CN211547139U - Paving brick for municipal construction - Google Patents
Paving brick for municipal construction Download PDFInfo
- Publication number
- CN211547139U CN211547139U CN201921788812.1U CN201921788812U CN211547139U CN 211547139 U CN211547139 U CN 211547139U CN 201921788812 U CN201921788812 U CN 201921788812U CN 211547139 U CN211547139 U CN 211547139U
- Authority
- CN
- China
- Prior art keywords
- brick
- body base
- municipal construction
- paving
- brick body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a paving brick for municipal construction relates to municipal construction technical field, specifically is a paving brick for municipal construction, including brick body base, the both sides fixed mounting of brick body base bottom has fixed awl, the middle part fixed mounting of brick body base lower surface has the mounting panel, the back fixedly connected with fixed column of brick body base. This paving brick for municipal construction, cooperation through lower water drainage tank and overhead water drainage tank is used, make this paving brick for municipal construction lay subaerial formation two water drainage tanks, and then kept can excrete the water on the brick face under the more condition of rainwater, and then avoid the inconvenient problem of pedestrian's walking, traditional paving brick mode with log raft to underground has been changed simultaneously, avoided groundwater too much to stretch to the road surface and rivers can take away the earth under the brick face and lead to the problem of road surface damage, the practicality of this paving brick for municipal construction has been improved.
Description
Technical Field
The utility model relates to a municipal construction technical field specifically is a paving brick for municipal construction.
Background
Municipal works construction is municipal construction's traditional concept, at the in-process of municipal road construction, need lay the paving brick on the pavement, so that people walk, but traditional paving brick is laid the back under the great condition of rainwater, to accumulating a large amount of ponding on the brick face, simultaneously because traditional paving brick is with water drainage to road surface basic unit, the basic unit that leads to the below can soften, water can take away earth simultaneously, cause the paving brick not hard up, lead to trampling the paving brick and have the muddy water spill, underground ponding is too much can stretch to ground simultaneously, influence the pedestrian current, current paving brick is because single atress when carrying out road surface laying simultaneously, lead to the monolithic to turn and remove and cave in, therefore we have proposed a paving brick for municipal construction.
SUMMERY OF THE UTILITY MODEL
The utility model is not enough to prior art, the utility model provides a paving brick for municipal construction, it is strong to possess the drainage effect, lay firmly, the advantage that stability is high, the traditional paving brick that proposes among the above-mentioned background is laid under the great condition of rainwater, to accumulating a large amount of ponding on the brick face, simultaneously because traditional paving brick is with log raft to road surface basic unit, the basic unit that leads to the below can soften, water can take away earth simultaneously, cause paving brick not hard up, lead to trampling paving brick and have the muddy water spill, simultaneously underground ponding is too much can stretch to ground, influence the pedestrian current, current paving brick is because single atress is uneven when carrying out road paving simultaneously, lead to the monolithic problem of turning and removing and subside.
For the drainage effect is strong more than realizing, lay firmly, the high purpose of stability, the utility model discloses a following technical scheme realizes: the utility model provides a paving brick for municipal construction, includes brick body base, the both sides fixed mounting of brick body base bottom has fixed awl, the middle part fixed mounting of brick body base lower surface has the mounting panel, the back fixedly connected with fixed column of brick body base, the quantity of fixed column is three, the hole has been seted up in the front of brick body base and has cup jointed to cup joint, the quantity in hole is three and is in a straight line with the position of fixed column, the top fixed mounting of brick body base has the support frame, the top fixed mounting of support frame has the permeable bed, one side fixed mounting of permeable bed has the fixed plate of pressing down, the horizontal fixed plate of two one side fixedly connected with of permeable bed.
Preferably, the number of the fixed cones is four, the fixed cones are symmetrically distributed with the center of the lower surface of the brick body base, and the bottoms of the four fixed cones are conical.
Preferably, the bottom of mounting panel fixed mounting has the fixed awl of sand and soil and the fixed awl of sand and soil is the bottom of regular cross arrangement at the mounting panel.
Preferably, the inner chamber of permeable bed has been seted up supplementary permeable hole, the upper surface fixed mounting of permeable bed has a plurality of antiskid ribbed tile, two form overhead water drainage tank between the antiskid ribbed tile, the material of permeable bed is river sand, cement, water, adds the concrete product that a certain proportion of water permeability agent and made again, the material of antiskid ribbed tile is granite aggregate, high-strength cement and cement polymer reinforcing agent to blend behind the polypropylene fiber stirring through the press forming.
Preferably, the support frames are made of high-strength concrete, and a gap between the two support frames forms a lower drainage channel.
Preferably, the bottoms of the pressing fixing plate and one side of the transverse fixing plate are fixedly connected to the side face of the brick body base, and the top of the pressing fixing plate is provided with an anti-skidding groove.
The utility model provides a paving brick for municipal construction possesses following beneficial effect:
1. this paving brick for municipal construction, cooperation through lower water drainage tank and overhead water drainage tank is used, make this paving brick for municipal construction lay subaerial formation two water drainage tanks, and then kept can excrete the water on the brick face under the more condition of rainwater, and then avoid the inconvenient problem of pedestrian's walking, traditional paving brick mode with log raft to underground has been changed simultaneously, avoided groundwater too much to stretch to the road surface and rivers can take away the earth under the brick face and lead to the problem of road surface damage, the practicality of this paving brick for municipal construction has been improved.
2. This paving brick for municipal construction, use through the fixed awl of sand and soil, when this paving brick for municipal construction is laid, utilize the fixed awl of sand and soil to fix the earth under the brick, avoided sand and soil loss to lead to the problem that vacuole formation damages the road surface under the brick, the use of the fixed awl of cooperation simultaneously, the fastness of this paving brick for municipal construction with ground has been improved, utilize simultaneously to cup joint the pore pair fixed column and cup joint and press the fixed plate to press down and cup joint horizontal fixed plate, and then make this paving brick for municipal construction lay back ground and form a whole, the problem of the removal of collapsing of single turning has been avoided.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic top view of the present invention;
fig. 3 is a schematic structural view of the sand fixing cone of the present invention.
In the figure: 1. a brick body base; 2. sleeving a hole; 3. a fixed cone; 4. a transverse fixed plate; 5. auxiliary water permeable holes; 6. a drainage groove is arranged on the upper part; 7. a drainage groove is arranged below; 8. an anti-skid plate; 9. a water permeable layer; 10. a support frame; 11. pressing the fixing plate; 12. mounting a plate; 13. a sand fixing cone; 14. fixing a column; 15. and (4) an anti-slip groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: the utility model provides a paving brick for municipal construction, including brick body base 1, the both sides fixed mounting of brick body base 1 bottom has fixed awl 3, the middle part fixed mounting of brick body base 1 lower surface has mounting panel 12, brick body base 1's back fixedly connected with fixed column 14, the quantity of fixed column 14 is three, brick body base 1's front has been seted up and has been cup jointed hole 2, the quantity of cup jointing hole 2 is three and is in a straight line with the position of fixed column 14, brick body base 1's top fixed mounting has support frame 10, the top fixed mounting of support frame 10 has permeable bed 9, one side fixed mounting of permeable bed 9 has presses fixed plate 11, two one side fixedly connected with horizontal fixed plate 4 of permeable bed 9.
Wherein, the quantity of fixed awl 3 is four and uses the central symmetric distribution of brick body base 1 lower surface, and the bottom of four fixed awl 3 is conical, through the use of fixed awl 3, can fix brick body base 1's position, avoids this paving brick for municipal construction to take place the displacement after the long-term atress, has improved this paving brick for municipal construction's stability.
Wherein, the bottom fixed mounting of mounting panel 12 has the fixed awl 13 of sand and soil and the fixed awl 13 of sand and soil to be the bottom of regular cross arrangement at mounting panel 12, utilizes mounting panel 12 to install the fixed awl 13 of sand and soil, utilizes the fixed 13 earth on the road surface of the fixed awl 13 of sand and soil of cross arrangement to fix simultaneously, avoids rivers etc. to take away the sand and soil on ground and leads to brick face bottom vacuole formation to lead to this paving brick for municipal construction to damage.
Wherein, the inner cavity of the permeable layer 9 is provided with auxiliary permeable holes 5, the upper surface of the permeable layer 9 is fixedly provided with a plurality of antiskid plates 8, an upper drainage groove 6 is formed between the two antiskid plates 8, the permeable layer 9 is made of river sand, cement and water, and is added with a certain proportion of water penetrating agent to prepare a concrete product, the antiskid plates 8 are made of granite aggregate, high-strength cement and cement polymer reinforcing agent, and are blended with polypropylene fiber and stirred and then are pressed to form, the inner cavity of the permeable layer 9 is provided with the auxiliary permeable holes 5, when the rainwater is in a larger environment, the drainage can not reach the drainage requirement by the permeable action of the permeable layer 9, so the permeable performance of the permeable layer 9 is increased by the auxiliary permeable holes 5, the excessive water accumulation on the brick surface is further avoided, the stability of the paving brick for municipal construction is improved, the accumulated water on the ground is drained by the upper drainage groove 6, guarantee the drying on the brick face, utilize antiskid ribbed tile 8 can increase the frictional force of sole and brick face simultaneously, avoid sliding.
Wherein, the material high strength concrete material of support frame 10, clearance between two support frames 10 forms underlying water drainage tank 7, connect between brick body base 1 and permeable bed 9 through support frame 10, not only can reduce this paving brick for municipal construction's weight and utilize the space formation underlying water drainage tank 7 between the support frame 10 simultaneously, make water discharge through underlying water drainage tank 7, and then form drainage channel under the road surface of having laid this paving brick, and then avoided traditional paving brick to arrange the rainwater to the underground can stretch to the problem that the rainwater can influence the pedestrian and pass through on the brick face when the rainwater is too much, the drainage effect of this paving brick for municipal construction has been improved.
Wherein, press the equal fixed connection in bottom of fixed plate 11 and 4 one sides of horizontal fixed plate to the side of brick body base 1, press the top of fixed plate 11 and seted up anti-skidding groove 15, when laying this paving brick for municipal construction, utilize and press fixed plate 11 to press horizontal fixed plate 4, and then fix between two paving bricks about, hole 2 and fixed column 14 are cup jointed to the cooperation simultaneously and utilize fixed column 14 to cup joint to the inner chamber of cup jointing hole 2 and then fix between two paving bricks in front and back, the road surface that makes this paving brick lay forms a whole, can not produce the problem that single brick body one end sinks when the atress, the practicality of this paving brick for municipal construction has been improved.
To sum up, this paving brick for municipal construction, during the use, at first place this paving brick in the assigned position, when horizontal laying, place a paving brick in the assigned position, then beat it through laying the hammer, make fixed awl 3 and sand and soil fixed awl 13 get into ground, make the bottom of brick body base 1 parallel with ground, then get the second paving brick and make and press fixed plate 11 and push down horizontal fixed plate 4, repeat above-mentioned operation and fix it, when vertical laying, make fixed column 14 cup joint to the inner chamber of cup joint hole 2, then beat the brick piece and fix, after laying is accomplished, when rainy day, utilize the water permeability characteristic of permeable bed 9 and the supplementary drainage performance of supplementary permeable bed 5, discharge water to the interior of underlying water drainage tank 7, subaerial water flows out through permeable bed 9 simultaneously, can.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a paving brick for municipal construction, includes brick body base (1), its characterized in that: the brick body base comprises a brick body base (1), a fixing cone (3) and a mounting plate (12), wherein the fixing cones (3) are fixedly mounted on two sides of the bottom of the brick body base (1), the mounting plate (12) is fixedly mounted at the middle of the lower surface of the brick body base (1), the fixing columns (14) are fixedly connected to the back of the brick body base (1), the number of the fixing columns (14) is three, the front of the brick body base (1) is provided with sleeving holes (2), the number of the sleeving holes (2) is three, the sleeving holes and the positions of the fixing columns (14) are located on a straight line, the top of the brick body base (1) is fixedly mounted with a support frame (10), a permeable layer (9) is fixedly mounted at the top of the support frame (10), a pressing fixing plate (11) is fixedly mounted on one side.
2. The paving brick for municipal construction according to claim 1, wherein: the fixed cones (3) are four and distributed symmetrically with the center of the lower surface of the brick body base (1), and the bottoms of the fixed cones (3) are conical.
3. The paving brick for municipal construction according to claim 1, wherein: the bottom fixed mounting of mounting panel (12) has the fixed awl of sand and soil (13) and the fixed awl of sand and soil (13) is the bottom of regular cross arrangement at mounting panel (12).
4. The paving brick for municipal construction according to claim 1, wherein: supplementary hole (5) of permeating water has been seted up to the inner chamber of permeable bed (9), the last fixed surface of permeable bed (9) installs a plurality of antiskid ribbed tile (8), two form overhead water drainage tank (6) between antiskid ribbed tile (8), the material of permeable bed (9) is river sand, cement, water, adds the concrete product that a certain proportion of water permeability agent and made again, the material of antiskid ribbed tile (8) is granite aggregate, high-strength cement and cement polymer reinforcing agent to blend behind the polypropylene fiber stirring through the press forming.
5. The paving brick for municipal construction according to claim 1, wherein: the material high strength concrete material of support frame (10), two clearance formation between support frame (10) puts water drainage tank (7) down.
6. The paving brick for municipal construction according to claim 1, wherein: the bottom of one side of the pressing fixing plate (11) and the bottom of one side of the transverse fixing plate (4) are fixedly connected to the side face of the brick body base (1), and the top of the pressing fixing plate (11) is provided with an anti-skidding groove (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921788812.1U CN211547139U (en) | 2019-10-23 | 2019-10-23 | Paving brick for municipal construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921788812.1U CN211547139U (en) | 2019-10-23 | 2019-10-23 | Paving brick for municipal construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211547139U true CN211547139U (en) | 2020-09-22 |
Family
ID=72497628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921788812.1U Expired - Fee Related CN211547139U (en) | 2019-10-23 | 2019-10-23 | Paving brick for municipal construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211547139U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113789693A (en) * | 2021-08-17 | 2021-12-14 | 安徽鋐硕绿色建材科技有限公司 | Brick is used in construction of sponge urban road surface and processingequipment thereof |
-
2019
- 2019-10-23 CN CN201921788812.1U patent/CN211547139U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113789693A (en) * | 2021-08-17 | 2021-12-14 | 安徽鋐硕绿色建材科技有限公司 | Brick is used in construction of sponge urban road surface and processingequipment thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106988184A (en) | Porous pavement | |
CN211472024U (en) | Town road laying structure | |
CN211547139U (en) | Paving brick for municipal construction | |
CN211815297U (en) | Permeable asphalt pavement | |
CN209890993U (en) | Floor tile with drainage function | |
CN212404688U (en) | Municipal works road laying structure | |
CN213507874U (en) | Antiskid type footpath stone | |
CN214362641U (en) | Sponge city permeable pavement | |
CN210066404U (en) | A central separation area curb for highway | |
CN211285126U (en) | Environment-friendly garden permeable road structure with rainwater collection function | |
CN206655078U (en) | A kind of porous pavement | |
CN207498769U (en) | A kind of road structure | |
CN216999127U (en) | Novel municipal administration paving brick | |
CN218951870U (en) | Ceramic water permeable brick structure | |
CN110924263A (en) | Water-permeable ecological brick fixing device and laying method | |
CN210561543U (en) | Colored rubble road surface structure of polyurethane | |
CN215329161U (en) | Antiskid urban and rural landscape footpath | |
CN212357856U (en) | Pavement brick produced by adding soil curing agent into sludge | |
CN212611790U (en) | Novel ecological permeable road structure | |
CN214737109U (en) | Permeable pavement | |
CN214301058U (en) | Pavement paving floor brick with good drainage effect | |
CN219410382U (en) | Antiskid permeable pavement | |
CN216947690U (en) | Road surface structure of road permeates water | |
CN213625017U (en) | Environment-friendly water permeable brick based on recycled aggregate | |
CN217869774U (en) | Pavement structure of permeable sidewalk |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200922 Termination date: 20211023 |
|
CF01 | Termination of patent right due to non-payment of annual fee |