CN209890993U - Floor tile with drainage function - Google Patents

Floor tile with drainage function Download PDF

Info

Publication number
CN209890993U
CN209890993U CN201920639766.2U CN201920639766U CN209890993U CN 209890993 U CN209890993 U CN 209890993U CN 201920639766 U CN201920639766 U CN 201920639766U CN 209890993 U CN209890993 U CN 209890993U
Authority
CN
China
Prior art keywords
brick
tile
frame
drainage
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920639766.2U
Other languages
Chinese (zh)
Inventor
刘锦丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920639766.2U priority Critical patent/CN209890993U/en
Application granted granted Critical
Publication of CN209890993U publication Critical patent/CN209890993U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a floor tile with drainage function, which comprises a top tile and a bottom tile, wherein the top tile is embedded on the upper part of the bottom tile; the top brick comprises a top brick frame, an inner drainage groove, a clamping groove, an embedded lug, an anti-skid line and a water seepage hole, wherein the inner drainage groove is formed around the top brick frame; the clamping groove is formed in the bottom side of the embedding lug; the embedding lugs are arranged on the periphery of the top brick frame; the antiskid line sets up the top at the roof brick frame, the utility model discloses the setting of roof brick and end brick makes the ceramic tile volume formula combination use, if take place roof brick or one of them damage of ceramic tile, can change alone, it is extravagant to have reduced the ceramic tile, if the water drainage tank takes place silt to block up, the clearance of also being convenient for inlays the setting of dress ear and joint ear, the roof brick inlays the dress in the end brick, make the high parallel and level in upper portion of roof brick and end brick, make the road of laying smooth, it is pleasing to the eye, neither hinder trickling of rainwater, can not appear stumbling the phenomenon to the pedestrian.

Description

Floor tile with drainage function
Technical Field
The utility model belongs to the technical field of city infrastructure, especially, relate to a ceramic tile with drainage function.
Background
Urban ground is easy to accumulate water, when water accumulation is not timely generated, water accumulation on sidewalks can be caused by drainage, inconvenience is brought to the traveling of pedestrians, and long-term water accumulation even can cause the collapse of roadbed surfaces.
The invention discloses a drainage floor tile with a Chinese patent publication No. CN 104652208A, which comprises a base layer and a deformation layer, wherein the base layer is positioned at the bottom layer of the floor tile, and the deformation layer is positioned on the base layer; the invention can deform when water accumulates, enables the accumulated water to flow to a low-lying position, and has the characteristics of safety, reliability, ingenious design and practicability. However, the existing drainage floor tile has the technical problems that the floor tile is difficult to realize when the function of the floor tile is realized, the deformation layer can deform when water is accumulated, the height of the floor tile is inclined, the drainage function cannot be realized if each floor tile is inclined, the road pavement is inconvenient, the difficulty is high when a certain floor tile is replaced, the floor tile is not firmly fixed, and pedestrians walk on the floor tile insecurely.
Therefore, it is necessary to develop a floor tile with drainage function.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a ceramic tile with drainage function to solve current drainage ceramic tile and still having when realizing the function of this kind of ceramic tile, there is a difficult problem in the technique, difficult realization, the deformation can take place for the time variant layer in ponding moreover, produce the high low slope, if every ceramic tile all inclines still can't realize the function of drainage, and inconvenient when road pavement, the degree of difficulty is big when changing a certain brick, and fixed insecure between the ceramic tile, the pedestrian walks on it insecure. A floor tile with a drainage function comprises a top tile and a bottom tile, wherein the top tile is embedded at the upper part of the bottom tile; the top brick comprises a top brick frame, an inner drainage groove, a clamping groove, an embedded lug, an anti-skid line and a water seepage hole, wherein the inner drainage groove is formed around the top brick frame; the clamping groove is formed in the bottom side of the embedding lug; the embedding lugs are arranged on the periphery of the top brick frame; the anti-skid grains are arranged on the top of the top brick frame; the plurality of water seepage holes are arranged and are all arranged at the top of the top brick frame and penetrate through the inner drainage groove; the bottom brick comprises a bottom brick frame, an outer drainage groove, a clamping lug and a bump, wherein the outer drainage groove is formed around the bottom brick frame; the clamping lugs are arranged on the periphery of the top of the bottom brick frame; the lug is arranged on the inner side of the clamping lug.
The top brick and the bottom brick are all set to be square bodies, the maximum size and the minimum size of the top brick and the bottom brick are 30cm and 20cm, perfect matching of the top brick and the bottom brick can be achieved, and the displacement phenomenon of the top brick is effectively prevented after laying.
The opening areas of the inner drainage groove and the outer drainage groove are 8-8 cm-10 cm, so that the inner drainage groove and the outer drainage groove are favorably attached, water flowing into the inner drainage groove flows into the next floor tile through the outer drainage groove, rainwater is conveniently changed into 'running water', the flowing effect of rainwater is improved, and the phenomenon of water accumulation on a sidewalk is reduced.
The water seepage holes are arranged in a cylindrical shape with the diameter of 10mm, the length of the water seepage holes is 10-15cm, and the water seepage holes are designed in a cylindrical shape so as to better protect the strength of the roof brick and avoid the phenomenon that cracks appear from the angular edges due to other shapes, so that the floor brick is cracked.
The main material of top brick and end brick is quartz sand, and quartz sand has better water permeability, can permeate the ponding on the road surface to the water drainage tank in the back for the infiltration of rainwater, the better effect that plays the drainage.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses the setting of roof brick and end brick makes the ceramic tile volume formula combination use, if take place roof brick or one of them damage of ceramic tile, can change alone, it is extravagant to have reduced the ceramic tile, if the water drainage tank takes place silt and blocks up, the clearance of also being convenient for has improved the drainage effect of ceramic tile.
2. The utility model discloses an inlay the setting of dress ear and joint ear for the roof brick inlays the dress in the end brick, makes the high parallel and level in upper portion of roof brick and end brick, makes the road of laying level and smooth, and is pleasing to the eye, neither hinders trickling of rainwater, can not appear stumbling the phenomenon to the pedestrian.
3. The utility model discloses a setting of draw-in groove and lug for it is firm with the bottom brick cooperation to push up the brick, rocks about ponding can not appear yet immediately again, simple to operate, and the joint is firm.
4. The utility model discloses a seepage hole, interior water drainage tank and outer drainage tank's setting is favorable to the fastest emission to the rainwater for ponding phenomenon does not appear in the road, guarantees pedestrian's rainy day walking safety.
5. The utility model discloses the material that roof brick and end brick set up is quartz sand, and convenient for material collection, simple structure easily realizes, and the cost is with low costs.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the section a-a of the present invention.
Fig. 3 is a schematic view of the cross-section structure of the roof brick of the present invention.
Fig. 4 is a schematic view of the sectional structure of the bottom brick of the present invention.
In the figure:
1-top brick, 11-top brick frame, 12-inner drainage groove, 13-clamping groove, 14-embedded lug, 15-anti-skid pattern, 16-water seepage hole, 2-bottom brick, 21-bottom brick frame, 22-outer drainage groove, 23-clamping lug and 24-lug.
Detailed Description
The invention is further described below with reference to the accompanying drawings:
example (b):
as shown in figures 1 to 4
The utility model provides a floor tile with drainage function, which comprises a top tile 1 and a bottom tile 2, wherein the top tile 1 is embedded on the upper part of the bottom tile 2; the roof brick 1 comprises a roof brick frame 11, an inner drainage groove 12, a clamping groove 13, an embedded lug 14, an anti-skid pattern 15 and a water seepage hole 16, wherein the inner drainage groove 12 is formed around the roof brick frame 11; the clamping groove 13 is formed in the bottom side of the embedding lug 14; the embedding lugs 14 are arranged on the periphery of the top brick frame 11; the anti-skid lines 15 are arranged on the top of the top brick frame 11; a plurality of water seepage holes 16 are arranged, are all arranged at the top of the top brick frame 11 and penetrate through the inner drainage groove 12; the bottom brick 2 comprises a bottom brick frame 21, an outer drainage groove 22, a clamping lug 23 and a convex block 24, wherein the outer drainage groove 22 is formed around the bottom brick frame 21; the clamping lugs 23 are arranged on the periphery of the top of the bottom brick frame 21; the projections 24 are arranged on the inner side of the snap lugs 23.
Top brick 1 and end brick 2 all set up to square body, and its maximum dimension and minimum dimension are 30 x 30cm and 20 x 20cm, can realize the perfect cooperation of top brick 1 and end brick 2, effectual top brick 1 that prevents after laying the aversion phenomenon appears.
The opening areas of the inner drainage grooves 12 and the outer drainage grooves 22 are 8cm to 10cm, so that the fitting degree of the inner drainage grooves 12 and the outer drainage grooves 22 is favorably realized, water flowing into the inner drainage grooves 12 flows into the next floor tile through the outer drainage grooves 22, rainwater is conveniently changed into 'running water', the flowing effect of rainwater is improved, and the phenomenon of water accumulation on a sidewalk is reduced.
The water seepage holes 16 are arranged in a cylindrical shape with the diameter of 10mm, the length of the water seepage holes is 10-15cm, and the cylindrical shape is designed for better protecting the strength of the roof tile and avoiding the cracking phenomenon from the corner edges due to other shapes, so that the floor tile is cracked.
The main material of roof brick 1 and end brick 2 is quartz sand, and quartz sand has better water permeability, can permeate the ponding on the road surface to the water drainage tank in after for the infiltration of rainwater, the better effect that plays the drainage.
Principle of operation
The utility model discloses in, at first fixed with 2 grooving of end brick during laying, the outer drainage groove 22 laminating between the end brick 2 is laid, end brick 2 is fixed the back that finishes, with 1 lock joint of roof brick on end brick 2, make draw-in groove 13 and lug 24 intermeshing, it is firm to make roof brick 1 and end brick 2 fixed, during raining, the rainwater flows into interior water drainage tank 12 through infiltration hole 16, flow into next ceramic tile behind interior water drainage tank 12 and outer drainage groove 22 according to the self slope water of road, so circulate, when rivers are to last ceramic tile, can get through digging in advance in the groove entering rain row, moreover, the steam generator is simple in structure, the drainage effect is better, and is worth marketing.
Utilize technical scheme, or technical personnel in the field are in the utility model discloses under technical scheme's the inspiration, design similar technical scheme, and reach above-mentioned technological effect, all fall into the utility model discloses a protection scope.

Claims (5)

1. A floor tile with a drainage function is characterized in that: the brick comprises a top brick (1) and a bottom brick (2), wherein the top brick (1) is embedded at the upper part of the bottom brick (2); the roof brick (1) comprises a roof brick frame (11), an inner drainage groove (12), a clamping groove (13), an embedded lug (14), an anti-skid pattern (15) and a water seepage hole (16), wherein the inner drainage groove (12) is formed in the periphery of the roof brick frame (11); the clamping groove (13) is formed in the bottom side of the embedding lug (14); the embedding lugs (14) are arranged on the periphery of the top brick frame (11); the anti-skid grains (15) are arranged on the top of the top brick frame (11); a plurality of water seepage holes (16) are arranged and are all arranged at the top of the top brick frame (11) and penetrate through the inner drainage groove (12); the bottom brick (2) comprises a bottom brick frame (21), an outer drainage groove (22), a clamping lug (23) and a convex block (24), wherein the outer drainage groove (22) is formed around the bottom brick frame (21); the clamping lugs (23) are arranged on the periphery of the top of the bottom brick frame (21); the projection (24) is arranged on the inner side of the clamping lug (23).
2. The tile with water drainage function according to claim 1, wherein: the top brick (1) and the bottom brick (2) are arranged to be square bodies, and the maximum size and the minimum size of the top brick and the bottom brick are both 30cm by 30cm and 20cm by 20 cm.
3. The tile with water drainage function according to claim 1, wherein: the opening areas of the inner drainage groove (12) and the outer drainage groove (22) are 8cm to 10 cm.
4. The tile with water drainage function according to claim 1, wherein: the water seepage holes (16) are arranged in a cylindrical shape with the diameter of 10mm, and the length of the water seepage holes is 10-15 cm.
5. The tile with water drainage function according to claim 1, wherein: the top brick (1) and the bottom brick (2) are mainly made of quartz sand.
CN201920639766.2U 2019-05-07 2019-05-07 Floor tile with drainage function Expired - Fee Related CN209890993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920639766.2U CN209890993U (en) 2019-05-07 2019-05-07 Floor tile with drainage function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920639766.2U CN209890993U (en) 2019-05-07 2019-05-07 Floor tile with drainage function

Publications (1)

Publication Number Publication Date
CN209890993U true CN209890993U (en) 2020-01-03

Family

ID=69020404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920639766.2U Expired - Fee Related CN209890993U (en) 2019-05-07 2019-05-07 Floor tile with drainage function

Country Status (1)

Country Link
CN (1) CN209890993U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112025A (en) * 2020-09-21 2020-12-22 严振华 Municipal administration road brick structure that drainage is good
CN112609602A (en) * 2020-12-03 2021-04-06 济南华锐铁路机械制造有限公司 Antiskid ground pavement structure for high-speed rail platform and pavement method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112025A (en) * 2020-09-21 2020-12-22 严振华 Municipal administration road brick structure that drainage is good
CN112112025B (en) * 2020-09-21 2021-07-06 苏州宝凡电子科技有限公司 Municipal administration road brick structure that drainage is good
CN112609602A (en) * 2020-12-03 2021-04-06 济南华锐铁路机械制造有限公司 Antiskid ground pavement structure for high-speed rail platform and pavement method thereof

Similar Documents

Publication Publication Date Title
CN209890993U (en) Floor tile with drainage function
CN106758638A (en) A kind of city sponge brick and its construction technology
CN211596246U (en) Permeable pavement structure
CN205276099U (en) Drainage formula brick that permeates water
CN211621053U (en) Colored road surface of antiskid that permeates water among municipal administration and landscape engineering
CN110130180A (en) A kind of road road shoulder water draining-collecting pparatus
CN206581379U (en) A kind of garden way tooth drainage system
CN211689725U (en) Landscape drainage road surface
CN211547139U (en) Paving brick for municipal construction
CN214245208U (en) Permeable sidewalk pavement structure with drainage channel
CN212670190U (en) Permeable sidewalk
CN212404688U (en) Municipal works road laying structure
CN210737276U (en) Antiskid type brick that permeates water convenient to firm installation
CN109423939A (en) Ecological garden all-purpose road
CN207597186U (en) Draining road dental structure
CN211285126U (en) Environment-friendly garden permeable road structure with rainwater collection function
CN106758678A (en) Multifunctional permeable water storage brick
CN106544940B (en) A kind of garden road pile foundation type spit of fland step structure and construction technology
CN205893848U (en) Highway and ford structure
CN214301058U (en) Pavement paving floor brick with good drainage effect
CN211848704U (en) Overhead support for paving sidewalk
CN211772651U (en) Road shoulder building board for highway engineering
CN214245207U (en) Novel corrosion-resistant assembled permeable pavement paving structure
CN213951819U (en) Novel town road pavement structure
CN216445718U (en) Highway subgrade structure capable of preventing subgrade from softening

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200103

CF01 Termination of patent right due to non-payment of annual fee