CN206753103U - One kind carries out itself typhoon protection bracing means using movable color steel foundations plinth - Google Patents
One kind carries out itself typhoon protection bracing means using movable color steel foundations plinth Download PDFInfo
- Publication number
- CN206753103U CN206753103U CN201720160221.4U CN201720160221U CN206753103U CN 206753103 U CN206753103 U CN 206753103U CN 201720160221 U CN201720160221 U CN 201720160221U CN 206753103 U CN206753103 U CN 206753103U
- Authority
- CN
- China
- Prior art keywords
- color steel
- anchor bar
- movable color
- steel
- concrete foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
It the utility model is related to movable plank house typhoon protection bracing means technical field, especially one kind carries out itself typhoon protection bracing means using movable color steel foundations plinth, including anchor bar, the anchor bar sets and is embedded in concrete foundation along center line of wall outside movable color steel room both sides, the movable color steel room is arranged on the top of concrete foundation, the movable color steel room includes multiple columns for being vertically arranged in wallboard side and is arranged on the roof boarding at top, is respectively connected with fixed steel bars and reinforcing bar draw ring described in both sides on anchor bar.The utility model has the advantages of easy to operate, safe, practicality is high, while anti-typhoon capacity is improved, device is visually integrated with movable color steel room, it is not take up any beyond movable color steel room using space, it is more convenient for using, and it can be reused after the material dismounting used in the present apparatus, save cost.
Description
Technical field
Movable plank house typhoon protection bracing means technical field is the utility model is related to, more particularly to one kind utilizes the color steel of activity
Board house basis carries out itself typhoon protection bracing means.
Background technology
At present, the interim office occupancy during China's engineering construction, interim life residential occupancy and job site
Temporary house generally uses movable color steel room, and its major advantage is:It is convenient to assemble and disassemble it is quick, the completion time of project is short, can be project
Offer powerful guarantee is provided into operation;Low cost, material can be used in turn, and can be that project saves construction cost.
3.2 ten thousand kilometers of China coastline total length, sea frontier zone is wide, 1.8 ten thousand kilometers of the continent edge from Liaoning to Guangxi
May all there be Landed Typhoon in Haiti area, and region of Southeast is even more frequently to be encroached on by typhoon.According to statistics, on northwest Pacific edge
In bank country, China is the most country of typhoon, average annual 9.2, occurs mainly in 7~September part.Work is built in coastal cities
The movable color steel room selected in journey construction is easily destroyed because of its own shortcoming by typhoon, and the energy that typhoon contains is huge, and
The meteorological model phenomenons such as heavy rain, strong wind, billow, strong tide that invariably accompany while occur, cause office equipment property loss, engineering
Data invades wet destruction and nearby life human life causes safely danger to garrisoning personnel and board house.
Stable firm, coastal cities construction project activity color steel room erection construction is applied to ensure that construction project faces to build
It must consider and plan in advance, typhoon protection reinforcement measure device is set in carry out activity color steel room foundation construction, in order to
The construction and installation of typhoon protection bracing means are once constructed in place when installation is set up in the foundation construction of movable color steel room, board house, typhoon
Only the firm situation of bracing means need to be checked before arriving.
Utility model content
The purpose of this utility model is to solve the shortcomings that consolidation effect is not ideal enough present in prior art, and is carried
The one kind gone out carries out itself typhoon protection bracing means using movable color steel foundations plinth.
To achieve these goals, the utility model employs following technical scheme:
Design one kind carries out itself typhoon protection bracing means, including anchor bar using movable color steel foundations plinth, described
Anchor bar sets and is embedded in concrete foundation along center line of wall outside movable color steel room both sides, the movable color steel room
The top of concrete foundation is arranged on, the movable color steel room includes multiple columns for being vertically arranged in wallboard side and set
The roof boarding at top is put, is respectively connected with fixed steel bars and reinforcing bar draw ring described in both sides on anchor bar, the reinforcing bar draw ring
One end is embedded in concrete foundation, and the other end of reinforcing bar draw ring stays the outside for being located at concrete foundation;
The top button of the roof boarding is provided with ridge tiles, and the both sides of the roofing plate top surface are respectively along each parallel to ridge direction
Two row's angle steel are set, wherein a row is to be set close to ridge tiles, another row is to be set close to eaves, and the movable color steel room is relative
Answer the column of both sides and the intersection of roof boarding offers perforation, and it is common through there is steel wire in two corresponding side perforations
Rope, the both ends of the steel wire rope sequentially pass through angle steel and perforation and are connected with flower basket bolt, and steel wire penetrating flower basket bolt
Knot is fixed by multiple U-shaped cards afterwards, the one end of the flower basket bolt away from steel wire rope is located at outside concrete foundation with staying
Reinforcing bar draw ring connection.
Preferably, the fixed steel bars are arranged to annular anchor bar, and the annular anchor bar is embedded in coagulation soil matrix
In plinth, the annular position of the annular anchor bar be located on anchor bar, and on the annular position of annular anchor bar
Also button is provided with reinforcing bar draw ring.
Preferably, the fixed steel bars are arranged to annular anchor bar and tension rib, and one end of the tension rib is embedded in
It is connected in concrete foundation and with anchor bar, and the other end of tension rib stays the outside for being located at concrete foundation and welded with column
Connect.
Preferably, the steel wire rope is arranged to galvanized steel wire rope.
The utility model proposes one kind carry out itself typhoon protection bracing means using movable color steel foundations plinth, beneficial to effect
Fruit is:The utility model is visually integrated while anti-typhoon capacity is improved with movable color steel room, is not take up movable coloured silk
It is any beyond steel plate room to use space, the discrepancy of Working Life personnel and the image that single or colony are overall are not influenceed, and
Investigation before typhoon need to only check flower basket bolt fastening situation, easy to operate, quick, safe, very useful.And
It can be reused after the dismounting of the materials such as steel wire rope, flower basket bolt and roofing angle steel in the present apparatus, be embedded in movable color steel room
Anchor bar in basis, recyclable processing is cost-effective when movable color steel room is removed and abolishes base concrete, is worth carrying
Advocate.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of carry out itself typhoon protection bracing means using movable color steel foundations plinth
Structural representation;
Fig. 2 be the utility model proposes a kind of carry out itself typhoon protection bracing means using movable color steel foundations plinth
Bottom side structural representation;
Fig. 3 be the utility model proposes a kind of carry out itself typhoon protection bracing means using movable color steel foundations plinth
Overall structure diagram;
Fig. 4 is the B portions enlarged drawing in Fig. 3;
Fig. 5 be the utility model proposes a kind of carry out itself typhoon protection bracing means using movable color steel foundations plinth
Tie bar structure schematic diagram.
In figure:Ridge tiles 1, angle steel 2, steel wire rope 3, roof boarding 4, U-shaped card 5, flower basket bolt 6, column 7, reinforcing bar draw ring 8, anchor
Gu reinforcing bar 9, annular anchor bar 10, concrete foundation 11, perforation 12, tension rib 13.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-4, one kind carry out itself typhoon protection bracing means, including anchor bar using movable color steel foundations plinth
9, anchor bar 9 sets and is embedded in concrete foundation 11, movable color steel along center line of wall outside movable color steel room both sides
Room is arranged on the top of concrete foundation 11, movable color steel room include multiple columns 7 for being vertically arranged in wallboard side and
The roof boarding 4 at top is arranged on, is respectively connected with fixed steel bars and reinforcing bar draw ring 8 on both sides anchor bar 9, the one of reinforcing bar draw ring 8
End is embedded in concrete foundation 11, and the other end of reinforcing bar draw ring 8 stays the outside for being located at concrete foundation 11, and fixed steel bars are set
Annular anchor bar 10 is set to, annular anchor bar 10 is embedded in concrete foundation 11, the ring part of annular anchor bar 10
Position be located on anchor bar 9, and also button is provided with reinforcing bar draw ring 8 on the annular position of annular anchor bar 10.
The top button of roof boarding 4 is provided with ridge tiles 1, and edge is respectively set parallel to ridge direction respectively for the both sides of the top surface of roof boarding 4
Two row's angle steel 2, wherein a row is to be set close to ridge tiles 1, another row is to be set close to eaves, the movable corresponding both sides in color steel room
The intersection of column 7 and roof boarding 4 offer perforation 12, it is and common through there is steel wire rope in two corresponding side perforations 12
3, steel wire rope 3 is arranged to galvanized steel wire rope, and the intensity of galvanized steel wire rope is more preferable and has preferable corrosion resistance, can make steel wire
The service life of rope 3 is longer, and the both ends of steel wire rope 3 sequentially pass through angle steel 2 and perforation 12 and are connected with flower basket bolt 6, and steel
Cord 3 is fixed knot by multiple U-shaped cards 5 after passing through flower basket bolt 6, and the one end of flower basket bolt 6 away from steel wire rope 3 is set with staying
Reinforcing bar draw ring 8 outside concrete foundation 11 connects.
Reference picture 5, it is with a upper embodiment only difference is that fixed as another preferred embodiment of the present utility model
Steel-bar arrangement is annular anchor bar 10 and tension rib 13, one end of tension rib 13 be embedded in concrete foundation 11 and with anchoring
Reinforcing bar 9 connects, and the other end of tension rib 13 stays the outside for being located at concrete foundation 11 and welded with column 7, and so setting can
Further strengthen the intensity that is connected firmly between board house and concrete foundation 11 according to actual use demand.
The utility model is by pre-buried anchor bar 9, annular anchoring in movable color steel foundations plinth concrete construction
Reinforcing bar 10, tension rib 13 etc., with steel wire rope 3, U-shaped card 5, flower basket bolt 6, angle steel 2 etc. after the installation of movable color steel room
Whole movable color steel room is fastenedly connected with basis by roofing and is integrated.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (4)
1. one kind carries out itself typhoon protection bracing means, including anchor bar (9), the anchoring using movable color steel foundations plinth
Reinforcing bar (9) sets along center line of wall outside movable color steel room both sides and is embedded in concrete foundation (11), the color steel of activity
Board house is arranged on the top of concrete foundation (11), and the movable color steel room is vertically arranged in the vertical of wallboard side including multiple
Post (7) and the roof boarding (4) for being arranged on top, it is characterised in that anchor bar described in both sides is respectively connected with fixed steel on (9)
Muscle and reinforcing bar draw ring (8), one end of the reinforcing bar draw ring (8) is embedded in concrete foundation (11), and reinforcing bar draw ring (8) is another
Stay the outside for being located at concrete foundation (11) in one end;
The top button of the roof boarding (4) is provided with ridge tiles (1), and the both sides of roof boarding (4) top surface are respectively along parallel to ridge
Direction respectively sets two row's angle steel (2), wherein a row is to be set close to ridge tiles (1), another row is to be set close to eaves, the activity
The column (7) of the corresponding both sides in color steel room offers perforation (12), and corresponding both sides with the intersection of roof boarding (4)
Common through there is steel wire rope (3) in perforation (12), the both ends of the steel wire rope (3) sequentially pass through angle steel (2) and perforation (12)
And be connected with flower basket bolt (6), and steel wire rope (3) pass through flower basket bolt (6) after knot is fixed by multiple U-shaped cards (5), institute
The one end of flower basket bolt (6) away from steel wire rope (3) is stated with staying the reinforcing bar draw ring (8) being located at outside concrete foundation (11) to be connected.
2. one kind according to claim 1 carries out itself typhoon protection bracing means using movable color steel foundations plinth, it is special
Sign is that the fixed steel bars are arranged to annular anchor bar (10), and the annular anchor bar (10) is embedded in coagulation soil matrix
In plinth (11), the annular position of the annular anchor bar (10) be located on anchor bar (9), and annular anchor bar
(10) also button is provided with reinforcing bar draw ring (8) on annular position.
3. one kind according to claim 2 carries out itself typhoon protection bracing means using movable color steel foundations plinth, it is special
Sign is that the fixed steel bars are arranged to annular anchor bar (10) and tension rib (13), and one end of the tension rib (13) is buried
It is located in concrete foundation (11) and is connected with anchor bar (9), and the other end of tension rib (13) stays and is located at concrete foundation
(11) outside simultaneously welded with column (7).
4. one kind according to claim 1 carries out itself typhoon protection bracing means using movable color steel foundations plinth, it is special
Sign is that the steel wire rope (3) is arranged to galvanized steel wire rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720160221.4U CN206753103U (en) | 2017-02-22 | 2017-02-22 | One kind carries out itself typhoon protection bracing means using movable color steel foundations plinth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720160221.4U CN206753103U (en) | 2017-02-22 | 2017-02-22 | One kind carries out itself typhoon protection bracing means using movable color steel foundations plinth |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206753103U true CN206753103U (en) | 2017-12-15 |
Family
ID=60608692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720160221.4U Expired - Fee Related CN206753103U (en) | 2017-02-22 | 2017-02-22 | One kind carries out itself typhoon protection bracing means using movable color steel foundations plinth |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206753103U (en) |
-
2017
- 2017-02-22 CN CN201720160221.4U patent/CN206753103U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109024896B (en) | Double-deck crashproof assembled steel construction truss reinforcing bar processing prevents pounding canopy | |
CN203487803U (en) | Safety protection structure for elevator shaft construction | |
CN206753103U (en) | One kind carries out itself typhoon protection bracing means using movable color steel foundations plinth | |
CN206972259U (en) | A kind of movable guard rail of hydraulic pressure inverted arch trestle | |
CN210066543U (en) | Wind-proof sound barrier | |
CN210263929U (en) | A preformed hole template for building civil engineering | |
CN204001220U (en) | A kind of steel structure node member | |
CN112227809A (en) | 5G communication network communication tower | |
CN204186086U (en) | Movable plank house bracing means | |
CN207194487U (en) | Piping lane engineering construction ceiling | |
CN206053545U (en) | Simple construction protection hurdle | |
CN213115585U (en) | Stable form bearing structure that building engineering used | |
CN212507305U (en) | High-altitude operation platform applied to large-span factory building | |
CN207960030U (en) | Distribution box protection canopy with assembling type base | |
CN107965170A (en) | Distribution box protection canopy with assembling type base | |
CN211736691U (en) | Foundation ditch safety device based on road engineering | |
CN208763473U (en) | A kind of cooling tower | |
CN203961373U (en) | Switchbox protection canopy | |
CN207749859U (en) | A kind of trestle support system for structure floor operation in Large-scale Hoisting equipment | |
CN208329667U (en) | A kind of horizontal hard protection system of integrated form floor edge | |
CN211341839U (en) | Construction elevator is with protection canopy | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN216866072U (en) | High-voltage wire protection safety frame for sea engineering | |
CN106049888A (en) | Rain-proof shed for construction in open cut pit | |
CN202047419U (en) | Foundation bottom plate with column cap of beamless underground parking garage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171215 Termination date: 20200222 |