer, 3, band conveyer, 4, mounting panel, 5, hoisting accessory, 6, transmission shaft, 7, wrapping post, 8, rope, 9, place the case, 10, lift motor, 11, conveyer belt, 12, conical gear one, 13, frame, 14, motor, 15, slider, 16, spout, 17, universal wheel, 18, conical gear two.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "lateral", "up", "down", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified. Furthermore, the term "comprises" and any variations thereof is intended to cover non-exclusive inclusions.
The present invention will be described in further detail with reference to the accompanying drawings.
A reinforcing steel bar storage fixing device for building construction comprises a U-shaped frame 1, wherein the opening of the U-shaped frame faces forwards, namely the U-shaped frame 1 is placed on the ground after being laid down, a lifting belt conveyor 2 and a belt conveyor 3 are arranged on the inner side of the U-shaped frame 1, the lifting belt conveyor 2 and the belt conveyor 3 are both in the prior art and are common belt conveyors in the field and in life, the lifting belt conveyor 2 is positioned on the front side of the belt conveyor 3, the lifting belt conveyor 2 vertically lifts in the U-shaped frame 1, a mounting plate 4 is fixedly arranged on the inner wall of the upper side of the U-shaped frame 1, a lifting device 5 is arranged on the upper side of the U-shaped frame 1, the lifting device 5 comprises a transmission shaft 6 and a winding post 7, the transmission shaft 6 is mounted on the upper side of the mounting plate 4 through a bearing seat, the winding post 7 is mounted on the U-shaped, the bearing block is the prior art, is the structure of commonly used in this field and industrial manufacturing industry to sheathe the bearing on transmission shaft or bull stick, and fixes the bearing on the mesa, and wrapping post 7 is located lift band conveyer 2 directly over and is connected through rope 8 between the lift band conveyer 2, be connected through gear drive between transmission shaft 6 and the wrapping post 7, band conveyer 3 is fixed to be set up in the inboard of U-shaped frame 1, band conveyer 3's motor fixed mounting is on the outer wall of U-shaped frame 1, and band conveyer 3's number is a plurality of and along U-shaped frame 1 from the bottom up evenly distributed, all placed on lift band conveyer 2 and band conveyer 3 and place case 9, the bottom of placing case 9 is equipped with the universal wheel 17 that has the brake, and a plurality of band conveyer 3 of vertical evenly distributed can upwards place reinforcing bar material space, thereby enabling more efficient use of the site of the construction site.
The lifting device 5 further comprises a lifting motor 10, the lifting motor 10 is fixedly arranged on the upper side of the mounting plate 4, the output shaft of the lifting motor 10 is in transmission connection with the middle of the transmission shaft 6 through a transmission belt 11, the transmission shaft is a structure which is common in life and is driven by the transmission belt, the number of the winding posts 7 is two, the winding posts are respectively arranged on the left side plate and the right side plate of the U-shaped frame 1, a first conical gear 12 is fixedly arranged at the rear end of each winding post 7, two conical gears 18 are arranged at two ends of the transmission shaft 6, and the first conical gear 12 is matched with the second conical gear 18. Lifting belt conveyor 2 includes frame 13 and motor 14, the left and right sides of frame 13 is equipped with slider 15 respectively, spout 16 has been seted up on 1 inner wall of U-shaped frame, spout 16 cooperatees with slider 15, and the lower tip fixed connection of rope 8 is in frame 13, and rope 8 can be many, places and breaks when lifting by crane, and frame 13 front side is equipped with landslide shape step, conveniently places case 9 and is pushed up, motor 14 fixed mounting is in the bottom of frame 13, and motor 14, the motor that lifts by crane motor 10 and belt conveyor all connect the power.
The utility model discloses when concrete implementation, will place case 9 and fill with steel and remove this device department, go down lift band conveyer 2 through hoisting accessory 5, will place case 9 propelling movement and place case 9 on lift band conveyer 2 and stabilize with the brake, restart hoisting accessory 5 lifts by crane 2 segment distances of lift band conveyer, stop when taking lift band conveyer 2 and lower floor's band conveyer 3 to reach same level, start lift band conveyer 2 and band conveyer 3 simultaneously, place case 9 alright be carried on band conveyer 3. Then the lifting belt conveyor 2 is lowered again and the second placing box 9 filled with the reinforcing steel bar material is stopped on the upper surface, the lifting belt conveyor 2 is lifted again, and stopped when the lifting belt conveyor 2 and the second layer belt conveyor 3 at the bottom reach the same level, and the lifting belt conveyor 2 and the belt conveyor 3 are simultaneously started again, so that the placing box 9 can be conveyed to the second layer belt conveyor 3 at the bottom. The above operation is repeated until each layer of the belt conveyor 3 is put on the placing box 9 filled with the reinforcing bar material. When needs were got, go on above-mentioned operation in reverse can, different kinds of steel bar material can be placed to band conveyer 3 on different layers, need get which layer just falls which layer, convenient practicality.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.
Claims (5)
1. The utility model provides a fixing device is deposited to reinforcing bar for construction, includes U-shaped frame (1), its characterized in that: the U-shaped frame opening is towards the front, a lifting belt conveyor (2) and a belt conveyor (3) are arranged on the inner side of the U-shaped frame (1), the lifting belt conveyor (2) is located on the front side of the belt conveyor (3), the lifting belt conveyor (2) vertically lifts in the U-shaped frame (1), a mounting plate (4) is fixedly arranged on the inner wall of the upper side of the U-shaped frame (1), a lifting device (5) is arranged on the upper side of the U-shaped frame (1), the lifting device (5) comprises a transmission shaft (6) and a winding post (7), the transmission shaft (6) is mounted on the upper side of the mounting plate (4) through a bearing seat, the winding post (7) is mounted on the U-shaped frame (1) through a bearing seat, the winding post (7) is located right above the lifting belt conveyor (2) and is connected with the lifting belt conveyor (2) through a rope (8), be connected through gear drive between transmission shaft (6) and wrapping post (7), band conveyer (3) are fixed to be set up in the inboard of U-shaped frame (1), and the number of band conveyer (3) is a plurality of and follows U-shaped frame (1) from the bottom up evenly distributed, all placed on lift band conveyer (2) and band conveyer (3) and place case (9).
2. A reinforcing bar storing and fixing device for construction according to claim 1, wherein: hoisting accessory (5) still include hoisting motor (10), hoisting motor (10) are fixed to be set up the upside in mounting panel (4), are connected through conveyer belt (11) transmission between the output shaft of hoisting motor (10) and the middle part of transmission shaft (6), the number of wrapping post (7) is two and installs respectively on the board of the left and right sides of U-shaped frame (1), and the rear end of wrapping post (7) is fixed and is equipped with conical gear (12), the both ends of transmission shaft (6) all are equipped with conical gear two (18), conical gear (12) and conical gear two (18) cooperate.
3. A reinforcing bar storing and fixing device for construction according to claim 1, wherein: lifting belt conveyor (2) include frame (13) and motor (14), the left and right sides of frame (13) is equipped with slider (15) respectively, spout (16) have been seted up on U-shaped frame (1) inner wall, spout (16) cooperate with slider (15), and the lower tip fixed connection of rope (8) is on frame (13), motor (14) fixed mounting is in the bottom of frame (13).
4. A reinforcing bar storing and fixing device for construction according to claim 1, wherein: and a motor of the belt conveyor (3) is fixedly arranged on the outer wall of the U-shaped frame (1).
5. A reinforcing bar storing and fixing device for construction according to claim 1, wherein: the bottom of the placing box (9) is provided with a universal wheel (17) with a brake.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020479372.8U CN212173411U (en) | 2020-04-03 | 2020-04-03 | Fixing device is deposited to reinforcing bar for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020479372.8U CN212173411U (en) | 2020-04-03 | 2020-04-03 | Fixing device is deposited to reinforcing bar for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212173411U true CN212173411U (en) | 2020-12-18 |
Family
ID=73769414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020479372.8U Expired - Fee Related CN212173411U (en) | 2020-04-03 | 2020-04-03 | Fixing device is deposited to reinforcing bar for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212173411U (en) |
-
2020
- 2020-04-03 CN CN202020479372.8U patent/CN212173411U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214819539U (en) | Building block production line convenient to maintenance | |
CN202292981U (en) | Automatic plate loader | |
CN212173411U (en) | Fixing device is deposited to reinforcing bar for construction | |
CN109823810A (en) | A kind of novel energy-storing vanadium cell pile production conveying device | |
CN110626694A (en) | Stereoscopic warehouse capable of automatically storing and taking sectional material goods | |
CN215363406U (en) | Automatic material box transferring and returning device | |
CN214087306U (en) | Device for lifting full load rate of stacked slab component stacking and transporting | |
CN213774378U (en) | Assembled building safety construction platform | |
CN211768045U (en) | Automatic machine of breaking yard of low-order tray | |
CN211169591U (en) | Quick dismounting and transferring device for container | |
CN210504208U (en) | Goods hoisting device for logistics storage | |
CN215906472U (en) | Reinforcing mesh for concrete in high-speed rail construction | |
CN220300216U (en) | Lifting device for transportation | |
CN220078467U (en) | Automobile chassis battery lifting machine | |
CN216918379U (en) | Hoisting device and dangerous waste rigid landfill equipment | |
CN201052957Y (en) | Electric piling car | |
CN216235784U (en) | Building construction material lifting machine | |
CN216549477U (en) | Tray type liftable car loader | |
CN218704138U (en) | Frame is piled up in packing of titanium plate waste material shaping titanium electrode | |
CN216659971U (en) | Conveying trolley for loading sand bags | |
CN220884191U (en) | Precast concrete member transportation frame | |
CN215206166U (en) | Band saw blade material transferring tower | |
CN215402818U (en) | Foundation pit lifting and transporting device | |
CN220165205U (en) | Automatic beer bottle stacker | |
CN220664691U (en) | Heavy prefabricated component area transfer device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201218 |
|
CF01 | Termination of patent right due to non-payment of annual fee |