CN112227809A - 5G communication network communication tower - Google Patents

5G communication network communication tower Download PDF

Info

Publication number
CN112227809A
CN112227809A CN202011324023.XA CN202011324023A CN112227809A CN 112227809 A CN112227809 A CN 112227809A CN 202011324023 A CN202011324023 A CN 202011324023A CN 112227809 A CN112227809 A CN 112227809A
Authority
CN
China
Prior art keywords
fixedly connected
steel
top end
sealing door
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011324023.XA
Other languages
Chinese (zh)
Inventor
杨智森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011324023.XA priority Critical patent/CN112227809A/en
Publication of CN112227809A publication Critical patent/CN112227809A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2238Sockets or holders for poles or posts to be placed on the ground
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B5/00Doors, windows, or like closures for special purposes; Border constructions therefor
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06CLADDERS
    • E06C9/00Ladders characterised by being permanently attached to fixed structures, e.g. fire escapes
    • E06C9/02Ladders characterised by being permanently attached to fixed structures, e.g. fire escapes rigidly mounted
    • E06C9/04Ladders characterised by being permanently attached to fixed structures, e.g. fire escapes rigidly mounted in the form of climbing irons or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention provides a 5G communication network communication tower, which relates to the field of communication towers and comprises a lightning arrester, a first connecting device, a ladder stand device, a second connecting device and a third connecting device, wherein the top end of the third connecting device is fixedly connected with the second connecting device; this communication tower opens the second through connecting the handle and seals a door, and the staff scrambles through the inside connection semi-ring of cat ladder sleeve and footboard, makes things convenient for the staff to scramble the communication tower, reduces the probability that dangerous appears to the staff.

Description

5G communication network communication tower
Technical Field
The invention relates to the technical field of communication towers, in particular to a 5G communication network communication tower.
Background
The communication tower belongs to a signal transmitting tower, also called a signal transmitting tower or a signal tower. The communication tower is a high-rise structure for installing communication antenna, and features high structure, relatively small cross section and transverse load.
The communication tower mainly comprises a tower body, a platform, a lightning rod, a ladder stand, an antenna support and other steel components. The main body of the existing communication tower is made of steel materials in the component process, and the integral structure of the communication tower needs to be galvanized or subjected to other anti-corrosion treatment after the components are finished so as to ensure the normal use of the communication tower. However, the communication tower subjected to the anti-corrosion treatment is easily influenced by weather, the tower body of the communication tower is easily condensed with water vapor, and frost is easily condensed in winter, so that great difficulty is brought to maintenance and detection work; when the existing communication tower is used for overhauling, a worker is required to directly climb to the tower top to detect a lightning rod, an antenna and the like, and the worker is required to climb the tower body to detect the tower body, so that the communication tower has high danger.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention discloses a 5G communication network communication tower to solve the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: a G communication network communication tower comprises a lightning arrester, a first connecting device, a ladder stand device, a second connecting device and a third connecting device, wherein the top end of the third connecting device is fixedly connected with the second connecting device, the top end of the second connecting device is fixedly connected with the first connecting device, the top end of the first connecting device is fixedly connected with the lightning arrester, the first connecting device comprises a first transition table, a first installation through hole is formed in the middle of the top end of the first transition table, the ladder stand device is fixedly installed in the first installation through hole and comprises a ladder stand sleeve, the top of the ladder stand sleeve is fixedly connected with a first connecting plate, a first sliding groove is formed in the top end of the first connecting plate, a first sliding boss is slidably installed in the first sliding groove, the bottom end of the first sliding boss is fixedly connected with a first sealing door, and the bottom end of the first sealing door is slidably connected with a positioning connecting ring, the positioning connection device is characterized in that a connection sliding groove is formed in the top end of the positioning connection ring, a second seal door is connected to the inside of the connection sliding groove in a sliding mode, a second connecting plate is connected to the bottom end of the second seal door in a sliding mode, two positioning plates are fixedly connected to two sides of the top end of the first connecting plate, a protective cover is arranged between the positioning plates, the back of the protective cover is rotatably connected with a turnover shaft, and a crawling ladder sleeve is fixedly connected to the.
Preferably, the third connecting device comprises a fixed foundation, the four corners of the top of the fixed foundation are fixedly embedded with supporting steel columns, the supporting steel columns are adjacent to each other, the supporting steel columns are fixedly connected with supporting steel structures, and the supporting steel structures are adjacent to each other and fixedly connected with connecting beams.
Preferably, the support steel constructs including connecting horizontal steel, it supports upright steel to connect horizontal steel bottom both sides fixedly connected with support, connect the first fixed oblique steel pole of horizontal steel top both sides fixedly connected with, two the fixed oblique steel pole of first fixed oblique steel pole bottom fixedly connected with second, the fixed oblique steel pole of second fixed oblique steel pole bottom fixedly connected with third.
Preferably, the second connecting device comprises a second transition table, a second installation through hole is formed in the middle of the top end of the second transition table, four oblique steel rods are fixedly connected to the top end of the second transition table, two adjacent oblique steel rods are fixedly connected to the bottom of the second transition table, the third transverse steel rod is fixedly connected to the top end of the third transverse steel rod, the second transverse steel rod is fixedly connected to the top end of the third transverse steel rod, the oblique steel rods are fixedly connected to the middle of the top end of the second transverse steel rod, and the first transverse steel rod is fixedly connected to the top end of the oblique steel rod.
Preferably, four support batter posts of first transition platform top fixedly connected with, adjacent two equal fixedly connected with connection horizontal pole, four support batter post top fixedly connected with mounting platform, a plurality of support stands of mounting platform top avris fixedly connected with, it is a plurality of support stand middle part fixedly connected with protection go-between, fixedly connected with signal transmitter in the middle of the mounting platform top.
Preferably, the lightning arrester comprises a fixed connecting ring, four connecting inclined columns and four connecting supports are fixedly connected to the top ends of the fixed connecting ring, a lightning rod is fixedly connected to the top ends of the connecting supports, and the bottom end of the fixed connecting ring is fixedly connected to the top end of the supporting stand column.
Preferably, a plurality of connecting semi-rings are fixedly connected with the inner wall of the ladder stand sleeve at equal intervals, a pedal is fixedly connected with the middle of each connecting semi-ring, the first connecting plate is embedded in the first mounting through hole, and the protective cover is rotatably mounted at the top of the inner wall of the ladder stand sleeve.
Preferably, the first sealing door is arranged at the top of the outer wall of the crawling ladder sleeve, a control clamping groove is formed in one side of the inner wall of the first sealing door, an arc-shaped sliding block is fixedly connected to the bottom of the first sealing door, and the arc-shaped sliding block is connected to the inside of the connecting sliding groove in a sliding mode.
Preferably, the positioning connecting ring is fixedly connected to the middle of the outer wall of the ladder stand sleeve, the second sealing door is arranged between the positioning connecting ring and the second connecting plate, an arc-shaped sliding block is fixedly connected to the bottom of the second sealing door, the arc-shaped sliding block is connected to the top end of the second connecting plate in a sliding mode, and a sliding block sliding groove is formed in the top end of the second connecting plate which is arranged on the top end of the fixed foundation.
Preferably, the middle part of one side of the outer wall of the second sealing door is fixedly connected with a connecting handle, one side of the outer wall of the ladder stand sleeve is fixedly connected with a connecting convex edge, and the middle part of one side of the ladder stand sleeve, away from the connecting convex edge, is fixedly connected with a fixing handle.
The invention discloses a 5G communication network communication tower, which has the following beneficial effects:
1. the second sealing door of the communication tower is opened through the connecting handle, and workers climb through the connecting semi-rings and the pedals in the ladder climbing sleeve, so that the communication tower is convenient for the workers to climb, and the probability of danger of the workers is reduced; if the worker needs to enter the second transition table, the first sealing door is opened through the control clamping groove, and the worker enters the second transition table to detect the steel structure assembly of the second connecting device; if the worker needs to enter the first transition table, the worker climbs to the top of the ladder stand sleeve through the pedal, opens the protective cover, enters the first transition table, detects the first connecting device, then climbs to the mounting platform through the connecting cross rods, and detects the signal transmitter and the lightning arrester, so that the overall detection work is more convenient, and the assembly of the overall communication tower is facilitated; accomplish the testing work back, the staff returns ground through the cat ladder sleeve, and close the visor in proper order, first a door and second a door, seal whole cat ladder device through fixed handle and connection handle at last, when the staff need not detect, directly seal the cat ladder device and lock, prevent that irrelevant personnel from climbing the communication tower, danger appears, whole cat ladder device can be sealed simultaneously, can not receive natural weather's influence, when needing to carry out body of the tower detection work, need not climb the body of the tower, provide more protection for the staff.
2. This communication tower is divided into the three with whole communication tower body through first connecting device, second connecting device and third connecting device, and the staff can carry out the subsection through fixed ground, first transition platform, second transition platform and mounting platform to each component of communication tower and detect, does not need the staff to go to climb the body of the tower again, reduces the danger coefficient that the staff worked.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of a lightning arrester according to the present invention;
FIG. 3 is a schematic structural diagram of a first connecting device according to the present invention;
FIG. 4 is a schematic view of a ladder climbing device according to the present invention;
FIG. 5 is an enlarged view of the structure at A in FIG. 4 according to the present invention;
FIG. 6 is an enlarged view of the structure at B in FIG. 4 according to the present invention;
FIG. 7 is a schematic view of a second connecting device according to the present invention;
fig. 8 is a schematic structural view of a third connecting device according to the present invention.
In the figure: 1. a lightning arrester; 2. a first connecting means; 3. a ladder climbing device; 4. a second connecting means; 5. a third connecting device; 101. a lightning rod; 102. connecting a support; 103. connecting the inclined columns; 201. a signal transmitter; 202. a protective connecting ring; 203. supporting the upright post; 204. mounting a platform; 205. connecting the cross bars; 206. supporting the batter post; 207. a first mounting through hole; 208. a first transition table; 301. positioning a plate; 302. a protective cover; 303. a first connecting plate; 304. a ladder climbing sleeve; 305. a first sealing door; 306. connecting the convex edge; 307. a second sealing door; 308. a second connecting plate; 309. fixing a handle; 310. a connecting handle; 311. a turning shaft; 312. a first sliding boss; 313. a first chute; 314. a control card slot; 315. connecting the half rings; 316. a pedal; 317. positioning the connecting ring; 318. connecting the sliding chute; 401. a first transverse steel; 402. supporting the inclined steel rod; 403. connecting the inclined steel rods; 404. second transverse steel; 405. connecting steel structures; 406. third transverse steel; 407. a second mounting through hole; 408. a second transition table; 501. connecting the cross beam; 502. supporting a steel column; 503. supporting the steel structure; 504. fixing a foundation; 5031. connecting the transverse steel; 5032. a first fixed diagonal steel bar; 5033. supporting vertical steel; 5034. a second fixed diagonal steel bar; 5035. and a third fixed oblique steel rod.
Detailed Description
The embodiment of the invention discloses a 5G communication network communication tower, which comprises a lightning arrester 1, a first connecting device 2, a ladder climbing device 3, a second connecting device 4 and a third connecting device 5, wherein the top end of the third connecting device 5 is fixedly connected with the second connecting device 4, the top end of the second connecting device 4 is fixedly connected with the first connecting device 2, the top end of the first connecting device 2 is fixedly connected with the lightning arrester 1, the first connecting device 2 comprises a first transition table 208, a first mounting through hole 207 is formed in the middle of the top end of the first transition table 208, the ladder climbing device 3 is fixedly mounted in the first mounting through hole 207, the ladder climbing device 3 comprises a ladder climbing sleeve 304, the ladder climbing sleeve 304 penetrates through the first connecting device 2, the second connecting device 4 and the third connecting device 5, the top of the ladder climbing sleeve 304 is fixedly connected with a first connecting plate 303, the top end of the first connecting plate 303 is provided with a first sliding groove 313, a first sliding boss 312 is slidably mounted in the first sliding groove 313, a first sealing door 305 is fixedly connected to the bottom end of the first sliding boss 312, a positioning connecting ring 317 is slidably connected to the bottom end of the first sealing door 305, a connecting sliding groove 318 is formed in the top end of the positioning connecting ring 317, a second sealing door 307 is slidably connected to the inside of the connecting sliding groove 318, the second sealing door 307 is arranged at the bottom of the outer wall of the ladder climbing sleeve 304, a second connecting plate 308 is slidably connected to the bottom end of the second sealing door 307, positioning plates 301 are fixedly connected to two sides of the top end of the first connecting plate 303, a protective cover 302 is arranged between the two positioning plates 301, a turnover shaft 311 is rotatably connected to the back of the protective.
The third connecting device 5 comprises a fixed foundation 504, supporting steel columns 502 are fixedly embedded at four corners of the top end of the fixed foundation 504, a supporting steel structure 503 is fixedly connected between every two adjacent supporting steel columns 502, and a connecting beam 501 is fixedly connected between every two adjacent supporting steel structures 503. The supporting steel structure 503 includes a connecting horizontal steel 5031, two sides of the bottom end of the connecting horizontal steel 5031 are fixedly connected with supporting vertical steel 5033, two sides of the top end of the connecting horizontal steel 5031 are fixedly connected with first fixed oblique steel rods 5032, the bottom ends of the two first fixed oblique steel rods 5032 are fixedly connected with second fixed oblique steel rods 5034, the bottom end of the second fixed oblique steel rod 5034 is fixedly connected with a third fixed oblique steel rod 5035, the top ends of the four supporting steel columns 502 are fixedly connected to the bottom end of the second transition table 408, the top ends of the two first fixed oblique steel rods 5032 in each supporting steel structure 503 are fixedly connected, the top ends of the two first fixed oblique steel rods 5032 are fixedly connected to the bottom end of the second transition table 408, the middle of the two first fixed oblique steel rods 5032 are connected to the top end of the supporting steel column 502 through a fourth fixed oblique steel rod, and two ends of the connecting beam 501 are fixedly connected with first.
The second connecting device 4 comprises a second transition table 408, a second mounting through hole 407 is formed in the middle of the top end of the second transition table 408, four supporting oblique steel rods 402 are fixedly connected to the top end of the second transition table 408, a third transverse steel 406 is fixedly connected to the bottom between two adjacent supporting oblique steel rods 402, four third transverse steels 406 are fixedly connected to the top end of the second transition table 408, a connecting steel structure 405 is fixedly connected to the top end of the third transverse steel 406, the four connecting steel structures 405 are all arranged in a W shape, a second transverse steel 404 is fixedly connected to the top end of the connecting steel structure 405, four second transverse steels 404 are respectively arranged in the middle between two adjacent supporting oblique steel rods 402, a connecting oblique steel rod 403 is fixedly connected to the middle of the top end of the second transverse steel 404, a first transverse steel 401 is fixedly connected to the top end of the connecting oblique steel rod 403, four first transverse steels 401 are respectively arranged at the top between two adjacent supporting oblique steel rods 402, and the top ends of the four supporting oblique steel rods 402 are fixedly connected to the bottom, the top ends of the four first transverse steels 401 are fixedly connected to the bottom end of the first transition table 208.
Four support batter posts 206 of first transition platform 208 top fixedly connected with, equal fixedly connected with connects horizontal pole 205 between two adjacent support batter posts 206, do not set up between two positive support batter posts 206 of first connecting device 2 and connect horizontal pole 205, four support batter post 206 top fixedly connected with mounting platform 204, a plurality of support stands 203 of mounting platform 204 top avris fixedly connected with, a plurality of support stands 203 middle part fixedly connected with protection go-between 202, fixedly connected with signal transmitter 201 in the middle of the mounting platform 204 top. Lightning arrester 1 includes the fixed connection ring, and four connection batter posts 103 of fixed connection ring top end fixedly connected with, four connection batter posts 103 top fixedly connected with connect support 102, connect support 102 and set up in signal transmitter 201 top, connect support 102 top fixedly connected with lightning rod 101, fixed connection ring bottom end fixed connection is on support post 203 top.
The inner wall of the ladder climbing sleeve 304 is fixedly connected with a plurality of connecting half rings 315 at equal intervals, the middle of each connecting half ring 315 is fixedly connected with a pedal 316, the first connecting plate 303 is embedded in the first mounting through hole 207, and the protective cover 302 is rotatably mounted on the top of the inner wall of the ladder climbing sleeve 304. First sealing door 305 sets up at cat ladder sleeve 304 outer wall top, and control slot 314 has been seted up to first sealing door 305 inner wall one side, and first sealing door 305 bottom fixedly connected with arc slider, arc slider sliding connection are inside connecting spout 318.
The positioning connecting ring 317 is fixedly connected to the middle of the outer wall of the ladder stand sleeve 304, the positioning connecting ring 317 is fixedly embedded in the second mounting through hole 407, the second sealing door 307 is arranged between the positioning connecting ring 317 and the second connecting plate 308, an arc-shaped sliding block is fixedly connected to the bottom of the second sealing door 307, the arc-shaped sliding block is slidably connected to the top end of the second connecting plate 308, a sliding block sliding groove is formed in the top end of the second connecting plate 308, and the second connecting plate 308 is arranged on the top end. Second is sealed door 307 outer wall one side middle part fixedly connected with and is connected handle 310, and cat ladder sleeve 304 outer wall one side fixedly connected with connects chimb 306, connects chimb 306 and keeps away from the fixed handle 309 of one side middle part fixedly connected with of cat ladder sleeve 304, and fixed handle 309 is the same with connection handle 310 size and corresponds the setting.
The working principle is as follows:
the architecture operation one, please refer to fig. 1 and 8;
firstly, four support steel columns 502 are embedded at four corners of the top end of a fixed foundation 504, then support vertical steel 5033 is embedded between two adjacent support steel columns 502, the top end of the support vertical steel 5033 is fixedly connected with a horizontal steel 5031, then a second fixed inclined steel rod 5034 and a third fixed inclined steel rod 5035 are fixedly connected between the support vertical steel 5033 and the support steel column 502 which are close to each other, the second fixed inclined steel rod 5034 and the third fixed inclined steel rod 5035 are fixedly connected at one end close to the support vertical steel 5033, the other end of the third fixed inclined steel rod 5035 is fixedly connected at the bottom of the support steel column 502, the other end of the second fixed inclined steel rod 5034 is fixedly connected with a first fixed inclined steel rod 5032 and fixedly connected to the support steel column 502, and the middle of the two first fixed inclined steel rods 5032 is connected to the top end of the support steel column 502 through a fourth fixed inclined steel rod;
after the supporting steel structures 503 are constructed between the two adjacent supporting steel columns 502, the two adjacent supporting steel structures 503 are fixedly connected through the connecting beam 501;
the architecture operation two, please refer to fig. 1 and 7;
the top ends of the four supporting steel columns 502 are fixedly connected with a second transition table 408, then eight first fixed oblique steel rods 5032 are fixedly connected to the bottom end of the second transition table 408, and reinforcing ribs can be added through the connecting cross beam 501 to be fixedly connected with the second transition table 408;
then, four supporting oblique steel rods 402 are fixedly connected to the top end of a second transition table 408, a third transverse steel 406 is fixedly connected to the bottom between every two adjacent supporting oblique steel rods 402, the bottom ends of the four third transverse steels 406 are fixedly connected to the top end of the second transition table 408, the top end of the third transverse steel 406 is fixedly connected with a connecting steel structure 405, the top end of the connecting steel structure 405 is fixedly connected with a second transverse steel 404, the four second transverse steels 404 are respectively arranged in the middle between every two adjacent supporting oblique steel rods 402, the middle of the top end of the second transverse steel 404 is fixedly connected with an oblique steel rod 403, the top end of the connecting oblique steel rod 403 is fixedly connected with a first transverse steel 401, and the four first transverse steels 401 are respectively arranged at the top between every two adjacent supporting oblique steel rods 402;
the architecture operation is three, please refer to fig. 1 and 3;
the top ends of four supporting inclined steel rods 402 are fixedly connected to the bottom end of the first transition table 208, and the top ends of four first transverse steels 401 are fixedly connected to the bottom end of the first transition table 208;
then, four supporting inclined columns 206 are fixedly connected to the top end of the first transition table 208, a connecting cross rod 205 is fixedly connected between every two adjacent supporting inclined columns 206, and the connecting cross rod 205 is not arranged between every two supporting inclined columns 206 on the front surface of the first connecting device 2;
then, the top ends of the four supporting oblique columns 206 are fixedly connected with an installation platform 204, the edge side of the top end of the installation platform 204 is fixedly connected with a plurality of supporting upright columns 203, the middle parts of the plurality of supporting upright columns 203 are fixedly connected with a protective connecting ring 202, and then the middle parts of the top ends of the installation platform 204 are fixedly connected with a signal emitter 201;
the architecture operation is four, please refer to fig. 1 and 2;
the top ends of the plurality of supporting upright posts 203 are connected with fixed connecting rings, the top ends of the fixed connecting rings are fixedly connected with four connecting inclined posts 103, the top ends of the four connecting inclined posts 103 are fixedly connected with a connecting support 102, the connecting support 102 is arranged above the signal transmitter 201, and the top end of the connecting support 102 is fixedly connected with a lightning rod 101;
the architecture operation is five, please refer to fig. 1, fig. 2, and fig. 3;
after the framework of the complete body communication tower is installed, the ladder climbing device 3 is installed in the communication tower, the second connecting plate 308 is fixedly installed at the top of the fixed foundation 504, then the top end of the ladder climbing sleeve 304 penetrates through the first installation through hole 207 and the second installation through hole 407, the bottom end of the ladder climbing sleeve 304 is fixedly installed at the top end of the second connecting plate 308, then the second sealing door 307 is installed at the top of the second connecting plate 308, then the positioning connecting ring 317 is installed at the top of the second sealing door 307, the positioning connecting ring 317 is fixedly installed in the second installation through hole 407, then the first sealing door 305 is installed at the top end of the positioning connecting ring 317, then the first connecting plate 303 is installed at the top end of the first sealing door 305, the first connecting plate 303 is fixedly installed in the first installation through hole 207, and finally the protective cover 302 is rotatably installed at the top end of;
please refer to fig. 1, fig. 2, fig. 3, fig. 4, and fig. 5;
the second door 307 is first opened by means of the connecting handle 310 and the worker climbs by means of the connecting half-ring 315 and the pedal 316 inside the ladder climbing sleeve 304;
if the worker needs to enter the second transition table 408, the first sealing door 305 is opened through the control clamping groove 314, and the worker enters the second transition table 408 to detect the steel structure component of the second connecting device 4;
if the worker needs to enter the first transition table 208, climb to the top of the ladder climbing sleeve 304 through the pedals 316, open the protective cover 302, enter the first transition table 208, detect the first connecting device 2, then climb to the mounting platform 204 through the connecting cross rods 205, and detect the signal emitter 201 and the lightning arrester 1;
after the detection work has been completed, the person returns to the ground via the ladder climbing sleeve 304 and closes the protective cover 302, the first closing door 305 and the second closing door 307 in that order, and finally closes the entire ladder climbing device 3 via the fixed handle 309 and the connecting handle 310.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (10)

1. The utility model provides a 5G communication network communication tower, includes lightning arrester (1), first connecting device (2), cat ladder device (3), second connecting device (4) and third connecting device (5), its characterized in that: the top end of the third connecting device (5) is fixedly connected with a second connecting device (4), the top end of the second connecting device (4) is fixedly connected with a first connecting device (2), the top end of the first connecting device (2) is fixedly connected with a lightning arrester (1), the first connecting device (2) comprises a first transition table (208), a first installation through hole (207) is formed in the middle of the top end of the first transition table (208), a ladder stand device (3) is fixedly installed in the first installation through hole (207), the ladder stand device (3) comprises a ladder stand sleeve (304), the top of the ladder stand sleeve (304) is fixedly connected with a first connecting plate (303), a first sliding groove (313) is formed in the top end of the first connecting plate (303), a first sliding boss (312) is slidably installed in the first sliding groove (313), and a first sealing door (305) is fixedly connected to the bottom end of the first sliding boss (312), first sealing door (305) bottom sliding connection has location go-between (317), connection spout (318) have been seted up on location go-between (317) top, connect inside sliding connection of spout (318) has second sealing door (307), second sealing door (307) bottom sliding connection has second connecting plate (308), first connecting plate (303) top both sides fixedly connected with locating plate (301), two be provided with between locating plate (301) visor (302), visor (302) dorsal rotation is connected with trip shaft (311), trip shaft (311) bottom fixedly connected with cat ladder sleeve (304).
2. The 5G communication network tower of claim 1, wherein: the third connecting device (5) comprises a fixed foundation (504), supporting steel columns (502) are fixedly buried at four corners of the top end of the fixed foundation (504), two adjacent supporting steel columns (502) are fixedly connected with supporting steel structures (503), and two adjacent supporting steel structures (503) are fixedly connected with connecting beams (501).
3. The 5G communication network tower of claim 2, wherein: the supporting steel structure (503) comprises connecting horizontal steel (5031), supporting vertical steel (5033) is fixedly connected to two sides of the bottom end of the connecting horizontal steel (5031), first fixed oblique steel rods (5032) are fixedly connected to two sides of the top end of the connecting horizontal steel (5031), second fixed oblique steel rods (5034) are fixedly connected to the bottom end of the first fixed oblique steel rods (5032), and third fixed oblique steel rods (5035) are fixedly connected to the bottom end of the second fixed oblique steel rods (5034).
4. The 5G communication network tower of claim 1, wherein: second connecting device (4) include second transition platform (408), second installation through-hole (407) have been seted up in the middle of second transition platform (408) top, four oblique steel pole (402) of support of second transition platform (408) top fixedly connected with, adjacent two bottom fixedly connected with third violently steel (406) between oblique steel pole (402) are supported, steel structure (405) is connected to third violently steel (406) top fixedly connected with, connect steel structure (405) top fixedly connected with second violently steel (404), fixedly connected with connects oblique steel pole (403) in the middle of second violently steel (404) top, connect first violently steel (401) of oblique steel pole (403) top fixedly connected with.
5. The 5G communication network tower of claim 1, wherein: first transition platform (208) top fixedly connected with supports batter post (206), adjacent two equal fixedly connected with between support batter post (206) connects horizontal pole (205), four support batter post (206) top fixedly connected with mounting platform (204), mounting platform (204) top avris fixedly connected with a plurality of support stands (203), and is a plurality of support stand (203) middle part fixedly connected with protection go-between (202), fixedly connected with signal transmitter (201) in the middle of mounting platform (204) top.
6. The 5G communication network tower of claim 1, wherein: the lightning arrester (1) comprises a fixed connecting ring, four connecting inclined columns (103) and four connecting inclined columns are fixedly connected to the top ends of the fixed connecting ring, a connecting support (102) is fixedly connected to the top ends of the connecting inclined columns (103), a lightning rod (101) is fixedly connected to the top ends of the connecting support (102), and the bottom ends of the fixed connecting ring are fixedly connected to the top ends of the supporting columns (203).
7. The 5G communication network tower of claim 1, wherein: the ladder stand sleeve (304) inner wall equidistance fixedly connected with a plurality of connecting semi-rings (315), fixedly connected with footboard (316) in the middle of connecting semi-ring (315), first connecting plate (303) inlay and establish inside first installation through-hole (207), visor (302) are rotated and are installed at ladder stand sleeve (304) inner wall top.
8. The 5G communication network tower of claim 1, wherein: first sealing door (305) sets up at cat ladder sleeve (304) outer wall top, control draw-in groove (314) have been seted up to first sealing door (305) inner wall one side, first sealing door (305) bottom fixedly connected with arc slider, arc slider sliding connection is inside connecting spout (318).
9. The 5G communication network tower of claim 1, wherein: the positioning connecting ring (317) is fixedly connected to the middle of the outer wall of the ladder stand sleeve (304), the second sealing door (307) is arranged between the positioning connecting ring (317) and the second connecting plate (308), the bottom of the second sealing door (307) is fixedly connected with an arc-shaped sliding block, the arc-shaped sliding block is connected to the top end of the second connecting plate (308) in a sliding mode and provided with a sliding block sliding groove, and the second connecting plate (308) is arranged on the top end of the fixed foundation (504).
10. The 5G communication network tower of claim 1, wherein: the middle part of one side of the outer wall of the second sealing door (307) is fixedly connected with a connecting handle (310), one side of the outer wall of the ladder climbing sleeve (304) is fixedly connected with a connecting convex edge (306), and the middle part of one side, far away from the ladder climbing sleeve (304), of the connecting convex edge (306) is fixedly connected with a fixing handle (309).
CN202011324023.XA 2020-11-23 2020-11-23 5G communication network communication tower Pending CN112227809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011324023.XA CN112227809A (en) 2020-11-23 2020-11-23 5G communication network communication tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011324023.XA CN112227809A (en) 2020-11-23 2020-11-23 5G communication network communication tower

Publications (1)

Publication Number Publication Date
CN112227809A true CN112227809A (en) 2021-01-15

Family

ID=74124420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011324023.XA Pending CN112227809A (en) 2020-11-23 2020-11-23 5G communication network communication tower

Country Status (1)

Country Link
CN (1) CN112227809A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113898235A (en) * 2021-08-30 2022-01-07 张新磊 Network communication tower for 5G communication
CN114482669A (en) * 2021-12-30 2022-05-13 电联工程技术股份有限公司 5G communication network communication tower

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2384084A1 (en) * 1977-03-16 1978-10-13 Icpp Sectional metal framed mast for telecommunications etc. - has maintenance ladder and is of braced triangular section in plain round steel bar
CN207960106U (en) * 2018-03-02 2018-10-12 南京盖迪电力器材有限公司 A kind of communications tower
CN109723268A (en) * 2018-12-30 2019-05-07 青海和众网络科技有限公司 A kind of wireless communication signal tower with safety climbing ladder
CN209228298U (en) * 2018-08-09 2019-08-09 湖北永润建设工程有限公司 A kind of architectural engineering disc type safety climbing ladder
CN110145160A (en) * 2019-05-24 2019-08-20 邵淦清 A kind of 5G communication network communications tower
CN211582164U (en) * 2019-07-23 2020-09-29 王丽霞 Special filing cabinet of economics

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2384084A1 (en) * 1977-03-16 1978-10-13 Icpp Sectional metal framed mast for telecommunications etc. - has maintenance ladder and is of braced triangular section in plain round steel bar
CN207960106U (en) * 2018-03-02 2018-10-12 南京盖迪电力器材有限公司 A kind of communications tower
CN209228298U (en) * 2018-08-09 2019-08-09 湖北永润建设工程有限公司 A kind of architectural engineering disc type safety climbing ladder
CN109723268A (en) * 2018-12-30 2019-05-07 青海和众网络科技有限公司 A kind of wireless communication signal tower with safety climbing ladder
CN110145160A (en) * 2019-05-24 2019-08-20 邵淦清 A kind of 5G communication network communications tower
CN211582164U (en) * 2019-07-23 2020-09-29 王丽霞 Special filing cabinet of economics

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113898235A (en) * 2021-08-30 2022-01-07 张新磊 Network communication tower for 5G communication
CN114482669A (en) * 2021-12-30 2022-05-13 电联工程技术股份有限公司 5G communication network communication tower

Similar Documents

Publication Publication Date Title
CN112227809A (en) 5G communication network communication tower
CN217500152U (en) Water patrol access way for connecting beam overhanging type pile foundation
CN208183773U (en) Building foundation pit water blocking platform
CN217925247U (en) Isolation guardrail convenient to build
CN107795185A (en) Chimney reinforces pylon high-altitude installation node security construction method
CN202731321U (en) Multifunctional movable shack at construction site
CN207406061U (en) A kind of aerial ready-package cabinet placement steel platform
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN112049503A (en) 5G iron tower safety device
CN213927700U (en) Machine room for long-life antenna installation
CN205955248U (en) Construction weather enclosure in open cut foundation ditch
CN215255023U (en) Lightning protection transmission line steel construction iron tower
JP3022359U (en) Beautification tower with stainless steel cover
CN213015484U (en) Assembled supporting construction is built in room
CN211473593U (en) Four-column angle steel comprehensive observation tower for forest ecological system positioning observation research station
CN220954572U (en) Rust-resistant device of scaffold
CN210013543U (en) Wire pole convenient to overhaul and maintain
CN211666427U (en) Assembled face limit protective apparatus
CN213039059U (en) Personnel warning device for building safety protection
CN215717779U (en) Light weather-proof protective equipment
CN211714740U (en) Internal-lifting type communication holding pole
CN215671872U (en) Debugging platform for subway electric hoist type flood-proof protective airtight door
CN217652309U (en) Anti-falling safety device for construction
CN221258979U (en) Rain-proof device of subway wind pavilion
CN220306725U (en) Block terminal protection canopy for construction site

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510000 room 504, No. 31, Fulan street, Xingnan Avenue, Nancun Town, Panyu District, Guangzhou City, Guangdong Province

Applicant after: Yang Zhisen

Address before: No. 30, Malian, wushixia neighborhood committee, Laolong Town, Longchuan County, Heyuan City, Guangdong Province, 517300

Applicant before: Yang Zhisen

CB02 Change of applicant information
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210115

WD01 Invention patent application deemed withdrawn after publication