CN201627362U - Suspended formwork support device for construction of steel structured concrete slabs - Google Patents

Suspended formwork support device for construction of steel structured concrete slabs Download PDF

Info

Publication number
CN201627362U
CN201627362U CN201020101222XU CN201020101222U CN201627362U CN 201627362 U CN201627362 U CN 201627362U CN 201020101222X U CN201020101222X U CN 201020101222XU CN 201020101222 U CN201020101222 U CN 201020101222U CN 201627362 U CN201627362 U CN 201627362U
Authority
CN
China
Prior art keywords
floor slab
concrete floor
steel structure
structure concrete
mould plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020101222XU
Other languages
Chinese (zh)
Inventor
郑蓉军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201020101222XU priority Critical patent/CN201627362U/en
Application granted granted Critical
Publication of CN201627362U publication Critical patent/CN201627362U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a suspended formwork support device for construction of steel structured concrete slabs, which comprises a formwork support cross beam, clamping pieces, fastening bolts, perpendicular lifting bolts, horizontal fastening bolts and the like. The formwork support cross beam is suspended on the lower flange of an H-type steel beam through the clamping pieces, the clamping pieces are fastened to the lower flange of the H-type steel beam through the fastening bolts, the vertical lifting bolts are used for adjusting the height of the formwork support beam, and the horizontal fastening bolts are used for horizontal positioning of the formwork support beam. Square woods and a formwork are mounted above the formwork support cross beam, so that formwork erection of the steel structured concrete slabs can be quickly and conveniently carried out.

Description

Steel structure concrete floor slab construction is with hanging mould plate supporting device
Technical field
The utility model relates to a kind of construction formwork bracing or strutting arrangement, relates in particular to a kind of steel structure concrete floor slab construction with hanging mould plate supporting device.
Background technology
Along with economic construction and social development, steel work is used more and more.In most of steel work, what floor adopted is profiled sheet concrete combined floor or concrete floor at present.The profiled sheet concrete combined floor is with the construction formwork of profiled sheet as floor, direct fluid concrete and forming thereon, advantage such as it is fast that it has installation rate, easy and simple to handle.The profiled sheet concrete combined floor is divided into combined and non-combined.Combined composite floor substitutes the floor slab bottoms reinforcing bar with profiled sheet simultaneously, participates in the stressed of floor, but must carry out flameproof protection to profiled sheet, and it is less that expensive flameproof protection expense makes combined composite floor use.But not combined composite floor only adopts profiled sheet to use as construction formwork, has caused waste economically, causes expense higher indirectly.
Along with country to the advocating of energy-conservation and low-carbon (LC) building, steel house has obtained greatly developing as the dwelling house system of environment protecting and power-saving.Because use habit that people are long-term and developer's cost control, steel house is not generally done furred ceiling, but the processing of plastering, obviously concrete floor has absolute predominance than profiled sheet composite floor in economical and use.
In the prior art, the job practices that directly adopts concrete floor is exactly directly to set up scaffold, and wooden form is installed then.
There is following shortcoming at least in above-mentioned prior art: workload is big, long construction period.
The utility model content
The purpose of this utility model provides a kind of steel structure concrete floor slab construction of steel structure concrete floor slab formwork erection that can carry out quickly and easily with hanging mould plate supporting device.
The purpose of this utility model is achieved through the following technical solutions:
Steel structure concrete floor slab construction of the present utility model comprises the template supporting traverse with hanging mould plate supporting device, and described template supporting traverse is suspended on the bottom flange of the H section steel beam of steel structure concrete floor slab.
The technical scheme that is provided by above-mentioned the utility model as can be seen, steel structure concrete floor slab construction described in the utility model is with hanging mould plate supporting device, because the template supporting traverse is suspended on the bottom flange of the H section steel beam of steel structure concrete floor slab, can carry out the steel structure concrete floor slab formwork erection quickly and easily.
Description of drawings
Fig. 1 is the plane structure schematic diagram of the utility model steel structure concrete floor slab construction with the suspension mould plate supporting device;
Fig. 2 is the sectional view of the A-A direction of Fig. 1;
Fig. 3 is the sectional view of the B-B direction of Fig. 1;
Fig. 4 is the sectional view of the C-C direction of Fig. 2.
The specific embodiment
Steel structure concrete floor slab construction of the present utility model is with hanging mould plate supporting device, and its preferable specific embodiment is:
Comprise the template supporting traverse, described template supporting traverse is suspended on the bottom flange of the H section steel beam of steel structure concrete floor slab.The two ends of template supporting traverse can be suspended on the bottom flange of two H section steel beams respectively by fastener.Can be provided with fastening bolt between the bottom flange of fastener and H section steel beam.
Fastener can have two, is suspended on the both sides of the bottom flange of H section steel beam respectively; Fastener also can have one, is suspended on a side of the bottom flange of H section steel beam.
Can be provided with the horizontal fixed bolt in the horizontal direction between fastener and the template supporting traverse, in the vertical direction can be provided with the vertical lift bolt.
The bottom of fastener is provided with square hole or hook, and the end of template supporting traverse is inserted in the square hole or hangs on the hook, and the horizontal fixed bolt is located on the sidewall of square hole or hook, and the vertical lift bolt is located on the diapire of square hole or hook.
In concrete the enforcement, template supporting traverse cross section can have any shape; The form of structure of fastener can be unrestricted, and template supporting traverse length can not be subjected to the restriction of H section steel beam spacing.
This bracing or strutting arrangement can have a plurality of, and mutual dislocation is placed between a plurality of bracing or strutting arrangements.Wherein, the fastener of the mutually close end of the template supporting traverse of adjacent two bracing or strutting arrangements can merge into a single whole.
One or more layers lumps of wood is installed in the top of template supporting traverse, and the top of the lumps of wood is provided with template.The concrete lumps of wood can have two-layer, is respectively the horizontal lumps of wood, vertical lumps of wood.
Steel structure concrete floor slab construction of the present utility model is with hanging plate device, is made up of template supporting traverse and fastener, fastening bolt, vertical lift bolt, horizontal fixed bolt etc.The template supporting traverse is suspended on H section steel beam bottom flange by fastener, and fastener is anchored on H shaped steel bottom flange by fastening bolt, and the vertical lift bolt is used to regulate the height of template supporting traverse, and the horizontal fixed bolt is used to regulate the horizontal location of template supporting traverse.The horizontal lumps of wood, vertical lumps of wood and template can directly be installed on this bracing or strutting arrangement.Have following beneficial effect:
But multilayer is constructed simultaneously, has improved operating efficiency;
The suspension technology makes the girder steel more reasonable stress, make template install, dismantle more quick and easy;
Be convenient to modularization and make, Construction Arrangement is more flexible, is beneficial to produce to promote;
Reusable, have better economic performance.
Also in conjunction with the accompanying drawings the application is described in detail below by specific embodiment:
As Fig. 1, Fig. 2, Fig. 3, shown in Figure 4, comprise steel column 1, steel girder 2, steel secondary beam 3 etc., template supporting traverse 4 hangs on by fastener 5 between the bottom flange of steel secondary beam 3, and fastener 5 is anchored between the bottom flange of steel secondary beam 3 by fastening bolt 6.Fastener 5 is provided with fastening bolt 6, vertical lift bolt 7, horizontal fixed bolt 8.The horizontal lumps of wood 9, the vertically lumps of wood 10 and template 11 etc. directly are installed on this bracing or strutting arrangement.
The program of total construction is: hang on fastener 5 between the bottom flange of steel secondary beam 3 by fastening bolt 6 earlier, again template supporting traverse 4 is inserted the fastener 5 from the end, adjust the height of template supporting traverse 4 by vertical lift bolt 7, also fixing by the horizontal location of horizontal fixed bolt 8 adjusting template supporting traverses 4 then, the horizontal lumps of wood 9 is installed at last successively, vertically the lumps of wood 10, template 11.
The above; it only is the preferable specific embodiment of the utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement all should be encompassed within the protection domain of the present utility model.

Claims (10)

1. a steel structure concrete floor slab construction is characterized in that with hanging mould plate supporting device comprise the template supporting traverse, described template supporting traverse is suspended on the bottom flange of the H section steel beam of steel structure concrete floor slab.
2. steel structure concrete floor slab construction according to claim 1 is characterized in that with hanging mould plate supporting device the two ends of described template supporting traverse are suspended on the bottom flange of two H section steel beams respectively by fastener.
3. steel structure concrete floor slab construction according to claim 2 is characterized in that with hanging mould plate supporting device, is provided with fastening bolt between the bottom flange of described fastener and described H section steel beam.
4. steel structure concrete floor slab construction according to claim 3 is characterized in that with hanging mould plate supporting device described fastener has two, is suspended on the both sides of the bottom flange of described H section steel beam respectively; Or described fastener has one, is suspended on a side of the bottom flange of described H section steel beam.
5. steel structure concrete floor slab construction according to claim 4 is with hanging mould plate supporting device, it is characterized in that, be provided with the horizontal fixed bolt in the horizontal direction between described fastener and the described template supporting traverse, in the vertical direction is provided with the vertical lift bolt.
6. steel structure concrete floor slab construction according to claim 5 is with hanging mould plate supporting device, it is characterized in that, the bottom of described fastener is provided with square hole or hook, the end of described template supporting traverse is inserted in the described square hole or hangs on the described hook, described horizontal fixed bolt is located on the sidewall of described square hole or hook, and described vertical lift bolt is located on the diapire of described square hole or hook.
7. use according to each described steel structure concrete floor slab construction of claim 1 to 6 and hang mould plate supporting device, it is characterized in that this bracing or strutting arrangement has a plurality of, mutual dislocation is placed between a plurality of bracing or strutting arrangements.
8. steel structure concrete floor slab construction according to claim 7 is characterized in that with hanging mould plate supporting device the fastener of the mutually close end of the template supporting traverse of adjacent two bracing or strutting arrangements merges into a single whole.
9. steel structure concrete floor slab construction according to claim 7 is characterized in that with hanging mould plate supporting device one or more layers lumps of wood is installed in the top of described template supporting traverse, and the top of the described lumps of wood is provided with template.
10. steel structure concrete floor slab construction according to claim 9 is characterized in that with hanging mould plate supporting device the described lumps of wood has two-layer, is respectively the horizontal lumps of wood, vertical lumps of wood.
CN201020101222XU 2010-01-25 2010-01-25 Suspended formwork support device for construction of steel structured concrete slabs Expired - Lifetime CN201627362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020101222XU CN201627362U (en) 2010-01-25 2010-01-25 Suspended formwork support device for construction of steel structured concrete slabs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020101222XU CN201627362U (en) 2010-01-25 2010-01-25 Suspended formwork support device for construction of steel structured concrete slabs

Publications (1)

Publication Number Publication Date
CN201627362U true CN201627362U (en) 2010-11-10

Family

ID=43058753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020101222XU Expired - Lifetime CN201627362U (en) 2010-01-25 2010-01-25 Suspended formwork support device for construction of steel structured concrete slabs

Country Status (1)

Country Link
CN (1) CN201627362U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116084A (en) * 2010-12-10 2011-07-06 陈永生 Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building
CN102587553A (en) * 2011-01-18 2012-07-18 王广武 Integrally-cast floor slab of wood-plastic support board, steel sections and concrete
CN103758343A (en) * 2014-01-26 2014-04-30 中铁建工集团有限公司 Hanging type construction method and hanging device for reinforced concrete floor
CN103930634A (en) * 2011-06-22 2014-07-16 福姆700私人有限公司 Formwork support improvements
CN106948597A (en) * 2017-05-16 2017-07-14 山东颜祥模板科技有限公司 Roof plate-girder Quick Release fast-assembling system and its erection method
CN109518950A (en) * 2018-12-05 2019-03-26 上海建工二建集团有限公司 Support-free tool-based template system applied to assembled cast-in-place section and use method thereof
CN111910914A (en) * 2020-08-31 2020-11-10 中冶京诚工程技术有限公司 Multi-story high-rise assembled steel structure non-composite floor slab supporting system and construction method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116084A (en) * 2010-12-10 2011-07-06 陈永生 Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building
CN102116084B (en) * 2010-12-10 2013-09-04 陈永生 Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building
CN102587553A (en) * 2011-01-18 2012-07-18 王广武 Integrally-cast floor slab of wood-plastic support board, steel sections and concrete
CN103930634A (en) * 2011-06-22 2014-07-16 福姆700私人有限公司 Formwork support improvements
CN103930634B (en) * 2011-06-22 2016-11-02 福姆700私人有限公司 The improvement of template support
CN103758343A (en) * 2014-01-26 2014-04-30 中铁建工集团有限公司 Hanging type construction method and hanging device for reinforced concrete floor
CN106948597A (en) * 2017-05-16 2017-07-14 山东颜祥模板科技有限公司 Roof plate-girder Quick Release fast-assembling system and its erection method
CN109518950A (en) * 2018-12-05 2019-03-26 上海建工二建集团有限公司 Support-free tool-based template system applied to assembled cast-in-place section and use method thereof
CN111910914A (en) * 2020-08-31 2020-11-10 中冶京诚工程技术有限公司 Multi-story high-rise assembled steel structure non-composite floor slab supporting system and construction method thereof

Similar Documents

Publication Publication Date Title
CN101787796B (en) Suspended formwork supporting system for construction of steel structure concrete floor
CN201627362U (en) Suspended formwork support device for construction of steel structured concrete slabs
CN101974974B (en) Support device for template for construction of steel structure concrete floor slab
CN201943344U (en) Supporting device of template used in the construction of steel structure concrete floor
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN203394027U (en) Semi-assembled construction system for frame-shear wall tube structure
CN203924432U (en) Prestressing force groove-shaped laminated board structural system
CN101701494B (en) Detachable convenient support device of steel structure building template and use method thereof
CN203257090U (en) Framework system of cantilever slab
CN108086674A (en) A kind of roof boarding hangs the construction method of mould and roof boarding
CN203285050U (en) Combined type Bailey frame multifunctional platform carried by sliding formwork to rise and fall
CN201011127Y (en) Suspended steel wood combined template
CN203334679U (en) Steel reinforced concrete beam suspending and supporting structure
CN102418417B (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN201539098U (en) Detachable convenient support device of steel structure building template
CN201972395U (en) Steel-frame double-layer-net building template
CN201915629U (en) Novel quick detaching template for cast-in-situ concrete floor of steel structure building
CN205591579U (en) Adopt girder steel to consolidate aerated concrete roof boarding structure
KR200457827Y1 (en) Supporting system for reinforcing beam of slab pannel
CN210342650U (en) Combined aluminum alloy template
CN112922359A (en) Prefabricated superposed shear wall mounting system and mounting method
CN111648513A (en) Corrugated steel web honeycomb beam floor bearing plate and manufacturing method and using method thereof
CN113789958B (en) Steel construction composite floor hangs mould structure
CN202338108U (en) Steel-wood support rigid supporting structure fixed on lower wing plates of steel beams of floor
CN205224579U (en) Steel framework template and self -supporting truss board combination concrete quick detach system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20101110

Effective date of abandoning: 20100125