CN211337955U - Panel receiving device - Google Patents

Panel receiving device Download PDF

Info

Publication number
CN211337955U
CN211337955U CN201922480924.7U CN201922480924U CN211337955U CN 211337955 U CN211337955 U CN 211337955U CN 201922480924 U CN201922480924 U CN 201922480924U CN 211337955 U CN211337955 U CN 211337955U
Authority
CN
China
Prior art keywords
skip
tray
crane
panel
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922480924.7U
Other languages
Chinese (zh)
Inventor
李启万
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Hele Door Industry Co Ltd
Original Assignee
Hubei Hele Door Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Hele Door Industry Co Ltd filed Critical Hubei Hele Door Industry Co Ltd
Priority to CN201922480924.7U priority Critical patent/CN211337955U/en
Application granted granted Critical
Publication of CN211337955U publication Critical patent/CN211337955U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model discloses a panel receiving device belongs to steel door leaf shaping unloading technical field. Including two guide rails, connect the skip, connect material tray, crane and power device, connect skip sliding connection on two guide rails, connect the material tray to place on connecing the skip, the crane setting is on connecing the skip of material tray lower part, and power device sets up on the material receiving skip of crane lower part, and the crane lifts under power device's effect and connects material tray upwards or downstream. The problem of transportation, pile and stack after the shaping of current door leaf panel be nonstandard, the panel that causes warp, stacks and waste time and energy is solved. The automatic production line has the advantages of improving production efficiency, saving labor cost and ensuring product quality.

Description

Panel receiving device
Technical Field
The utility model relates to a steel door leaf shaping unloading technical field, more specifically the panel receiving device that says so relates to.
Background
At present the door trade is produced door leaf panel shaping and is adopted artifical pile board, during artifical pile material, is on a fixed material tray that connects with the panel stack, because panel tray height is fixed, in order to place some panel more, what the panel tray generally can be placed is lower a lot than the shaping panel discharge gate, when placing panel like this, place panel and when placing panel at the very beginning, all can cause easily panel deformation.
This is because when placing at first, the height of panel tray is very much lower than shaping panel discharge gate, and when placing at last, the height of panel stack on the panel tray is very much higher than shaping panel discharge gate, and these two kinds of circumstances can make the panel that the manual work caused when stacking the panel warp easily.
SUMMERY OF THE UTILITY MODEL
When connecing the material, one of the above-mentioned technical problem who exists in order to solve current shaping panel discharge gate, the utility model provides a panel receiving device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a panel receiving device, includes two guide rails, connects the skip, connects material tray, crane and power device, connect skip sliding connection on two guide rails, connect the material tray to place on connecing the skip, the crane setting is on connecing the skip of material tray lower part, and power device sets up on connecing the skip of crane lower part, and the crane lifts under power device's effect and connects material tray upwards or the downstream.
The utility model discloses a receiving device for can adjust at any time when connecing the height of material tray, can adjust the height of connecing the material tray gradually along with connecing the increase of the panel on the material tray, let connect the horizontal plane of material tray remain inertial reasonable height when manual operation throughout. The lifting of the material receiving tray is controlled by the power device, when the material receiving tray is an empty tray, the lifting frame is controlled by the power device to lift the material receiving tray to a height slightly lower than the height of the discharge hole of the sheet metal equipment, and because of the height, an operator can directly slide a plate at the discharge hole of the sheet metal equipment to the material receiving tray, the force is least, and the time consumption is shortest; then, with the increase of the plates, the lifting frame is lowered through the power device, so that the material receiving tray is driven to be lowered, the height of the plates stacked on the material receiving tray is reduced, and the uppermost plate on the material receiving tray is always slightly lower than the height of a discharge hole of the sheet metal equipment as much as possible; maintaining a reasonable height of inertia for manual operation.
Further, the material receiving trolley comprises a frame, an installation shaft, a driving speed reduction motor, a chain and guide wheels, the material receiving tray is placed at the top of the frame, the installation shaft is arranged at the bottom of the frame, the guide wheels are respectively installed at two ends of the installation shaft, the guide wheels are connected on the guide rails in a rolling manner, the driving speed reduction motor is installed on the frame at the lower portion of the material receiving tray, a gear is arranged on the installation shaft, one end of the chain is sleeved at the output end of the driving speed reduction motor, and the other end of the chain.
Further, the frame includes two-layerly, is the first layer support body that is located the bottom and sets up the second floor support body on first layer support body upper portion respectively, connects the material tray to place on the first layer support body, and the installation axle sets up the bottom at second floor support body, and drive gear motor installs on second floor support body.
Furthermore, the installation axle has 3, equidistant setting in the bottom of second floor support body respectively, and the gear is installed on the installation axle in the middle of.
Furthermore, the width of crane is less than the width of frame, is connected with a plurality of guide bars on the crane, has seted up the guiding hole in the position department relative with the guide bar on second floor support body, and guide bar sliding connection is in the guiding hole.
Further, power device includes lift gear motor and helical structure lift, and lift gear motor and helical structure lift are all installed on first layer support body, and lift gear motor's output and helical structure lift link to each other, and the top of helical structure lift and the bottom of crane link to each other.
Furthermore, the power device has two sets of, sets up respectively at the both ends of the first layer support body of mounting bracket lower part.
Further, the material receiving tray is provided with 3 trays which are arranged on the material receiving vehicle at equal intervals.
Compared with the prior art, the utility model beneficial effect who has is:
1. the material receiving device adopts the power device to control the height of the material receiving tray, can automatically descend according to the height of material receiving, stops working immediately when reaching the material receiving height of the equipment, can continuously produce 3 material receiving trays and fill the material after moving the material receiving vehicle, saves the production and turnover time, and improves the production efficiency.
2. The material receiving device enables the plane of the material receiving tray (or the uppermost plate on the material receiving tray) to be always kept at a proper height through the power device, the formed plate can be smoothly placed on the material receiving tray or the uppermost plate on the material receiving tray, and the plate is not easy to deform.
Drawings
Fig. 1 is a schematic structural view of a plate receiving device of the present invention;
fig. 2 is a schematic structural view of a panel receiving device of the present invention without a receiving tray;
fig. 3 is a side view of the plate receiving device of the present invention.
The labels in the figure are: the automatic material receiving and conveying device comprises a guide rail 1, a material receiving vehicle 2, a material receiving tray 3, a lifting frame 4, a first-layer frame body 5, a second-layer frame body 6, a guide rod 7, a guide wheel 8, an installation shaft 9, a gear 10, a drag chain 11, a driving speed reducing motor 12, a lifting speed reducing motor 13 and a spiral structure lifter 14.
Detailed Description
The present invention will be further described with reference to the following examples, which are only some, but not all, of the examples of the present invention. Based on the embodiments in the present invention, other embodiments used by those skilled in the art without creative work belong to the protection scope of the present invention.
Example 1:
as shown in fig. 1, a panel receiving device, including two guide rails 1, connect skip 2, connect material tray 3, crane 4 and power device, connect skip 2 sliding connection on two guide rails 1, connect material tray 3 to place on connecing skip 2, crane 4 sets up on connecing the material tray 2 of connecing 3 lower parts of material tray, and power device sets up on connecing skip 2 of crane 4 lower part, and crane 4 lifts under power device's effect and connects material tray 3 to make progress or the downstream.
The utility model discloses a receiving device for can adjust at any time when connecing the height of material tray 3, can adjust gradually along with connecing the increase of the panel on the material tray 3 and connect the height of material tray 3, let connect the horizontal plane of material tray 3 to remain inertial reasonable height when manual operation throughout. The lifting of the material receiving tray 3 is controlled by the power device, when the material receiving tray 3 is an empty tray, the lifting frame 4 is controlled by the power device to lift the material receiving tray 3 to a height slightly lower than the height of the discharge hole of the sheet metal equipment, so that the material receiving tray 3 corresponds to the discharge hole of the sheet metal equipment, and because of the height, an operator can directly slide the plates at the discharge hole of the sheet metal equipment to the material receiving tray 3, the force is least, and the time consumption is shortest; then, with the increase of the plates, the lifting frame 4 is lowered through the power device, so that the material receiving tray 3 is driven to be lowered, the height of the plates stacked on the material receiving tray 3 is lowered, and the uppermost plate on the material receiving tray 3 is always slightly lower than the height of a discharge hole of the sheet metal equipment as much as possible; maintaining a reasonable height of inertia for manual operation.
As shown in fig. 2 and 3, in this embodiment, the material receiving vehicle 2 includes a frame, an installation shaft 9, a driving gear motor 12, a chain and a guide wheel 8, the material receiving tray 3 is placed on the top of the frame, the installation shaft 9 is disposed at the bottom of the frame, the guide wheel 8 is respectively installed at two ends of the installation shaft 9, the guide wheel 8 is connected to the guide rail 1 in a rolling manner, the driving gear motor 12 is installed on the frame below the material receiving tray 3, a gear 10 is disposed on the installation shaft 9, a sleeve of the chain is disposed at an output end of the driving gear motor 12, and the other sleeve of the chain is disposed. The installation axle 9 has 3, equidistant setting respectively is in the bottom of second floor support body 6, and gear 10 installs on the installation axle 9 in the middle of. The material receiving tray 3 is provided with 3 pieces which are arranged on the material receiving vehicle 2 at equal intervals.
This embodiment provides a concrete structure of material receiving vehicle 2, and material receiving vehicle 2 that this embodiment provided specifically can drive the chain rotation through drive gear motor 12 from taking driving system, and then drives installation axle 9 through gear 10 and rotate, then makes guide pulley 8 rotate on removing the track. In order to enable the receiving vehicle 2 to run on the moving track more stably, three mounting shafts 9 are arranged on the lower portion of the vehicle frame, one shaft connected with the speed reducing motor is a driving shaft, and the other two shafts are driven shafts.
Through this kind of structure, can be so that connect material tray 3 under the help that connects skip 2, realize the operation on the removal track, after first connect material tray 3 to fill with promptly, drive gear motor 12 is rotatory, drive through the chain and connect skip 2 one section distance of forward movement, make second connect material tray 3 just to the sheet metal equipment discharge gate, and make connect material tray 3 to be less than the sheet metal equipment discharge gate height slightly, repeat first connect the material step of material tray 3 can, accomplish the feeding of third connect material tray 3 in the same way. 3 receiving trays 3 can be continuously produced and filled, the production and turnover time is saved, and the production efficiency is improved.
In this embodiment, the frame includes two-layerly, is the first layer support body 5 that is located the bottom respectively and sets up the second floor support body 6 on 5 upper portions of first layer support body, connects material tray 3 to place on first layer support body 5, and installation axle 9 sets up in the bottom of second floor support body 6, and drive gear motor 12 installs on second floor support body 6. The frame sets up the height of double-deck increase frame because frame lower part will install crane 4 and lift gear motor 13, and simultaneously, gear drive motor and lift drive motor install respectively on the support body of different layers. The width of crane 4 is less than the width of frame, is connected with a plurality of guide bars 7 on the crane 4, has seted up the guiding hole with 7 relative positions departments of guide bar on second floor support body 6, and guide bar 7 sliding connection is in the guiding hole. The guide hole that sets up on the second floor support body 6 can make crane 4 carry on spacingly through guide bar 7 when ascending or descending, makes it more steady when ascending or descending.
In this embodiment, power device includes lift gear motor 13 and helical structure lift 14, and lift gear motor 13 and helical structure lift 14 are all installed on first layer support body 5, and lift gear motor 13's output and helical structure lift 14 link to each other, and the top of helical structure lift 14 and the bottom of crane 4 link to each other. The lifting gear motor 13 and the spiral structure lifter 14 are common electromechanical devices in the prior art, the plane of the receiving tray 3 (or the uppermost plate on the receiving tray 3) can be always kept at a proper height through the matching of the lifting gear motor 13 and the spiral structure lifter 14, the formed plate can be smoothly placed on the tray, and the plate is not easy to deform.
As the preferred technical scheme, the power device has two groups, and the two groups are respectively arranged at two ends of the first layer frame body 5 at the lower part of the mounting frame. Considering that the receiving trolley 2 is provided with three or more receiving trays 3, the maximum weight required to be lifted by the power device is heavier, and therefore the power device in the embodiment is provided with two groups, so that the stability and the safety of the receiving rack during ascending or descending are ensured.
Adopt the utility model discloses a panel connects material equipment's theory of operation as follows:
step 1: placing the three receiving trays 3 on the receiving vehicle 2;
step 2: the receiving vehicle 2 moves on the guide rail 1, so that the first receiving tray 3 stops at a position right opposite to a discharge port of the sheet metal equipment;
and 3, step 3: starting a lifting speed reducing motor 13, and lifting a spiral structure lifter 14 to enable the material receiving tray 3 to be slightly lower than the height of a discharge hole of the sheet metal equipment;
and 4, step 4: the sheet metal equipment starts to produce the sheets, and the produced sheets are manually placed on the receiving tray 3 one by one;
and 5, step 5: along with the increase of the production time, the height of the plate is correspondingly increased, the lifting speed reduction motor 13 starts to perform reverse action, the spiral structure lifter 14 starts to descend for a certain height, and the uppermost plate on the stacked receiving tray 3 is slightly lower than the height of a discharge hole of the sheet metal equipment;
and 6, step 6: when the material receiving height of the plate on the material receiving tray 3 reaches a set value or the product variety needs to be replaced, the mounting shaft 9 is driven to rotate by driving the speed reduction motor 12, and the material receiving vehicle 2 starts to move, so that the second material receiving tray 3 stops just facing the discharge port of the sheet metal equipment;
and 7, step 7: and executing the step 1 circulation action until the third receiving tray 3 is full or the product type is changed.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (8)

1. The utility model provides a panel receiving device, its characterized in that includes two guide rails (1), connects skip (2), connects material tray (3), crane (4) and power device, connect skip (2) sliding connection on two guide rails (1), connect material tray (3) to place on connect skip (2), crane (4) set up on connecing skip (2) of material tray (3) lower part, power device sets up on connecing skip (2) of crane (4) lower part, crane (4) lift under power device's effect and connect material tray (3) to make progress or downstream.
2. The plate receiving device according to claim 1, wherein the receiving vehicle (2) comprises a vehicle frame, a mounting shaft (9), a driving gear motor (12), a chain and guide wheels (8), the receiving tray (3) is placed on the top of the vehicle frame, the mounting shaft (9) is arranged on the bottom of the vehicle frame, the guide wheels (8) are respectively mounted at two ends of the mounting shaft (9), the guide wheels (8) are connected to the guide rails (1) in a rolling manner, the driving gear motor (12) is mounted on the vehicle frame at the lower portion of the receiving tray (3), the mounting shaft (9) is provided with the gear (10), one end of the chain is sleeved on the output end of the driving gear motor (12), and the other end of the chain is sleeved on the gear (10).
3. The plate receiving device according to claim 2, characterized in that the frame comprises two layers, namely a first layer frame body (5) at the bottom and a second layer frame body (6) arranged on the upper portion of the first layer frame body (5), the receiving tray (3) is placed on the first layer frame body (5), the mounting shaft (9) is arranged at the bottom of the second layer frame body (6), and the driving speed reduction motor (12) is arranged on the second layer frame body (6).
4. A panel receiving device according to claim 3, characterised in that there are 3 mounting shafts (9) which are respectively arranged at equal intervals at the bottom of the second layer frame body (6), and the gear (10) is mounted on the middle mounting shaft (9).
5. A panel receiving device according to claim 4, characterized in that the width of the lifting frame (4) is smaller than the width of the frame, the lifting frame (4) is connected with a plurality of guide rods (7), the second layer frame body (6) is provided with guide holes at positions opposite to the guide rods (7), and the guide rods (7) are slidably connected in the guide holes.
6. A panel receiving device according to claim 3, characterized in that the power unit comprises a lifting gear motor (13) and a spiral elevator (14), the lifting gear motor (13) and the spiral elevator (14) are both mounted on the first layer frame body (5), the output end of the lifting gear motor (13) is connected with the spiral elevator (14), and the top of the spiral elevator (14) is connected with the bottom of the lifting frame (4).
7. A panel receiving device according to claim 6, characterised in that the power means are provided in two groups, one at each end of the first layer of frame bodies (5) below the mounting frame.
8. A panel receiving device according to any one of claims 1-7, characterised in that there are 3 receiving trays (3) placed on the receiving trolley (2) at equal intervals.
CN201922480924.7U 2019-12-31 2019-12-31 Panel receiving device Active CN211337955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922480924.7U CN211337955U (en) 2019-12-31 2019-12-31 Panel receiving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922480924.7U CN211337955U (en) 2019-12-31 2019-12-31 Panel receiving device

Publications (1)

Publication Number Publication Date
CN211337955U true CN211337955U (en) 2020-08-25

Family

ID=72097883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922480924.7U Active CN211337955U (en) 2019-12-31 2019-12-31 Panel receiving device

Country Status (1)

Country Link
CN (1) CN211337955U (en)

Similar Documents

Publication Publication Date Title
CN210285743U (en) Novel template composing hanging basket type lifter
CN110921338A (en) Panel material receiving equipment
CN210973030U (en) Offline stacking production line
CN202226370U (en) Automatic feeding system for cross members of container
CN211337955U (en) Panel receiving device
CN209922141U (en) Integrated laser automatic feeding and discharging mechanism
CN211337956U (en) Panel material receiving equipment
CN217577915U (en) Cage car tray dual-purpose vertical lift
CN215479067U (en) Double-station tray elevator
CN203345769U (en) Full-automatic brick stacking machine
CN206407608U (en) The rewinding material placing mechanism of air-conditioning lower margin transporter
CN213801922U (en) Glass material plate lifting and pushing mechanism for hawthorn cake scraping piece conveying line
CN213622082U (en) Material shunting conveyor
CN211768045U (en) Automatic machine of breaking yard of low-order tray
CN113955503A (en) Automatic tray conveying and stacking machine
CN110155737B (en) Automatic leaning and unstacking system
CN219155871U (en) Mould pile up neatly device and automatic pile up neatly system
CN210655994U (en) Plate buffering lifting machine
CN219155870U (en) Device for mould stacking and automatic stacking system
CN218859801U (en) Mold stacking device and automatic stacking system
CN201317076Y (en) Automatic lifting trolley device of flow-casting compounding machine and extrusion machine
CN221216102U (en) Stacking device
CN213678886U (en) Double-layer glass material plate supporting mechanism for hawthorn cake scraping piece conveying line
CN221190731U (en) Automatic shine board collecting machine
CN212101011U (en) Purlin buttress material machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant