CN211308558U - Sliding trolley for installing air pipe in limited area - Google Patents

Sliding trolley for installing air pipe in limited area Download PDF

Info

Publication number
CN211308558U
CN211308558U CN201921212318.0U CN201921212318U CN211308558U CN 211308558 U CN211308558 U CN 211308558U CN 201921212318 U CN201921212318 U CN 201921212318U CN 211308558 U CN211308558 U CN 211308558U
Authority
CN
China
Prior art keywords
joist
sliding trolley
welded
limited area
rolling wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921212318.0U
Other languages
Chinese (zh)
Inventor
樊涛
张国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201921212318.0U priority Critical patent/CN211308558U/en
Application granted granted Critical
Publication of CN211308558U publication Critical patent/CN211308558U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A sliding trolley for installing an air pipe in a limited area belongs to the technical field of installation of large-scale ventilation pipelines in sports stadiums. Comprises a top joist (1), a middle joist (2), a bottom joist (3), rolling wheels (4) and rolling wheel shafts (9); the top joist (1) is welded with the middle joist (2), the middle joist (2) is welded on the bottom joist (3), the two bottom joists (3) are connected and welded by the rolling wheel shaft (9), and the rolling wheel (4) is arranged below the bottom joist (3). The method has the advantages that the installation of the air pipes in the limited area is simple and easy to operate, the roof panel is prevented from being dismantled and restored, labor, time and mechanical machine shifts are saved, and the construction cost is greatly reduced.

Description

Sliding trolley for installing air pipe in limited area
Technical Field
The utility model belongs to the technical field of the installation of the large-scale air pipe in sports stadium, especially, a sliding trolley who installs the tuber pipe in the restriction region and use is provided.
Background
When the large-scale ventilation duct of sports stadium is installed, for the tuber pipe on the platform of stadium top, because the later stage installation, all demolish partial roofing roof, reuse large-scale hoisting equipment and hoist the tuber pipe and take one's place, resume the roofing after the tuber pipe takes one's place to install, take a lot of work, waste time, take mechanical shift, increased construction cost.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a sliding trolley that installation tuber pipe used in the limitation region, when venue top tuber pipe erection construction, use a sliding trolley, the tuber pipe that will install in advance is chosen from the venue tip and is placed on sliding trolley on the temporary platform outward, sliding trolley lays on the guide rail, bottom roll wheel and guide rail contact under the slip, and form and slide, then utilize the hoist to stimulate to slide and get off, after sliding trolley moves tuber pipe mounted position, recycle top chain fall and hang the tuber pipe from the slip and get off, the hoist drives and drags from sliding trolley, the tuber pipe installation is taken one's place.
The utility model discloses a top joist 1, middle part joist 2, bottom joist 3, roll wheel 4, roll wheel axle 9. The top joist 1 is welded with the middle joist 2, the middle joist 2 is welded on the bottom joist 3, the rolling wheel shaft 9 is connected with and welded with the two bottom joists 3, and the rolling wheel 4 is arranged below the bottom joist 3. The top joist 1, the middle joist 2, the bottom joist 3 and the rolling wheel 4 are all two. (see FIGS. 1 and 2)
The top joist 1 is an I-shaped steel section, and the top surface of the I-shaped steel is processed into an arc surface; the middle joist 2 and the bottom joist 3 are both rolled H-shaped steel.
The method comprises the steps that a pre-installed air pipe 5 is picked out from the end part of a venue and placed on a temporary platform on a joist at the top of a sliding trolley 1, the sliding trolley is placed on a guide rail 6, a rolling wheel 4 at the bottom of the sliding trolley is in contact with the guide rail 6 to form sliding (shown in figures 3 and 4), then the sliding trolley is pulled by a winch 7 to slide to get off (shown in figure 5), when the sliding trolley runs to the installation position of the air pipe 5, the air pipe is lifted away from the sliding trolley by a top chain block 8, the winch 7 is driven to be pulled away from the sliding trolley, and the air pipe 5 is.
The use of the sliding trolley enables the installation of the air pipe in the limited area to be simple and easy to operate, avoids the dismantling and the recovery of the roof panel, saves labor, time and mechanical machine shifts, greatly reduces the construction cost and obtains good economic benefit for companies.
Drawings
Fig. 1 is a side view of a sliding cart.
Fig. 2 is a front view of the sliding cart.
FIG. 3 is a front view of the air duct mounted on the sliding cart.
FIG. 4 is a top view of the mounting air duct on the trolley.
Fig. 5 is a diagram of a sliding trolley driven by the traction of a winch.
FIG. 6 is a drawing showing the installation and alignment of the air duct on the inverted chain hoisting sliding trolley.
In the figure, a top joist 1, a middle joist 2, a bottom joist 3, rolling wheels 4, an air pipe 5, a guide rail 6, a winch 7, a chain block 8 and rolling wheel shafts 9.
Detailed Description
Fig. 1-6 show a specific embodiment of the present invention. The present invention will be further explained with reference to the accompanying drawings.
The utility model discloses a top joist 1, middle part joist 2, bottom joist 3, roll wheel 4, roll wheel axle 9. The top joist 1 is welded with the middle joist 2, the middle joist 2 is welded on the bottom joist 3, the rolling wheel shaft 9 is connected with and welded with the two bottom joists 3, and the rolling wheel 4 is arranged below the bottom joist 3. (see FIGS. 1 and 2)
The method comprises the steps that a pre-installed air pipe 5 is picked out from the end part of a venue and placed on a temporary platform on a joist at the top of a sliding trolley 1, the sliding trolley is placed on a guide rail 6, a rolling wheel 4 at the bottom of the sliding lower car is in contact with the guide rail 6 to form sliding, then the sliding lower car is pulled by a winch 7, after the sliding trolley runs to the installation position of the air pipe 5, the air pipe is lifted away from the sliding lower car by a top chain block 8, the winch 7 is driven to be pulled away from the sliding trolley, and the air pipe 5 is installed in.

Claims (3)

1. A sliding trolley used for installing an air pipe in a limited area is characterized by comprising a top joist (1), a middle joist (2), a bottom joist (3), rolling wheels (4) and rolling wheel shafts (9); the top joist (1) is welded with the middle joist (2), the middle joist (2) is welded on the bottom joist (3), the two bottom joists (3) are connected and welded by the rolling wheel shaft (9), and the rolling wheel (4) is arranged below the bottom joist (3).
2. The sliding trolley for installing the air duct in the limited area according to claim 1, wherein the top joist (1) is an I-steel section, an arc-shaped surface is processed on the top surface of the I-steel, and the middle joist (2) and the bottom joist (3) are both rolled H-shaped steel.
3. The sliding trolley for installing the air duct in the limited area according to claim 1, wherein the top joist (1), the middle joist (2), the bottom joist (3) and the rolling wheels (4) are two pieces.
CN201921212318.0U 2019-07-30 2019-07-30 Sliding trolley for installing air pipe in limited area Active CN211308558U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921212318.0U CN211308558U (en) 2019-07-30 2019-07-30 Sliding trolley for installing air pipe in limited area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921212318.0U CN211308558U (en) 2019-07-30 2019-07-30 Sliding trolley for installing air pipe in limited area

Publications (1)

Publication Number Publication Date
CN211308558U true CN211308558U (en) 2020-08-21

Family

ID=72081309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921212318.0U Active CN211308558U (en) 2019-07-30 2019-07-30 Sliding trolley for installing air pipe in limited area

Country Status (1)

Country Link
CN (1) CN211308558U (en)

Similar Documents

Publication Publication Date Title
CN203979647U (en) A kind of detachable recycling guide rail pipe perforator
CN109987546B (en) Self-propelled pipeline transportation installation vehicle in corridor and construction method thereof
CN104775825A (en) Shield machine single well overall originating construction method
CN105545313A (en) T-shaped concealed excavated tunnel shield tunneling machine backup trolley lowering translation system and method thereof
CN109931082A (en) The lossless method for dismounting of negative endless tube piece after the excessively intermediate ventilating shaft of shield machine
CN112319731A (en) Installation method of large-scale marine equipment
CN211308558U (en) Sliding trolley for installing air pipe in limited area
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN102774624B (en) Overhaul and transport vehicle and overhauling and transport method
CN205314590U (en) Special mechanism of main equipment dismouting in factory building and frame
CN102311057B (en) Floating crane revolving support dismounting method
CN205387937U (en) T -shaped undercut tunnel shield constructs supporting platform truck in machine back translation system of going into well
CN105421246A (en) Installation method of towing cable hanging baskets
CN111043397A (en) Device convenient to heavy pipeline of tunnel installation in pit
CN106049681A (en) Large-span butterfly space bent and twisted pipe truss and construction method thereof
CN207633661U (en) A kind of roofing board mounting assembly
CN205907813U (en) Large -span butterfly type space pipe truss that crumples
CN210213802U (en) Device for conveying concrete pipe in sleeve
CN208326391U (en) A kind of pipeline mounting device
CN105984821A (en) Hoisting device used according to needs and used in wind power unit cabin
CN220010809U (en) Pipeline installation hauling device
CN210289161U (en) Steel construction engineering component mounting structure
CN203359892U (en) Device for assembling and disassembling construction trolley inside tunnel
CN205908000U (en) Balladeur train

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant