CN106988184A - Porous pavement - Google Patents

Porous pavement Download PDF

Info

Publication number
CN106988184A
CN106988184A CN201710186262.5A CN201710186262A CN106988184A CN 106988184 A CN106988184 A CN 106988184A CN 201710186262 A CN201710186262 A CN 201710186262A CN 106988184 A CN106988184 A CN 106988184A
Authority
CN
China
Prior art keywords
brick
block
base course
porous base
permeable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710186262.5A
Other languages
Chinese (zh)
Other versions
CN106988184B (en
Inventor
葛威延
葛恒闯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Kewei Building Materials Co Ltd
Original Assignee
Jiangsu Kewei Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Kewei Building Materials Co Ltd filed Critical Jiangsu Kewei Building Materials Co Ltd
Priority to CN201710186262.5A priority Critical patent/CN106988184B/en
Publication of CN106988184A publication Critical patent/CN106988184A/en
Application granted granted Critical
Publication of CN106988184B publication Critical patent/CN106988184B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/02Paving elements having fixed spacing features
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention is a kind of porous pavement and the basic road surface using the brick, including levelling basic unit, basic supercrust and the permeable brick layer set gradually from lower to upper, and the basic supercrust is laid and constituted successively by some pieces of porous base course bricks;The permeable brick layer is made up of the laying of some water-permeable bricks;It is embedded with water leg, the basic supercrust of opening direction of water leg respectively along its length in the both sides of levelling basic unit and basic supercrust.Road surface roadbed of the present invention is soft or hard identical, and globality is strong, and road surface is not in that cracking sinks, and water-permeable brick is not easy to be trampled on, is broken, loosens, when there is a little ponding on ground, does not have water when people step on and extruded from brickwork joint, get wet and make shoes trousers of pedestrian etc. dirty;Quick construction is convenient simultaneously, time saving and energy saving, it is not necessary to use substantial amounts of cement stone, therefore construction cost is low, efficiency high.

Description

Porous pavement
Technical field
The present invention relates to road construction technical field, more particularly to a kind of porous pavement.
Background technology
At present in public open spaces such as urban construction pavement, squares, to solve rainy day excess surface water or draining not Smooth the problems such as, through directly laying water-permeable brick as the porous pavement of these open spaces frequently with normal concrete.It is this Mode cost is high, and construction is inconvenient.When raining, the rainwater on outdoor ground penetrates into underground by water-permeable brick.But it is due to road The soft or hard difference of base, common water-permeable brick in laying using after a period of time, road surface subsidence, water-permeable brick trampled on appearance fracture, The phenomenons such as loosening, road surface is damaged, and when there is a little ponding on ground, water is also had when people step on and is quickly squeezed from brickwork joint Go out, get wet and make shoes trousers of pedestrian etc. dirty.
The content of the invention
The technical problems to be solved by the invention are that there is provided rational in infrastructure, the permeable row of one kind in view of the shortcomings of the prior art The good porous pavement of water effect.
The technical problems to be solved by the invention are realized by following technical scheme, and the present invention is a kind of permeable Road surface, is characterized in:Including the levelling basic unit set gradually from lower to upper, basic supercrust and permeable brick layer, the basic road Surface layer is laid and constituted successively by some pieces of porous base course bricks;The permeable brick layer is made up of the laying of some water-permeable bricks;In levelling base The both sides of layer and basic supercrust are embedded with water leg, the basic supercrust of opening direction of water leg respectively along its length.
The size of the porous base course brick is that length is 40-110cm, and width is 10-70cm, is highly 10-40cm.It is permeable Base course has pervious function, can be made up of building waste, and its production cost is low, and twice laid reduces the wasting of resources.Thoroughly The size of water brick is the size of water-permeable brick commonly used in the prior art.The bottom wall of water leg tilts down setting, close to basis road Surface layer one end is high, and one end away from basis supercrust is low, and the water capacity that so basic supercrust comes easily is flowed into water leg.
In above-mentioned porous pavement, the water-permeable brick is provided with brick body, and brick body includes porous base course and is covered in institute The permeable top layer on porous base course is stated, some permeable holes through brick body, the permeable hole bag are provided with the upper surface of brick body Hole and lower opening are included, the aperture of lower opening is more than the aperture in upper hole, and the upper hole is located on permeable top layer and extends to porous base course In, the upper hole depth in porous base course and the deep equality in permeable top layer are in, the lower opening is located in porous base course.
Described permeable hole is uniformly arranged and is arranged in 2 rows, is set in parallel in along the length direction of brick body in brick body.Often Row is provided with 4-8, and the aperture in the upper hole is 4-6mm, and hole depth is 8-12mm, and the aperture of lower opening is 8-12mm.
In above-mentioned porous pavement, the porous base course is made up of upper and lower part, and the length of bottom is less than top Length, the through hole run through along lower length direction is provided with the side of porous base course, when at least two pieces water-permeable brick splicings, The through hole constituted between the side of the bottom of adjacent two pieces of water-permeable bricks on infiltration groove, each water-permeable brick is communicated with infiltration groove.
In above-mentioned porous pavement, the porous base course is made up of upper and lower part, and the middle part of bottom is provided with along brick body Infiltration groove of the thickness direction through extension;It is respectively equipped with the two sides of porous base course along leading to that lower length direction is run through Hole, through hole is communicated with infiltration groove.
In above-mentioned porous pavement, the porous base course brick includes the support sole piece and branch support shifted to install up and down Block, is connected by contiguous block between support sole piece and support jacking block and constitutes an entirety, upper surface and the support jacking block of contiguous block Upper surface flush, the lower surface of contiguous block is with supporting the lower surface of sole piece to flush, height and support sole piece and the branch of contiguous block The total height of support block is equal;Support on sole piece, support jacking block and contiguous block at least provided with one along its width insertion Collect cavity, in catchment through holes of the upper surface of contiguous block provided with several connections with corresponding collect cavity;In support sole piece, support The groove through extension along its short transverse is equipped with the front and rear sides face of jacking block and contiguous block.
A pair of groove difference 1 on support sole piece, support jacking block and the contiguous block per adjacent two pieces of porous base course bricks Connect, form several permeable holes extended along its short transverse.
Collect cavity on the contiguous block is preferably provided with two, is located at side by side on contiguous block, is set in the upper surface of contiguous block There are two through holes that catchment, two through holes that catchment correspond with two collect cavities connect respectively.On the upper surface of contiguous block also Provided with depressed area, two through holes that catchment are respectively positioned on the depressed area.
The contiguous block accounts for the 1/3-3/5 of whole porous base course brick length, and length, the width of support sole piece and support jacking block Degree and height are equal respectively.
In above-mentioned porous pavement, the porous base course brick includes two horizontal support blocks, in two horizontal support blocks Between be provided with intermediate support block, two horizontal support blocks are connected as a single entity with intermediate support block, and the height of the horizontal support block is The half of intermediate support block, the width of horizontal support block is equal with the width of intermediate support block, in horizontal support block and middle branch The collect cavity along its width insertion is equipped with bracer, the collection connected with collect cavity is provided with the upper surface of intermediate support block Water through hole;It is equipped with the front and rear sides face of horizontal support block and intermediate support block along its short transverse through the recessed of extension Groove.
The upper surface of the intermediate support block is provided with depressed area, and the through hole that catchments is located at the depressed area.Depressed area is in Between the outward flange of support block gradually reduce to be formed to the circumferential edge of through hole, lead-in chamfered is thusly-formed, to promote rainwater along should Inclined-plane flow direction catchments through hole smoothly into collect cavity.
The intermediate support block accounts for the 1/3-1/2 of whole porous base course brick length.In every adjacent two pieces of porous base course bricks Corresponding groove is docked respectively between horizontal support block and horizontal support block, intermediate support block and intermediate support block, forms number The individual permeable hole extended along its short transverse.
In above-mentioned porous pavement, the porous base course brick is made up of the lower support block and upper support block being connected, Upper support block is located at the middle part of lower support block, and the height of lower support block and upper support block is equal, and upper support block accounts for whole permeable base The 1/3-4/5 of layer brick length, is provided with 5 collect cavities along its width insertion on porous base course brick, and 5 collect cavities are divided into Two rows are located in brick body, and upper row is provided with 2 collect cavities, and lower row is provided with 3 collect cavities;The upper surface of upper support block be provided with Upper 2 collect cavities of row correspond the through hole that catchments of connection;If on the front and rear sides face of porous base course brick provided with arterial highway along its Groove of the short transverse through extension.
Groove on per adjacent two pieces of porous base course bricks is docked respectively, forms several along the permeable of its short transverse extension Hole.
It is preferred that the section of the lower support block and upper support block is up big and down small isosceles trapezoid, the upper folder of isosceles trapezoid Angle is 30 ° -75 °.
Groove on the porous base course brick of above-mentioned three kinds of structures is semi-circular recesses, a diameter of 1.5-3cm of groove.On State a diameter of 1.5cm-2.5cm of the through hole that catchments on the porous base course brick of three kinds of structures.
In above-mentioned porous pavement, the collect cavity on adjacent porous base course brick be mutually butted respectively connection composition catchment it is logical Road, collecting channel is connected with the water leg of basic supercrust both sides.
In above-mentioned porous pavement, the water leg is U-type groove, and some osculums, Mei Gepai are provided with water leg PVC drain pipe is connected with water hole.PVC drain pipe can guide to water greening or the urban sewage system of porous pavement both sides In.
In above-mentioned porous pavement, the levelling basic unit is paved into by pervious concrete, and its coefficient of permeability is at least 2.0 ×10-2Cm/s, thickness are 1-3cm.
The porous pavement of the present invention is that porous base course brick basis of formation road surface is laid in levelling basic unit, then on basic road Water-permeable brick is re-layed on face and forms permeable brick layer.Water-permeable brick is provided with permeable hole, can increase the displacement of water-permeable brick and permeable Power, makes road surface not have ponding, and water-permeable brick is provided with infiltration groove in addition, when having little time to drain rainwater more, can be by the groove that seeps water by rain Water is temporary, discharge after buffering, so that road surface does not have ponding, and the through hole communicated with infiltration groove is provided with brick body bottom, works as brick Have after loosening, pedestrian step on, the ponding in infiltration groove can be by flow therethrough, from without being squeezed under brick face Situation about going out.
Porous base course brick has pervious function, building waste can be used to be made, and is by one piece of block base course phase when using Mutually occlusion laying is constituted, therefore basic road surface globality is strong, and quick construction is convenient, time saving and energy saving, it is not necessary to use substantial amounts of water Mudstone.Porous base course brick is provided with collect cavity, and the through hole that catchments is passed through from the rainwater in the permeable hole on water-permeable brick or infiltration groove Or porous base course brick body is penetrated into collect cavity, rainwater can be discharged after temporary, buffering when rainfall is larger, collect cavity is mutual The collecting channel constituted is connected, the rainwater in collect cavity can be made mutually to be flowed by collecting channel, from basic road surface both sides Water leg is discharged, and improves drainage efficiency, and the phenomenon of ponding occurs in road surface when reducing heavy rain.
Compared with prior art, road surface roadbed of the present invention is soft or hard identical, and globality is strong, and road surface is not in that cracking sinks, Water-permeable brick is not easy to be trampled on, is broken, loosens, and when there is a little ponding on ground, does not have water when people step on and is squeezed from brickwork joint Go out, get wet and make shoes trousers of pedestrian etc. dirty;Quick construction is convenient simultaneously, time saving and energy saving, it is not necessary to use substantial amounts of Behavior of Hardened Cement Paste Son, therefore construction cost is low, efficiency high.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present invention.
Fig. 2 is a kind of structural representation of porous base course brick.
Fig. 3 is another structural representation of porous base course brick.
Fig. 4 is the yet another construction schematic diagram of porous base course brick.
Fig. 5 is a kind of structural representation of water-permeable brick.
Fig. 6 is Fig. 5 cross section structure diagram.
Fig. 7 is another structural representation of water-permeable brick.
Fig. 8 is the yet another construction schematic diagram of water-permeable brick.
Embodiment
Referring to the drawings, the concrete technical scheme of the present invention is further described, in order to which those skilled in the art enters One step the present invention is understood, without constituting the limitation to its right.
Reference picture 1, a kind of porous pavement, including levelling basic unit 6, basic supercrust 5 and the water-permeable brick set gradually from lower to upper Layer 2, the permeable brick layer 2 is made up of the laying of some water-permeable bricks 3.
The levelling basic unit 6 is paved into by pervious concrete, the laying on convenient basis road surface, and the levelling coefficient of permeability of basic unit 6 is extremely It is 2.0 × 10 less-2Cm/s, thickness are 2cm.It is pre- respectively along its length in the both sides of levelling basic unit 6 and basic supercrust 5 Water leg 1 is embedded with, the opening of water leg 1 is towards basic supercrust 5, and so the water in the supercrust of basis, which is easily flowed into, catchments In groove.The water leg 1 be U-type groove, on water leg 1 be provided with some osculums, osculum can be located at opening just to On cell wall, PVC drain pipe is respectively connected with each osculum, the end of PVC drain pipe can guide to water porous pavement both sides Greening or urban sewage system in, can so improve drainage speed.
The basic supercrust 5 is made up of some pieces of porous base course bricks 4 successively lapped layup;Porous base course brick 4 is by building The brick with pervious function is made in rubbish etc., and its production cost is low, and twice laid reduces the wasting of resources.The porous base course brick 4 size preferred lengths are 50cm, and width is 40cm, is highly 20cm.In addition, porous base course brick 4 can also be other specifications Size, all should be within the scope of the present invention for the sizes base course of such a structure.The structure of porous base course brick 4 Have a variety of, main several structures are as follows:
Referring to the drawings 2, the first porous base course brick 4 includes the support sole piece 41 shifted to install up and down and support jacking block 45, support It is connected between sole piece 41 and support jacking block 45 by contiguous block 44 and constitutes an entirety, upper surface and the support jacking block of contiguous block 44 45 upper surface flush, the lower surface of contiguous block 44 is with supporting the lower surface of sole piece 41 to flush, the height of contiguous block 44 and support Sole piece 41 is equal with the total height of support jacking block 45;The contiguous block 44 accounts for the 3/5 of whole base course length, and support sole piece 41 Equal respectively with the length of support jacking block 45, width and height, during such brick laying, support jacking block 45 can be completely placed in branch Support on sole piece 41.
Sole piece 41, support jacking block 45 is supported to be provided with a collect cavity 46 along its width insertion, contiguous block 44 and set There are two collect cavities 46 along its width insertion, two collect cavities 46 or so are parallel to be located on contiguous block 44 side by side.Even The upper surface of block 44 is connect provided with two through holes 42 that catchment, two through holes 42 that catchment correspond with two collect cavities 46 connect respectively It is logical.It is equipped with the front and rear sides face of support sole piece 41, support jacking block 45 and contiguous block 44 along its short transverse through extension Groove 43.
Depressed area is additionally provided with the upper surface of contiguous block 44, two through holes 42 that catchment are respectively positioned on the depressed area.Depressed area To be formed gradually to be reduced along the outward flange of contiguous block 44 to the circumferential edge for the through hole 42 that catchments, be thusly-formed lead-in chamfered, to promote Enter rainwater and catchment through hole 42 smoothly into collect cavity 46 along inclined-plane flow direction.
Porous base course brick 4 is in specific laying, and the surface of support sole piece 41 lands, if therefore width of roadway or length be by Tiling is spliced to form dry block base course side by side successively, and road surface length or width are placed on by the support jacking block 45 of one piece of base course Lapped layup is constituted on the support sole piece 41 of another piece of base course.Basic road surface surrounding end portion can use concrete mortar Or filled up using auxiliary fragment of brick, make road surface complete, so that basis of formation supercrust 5.
The support jacking block 45 of one piece of porous base course brick 4 is placed on when being overlapped on the support sole piece 41 of another piece of base course, can To support jacking block 45 to be completely superposed lapped layup with support sole piece 41.Can also be by the support jacking blocks of two porous base course bricks 4 45 width for respectively accounting for half are placed on same support sole piece 41, and so every three pieces of porous base course bricks 4 are mutually twisted laying, paving If basic road surface firm stable it is good.
43 points of the groove on support sole piece 41, support jacking block 45 and the contiguous block 44 per adjacent two pieces of porous base course bricks 4 Do not dock one by one, form several permeable holes extended along its short transverse.There are some permeable holes on the whole basic road surface.Together When support jacking block 45 with support sole piece 41 be completely superposed lapped layup when, support jacking block 45 docking constitute permeable hole with support bottom The permeable hole that the docking of block 41 is constituted corresponds to connection up and down, and the rainwater being so permeated from water-permeable brick 3 can be arranged by permeable hole Go out, improve drainage speed, effectively prevent ponding.
When some pieces of porous base course bricks 4 splice laying side by side, support sole piece 41 and support sole piece 41, the branch of adjacent base layer brick Support block 45 and the collect cavity 46 on support jacking block 45, contiguous block 44 and contiguous block 44 are docked and connected composition collecting channel respectively, Collecting channel is connected with the water leg 1 of the basic both sides of supercrust 5.Rainwater on water-permeable brick 3 can by catchment through hole 42 or Brick body is penetrated into collect cavity 46 in itself, is mutually flowed in the collecting channel of formation, can be from the collection of basic road surface both sides Tank 1 is discharged, and improves drainage efficiency, and when reducing heavy rain, the phenomenon of ponding occurs in road surface.
Referring to the drawings 3, second porous base course brick 4 includes two horizontal support blocks 47, two horizontal support blocks 47 it Between be provided with intermediate support block 48, two horizontal support blocks 47 are connected as a single entity with intermediate support block 48, the horizontal support block 47 Highly it is the half of intermediate support block 48, the width of horizontal support block 47 is equal with the width of intermediate support block 48, intermediate supports Block 48 accounts for the 1/3 of the whole length of porous base course brick 4.It is equipped with horizontal support block 47 and intermediate support block 48 along its width side To the collect cavity 46 of insertion, the through hole 42 that catchments connected with collect cavity 46 is provided with the upper surface of intermediate support block 48;Catchment logical A diameter of 2cm in hole 42.The upper surface of the intermediate support block 48 is provided with depressed area, and the through hole 42 that catchments is located at the depressed area. Depressed area is thusly-formed lead-in chamfered gradually to reduce to be formed along the outward flange of intermediate support block 48 to the circumferential edge of through hole, To promote rainwater to catchment through hole 42 smoothly into collect cavity 46 along inclined-plane flow direction.
It is equipped with the front and rear sides face of horizontal support block 47 and intermediate support block 48 along its short transverse through extension Groove 43.
The basic supercrust 5 is made up of some pieces of porous base course bricks 4 successively staggered relative lapped layup.Specifically, road Face width or length are that tiling is spliced to form side by side successively by some pieces of porous base course bricks 4, and road surface length or width are by one Direction is directed downward for one upward, and the horizontal support block 47 of one piece of porous base course brick 4 is placed on another piece of porous base course Opposing lap joint ends laying is constituted on the horizontal support block 47 of brick 4.Basic road surface surrounding end portion can use concrete mortar or Person is filled up using auxiliary fragment of brick, makes road surface complete.
The horizontal support block 47 of one piece of porous base course brick 4 is placed on the horizontal support block 47 of another piece of porous base course brick 4 Can be that horizontal support block 47 is completely superposed lapped layup with horizontal support block 47 during overlap joint.Two permeable bases can also be passed through The width that the horizontal support block 47 of layer brick 4 respectively accounts for half is placed on same horizontal support block 47, so every three pieces of permeable bases Layer brick 4 is mutually twisted laying, and the basic road surface firm stable of laying is good.
In the horizontal support block 47 and horizontal support block 47 per adjacent two pieces of porous base course bricks 4, intermediate support block 48 with Between groove 43 corresponding between support block 48 dock respectively, form several permeable holes extended along its short transverse.It is described whole There are some permeable holes on individual basic road surface.
When some pieces of porous base course bricks 4 splice laying side by side, horizontal support block 47 and the level branch of adjacent porous base course brick 4 Bracer 47, intermediate support block 48 are interconnected and constitute collecting channel respectively with the collect cavity 46 in intermediate support block 48, catchment logical Road is connected with the water leg 1 of the basic both sides of supercrust 5.Rainwater on water-permeable brick 3 can pass through through hole 42 or the brick body sheet of catchmenting Body is penetrated into collect cavity 46, is mutually flowed in the collecting channel of formation, can be from the rows of water leg 1 of basic road surface both sides Go out, improve drainage efficiency, when reducing heavy rain, the phenomenon of ponding occurs in road surface.
Referring to the drawings 4, the third porous base course brick 4 is made up of the lower support block 49 and upper support block 410 being connected, under The section of support block 49 and upper support block 410 is up big and down small isosceles trapezoid, and the upper angle of isosceles trapezoid is 60 °.Lower branch The height of support block 410 is equal on bracer 491, and upper support block 410 is located at the middle part of lower support block 49, and upper support block 410 Account for the 4/5 of whole brick body length.
Above and below being divided on porous base course brick 4 provided with 5 46,5 collect cavities 46 of collect cavity along its width insertion Two rows are located in brick body, and upper row is in upper support block 410 provided with 2 equal-sized 46,2 collect cavities 46 of collect cavity, under Row is in lower support block 49 provided with 3 small big equal 46,3 collect cavities 46 of collect cavity, and each collect cavity 46 of upper row Sectional area be more than each collect cavity 46 of lower row sectional area.
The upper surface of upper support block 410 is provided with corresponds the through hole 42 that catchments connected with upper 2 collect cavities 46 of row;Upper branch The upper surface of bracer 410 is provided with depressed area, and two through holes are respectively positioned on the depressed area.Depressed area is along the outer of upper support block 410 The circumferential edge of edge to two through holes, which is gradually reduced, to be formed, and is thusly-formed lead-in chamfered, to promote rainwater to be flowed to along the inclined-plane Through hole smoothly enters collect cavity 46.
If running through the groove 43 of extension along its short transverse provided with arterial highway on the front and rear sides face of porous base course brick 4.It is recessed Groove 43 may be in lower support block 49, or be located in support block 410 and extend to the bottom of lower support block 49, side Groove 43 mutually be arranged in parallel.
The basic supercrust 5 is made up of some pieces of base courses successively staggered relative lapped layup.Specifically, width of roadway Or length is that tiling is spliced to form side by side successively by some pieces of porous base course bricks 4, road surface length or width are by a direction court Upper one is directed downward, and the lower support block 49 of one piece of porous base course brick 4 is placed on the lower branch of another piece of porous base course brick 4 Opposing lap joint ends laying is constituted on bracer 49.Basic road surface surrounding end portion can use concrete mortar or use auxiliary brick Block is filled up, and makes road surface complete.
The lower support block 49 of one piece of porous base course brick 4 is placed in the lower support block 49 of another piece of porous base course brick 4 and overlapped When, can be completely superposed lapped layup.The width of half can also be respectively accounted for by the lower support block 49 of two porous base course bricks 4 It is placed in same lower support block 49, so every three pieces of porous base course bricks 4 are mutually twisted laying, and the basic road surface of laying is firm Stability is good.
Docked respectively per the groove 43 on adjacent two pieces of porous base course bricks 4, formed and several extended along its short transverse Permeable hole.There are some permeable holes on the whole basic road surface.It can accelerate to be permeated from water-permeable brick 3 using permeable hole Rainwater is discharged, and is improved drainage speed, is effectively prevented ponding.
When some pieces of porous base course bricks 4 splice laying side by side, the collect cavity 46 on adjacent porous base course brick 4 is mutually interconnected respectively Logical to constitute collecting channel, collecting channel is connected with the water leg 1 of the basic both sides of supercrust 5.Collect the rain in collect cavity 46 Water can mutually be flowed by collecting channel, can be discharged from the water leg 1 of basic road surface both sides.
Groove 43 on the porous base course brick 4 of above-mentioned three kinds of structures is semi-circular recesses 43, groove 43 it is a diameter of 2cm.A diameter of 2cm of the through hole 42 that catchments on the porous base course brick 4 of above-mentioned three kinds of structures.
Reference picture 5 and Fig. 6, the water-permeable brick 3 are provided with brick body, and brick body includes porous base course 31 and is covered in described Permeable top layer 33 on water-base 31, the thickness on permeable top layer 33 is 5mm.Permeable top layer 33 can be by high intensity quartz sand system Into porous base course 31 can be made up of crushed stone concrete.Some permeable holes 32 through brick body are provided with the upper surface of brick body, The permeable hole 32 includes upper hole 34 and lower opening 35, natural transition between upper hole 34 and lower opening 35, and the aperture of lower opening 35 is more than upper The aperture in hole 34, the aperture in upper hole 34 is 5mm, and the aperture of lower opening 35 is 9mm.The aperture in upper hole 34 can not be too small, can fall grey quilt Block, can not be too big, heel of high-heel shoe is blocked in too conference, dangerous.The upper hole 34 is located on permeable top layer 33 and extended Into porous base course 31, lower opening 35 is located in porous base course 31.
Described permeable hole 32 is uniformly arranged and is arranged in 2 rows, is set in parallel in along the length direction of brick body in brick body. Often row is provided with 6 permeable holes 32.Total hole depth in upper hole 34 is 10mm.The depth of upper hole 34 being in porous base course 31 and permeable table Deep equality in layer 33 is respectively 5mm.
When raining more anxious, the rainwater on road surface can be drained by permeable hole 32, accelerate drainage speed, make road surface Ponding will not be formed.
With reference to Fig. 7, porous base course 31 is made up of top 37 and bottom 36, and top 37 is equal with the thickness of bottom 36, bottom 36 length is less than 3/5 that the length on top 37, the i.e. length of bottom 36 are the length of top 37, therefore the bottom two of water-permeable brick 3 Side respectively forms a breach.The through hole 39 run through along the length direction of bottom 36 is provided with the side of porous base course 31.When at least When two pieces of water-permeable bricks 3 splice, infiltration groove 38, Mei Getou is constituted between the side of the bottom 36 of adjacent two pieces of water-permeable bricks 3 Through hole 39 on water brick 3 is communicated with infiltration groove 38.
When having little time to drain rainwater, from the row of 31 brick of porous base course 4 after rainwater can be kept in, buffered by the groove 38 that seeps water more Go out, so that road surface does not have ponding.In addition after brick has loosening, pedestrian to step on, the ponding in infiltration groove 38 can be by logical Hole 39 is flowed, from the situation without being extruded under brick face.
With reference to Fig. 8, another structure of porous base course 31, it is made up of top 37 and bottom 36, top 37 and bottom 36 Thickness it is equal, the middle part of bottom 36 is provided with the infiltration groove 38 through extension along brick body thickness direction.Infiltration groove 38 length be The 1/3 of the overall length of brick body bottom 36.The through hole run through along the length direction of bottom 36 is respectively equipped with the two sides of porous base course 31 39, through hole 39 is communicated with infiltration groove 387.Infiltration groove 38 is located at the middle part of brick body, the effect with temporary buffering rainwater, equally, After brick has loosening, pedestrian to step on, the ponding in infiltration groove 38 can be flowed by through hole 39, from without from brick face Under situation about being extruded.

Claims (10)

1. a kind of porous pavement, it is characterised in that:Including the levelling basic unit set gradually from lower to upper, basic supercrust and permeable Brick layer, the basic supercrust is laid and constituted successively by some pieces of porous base course bricks;The permeable brick layer is spread by some water-permeable bricks If constituting;Water leg, the opening of water leg are embedded with respectively along its length in the both sides of levelling basic unit and basic supercrust Towards basic supercrust.
2. porous pavement according to claim 1, it is characterised in that:The water-permeable brick is provided with brick body, and brick body includes Porous base course and the permeable top layer being covered on the porous base course, provided with some through the saturating of brick body on the upper surface of brick body Water hole, the permeable hole includes upper hole and lower opening, and the aperture of lower opening is more than the aperture in upper hole, and the upper hole is located on permeable top layer And extend in porous base course, the upper hole depth in porous base course and the deep equality in permeable top layer are in, the lower opening is set In porous base course.
3. porous pavement according to claim 2, it is characterised in that:The porous base course is made up of upper and lower part, under The length in portion is less than the length on top, the through hole run through along lower length direction is provided with the side of porous base course, when at least two When water-permeable brick described in block splices, constituted between the side of the bottom of adjacent two pieces of water-permeable bricks on infiltration groove, each water-permeable brick Through hole is communicated with infiltration groove.
4. porous pavement according to claim 2, it is characterised in that:The porous base course is made up of upper and lower part, under The middle part in portion is provided with the infiltration groove through extension along brick body thickness direction;It is respectively equipped with the two sides of porous base course along bottom The through hole that length direction runs through, through hole is communicated with infiltration groove.
5. porous pavement according to claim 1, it is characterised in that:The porous base course brick includes what is shifted to install up and down Sole piece and support jacking block are supported, is connected between support sole piece and support jacking block by contiguous block and constitutes an entirety, contiguous block Upper surface and the upper surface flush of support jacking block, the lower surface of contiguous block is with supporting the lower surface of sole piece to flush, the height of contiguous block Spend equal with the total height of support sole piece and support jacking block;Support on sole piece, support jacking block and contiguous block at least provided with one Along the collect cavity of its width insertion, in the upper surface of contiguous block provided with several logical with catchmenting for corresponding collect cavity connection Hole;The groove through extension along its short transverse is equipped with the front and rear sides face of support sole piece, support jacking block and contiguous block.
6. porous pavement according to claim 1, it is characterised in that:The porous base course brick includes two horizontal supports Block, is provided with intermediate support block, two horizontal support blocks are connected as a single entity with intermediate support block, described between two horizontal support blocks The height of horizontal support block is the half of intermediate support block, and the width of horizontal support block is equal with the width of intermediate support block, The collect cavity along its width insertion is equipped with horizontal support block and intermediate support block, is set in the upper surface of intermediate support block There is the through hole that catchments connected with collect cavity;It is equipped with the front and rear sides face of horizontal support block and intermediate support block along its height Groove of the direction through extension.
7. porous pavement according to claim 1, it is characterised in that:The porous base course brick is by the lower support that is connected Block and upper support block are constituted, and upper support block is located at the middle part of lower support block, and the height of lower support block and upper support block is equal, upper branch Bracer accounts for the 1/3-4/5 of whole porous base course brick length, provided with 5 catchmenting along its width insertion on porous base course brick Chamber, 5 collect cavities are divided into two rows and are located in brick body, and upper row is provided with 2 collect cavities, and lower row is provided with 3 collect cavities;Upper support The upper surface of block is provided with corresponds the through hole that catchments connected with upper 2 collect cavities of row;In the front and rear sides face of porous base course brick If provided with arterial highway along its short transverse through the groove extended.
8. the porous pavement according to claim 5 or 6 or 7, it is characterised in that:Collect cavity point on adjacent porous base course brick Connection is not mutually butted and constitutes collecting channel, and collecting channel is connected with the water leg of basic supercrust both sides.
9. porous pavement according to claim 8, it is characterised in that:The water leg is U-type groove, is provided with water leg PVC drain pipe is connected with some osculums, each osculum.
10. porous pavement according to claim 1, it is characterised in that:The levelling basic unit is paved into by pervious concrete, its Coefficient of permeability is at least 2.0 × 10-2cm/s, thickness for 1-3cm.
CN201710186262.5A 2017-03-27 2017-03-27 porous pavement Active CN106988184B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710186262.5A CN106988184B (en) 2017-03-27 2017-03-27 porous pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710186262.5A CN106988184B (en) 2017-03-27 2017-03-27 porous pavement

Publications (2)

Publication Number Publication Date
CN106988184A true CN106988184A (en) 2017-07-28
CN106988184B CN106988184B (en) 2018-06-22

Family

ID=59412875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710186262.5A Active CN106988184B (en) 2017-03-27 2017-03-27 porous pavement

Country Status (1)

Country Link
CN (1) CN106988184B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447615A (en) * 2017-08-16 2017-12-08 仁创生态环保科技股份有限公司 A kind of assembled building block
CN107503259A (en) * 2017-08-16 2017-12-22 仁创生态环保科技股份有限公司 A kind of assembled building block
CN108277717A (en) * 2018-03-22 2018-07-13 福建四方如钢市政工程有限公司 Road surface water-permeable brick plate and preparation method thereof with composite cover
CN108589459A (en) * 2018-04-25 2018-09-28 河南省海绵城市建设有限公司 Sponge city sectional polyurethane eco-landscape road and construction method
CN109722968A (en) * 2019-01-10 2019-05-07 江苏工程职业技术学院 A kind of high-performance permeable concrete system and preparation method thereof of building waste preparation
CN110485232A (en) * 2019-08-30 2019-11-22 上海市政工程设计研究总院(集团)有限公司 A kind of three-dimensional interlocking fabricated permeable sub-surface
CN114737431A (en) * 2022-03-30 2022-07-12 上海玖鼎环保科技有限公司 Permeable pavement structure and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1807152A1 (en) * 1990-07-18 1993-04-07 Sibirsk Avtomobil Dorozh Inst Paving
KR20120094816A (en) * 2011-02-17 2012-08-27 김민경 Double water sink into a block
CN103882793A (en) * 2012-12-19 2014-06-25 天津市华鑫吊装运输有限公司 Novel water-permeable brick
KR20150062096A (en) * 2013-11-28 2015-06-05 고인석 Double block with reservoir and surface and base layers
CN204780501U (en) * 2015-06-26 2015-11-18 朱力鸣 Lock combination formula environmental protection floor tile and fixed building each other are held in palm to high strength
CN205821930U (en) * 2016-07-13 2016-12-21 浙江诚宏建设有限公司 A kind of pavior brick of water drainage skid
CN106320433A (en) * 2016-09-21 2017-01-11 沈阳建筑大学 Urban road rainwater collection structure
CN205975275U (en) * 2016-07-13 2017-02-22 浙江诚宏建设有限公司 Prevent pavior brick of ponding
CN206655078U (en) * 2017-03-27 2017-11-21 葛威延 A kind of porous pavement

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1807152A1 (en) * 1990-07-18 1993-04-07 Sibirsk Avtomobil Dorozh Inst Paving
KR20120094816A (en) * 2011-02-17 2012-08-27 김민경 Double water sink into a block
CN103882793A (en) * 2012-12-19 2014-06-25 天津市华鑫吊装运输有限公司 Novel water-permeable brick
KR20150062096A (en) * 2013-11-28 2015-06-05 고인석 Double block with reservoir and surface and base layers
CN204780501U (en) * 2015-06-26 2015-11-18 朱力鸣 Lock combination formula environmental protection floor tile and fixed building each other are held in palm to high strength
CN205821930U (en) * 2016-07-13 2016-12-21 浙江诚宏建设有限公司 A kind of pavior brick of water drainage skid
CN205975275U (en) * 2016-07-13 2017-02-22 浙江诚宏建设有限公司 Prevent pavior brick of ponding
CN106320433A (en) * 2016-09-21 2017-01-11 沈阳建筑大学 Urban road rainwater collection structure
CN206655078U (en) * 2017-03-27 2017-11-21 葛威延 A kind of porous pavement

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447615A (en) * 2017-08-16 2017-12-08 仁创生态环保科技股份有限公司 A kind of assembled building block
CN107503259A (en) * 2017-08-16 2017-12-22 仁创生态环保科技股份有限公司 A kind of assembled building block
CN108277717A (en) * 2018-03-22 2018-07-13 福建四方如钢市政工程有限公司 Road surface water-permeable brick plate and preparation method thereof with composite cover
CN108589459A (en) * 2018-04-25 2018-09-28 河南省海绵城市建设有限公司 Sponge city sectional polyurethane eco-landscape road and construction method
CN109722968A (en) * 2019-01-10 2019-05-07 江苏工程职业技术学院 A kind of high-performance permeable concrete system and preparation method thereof of building waste preparation
CN110485232A (en) * 2019-08-30 2019-11-22 上海市政工程设计研究总院(集团)有限公司 A kind of three-dimensional interlocking fabricated permeable sub-surface
CN114737431A (en) * 2022-03-30 2022-07-12 上海玖鼎环保科技有限公司 Permeable pavement structure and construction method thereof

Also Published As

Publication number Publication date
CN106988184B (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN106988184B (en) porous pavement
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN205276099U (en) Drainage formula brick that permeates water
CN106758638A (en) A kind of city sponge brick and its construction technology
CN206655077U (en) A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick
CN205347914U (en) Interlocking formula ecology concrete road surface brick that permeates water with water conservancy diversion hole
CN204875442U (en) Pavement ceramic tile and pavement
CN108086087A (en) A kind of construction method of porous pavement
CN206736675U (en) A kind of cell pavement
CN110042723B (en) Construction method of full-prefabricated assembled permeable road
CN215210279U (en) Modular permeable pavement system
CN206655078U (en) A kind of porous pavement
CN210975426U (en) Prefabricated assembled type oval-shaped groove blind drain ditch system
CN110983907A (en) Assembled self-draining sidewalk
CN206736666U (en) A kind of base course suitable for porous pavement and the basic road surface using the brick
CN206721596U (en) A kind of pavement structure of permeable road
CN108179677A (en) Sponge urban water-through pavement
CN211571261U (en) Garden road structure
CN211848696U (en) Type bituminous paving structure permeates water
CN106996063A (en) A kind of pavement structure of permeable road
CN206655080U (en) Base course suitable for porous pavement and the basic road surface using the brick
CN209722651U (en) A kind of water-permeable brick and its pavement with the water-permeable brick
CN108570904B (en) Sidewalk structure and construction method thereof
CN108018753A (en) A kind of porous pavement
CN218596785U (en) Prevent roadbed structure that softens

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant