CN214362641U - Sponge city permeable pavement - Google Patents

Sponge city permeable pavement Download PDF

Info

Publication number
CN214362641U
CN214362641U CN202022472918.XU CN202022472918U CN214362641U CN 214362641 U CN214362641 U CN 214362641U CN 202022472918 U CN202022472918 U CN 202022472918U CN 214362641 U CN214362641 U CN 214362641U
Authority
CN
China
Prior art keywords
layer
permeable
water
permeable brick
pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022472918.XU
Other languages
Chinese (zh)
Inventor
杨艳柯
田鹏
霍伟光
夏守华
马宽
杜斌
姚磊
李保顺
曹冬辉
孙林浩
李建勋
冯帅令
高超会
谢珂伟
丁子豪
师贺旗
潘婕
李顺超
吕世祥
戚凯
王凯
关亚勇
朱利涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Huijian Construction Engineering Co ltd
Original Assignee
Henan Huijian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Huijian Construction Engineering Co ltd filed Critical Henan Huijian Construction Engineering Co ltd
Priority to CN202022472918.XU priority Critical patent/CN214362641U/en
Application granted granted Critical
Publication of CN214362641U publication Critical patent/CN214362641U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a permeable pavement in sponge city, which comprises a pavement body and drainage ditches arranged at both sides of the pavement body; the pavement body sequentially comprises a permeable brick layer, a gravel layer, a permeable concrete layer, a water storage layer and a tamping roadbed from top to bottom, wherein an aggregate layer is pressed on the surface of the tamping roadbed, a supporting plate for supporting the first permeable concrete layer is arranged on the aggregate layer, and a notch is formed in the bottom of the supporting plate; the permeable brick layer is formed by splicing permeable bricks, a vertically crossed through type drainage channel is arranged in each permeable brick, the front, the rear, the left and the right of each permeable brick are respectively provided with an end socket or a sink groove corresponding to the end socket, and the upper surface of each permeable brick is provided with a water leakage hole extending to the drainage channel; the top of the drainage ditch is covered with a grate plate, and the side surface of the drainage ditch is provided with a through hole communicated with the drainage channel. The utility model discloses can be fast discharge rainwater to the secret infiltration or through the escape canal, structural design is simple, practical.

Description

Sponge city permeable pavement
Technical Field
The utility model belongs to the technical field of the sponge city, concretely relates to sponge city road surface of permeating water.
Background
Along with the process of Chinese urbanization is accelerated, not only the heavy rain often causes serious urban waterlogging, but also the rainwater can not well get into the urban underground water circulation system when a small amount of rainfall, and when meeting rainy days, the road surface can produce ponding, which seriously affects the trip of pedestrians. The reasons for the above phenomena are mainly that the urban road area is too large, and the water absorbing and draining capacity of the urban road system is poor. At present, the solutions for the problems in China mainly include the steps of increasing the diameter of a drainage pipe, storing water on line, building a reservoir and the like, and the measures not only generally have the defects of large investment, large occupied space and the like, but also have long construction time and low efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the not enough of prior art, provide a sponge city permeable pavement, concrete scheme is as follows:
a sponge urban permeable pavement comprises a pavement body and drainage ditches arranged on two sides of the pavement body; the pavement body sequentially comprises a permeable brick layer, a gravel layer, a permeable concrete layer, a water storage layer and a tamping roadbed from top to bottom, wherein an aggregate layer is pressed on the surface of the tamping roadbed, a supporting plate for supporting the permeable concrete layer is arranged on the aggregate layer, the extending direction of the supporting plate is consistent with the extending direction of a road, and a notch is formed in the bottom of the supporting plate; the water permeable brick layer is formed by splicing water permeable bricks which are matched with each other, a vertically crossed through type drainage channel is arranged inside each water permeable brick, the front, the rear, the left and the right of each water permeable brick are respectively provided with an end socket or a sinking groove corresponding to the end socket, and the upper surface of each water permeable brick is provided with a water leakage hole extending to the drainage channel; the top of the drainage ditch is covered with a grate plate, and the side surface of the drainage ditch is provided with a through hole communicated with the drainage channel.
Based on the above, the surface equipartition of brick that permeates water is equipped with dentate anti-skidding line, the hole that leaks is located between the anti-skidding line.
Based on the above, the pervious concrete layer is formed by splicing prefabricated plates.
Based on the above, the compacted roadbed and the aggregate layer on the surface of the compacted roadbed have the tendency of high middle and low two sides.
The utility model discloses relative prior art has substantive characteristics and progress, specifically speaking, the utility model has the following advantages:
1. the utility model discloses in, the structural design of road surface body makes the rainwater can permeate or arrange the escape canal to the underground fast, effectively avoids the emergence of surface gathered water phenomenon.
2. The utility model discloses in, the structural design of water-storage layer plays certain buffering effect to under the super heavy rainstorm condition, the in-process of secret infiltration.
3. The utility model discloses in, the escape canal design of road surface body both sides makes near the water in escape canal discharge fast, leads to the road intermediate position infiltration volume relatively great, so will tamp road bed and surperficial aggregate layer design for be middle high, the low trend in both sides for the water of infiltration water-storage layer flows to both sides, plays a balancing act, also accelerates the infiltration speed simultaneously.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the fitting structure of the middle water permeable brick of the present invention.
Fig. 3 is a top view of the middle water permeable brick of the present invention.
In the figure: 1. a permeable brick layer; 1-1, water permeable bricks; 1-2, end head; 1-3, sinking a groove; 1-4, water leakage holes; 1-5, anti-skid lines; 1-6, a drainage channel; 2. a crushed stone layer; 3. a pervious concrete layer; 4. a aquifer; 5. a bone material layer; 6. tamping the roadbed; 7. a support plate; 8. a notch; 9. a drainage ditch; 10. a grid plate; 11. and a through hole.
Detailed Description
The technical solution of the present invention will be described in further detail through the following embodiments.
Examples
As shown in figures 1-3, the utility model provides a sponge city permeable pavement, including road surface body and setting the escape canal 9 of road surface body both sides.
The road surface body is from last down be permeable to water brick layer 1, metalling 2, permeable concrete layer 3, water-storage layer 4 and tamp road bed 6 in proper order, tamp road bed 6 surface pressure is equipped with aggregate layer 5, be equipped with the support on aggregate layer 5 permeate water concrete layer 3's backup pad 7, the extending direction of backup pad 7 is unanimous with the road extending direction, and breach 8 is seted up to the bottom of backup pad 7.
The water permeable brick layer 1 is formed by splicing water permeable bricks 1-1 which are matched with each other, a penetrating type drainage channel 1-6 which is vertically intersected is arranged inside the water permeable brick 1-1, the front, the back, the left and the right of the water permeable brick 1-1 are respectively provided with an end 1-2 or a sink 1-3 which corresponds to the end 1-2, and the upper surface of the water permeable brick 1-1 is provided with a water leakage hole 1-4 which extends to the drainage channel 1-6.
The top of the drainage ditch 9 is covered with a grid plate 10 for filtering impurities, and the side surface of the drainage ditch 9 is provided with a through hole 11 communicated with the drainage channels 1-6.
It should be noted that tooth-shaped anti-slip lines 1-5 are uniformly distributed on the surface of the water permeable brick 1-1, and the water leakage holes 1-4 are positioned among the anti-slip lines 1-5, so that the water permeable brick not only can play a role of anti-slip, but also can play a role of protecting the water leakage holes 1-4 to a certain extent.
It should be noted that, in order to facilitate the laying of the pervious concrete layer 3, the pervious concrete layer 3 is formed by splicing prefabricated plates.
Considering that the design of the drainage ditch 9 on both sides of the pavement body enables water near the drainage ditch 9 to be rapidly discharged, and the water seepage amount at the middle position of the road is relatively large, so that the compacted roadbed 6 and the aggregate layer 5 on the surface of the compacted roadbed are designed to have the trend of high in the middle and low on both sides, so that the water permeating into the water storage layer 4 flows to both sides, a balance effect is achieved, and the water seepage speed is accelerated.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention and not to limit it; although the present invention has been described in detail with reference to preferred embodiments, it should be understood by those skilled in the art that: the invention can be modified or equivalent substituted for some technical features; without departing from the spirit of the present invention, it should be understood that the scope of the claims is intended to cover all such modifications and variations.

Claims (4)

1. The utility model provides a sponge city permeable pavement which characterized in that: comprises a pavement body and drainage ditches (9) arranged at two sides of the pavement body; the pavement body sequentially comprises a permeable brick layer (1), a gravel layer (2), a permeable concrete layer (3), a water storage layer (4) and a tamping roadbed (6) from top to bottom, wherein an aggregate layer (5) is pressed on the surface of the tamping roadbed (6), a supporting plate (7) for supporting the permeable concrete layer (3) is arranged on the aggregate layer (5), the extending direction of the supporting plate (7) is consistent with the extending direction of a road, and a notch (8) is formed in the bottom of the supporting plate (7); the water permeable brick layer (1) is formed by splicing water permeable bricks (1-1) which are matched with each other, a vertically crossed through type drainage channel (1-6) is arranged inside the water permeable brick (1-1), the front, the back, the left and the right of the water permeable brick (1-1) are respectively provided with an end head (1-2) or a sink groove (1-3) corresponding to the end head (1-2), and the upper surface of the water permeable brick (1-1) is provided with water leakage holes (1-4) which extend to the drainage channel (1-6); the top of the drainage ditch (9) is covered with a grate plate (10), and the side surface of the drainage ditch (9) is provided with a through hole (11) communicated with the drainage channel (1-6).
2. The sponge urban permeable pavement according to claim 1, characterized in that: toothed anti-slip grains (1-5) are uniformly distributed on the surface of the water permeable brick (1-1), and the water leakage holes (1-4) are located among the anti-slip grains (1-5).
3. The sponge urban permeable pavement according to claim 1, characterized in that: the pervious concrete layer (3) is formed by splicing prefabricated plates.
4. The sponge urban permeable pavement according to claim 1, characterized in that: the compacted roadbed (6) and the aggregate layer (5) on the surface of the compacted roadbed are high in the middle and low on two sides.
CN202022472918.XU 2020-10-30 2020-10-30 Sponge city permeable pavement Active CN214362641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022472918.XU CN214362641U (en) 2020-10-30 2020-10-30 Sponge city permeable pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022472918.XU CN214362641U (en) 2020-10-30 2020-10-30 Sponge city permeable pavement

Publications (1)

Publication Number Publication Date
CN214362641U true CN214362641U (en) 2021-10-08

Family

ID=77975432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022472918.XU Active CN214362641U (en) 2020-10-30 2020-10-30 Sponge city permeable pavement

Country Status (1)

Country Link
CN (1) CN214362641U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114604987A (en) * 2022-03-09 2022-06-10 潍坊风雷益园林科技有限公司 Permeable concrete rainwater and sewage purification potential energy conversion power generation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114604987A (en) * 2022-03-09 2022-06-10 潍坊风雷益园林科技有限公司 Permeable concrete rainwater and sewage purification potential energy conversion power generation system

Similar Documents

Publication Publication Date Title
CN209779396U (en) Road of seepage and drainage combination structure of mating formation that permeates water
CN109629369B (en) Water permeable pavement structure based on construction waste crushed materials and paving method thereof
CN214362641U (en) Sponge city permeable pavement
CN213804678U (en) Sponge city ecological road roadbed structure
CN210002537U (en) lateral slope type grass planting ditch for sponge city
CN209099101U (en) It is suitably applied the permeable pavement structure of groundwater level region
CN104145673B (en) Based on water drainage and the integrated form greenbelt system of water conservation and water drainage and water-retaining method
CN106544987A (en) A kind of anti-seepage of channels construction method for storing flooded wetland
CN105484125A (en) Step capable of collecting and utilizing rainwater
CN207159749U (en) A kind of high intensity high water-permeability road paving structure for sponge city
CN213295953U (en) Concrete road surface structure permeates water
CN214656073U (en) Natural permeable quarrying paving structure for sponge city
CN214402046U (en) Saline and alkaline land afforestation salt elimination infiltration structure
CN205529776U (en) Infiltration structure of waterproof road in road surface
CN210288015U (en) A pavement that permeates water for sponge city construction
CN111535110B (en) Road and construction method thereof
CN211596801U (en) Waterproof face guard wall structure
CN206127800U (en) Sponge city infiltration road structure
CN211547139U (en) Paving brick for municipal construction
CN209338953U (en) A kind of urban road ecological side drain with sponge municipal drainage facility
CN107151963A (en) A kind of sponge urban water-through structure
CN113622603A (en) Sponge urban rainwater system
CN208152219U (en) A kind of dry depression for sponge city
CN201770925U (en) Highway leaching well
CN110616619A (en) Lawn field convenient for water seepage and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant