CN211450971U - Can avoid arranging waste incineration power generation facility that sediment appears blocking - Google Patents

Can avoid arranging waste incineration power generation facility that sediment appears blocking Download PDF

Info

Publication number
CN211450971U
CN211450971U CN201921717181.4U CN201921717181U CN211450971U CN 211450971 U CN211450971 U CN 211450971U CN 201921717181 U CN201921717181 U CN 201921717181U CN 211450971 U CN211450971 U CN 211450971U
Authority
CN
China
Prior art keywords
power generation
incineration power
mounting plate
shaft
connecting shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921717181.4U
Other languages
Chinese (zh)
Inventor
周细城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suihua Green Energy New Energy Co Ltd
Original Assignee
Suihua Green Energy New Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suihua Green Energy New Energy Co Ltd filed Critical Suihua Green Energy New Energy Co Ltd
Priority to CN201921717181.4U priority Critical patent/CN211450971U/en
Application granted granted Critical
Publication of CN211450971U publication Critical patent/CN211450971U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a can avoid arranging waste incineration power generation facility that sediment appears blockking up, including burning furnace main part, rubbish feed inlet, slag pipe and driving motor, burn burning furnace main part's left side and install the rubbish feed inlet, and burn burning furnace main part's right side below and be connected with the slag pipe to burn burning furnace main part's internally mounted has the mounting panel, the middle part of mounting panel runs through there is the connecting axle, and the surface mounting of connecting axle has metal flabellum, and metal flabellum is located the below of mounting panel. This can avoid arranging waste incineration power generation facility that sediment appeared blockking up is provided with metal flabellum, connecting axle and puddler, drives metal flabellum through the high temperature high-pressure gas's in the stove flow when burning rubbish and rotates to make the puddler rotate under the effect of connecting axle, carry out certain stirring to rubbish, make that rubbish can be more abundant burn, improve the work efficiency of device simultaneously.

Description

Can avoid arranging waste incineration power generation facility that sediment appears blocking
Technical Field
The utility model relates to a msw incineration power generation technical field specifically is a can avoid arranging the msw incineration power generation facility that sediment appears blocking up.
Background
Along with the development of society and the improvement of people to environmental protection consciousness, the human beings begin to explore more sustainable development roads, and waste incineration power generation is a mode of handling rubbish, and heat energy through burning the rubbish produces turns into the electric energy and supplies people to use, and the waste residue after the while handling still can be used as building material etc. has reduced the pollution that rubbish caused to the environment, has improved the utilization ratio of rubbish simultaneously, but current waste incineration power generation facility still has some weak points when using:
1. after the existing waste incineration power generation device incinerates waste, the phenomenon of blockage of waste residues generated after the waste is combusted is easy to occur when the waste residues are discharged, and simultaneously, the blockage of slag discharge can be caused after part of waste blocks are large and combusted, so that the subsequent normal use of the device is influenced, and the use convenience of the device is reduced;
2. when the conventional waste incineration power generation device incinerates waste, the waste is in a stacked static state in the incinerator, so that the waste can not be combusted sufficiently when being incinerated, meanwhile, the combustion time is long, and the working efficiency and the practicability of the device are reduced.
In order to solve the problems, innovative design is urgently needed on the basis of the original waste incineration power generation device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a can avoid arranging the msw incineration power generation facility that sediment appears blockking up to solve the existing msw incineration power generation facility on the existing market that above-mentioned background art provided and burning the back to rubbish, and the phenomenon that the jam appears easily in the waste residue that produces after the msw combustion when discharging, simultaneously because rubbish is in the incinerator and piles up quiescent condition, can not comparatively abundant messenger's its problem of burning when burning it.
In order to achieve the above object, the utility model provides a following technical scheme: a waste incineration power generation device capable of avoiding blockage caused by slag discharge comprises an incinerator body, a waste feeding hole, a slag discharging pipe and a driving motor, wherein the waste feeding hole is installed on the left side of the incinerator body, the slag discharging pipe is connected to the lower right side of the incinerator body, a mounting plate is installed inside the incinerator body, a connecting shaft penetrates through the middle of the mounting plate, a metal fan blade is installed on the surface of the connecting shaft and located below the mounting plate, a fixing rod is arranged below the metal fan blade and located on the outer surface of the connecting shaft, the driving motor is installed on the outer side of the slag discharging pipe, a transmission shaft is installed on the left side of the driving motor and penetrates through the inside of the slag discharging pipe, a first transmission gear is installed at the left end of the transmission shaft, a second transmission gear is connected below the first transmission gear, and a movable shaft penetrates through the middle of the second transmission gear, the right side of the movable shaft is positioned in the slag discharging pipe.
Preferably, the mounting plate and the incinerator body are designed to be an integrated structure, the width of the mounting plate is larger than the diameter of the connecting shaft, and the center of the connecting shaft coincides with the center of the mounting plate.
Preferably, the lower end of the connecting shaft is provided with a cross rod, the lowest point of the cross rod is positioned above the bottom of the incinerator body, and the connecting shaft and the mounting plate are in rotary connection.
Preferably, a stirring rod is arranged below the fixing rod, the stirring rod and the fixing rod are perpendicular to each other, and the length of the fixing rod is greater than that of the cross rod.
Preferably, the surface of the transmission shaft is provided with a cutting knife, the transmission shaft and the slag discharging pipe form bearing connection, and the transmission shaft is connected with the second transmission gear through the first transmission gear.
Preferably, the surface of the movable shaft is provided with the auger blade, the movable shaft and the second transmission gear are structurally designed into a whole, and the diameter of the second transmission gear is larger than that of the first transmission gear.
Compared with the prior art, the beneficial effects of the utility model are that: the waste incineration power generation device can avoid blockage caused by slag discharge;
(1) the cutting knife and the auger blade are arranged, so that when waste residues are discharged, the cutting knife can cut and crush the waste residues with larger volume, the waste residues can be conveniently and subsequently utilized, meanwhile, the rotation of the auger blade can stably convey the waste residues outwards, the blockage of the waste residues during discharge is avoided, the device can be conveniently and subsequently reused, and the functionality and the use convenience of the device are improved;
(2) be provided with metal flabellum, connecting axle and puddler, drive metal flabellum through the high temperature high-pressure gas's in the stove flow and rotate when burning rubbish to make the puddler rotate under the effect of connecting axle, carry out certain stirring to rubbish, make that rubbish can be more abundant burn, improve the work efficiency of device simultaneously.
Drawings
FIG. 1 is a schematic view of the main sectional structure of the present invention;
FIG. 2 is a schematic view of the mounting plate of the present invention;
FIG. 3 is a schematic view of the bottom view of the metal fan blade of the present invention;
fig. 4 is a schematic view of the connecting shaft of the present invention.
In the figure: 1. an incinerator body; 2. a garbage feeding hole; 3. a slag pipe; 4. mounting a plate; 5. a connecting shaft; 501. a cross bar; 6. a metal fan blade; 7. fixing the rod; 701. a stirring rod; 8. a drive motor; 9. a drive shaft; 901. a cutting knife; 10. a first drive gear; 11. a second transmission gear; 12. a movable shaft; 1201. auger blade.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a waste incineration power generation device capable of avoiding blockage of slag discharge comprises an incinerator body 1, a waste feeding hole 2, a slag discharge pipe 3, a mounting plate 4, a connecting shaft 5, metal fan blades 6, a fixing rod 7, a driving motor 8, a transmission shaft 9, a first transmission gear 10, a second transmission gear 11 and a movable shaft 12, wherein the waste feeding hole 2 is installed on the left side of the incinerator body 1, the slag discharge pipe 3 is connected to the lower right side of the incinerator body 1, the mounting plate 4 is installed inside the incinerator body 1, the connecting shaft 5 penetrates through the middle of the mounting plate 4, the metal fan blades 6 are installed on the surface of the connecting shaft 5, the metal fan blades 6 are located below the mounting plate 4, the fixing rod 7 is arranged below the metal fan blades 6, the fixing rod 7 is located on the outer surface of the connecting shaft 5, the driving motor 8 is installed on the outer side of the slag discharge pipe 3, the transmission shaft 9 penetrates through the inside of the slag discharging pipe 3, the first transmission gear 10 is installed at the left end of the transmission shaft 9, the second transmission gear 11 is connected below the first transmission gear 10, the movable shaft 12 penetrates through the middle of the second transmission gear 11, and the right side of the movable shaft 12 is located inside the slag discharging pipe 3;
the mounting plate 4 and the incinerator body 1 are designed into an integrated structure, the width of the mounting plate 4 is larger than the diameter of the connecting shaft 5, the center of the connecting shaft 5 is overlapped with the center of the mounting plate 4, the position of the connecting shaft 5 can be fixed through the mounting plate 4 through the structural design, and a stable mounting surface is provided for the connecting shaft 5;
the lower end of the connecting shaft 5 is provided with a cross rod 501, the lowest point of the cross rod 501 is positioned above the bottom of the incinerator body 1, the connecting shaft 5 and the mounting plate 4 form rotary connection, and the connecting shaft 5 can rotate under the action of the metal fan blades 6 due to the structural design, so that the subsequent garbage stirring operation is realized;
the stirring rod 701 is arranged below the fixed rod 7, the stirring rod 701 and the fixed rod 7 are perpendicular to each other, the length of the fixed rod 7 is larger than that of the cross rod 501, and the garbage can be sufficiently stirred through the mutual matching of the stirring rod 701 and the cross rod 501 through the structural design, so that the garbage can be sufficiently combusted;
the surface of the transmission shaft 9 is provided with a cutting knife 901, the transmission shaft 9 and the slag discharging pipe 3 form bearing connection, the transmission shaft 9 is connected with a second transmission gear 11 through a first transmission gear 10, and the structural design can cut and smash waste slag with larger volume through the cutting knife 901, so that the blockage of the slag discharging pipe 3 is avoided;
the auger leaves 1201 are arranged on the surface of the movable shaft 12, the movable shaft 12 and the second transmission gear 11 are structurally designed into a whole, the diameter of the second transmission gear 11 is larger than that of the first transmission gear 10, and the transmission shaft 9 can drive the movable shaft 12 to synchronously rotate while rotating due to the structural design, so that the auger leaves 1201 rotate, and waste residues are conveniently discharged.
The working principle is as follows: when the garbage incineration power generation device capable of avoiding blockage caused by slag discharge is used, firstly, according to the structure shown in figure 1, the incinerator body 1 is ignited, then garbage is clamped through devices such as an external claw and the like, the garbage is placed into the incinerator body 1 through the garbage feeding hole 2 for incineration treatment, when the garbage is combusted, a large amount of hot gas is generated, the gas moves upwards along the incinerator body 1, the structure and the structure shown in figures 2 and 3 drive the metal fan blades 6 to rotate when the gas flows through the metal fan blades 6, the metal fan blades 6 drive the connecting shaft 5 to rotate simultaneously when rotating, in combination with the structure shown in figure 4, the connecting shaft 5 drives the cross rod 501 and the fixed rod 7 to synchronously rotate when rotating in the mounting plate 4, the cross rod 501 stirs the bottom of the garbage, the fixed rod 7 stirs the garbage above through the stirring rod 701 to a certain degree, so that the garbage can be more fully combusted, the mounting plate 4, the connecting shaft 5, the fixing rod 7 and other parts are made of high-resistant materials, so that the time required by garbage combustion is reduced, and the working efficiency of the device is improved;
according to fig. 1, waste residue accessible slag pipe 3 is discharged after msw incineration accomplishes, start driving motor 8, driving motor 8 drives transmission shaft 9 and rotates, make cutting knife 901 cut the great waste residue of volume and smash, avoid causing the jam, will drive second drive gear 11 through first drive gear 10 and rotate when transmission shaft 9 pivoted, make second drive gear 11 drive loose axle 12 and rotate, thereby make auger leaf 1201 work, will be through the even transport external of waste residue after the cutting, it takes place to block up to have avoided slag pipe 3, make things convenient for follow-up to carry out used repeatedly to the device, increase the functionality and the convenience in use of device.
Those not described in detail in this specification are within the skill of the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a can avoid arranging the waste incineration power generation facility that sediment appears blockking up, includes to burn burning furnace main part (1), rubbish feed inlet (2), slag pipe (3) and driving motor (8), its characterized in that: the garbage incinerator is characterized in that a garbage feeding hole (2) is installed on the left side of the incinerator body (1), a slag discharging pipe (3) is connected to the lower right side of the incinerator body (1), a mounting plate (4) is installed inside the incinerator body (1), a connecting shaft (5) penetrates through the middle of the mounting plate (4), a metal fan blade (6) is installed on the surface of the connecting shaft (5), the metal fan blade (6) is located below the mounting plate (4), a fixing rod (7) is arranged below the metal fan blade (6), the fixing rod (7) is located on the outer surface of the connecting shaft (5), a driving motor (8) is installed on the outer side of the slag discharging pipe (3), a transmission shaft (9) is installed on the left side of the driving motor (8), the transmission shaft (9) penetrates through the inside of the slag discharging pipe (3), and a first transmission gear (10) is installed at the, and the lower part of the first transmission gear (10) is connected with a second transmission gear (11), the middle part of the second transmission gear (11) penetrates through a movable shaft (12), and the right side of the movable shaft (12) is positioned in the slag discharging pipe (3).
2. The waste incineration power generation device capable of avoiding clogging due to slag discharge according to claim 1, wherein: the mounting plate (4) and the incinerator body (1) are designed into an integrated structure, the width of the mounting plate (4) is larger than the diameter of the connecting shaft (5), and the center of the connecting shaft (5) is coincided with the center of the mounting plate (4).
3. The waste incineration power generation device capable of avoiding clogging due to slag discharge according to claim 1, wherein: the lower end of the connecting shaft (5) is provided with a cross rod (501), the lowest point of the cross rod (501) is positioned above the bottom of the incinerator body (1), and the connecting shaft (5) and the mounting plate (4) are in rotating connection.
4. The refuse incineration power generation plant according to claim 3, wherein the refuse incineration power generation plant is adapted to avoid clogging due to slag discharge, and comprises: a stirring rod (701) is arranged below the fixing rod (7), the stirring rod (701) and the fixing rod (7) are perpendicular to each other, and the length of the fixing rod (7) is larger than that of the cross rod (501).
5. The waste incineration power generation device capable of avoiding clogging due to slag discharge according to claim 1, wherein: the surface mounting of transmission shaft (9) has cutting knife (901), and transmission shaft (9) and slag pipe (3) constitute the bearing and connect to transmission shaft (9) are connected through first drive gear (10) and second drive gear (11).
6. The waste incineration power generation device capable of avoiding clogging due to slag discharge according to claim 1, wherein: packing auger leaves (1201) are installed on the surface of the movable shaft (12), the movable shaft (12) and the second transmission gear (11) are structurally designed into a whole, and the diameter of the second transmission gear (11) is larger than that of the first transmission gear (10).
CN201921717181.4U 2019-10-14 2019-10-14 Can avoid arranging waste incineration power generation facility that sediment appears blocking Active CN211450971U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921717181.4U CN211450971U (en) 2019-10-14 2019-10-14 Can avoid arranging waste incineration power generation facility that sediment appears blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921717181.4U CN211450971U (en) 2019-10-14 2019-10-14 Can avoid arranging waste incineration power generation facility that sediment appears blocking

Publications (1)

Publication Number Publication Date
CN211450971U true CN211450971U (en) 2020-09-08

Family

ID=72315716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921717181.4U Active CN211450971U (en) 2019-10-14 2019-10-14 Can avoid arranging waste incineration power generation facility that sediment appears blocking

Country Status (1)

Country Link
CN (1) CN211450971U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113669745A (en) * 2021-08-24 2021-11-19 泰山集团泰安华电热工有限公司 Anti-blocking slag discharging device of biomass boiler and using method thereof
CN114086007A (en) * 2021-11-17 2022-02-25 赣州中凯稀土材料有限公司 Energy-saving roasting device capable of uniformly feeding for rare earth waste treatment and processing technology

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113669745A (en) * 2021-08-24 2021-11-19 泰山集团泰安华电热工有限公司 Anti-blocking slag discharging device of biomass boiler and using method thereof
CN113669745B (en) * 2021-08-24 2023-12-12 泰山集团泰安华电热工有限公司 Anti-blocking slag discharging device of biomass boiler and using method thereof
CN114086007A (en) * 2021-11-17 2022-02-25 赣州中凯稀土材料有限公司 Energy-saving roasting device capable of uniformly feeding for rare earth waste treatment and processing technology

Similar Documents

Publication Publication Date Title
CN211450971U (en) Can avoid arranging waste incineration power generation facility that sediment appears blocking
CN109681882B (en) Garbage incineration device for garbage disposal
CN112648620B (en) Garbage crushing device
CN211450933U (en) Incineration equipment for garbage disposal
CN204786431U (en) Waste incinerator by screw rod propelling movement and broken rubbish
CN214745751U (en) Waste incineration device for waste incineration power generation
CN211146496U (en) Garbage disposal furnace with sufficient garbage disposal
CN212319725U (en) Waste power generation is with burning device convenient to clearance residue
CN212274002U (en) High-temperature heating furnace for waste solid treatment
CN210165386U (en) Combined internal combustion garbage power generation equipment
CN212943302U (en) Crushing device
CN212777359U (en) Waste incineration equipment with efficient combustion
CN214332726U (en) Feeding device with anti-blocking structure for waste incineration power generation
CN206593108U (en) A kind of TRT generated electricity using waste
CN114234199B (en) Industrial solid waste treatment device capable of fully incinerating
CN212644612U (en) Garbage crushing treatment device for garbage power generation
CN214064924U (en) Waste incineration device based on energy-saving and environment-friendly technology
CN215614033U (en) Environment measuring and environmental impact evaluation are with waste matter high efficiency shredding device
CN219889560U (en) High-efficient recovery unit of noble metal
CN211876039U (en) Garbage disposal is with burning furnace that burns
CN220186818U (en) Chemical industry incinerator
CN215765112U (en) Waste incineration device for new energy
CN217082561U (en) Waste incineration equipment
CN220471618U (en) Energy-saving environment-friendly garbage power generation device
CN212943319U (en) Waste incineration power generation equipment capable of not participating in combustion material removal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant