CN203569905U - Novel safety protection structure for decoration - Google Patents

Novel safety protection structure for decoration Download PDF

Info

Publication number
CN203569905U
CN203569905U CN201320663525.4U CN201320663525U CN203569905U CN 203569905 U CN203569905 U CN 203569905U CN 201320663525 U CN201320663525 U CN 201320663525U CN 203569905 U CN203569905 U CN 203569905U
Authority
CN
China
Prior art keywords
protection structure
safety protection
square tube
net
novel decorative
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320663525.4U
Other languages
Chinese (zh)
Inventor
朱智慧
王宏
陈磊
朱小艳
厉瑨
王小江
林飘鹤
黄宇
徐胡善
徐冠宇
俞越
孙玉刚
徐剑
季晶
沈文华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201320663525.4U priority Critical patent/CN203569905U/en
Application granted granted Critical
Publication of CN203569905U publication Critical patent/CN203569905U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a novel safety protection structure for decoration. The novel safety protection structure for decoration comprises first square pipes (1), second square pipes (2), steel plates (3), cross rods (41), a safety net (5) and net buckles (9), wherein one end of each first square pipe (1) is vertically inserted in the corresponding second square pipe (2) in an adjustable mode, each first square pipe (1) and the corresponding second square pipe (2) are fixed through a bolt (8) to form a vertical rod, the other end of each first square pipe (1) is fixed to the corresponding steel plate on a cross beam, the cross rods (41) with holes formed in the side edges are fixed to the second square pipes (2) through bolts (8) to form a basic framework, the net buckles (9) are connected in the holes of the cross rods (41) in a hooking mode, the safety net (5) is connected with the cross rods (41) in a hooked mode through the net buckles (9), and the basic framework is fixed to a basic layer through embedded parts (42), so that the complete structure is formed. According to the novel safety protection structure for decoration, threats to construction of building edges and holes are completely avoided, safety and reliability are guaranteed, materials can be recycled, and no damage is caused; construction can be conducted easily and conveniently, labor loss and material resource loss are reduced, and construction efficiency is improved.

Description

The safety protection structure that novel decorative is used
Technical field
The utility model relates to the safety protection structure that a kind of novel decorative is used.
Background technology
Domestic existing interior decoration job site is faced frontier defense and is protected and mostly be the main material that mao bamboon, log, reinforcing bar, steel pipe, angle bar etc. are cross bar and vertical rod, cross bar and vertical rod connected mode are generally steel wire or welding, install, dismantlement work amount is very large, and the average height of protection can not exceed 1.1m.Along with the development of architectural decoration, at building curtain wall, also do not had totally enclosed time, decorate and just start at indoor construction, constructor ascends a height, and to face limit operation visible everywhere, faces the scheme that frontier defense protects can not meet on-the-spot omnibearing construction protection demand therefore existing.Particularly in the construction peak period of highrise building, between work post, operation, intersect particularly thorny, the serious construction safety that has influence on constructor, simultaneously, the assembly and disassembly of the materials such as the steel pipe of thick heaviness, fastener expend a large amount of artificial, novel developing direction of facing limit and greatly improved decorative product.This technology is to the scheme of facing frontier defense and the protecting lifting of making rational planning for, and omnibearing protection constructor's effect safety, can recycle, and well reduces construction costs cost, has greatly reduced construction costs cost, can save a large amount of social resources.
Utility model content
The purpose of this utility model is: the safety protection structure that provides a kind of novel decorative to use, and it has solved up hill and dale building and has faced the threat to building operations of limit and hole, and safe and reliable, material can recycle, without any damage; Construct simple and convenient, reduce manpower and materials loss, improve efficiency of construction.
The technical solution of the utility model is: the safety protection structure that a kind of novel decorative is used, it comprises square tube one, square tube two, steel plate, cross bar, net, net are buckled completely, described square tube one one end is adjustable is vertically plugged in square tube two, be bolted formation vertical rod, and the steel plate on one end and crossbeam is fixed; The cross bar that side has a hole is bolted in square tube two and forms basic boom; Net button hook is connected in the hole of cross bar, and Netcom crosses to net to detain with cross bar and articulates completely, and described basic boom is fixed on basic unit by built-in fitting and forms complete structure.
Below technique scheme is further expalined:
Described basic boom lower, transverse is provided with foot guard plate.
The square tube that described square tube two is 40*60mm.
The square tube that described square tube one is 30*50mm.
Described cross bar is the intercepting section of L-type angle bar.
Described built-in fitting is the intercepting part of angle bar.
Described pore size distribution is even.
Described steel plate is provided with three equally distributed parallel holes.
Described steel plate is fixed by expansion bolt and crossbeam.
The utility model has the advantages that: the safety protection structure that novel decorative of the present utility model is used, its all parts is all demountable, and each connection does not adopt welding, and connecting material can recycle, and the proportion of goods damageds are lower; Safety is higher, has stopped to a great extent the generation of safe injury, has promoted the safeguard measure to workman; Time saving and energy saving, simple to operate flexibly, location that can differing heights, the frontier defense of facing that can at utmost meet different job sites is protected.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described:
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the structural representation of the basic boom of the utility model embodiment;
Fig. 3 is the connection diagram between square tube and the cross bar of the utility model embodiment;
Fig. 4 is the steel plate structure schematic diagram of the utility model embodiment;
Wherein: 1 square tube one; 2 square tubes two; 3 steel plates; 41 cross bars; 42 built-in fittings; 5 nets completely; 6 foot guard plates; 7 holes; 8 bolts; 9 net buttons.
The specific embodiment
Embodiment: as shown in Figure 1, the safety protection structure that a kind of novel decorative is used, it comprises square tube 1, square tube 22, steel plate 3, cross bar 41, built-in fitting 42, net 5, foot guard plate 6, hole 7, bolt 8, net buckle 9 completely.
As shown in Figure 3, square tube one 1 one end are adjustable is vertically plugged in square tube 22, fixing by bolt 8, and the square tube of different model is socketed, and then with bolt 8 punchings, is fixed, and the convenient transparent marble of hanging hangs muscle and accurately locates adjustment; The cross bar 41 that side has hole 7 is fixed in square tube 22 by bolt 8, in cross bar 41 side perforates and with square tube 22, forms and is reliably connected, and forms basic boom.
Basic boom lower, transverse is provided with foot guard plate 6 as shown in Figure 1 and Figure 2; Net button 9 links in the hole of cross bar 41, and net 5 buckle 9 by net and articulated with cross bar 41 completely, and hole 7 is evenly distributed, and detains 9 and is connected with netting; Through net 5 hanging tests completely, according to the evenly perforate on the cross bar 41 towards construction area direction of certain modulus, to use net button 9 safety net 5 can be connected fast with cross bar 41.Basic boom with by built-in fitting, be fixed on basic unit and form complete structure.The square tube that square tube 22 is 40*60mm; The square tube that square tube 1 is 30*50mm; As shown in Figure 4, described cross bar 41 is the intercepting section of L-type angle bar, and built-in fitting 42 is the intercepting part of L-type angle bar.
The enforcement of the present embodiment comprises following main points:
1, the safety protection structure that novel decorative is used: intend adopting big or small metal side tube to be socketed the mode running through, carry out vertical adjustment according to on-the-spot actual height and stretch; The height of protection need be controlled in 9 meters, flexible connection between metal side tube, intend adopting bolt 8 fastening to wearing, form vertical rod, the pitch-row of bolt 8 is uniformly distributed according to certain size, and the length that guarantees vertical rod can regulate arbitrarily in maximal dilation value, bolt 8 can be fixed arbitrarily flexible height.
The link technique of the safety protection structure built-in fitting 42 that 2, novel decorative is used: the built-in fitting of intending the convenient inserting mode of employing and end face, ground is fastenedly connected.
3, the control of cross bar 41 and safety net 5: intend in cross bar 41 side perforates and form reliable connection with vertical rod; Through safety net 5 hanging tests, according to the evenly perforate on the cross bar 41 towards construction area direction of certain modulus, to use hook safety net 5 can be connected fast with cross bar 41.
4, the connection control of vertical rod and crossbeam: the interior survey at crossbeam is fixed on steel plate 3 on crossbeam by rearmounted expansion bolt, reserved screw in the middle of steel plate 3, can allow the top of vertical rod be bolted on the screw of steel plate 3 easily simultaneously.
It should be pointed out that for the utility model through absolutely proving, also can there is the embodiment of multiple conversion and remodeling, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present utility model, rather than to restriction of the present utility model.In a word, protection domain of the present utility model should comprise those apparent conversion or alternative and remodeling to those skilled in the art.

Claims (9)

1. the safety protection structure that novel decorative is used, it is characterized in that: it comprises square tube one (1), square tube two (2), steel plate (3), cross bar (41), net (5), net are buckled (9) completely, what described square tube one (1) one end was adjustable is vertically plugged in square tube two (2), by the vertical rod of the fixing formation of bolt (8), and the steel plate (3) on one end and crossbeam is fixing; The cross bar (41) of side porose (7) is fixed on the upper basic boom that forms of square tube two (2) by bolt (8); Net button (9) links in the hole of cross bar (41), and net (5) is buckled (9) by net and cross bar (41) articulates completely, and described basic boom is fixed on basic unit by built-in fitting (42) and forms complete structure.
2. the safety protection structure that novel decorative according to claim 1 is used, is characterized in that: described basic boom lower, transverse is provided with foot guard plate (6).
3. the safety protection structure that novel decorative according to claim 1 is used, is characterized in that: the square tube that described square tube two (2) is 40*60mm.
4. the safety protection structure that novel decorative according to claim 1 is used, is characterized in that: the square tube that described square tube one (1) is 30*50mm.
5. the safety protection structure that novel decorative according to claim 1 is used, is characterized in that: the intercepting section that described cross bar (41) is L-type angle bar.
6. the safety protection structure that novel decorative according to claim 1 is used, is characterized in that: the intercepting part that described built-in fitting (42) is L-type angle bar.
7. the safety protection structure that novel decorative according to claim 1 is used, is characterized in that: described hole (7) are evenly distributed.
8. the safety protection structure that novel decorative according to claim 1 is used, is characterized in that: described steel plate (3) is provided with three parallel holes.
9. the safety protection structure that novel decorative according to claim 1 is used, is characterized in that: described steel plate (3) is fixed by expansion bolt and crossbeam.
CN201320663525.4U 2013-10-28 2013-10-28 Novel safety protection structure for decoration Expired - Lifetime CN203569905U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320663525.4U CN203569905U (en) 2013-10-28 2013-10-28 Novel safety protection structure for decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320663525.4U CN203569905U (en) 2013-10-28 2013-10-28 Novel safety protection structure for decoration

Publications (1)

Publication Number Publication Date
CN203569905U true CN203569905U (en) 2014-04-30

Family

ID=50537642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320663525.4U Expired - Lifetime CN203569905U (en) 2013-10-28 2013-10-28 Novel safety protection structure for decoration

Country Status (1)

Country Link
CN (1) CN203569905U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590615A (en) * 2013-10-28 2014-02-19 苏州金螳螂建筑装饰股份有限公司 Novel safety protection structure for decoration
CN111727293A (en) * 2017-12-15 2020-09-29 J·J·梅利克 Security fence assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103590615A (en) * 2013-10-28 2014-02-19 苏州金螳螂建筑装饰股份有限公司 Novel safety protection structure for decoration
CN111727293A (en) * 2017-12-15 2020-09-29 J·J·梅利克 Security fence assembly

Similar Documents

Publication Publication Date Title
CN202324571U (en) Overhanging type double-row scaffold
CN204850523U (en) Existing brickwork wall reinforced structure based on mesh grid is taken in packing
CN201687251U (en) Anti-climbing net structure of truss iron tower
CN203569905U (en) Novel safety protection structure for decoration
CN204752026U (en) Tower crane escape way
CN203626275U (en) Steel beam structure and under-beam clamp used for hanging horizontal safety net thereof
CN201908447U (en) Lift-type horizontal safety net
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN203947756U (en) Exterior wall protective frame
CN103615120A (en) Combined-type shaping building peripheral horizontal safety net
CN103590615B (en) Ornamental safety protection structure
CN202899600U (en) Construction site limb quick installation and removal protecting device
CN102182324A (en) Anti-falling safety net
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN205025124U (en) Standardized limit of facing can be dismantled and is prevented guardrail bar
CN104533092B (en) The construction method of rack roofing furred ceiling
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN201714103U (en) Continuously recyclable edge protection structure
CN204081430U (en) A kind of overhanging type discharging platform works in coordination with scaffold unitary construction
CN203499259U (en) Tool type cantilevered unloading platform
CN202064686U (en) Bamboo weaved plate safety maintenance device for construction peripheral safeguard
CN204609324U (en) A kind of lifting device used in steel work purlin is installed
CN203008400U (en) Enhanced-type fine mesh safe vertical net
CN111608376B (en) Comprehensive construction method for shaping component
CN203308109U (en) External carrying net device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140430