CN211308558U - Sliding trolley for installing air pipe in limited area - Google Patents
Sliding trolley for installing air pipe in limited area Download PDFInfo
- Publication number
- CN211308558U CN211308558U CN201921212318.0U CN201921212318U CN211308558U CN 211308558 U CN211308558 U CN 211308558U CN 201921212318 U CN201921212318 U CN 201921212318U CN 211308558 U CN211308558 U CN 211308558U
- Authority
- CN
- China
- Prior art keywords
- joist
- sliding trolley
- welded
- limited area
- rolling wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
A sliding trolley for installing an air pipe in a limited area belongs to the technical field of installation of large-scale ventilation pipelines in sports stadiums. Comprises a top joist (1), a middle joist (2), a bottom joist (3), rolling wheels (4) and rolling wheel shafts (9); the top joist (1) is welded with the middle joist (2), the middle joist (2) is welded on the bottom joist (3), the two bottom joists (3) are connected and welded by the rolling wheel shaft (9), and the rolling wheel (4) is arranged below the bottom joist (3). The method has the advantages that the installation of the air pipes in the limited area is simple and easy to operate, the roof panel is prevented from being dismantled and restored, labor, time and mechanical machine shifts are saved, and the construction cost is greatly reduced.
Description
Technical Field
The utility model belongs to the technical field of the installation of the large-scale air pipe in sports stadium, especially, a sliding trolley who installs the tuber pipe in the restriction region and use is provided.
Background
When the large-scale ventilation duct of sports stadium is installed, for the tuber pipe on the platform of stadium top, because the later stage installation, all demolish partial roofing roof, reuse large-scale hoisting equipment and hoist the tuber pipe and take one's place, resume the roofing after the tuber pipe takes one's place to install, take a lot of work, waste time, take mechanical shift, increased construction cost.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a sliding trolley that installation tuber pipe used in the limitation region, when venue top tuber pipe erection construction, use a sliding trolley, the tuber pipe that will install in advance is chosen from the venue tip and is placed on sliding trolley on the temporary platform outward, sliding trolley lays on the guide rail, bottom roll wheel and guide rail contact under the slip, and form and slide, then utilize the hoist to stimulate to slide and get off, after sliding trolley moves tuber pipe mounted position, recycle top chain fall and hang the tuber pipe from the slip and get off, the hoist drives and drags from sliding trolley, the tuber pipe installation is taken one's place.
The utility model discloses a top joist 1, middle part joist 2, bottom joist 3, roll wheel 4, roll wheel axle 9. The top joist 1 is welded with the middle joist 2, the middle joist 2 is welded on the bottom joist 3, the rolling wheel shaft 9 is connected with and welded with the two bottom joists 3, and the rolling wheel 4 is arranged below the bottom joist 3. The top joist 1, the middle joist 2, the bottom joist 3 and the rolling wheel 4 are all two. (see FIGS. 1 and 2)
The top joist 1 is an I-shaped steel section, and the top surface of the I-shaped steel is processed into an arc surface; the middle joist 2 and the bottom joist 3 are both rolled H-shaped steel.
The method comprises the steps that a pre-installed air pipe 5 is picked out from the end part of a venue and placed on a temporary platform on a joist at the top of a sliding trolley 1, the sliding trolley is placed on a guide rail 6, a rolling wheel 4 at the bottom of the sliding trolley is in contact with the guide rail 6 to form sliding (shown in figures 3 and 4), then the sliding trolley is pulled by a winch 7 to slide to get off (shown in figure 5), when the sliding trolley runs to the installation position of the air pipe 5, the air pipe is lifted away from the sliding trolley by a top chain block 8, the winch 7 is driven to be pulled away from the sliding trolley, and the air pipe 5 is.
The use of the sliding trolley enables the installation of the air pipe in the limited area to be simple and easy to operate, avoids the dismantling and the recovery of the roof panel, saves labor, time and mechanical machine shifts, greatly reduces the construction cost and obtains good economic benefit for companies.
Drawings
Fig. 1 is a side view of a sliding cart.
Fig. 2 is a front view of the sliding cart.
FIG. 3 is a front view of the air duct mounted on the sliding cart.
FIG. 4 is a top view of the mounting air duct on the trolley.
Fig. 5 is a diagram of a sliding trolley driven by the traction of a winch.
FIG. 6 is a drawing showing the installation and alignment of the air duct on the inverted chain hoisting sliding trolley.
In the figure, a top joist 1, a middle joist 2, a bottom joist 3, rolling wheels 4, an air pipe 5, a guide rail 6, a winch 7, a chain block 8 and rolling wheel shafts 9.
Detailed Description
Fig. 1-6 show a specific embodiment of the present invention. The present invention will be further explained with reference to the accompanying drawings.
The utility model discloses a top joist 1, middle part joist 2, bottom joist 3, roll wheel 4, roll wheel axle 9. The top joist 1 is welded with the middle joist 2, the middle joist 2 is welded on the bottom joist 3, the rolling wheel shaft 9 is connected with and welded with the two bottom joists 3, and the rolling wheel 4 is arranged below the bottom joist 3. (see FIGS. 1 and 2)
The method comprises the steps that a pre-installed air pipe 5 is picked out from the end part of a venue and placed on a temporary platform on a joist at the top of a sliding trolley 1, the sliding trolley is placed on a guide rail 6, a rolling wheel 4 at the bottom of the sliding lower car is in contact with the guide rail 6 to form sliding, then the sliding lower car is pulled by a winch 7, after the sliding trolley runs to the installation position of the air pipe 5, the air pipe is lifted away from the sliding lower car by a top chain block 8, the winch 7 is driven to be pulled away from the sliding trolley, and the air pipe 5 is installed in.
Claims (3)
1. A sliding trolley used for installing an air pipe in a limited area is characterized by comprising a top joist (1), a middle joist (2), a bottom joist (3), rolling wheels (4) and rolling wheel shafts (9); the top joist (1) is welded with the middle joist (2), the middle joist (2) is welded on the bottom joist (3), the two bottom joists (3) are connected and welded by the rolling wheel shaft (9), and the rolling wheel (4) is arranged below the bottom joist (3).
2. The sliding trolley for installing the air duct in the limited area according to claim 1, wherein the top joist (1) is an I-steel section, an arc-shaped surface is processed on the top surface of the I-steel, and the middle joist (2) and the bottom joist (3) are both rolled H-shaped steel.
3. The sliding trolley for installing the air duct in the limited area according to claim 1, wherein the top joist (1), the middle joist (2), the bottom joist (3) and the rolling wheels (4) are two pieces.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921212318.0U CN211308558U (en) | 2019-07-30 | 2019-07-30 | Sliding trolley for installing air pipe in limited area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921212318.0U CN211308558U (en) | 2019-07-30 | 2019-07-30 | Sliding trolley for installing air pipe in limited area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211308558U true CN211308558U (en) | 2020-08-21 |
Family
ID=72081309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921212318.0U Active CN211308558U (en) | 2019-07-30 | 2019-07-30 | Sliding trolley for installing air pipe in limited area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211308558U (en) |
-
2019
- 2019-07-30 CN CN201921212318.0U patent/CN211308558U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203979647U (en) | A kind of detachable recycling guide rail pipe perforator | |
CN109987546B (en) | Self-propelled pipeline transportation installation vehicle in corridor and construction method thereof | |
CN104775825A (en) | Shield machine single well overall originating construction method | |
CN105545313A (en) | T-shaped concealed excavated tunnel shield tunneling machine backup trolley lowering translation system and method thereof | |
CN109931082A (en) | The lossless method for dismounting of negative endless tube piece after the excessively intermediate ventilating shaft of shield machine | |
CN112319731A (en) | Installation method of large-scale marine equipment | |
CN211308558U (en) | Sliding trolley for installing air pipe in limited area | |
CN108396749B (en) | Installation system and installation method of steel support in foundation pit | |
CN212251443U (en) | Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device | |
CN102774624B (en) | Overhaul and transport vehicle and overhauling and transport method | |
CN205314590U (en) | Special mechanism of main equipment dismouting in factory building and frame | |
CN102311057B (en) | Floating crane revolving support dismounting method | |
CN205387937U (en) | T -shaped undercut tunnel shield constructs supporting platform truck in machine back translation system of going into well | |
CN105421246A (en) | Installation method of towing cable hanging baskets | |
CN111043397A (en) | Device convenient to heavy pipeline of tunnel installation in pit | |
CN106049681A (en) | Large-span butterfly space bent and twisted pipe truss and construction method thereof | |
CN207633661U (en) | A kind of roofing board mounting assembly | |
CN205907813U (en) | Large -span butterfly type space pipe truss that crumples | |
CN210213802U (en) | Device for conveying concrete pipe in sleeve | |
CN208326391U (en) | A kind of pipeline mounting device | |
CN105984821A (en) | Hoisting device used according to needs and used in wind power unit cabin | |
CN220010809U (en) | Pipeline installation hauling device | |
CN210289161U (en) | Steel construction engineering component mounting structure | |
CN203359892U (en) | Device for assembling and disassembling construction trolley inside tunnel | |
CN205908000U (en) | Balladeur train |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |