CN211341839U - Construction elevator is with protection canopy - Google Patents

Construction elevator is with protection canopy Download PDF

Info

Publication number
CN211341839U
CN211341839U CN201921674095.XU CN201921674095U CN211341839U CN 211341839 U CN211341839 U CN 211341839U CN 201921674095 U CN201921674095 U CN 201921674095U CN 211341839 U CN211341839 U CN 211341839U
Authority
CN
China
Prior art keywords
protection
protective
construction elevator
structures
shed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921674095.XU
Other languages
Chinese (zh)
Inventor
罗重华
彭锋
孙宏军
刘高强
陈孟达
周华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN SUNPEAK CONSTRUCTION CO Ltd
Original Assignee
HUNAN SUNPEAK CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN SUNPEAK CONSTRUCTION CO Ltd filed Critical HUNAN SUNPEAK CONSTRUCTION CO Ltd
Priority to CN201921674095.XU priority Critical patent/CN211341839U/en
Application granted granted Critical
Publication of CN211341839U publication Critical patent/CN211341839U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a protective shed for a construction elevator, which is provided with a channel communicated with an entrance of the construction elevator, the protective shed comprises two first protective structures arranged in parallel and a ceiling structure connected to the upper parts of the two first protective structures, and the two first protective structures and the ceiling structure are enclosed to form the channel; the first protective structure comprises a plurality of stand columns which are arranged at intervals, and a protective layer is laid between every two adjacent stand columns; the lower extreme of stand is fixed in on the ground through connection structure, and connection structure includes the bottom plate that is fixed in the ground through the connecting piece to and be fixed in the sleeve of bottom plate upper end, the lower extreme of stand wears to locate in the sleeve and links firmly through the fastener with the sleeve. Personnel and materials need to enter the construction elevator through the passage, so that the risk that workers can conveniently enter the protective shed from the side and are struck by high-altitude objects is reduced. In addition, this structure is installed and is torn open conveniently, repeatedly usable just can adjust the height of stand along with the slope wantonly.

Description

Construction elevator is with protection canopy
Technical Field
The utility model belongs to the technical field of construction safety protection facility, especially, relate to a construction elevator is with protection canopy.
Background
In recent years, as a construction unit of engineering construction, the assembled building has to meet the requirements of energy conservation and emission reduction, low carbon, green and environmental protection and eight hundred percent requirements in hundreds of relevant regulations, reduces construction cost, reduces resource consumption in the building construction process, reduces carbon dioxide emission and environmental pollution, gradually moves to green construction, and is innovation and breakthrough which must be carried out by the construction unit.
The protection canopy adopts the simple and easy processing canopy that is set up by materials such as steel pipe, square steel, template board and forms basically, and the requirement of safe civilized construction can't be satisfied in the outward appearance, and traditional protection canopy is mostly double column, transports the material with the tower crane, especially longer object easily produces the potential safety hazard such as steel crossbeam.
At present, construction units advocate and implement safe production vigorously to make safe and civilized construction units. Construction sites have many potential safety hazards, and in order to reduce the occurrence of construction accidents, building construction units must install assembled and tooled protection devices.
The prior construction technology has the following defects:
1. in the prior art, only the top of a protective shed is protected, the periphery of the protective shed is in full communication with the surrounding, and traffic has no guidance;
2. related documents such as warning signs, slogans, safety detection boards, operation certificates of operators and the like are hung in no place or at uncertain hanging positions;
3. random arrangement, poor integrity and poor appearance.
4. The assembled rate is low, and the dismouting is inconvenient, and reuse rate is low.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome prior art not enough, provide an ann tears protection canopy for construction elevator that convenience, repeatedly usable and traffic have the guidance quality open.
In order to solve the technical problem, the utility model discloses a following technical scheme:
a protection shed for a construction elevator is provided with a channel communicated with an entrance of the construction elevator, and comprises two first protection structures arranged in parallel and a ceiling structure connected to the upper parts of the two first protection structures, wherein the two first protection structures and the ceiling structure are enclosed to form the channel; the first protection structure comprises a plurality of stand columns which are arranged at intervals, and a protection layer is laid between every two adjacent stand columns; the lower extreme of stand is fixed in on the ground through connection structure, connection structure includes the bottom plate that is fixed in the ground through the connecting piece to and be fixed in the sleeve of bottom plate upper end, the lower extreme of stand wears to locate in the sleeve and links firmly through the fastener with the sleeve.
The passage communicated with the entrance of the construction elevator is formed by enclosing the two first protective structures and the ceiling structure, and personnel and materials enter the construction elevator through the passage, so that traffic has guidance, and the risk that workers can conveniently enter the protective shed from the side and be struck by high-altitude objects is reduced.
In addition, the stand is fixed in the ground through connection structure on, and the ann tears the convenience open, has reduced power consumption such as welding dangerous, and the protection canopy can constantly have enough to meet the need the use. Moreover, the height of the upright post can be adjusted randomly along with the gradient through the insertion and matching of the sleeve and the upright post, and the installation cannot be influenced due to the large gradient change.
As a further improvement of the above technical solution:
the protective layer comprises a plurality of first protective nets and a plurality of protective plates, and the first protective nets and the protective plates are arranged in turn in the height direction of the stand column. The arrangement of the protection plate is convenient for hanging certificates, load limiting marks, safety slogans and the like.
For preventing that the workman picture is convenient to get into the construction elevator from the clearance of protection canopy and construction elevator, two first protective structure all are equipped with towards another first protective structure of orientation and extend to the second protective structure of construction elevator entry towards the one end of construction elevator.
The top of two second protective structure is equipped with the instruction tablet board that links to each other with the ceiling structure, encloses between two second protective structure and the instruction tablet board and closes the protection canopy export that forms and construct the elevator entry complex.
The second protective structure comprises a frame structure and a second protective net paved on the surface of the frame structure.
The ceiling structure comprises an upper ceiling and a lower ceiling, the upper ceiling comprises a plurality of cross beams connected with two first protective structures and gangboards laid on the cross beams, and the lower ceiling comprises a plurality of cross beams connected with the two first protective structures and corrugated tiles laid on the cross beams.
The top of the protection shed is not required to be provided with the rain shielding cloth, and the corrugated tiles of the lower ceiling are used for organizing water drainage, so that the protection shed can keep rain-proof and can also keep sanitation in the protection shed.
Compared with the prior art, the utility model has the advantages of:
1. the utility model is convenient to install and dismantle, and can be installed and dismantled by about 3 persons;
2. the stereotype only needs one-time manufacture and can be used repeatedly;
3. the installation is simple and beautiful, the sight is good, and the traffic has guidance;
4. the height of the vertical rod of the shaped protection shed can be adjusted randomly along with the gradient, and the installation cannot be influenced due to large gradient change;
5. the double-deck protection is done to regularization protection canopy top adoption truss, and the ceiling bottom adopts the buckled plate furred ceiling, protects the rank height.
Drawings
Fig. 1 is the utility model discloses construction elevator is with main structure schematic diagram of looking at of protection canopy.
Fig. 2 is a schematic structural diagram of the first protection structure.
Fig. 3 is an enlarged schematic view of the structure at a in fig. 2.
Fig. 4 is a top view of the base plate.
Illustration of the drawings: 1. a channel; 2. a first guard structure; 21. a column; 22. a protective layer; 221. a first protection net; 222. a protection plate; 3. a ceiling structure; 31. an upper ceiling is arranged; 32. a lower ceiling; 4. a connecting structure; 41. a base plate; 411. bolt holes; 42. a sleeve; 43. a fastener; 5. a second protective structure; 51. a frame structure; 52. a second protective net; 6. an indicator board.
Detailed Description
The invention is further described below with reference to specific preferred embodiments, without thereby limiting the scope of protection of the invention.
Example (b):
as shown in fig. 1, the protection shed for the construction elevator of the embodiment has a passage 1 communicated with an entrance of the construction elevator, the protection shed comprises two first protection structures 2 arranged in parallel and a ceiling structure 3 connected to the upper parts of the two first protection structures 2, and the two first protection structures 2 and the ceiling structure 3 enclose to form the passage 1.
As shown in fig. 2, the first protective structure 2 includes a plurality of columns 21 arranged at intervals, and a protective layer 22 is laid between two adjacent columns 21; the protective layer 22 includes a plurality of first protective nets 221 and a plurality of protective plates 222, and the first protective nets 221 and the protective plates 222 are alternately arranged in the height direction of the column 21.
As shown in fig. 3, the lower end of the upright post 21 is fixed on the foundation by the connecting structure 4, the connecting structure 4 comprises a bottom plate 41 fixed on the foundation by a connecting piece, and a sleeve 42 fixed on the upper end of the bottom plate 41, the lower end of the upright post 21 is inserted into the sleeve 42 and fixedly connected with the sleeve 42 by a fastener 43. Specifically, as shown in fig. 4, the bottom plate 41 is provided with bolt holes 411 distributed in an array, and the bottom plate 41 is fixed to the foundation by bolts. After the lower end of the column 21 is inserted into the sleeve 42, a plurality of fasteners 43 extend through the sleeve 42 and the sidewall of the column 21 to secure the sleeve 42 to the column 21.
With continued reference to fig. 2, the ends of the two first protective structures 2 facing the construction elevator are each provided with a second protective structure 5 extending towards the other first protective structure 2 to the entrance of the construction elevator. The top of two second protective structure 5 is equipped with the instruction tablet board 6 that links to each other with ceiling structure 3, encloses between two second protective structure 5 and the instruction tablet board 6 and closes the protection canopy export that forms and construct elevator entry complex. Wherein, the second protective structure 5 comprises a frame structure 51 and a second protective net 52 laid on the surface of the frame structure 51.
Furthermore, the ceiling structure 3 comprises an upper ceiling 31 and a lower ceiling 32, the upper ceiling 31 comprising a plurality of beams connected to the two first shielding structures 2 and gangboards laid on the plurality of beams, the lower ceiling 32 comprising a plurality of beams connected to the two first shielding structures 2 and corrugated tiles laid on the plurality of beams.
The construction process of the protection shed for the construction elevator of the embodiment is as follows:
1. according to the layout positioning diagram of the protective shed of the construction elevator, two rows of upright posts are measured and positioned on the top plate of the basement (after the top plate of the basement is not positioned, 400-350 mmC20 concrete bases are poured, and the concrete bases are independent foundations or finished structural plate surfaces).
2. Fixing the connecting structure 4 of each upright column through an expansion bolt;
3. fixing each upright post on the connecting structure 4 through self-tapping screws;
4. fixing a mesh sheet consisting of angle steel and a steel wire mesh and a mesh sheet consisting of angle steel and galvanized sheet iron between two adjacent stand columns of the first protective structure 2;
5. a plurality of cross beams of an upper ceiling and a lower ceiling are arranged, and the distance between the upper ceiling and the lower ceiling is 800 mm; the cross beam and the upright post are connected through the bolts, so that the mounting, mounting and dismounting can be flexible and convenient, the electricity utilization danger such as welding is reduced, and the upright post and the cross beam are both made of square steel;
6. a single-layer white ripple color steel plate is paved on the beam of the lower ceiling and fixed by self-tapping screws;
7. paving a wood springboard or a bamboo springboard on a beam of the upper ceiling, and firmly binding the wood springboard or the bamboo springboard by using a galvanized iron wire with the diameter of 1.2 mm;
8. the inside galvanized iron sheet and the outside of construction elevator protection canopy hang people's goods elevator and detect certification, record registration card, operating personnel certificate, limit and carry sign, safe slogan etc..
The above description is only for the preferred embodiment of the present application and should not be taken as limiting the present application in any way, and although the present application has been disclosed in the preferred embodiment, it is not intended to limit the present application, and those skilled in the art should understand that they can make various changes and modifications within the technical scope of the present application without departing from the scope of the present application, and therefore all the changes and modifications can be made within the technical scope of the present application.

Claims (6)

1. The protection shed for the construction elevator is characterized by comprising a channel (1) communicated with an entrance of the construction elevator, the protection shed comprises two first protection structures (2) which are arranged in parallel and a ceiling structure (3) connected to the upper parts of the two first protection structures (2), and the two first protection structures (2) and the ceiling structure (3) are enclosed to form the channel (1); the first protective structure (2) comprises a plurality of stand columns (21) arranged at intervals, and a protective layer (22) is laid between every two adjacent stand columns (21); the lower extreme of stand (21) is fixed in on the ground through connection structure (4), connection structure (4) are including being fixed in bottom plate (41) of ground through the connecting piece to and be fixed in sleeve (42) of bottom plate (41) upper end, the lower extreme of stand (21) is worn to locate in sleeve (42) and link firmly through fastener (43) with sleeve (42).
2. The shelter for the construction elevator according to claim 1, wherein the protection layer (22) comprises a plurality of first protection nets (221) and a plurality of protection plates (222), and the first protection nets (221) and the protection plates (222) are alternately arranged in a height direction of the columns (21).
3. Protection shed for construction elevator according to claim 1, characterized in that the end of both first protection structures (2) facing the construction elevator is provided with a second protection structure (5) extending towards the other first protection structure (2) to the entrance of the construction elevator.
4. The protection shed for the construction elevator as claimed in claim 3, wherein an indicator board plate (6) connected with the ceiling structure (3) is arranged at the top of the two second protection structures (5), and a protection shed outlet matched with the construction elevator inlet is formed by the two second protection structures (5) and the indicator board plate (6) in an enclosing manner.
5. The shelter for construction elevator according to claim 3, wherein the second protection structure (5) comprises a frame structure (51) and a second protection net (52) laid on the surface of the frame structure (51).
6. Protective shed for construction elevators according to any of claims 1-5, characterized in that the roof structure (3) comprises an upper roof (31) and a lower roof (32), the upper roof (31) comprising a plurality of beams connected to the two first protective structures (2) and gangboards laid on the plurality of beams, and the lower roof (32) comprising a plurality of beams connected to the two first protective structures (2) and corrugated tiles laid on the plurality of beams.
CN201921674095.XU 2019-10-08 2019-10-08 Construction elevator is with protection canopy Active CN211341839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921674095.XU CN211341839U (en) 2019-10-08 2019-10-08 Construction elevator is with protection canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921674095.XU CN211341839U (en) 2019-10-08 2019-10-08 Construction elevator is with protection canopy

Publications (1)

Publication Number Publication Date
CN211341839U true CN211341839U (en) 2020-08-25

Family

ID=72136068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921674095.XU Active CN211341839U (en) 2019-10-08 2019-10-08 Construction elevator is with protection canopy

Country Status (1)

Country Link
CN (1) CN211341839U (en)

Similar Documents

Publication Publication Date Title
CN109024896B (en) Double-deck crashproof assembled steel construction truss reinforcing bar processing prevents pounding canopy
CN201687251U (en) Anti-climbing net structure of truss iron tower
CN201627362U (en) Suspended formwork support device for construction of steel structured concrete slabs
CN206737563U (en) A kind of construction guard fender quickly assembled
CN201786036U (en) Temporary protective barrier for building construction
CN205476545U (en) Multipurpose combined strength construction ground protection shed structure support frame
CN211341839U (en) Construction elevator is with protection canopy
CN205314242U (en) Job site ground many function combination formula protection canopy
CN206616876U (en) One kind is encorbelmented protective platform system
CN205617823U (en) Guardrail bar is prevented to assembled net
CN111236603A (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN107965170A (en) Distribution box protection canopy with assembling type base
CN207960030U (en) Distribution box protection canopy with assembling type base
CN203569905U (en) Novel safety protection structure for decoration
CN204983711U (en) Standardized escape way
CN206987720U (en) A kind of double shield cage cat ladders
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN206110693U (en) Protection device for prevent that factory building concrete block from falling
CN213039059U (en) Personnel warning device for building safety protection
CN206753103U (en) One kind carries out itself typhoon protection bracing means using movable color steel foundations plinth
CN111608377A (en) Set up overhanging scaffold and comprehensive construction method thereof
CN219343475U (en) Modular assembled building structure
CN209942266U (en) Regularization pin-connected panel high altitude protector that encorbelments
CN216109262U (en) BIPV arc roof safety protection structure
CN215484823U (en) Temporary safety channel used in strong wind environment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant