CN102311057B - Floating crane revolving support dismounting method - Google Patents
Floating crane revolving support dismounting method Download PDFInfo
- Publication number
- CN102311057B CN102311057B CN 201110250871 CN201110250871A CN102311057B CN 102311057 B CN102311057 B CN 102311057B CN 201110250871 CN201110250871 CN 201110250871 CN 201110250871 A CN201110250871 A CN 201110250871A CN 102311057 B CN102311057 B CN 102311057B
- Authority
- CN
- China
- Prior art keywords
- support
- dismounting
- revolution
- slide rail
- connection pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention discloses a floating crane revolving support dismounting method, which comprises the following steps of: firstly making a preparation before dismounting, then dismounting cables and connecting pipes inside a cylinder; dismounting an inclined ladder, a roller and a roller support, establishing a slide rail platform, establishing a process platform and a slide rail on the fixed cylinder, lifting up and moving out the revolving support, dragging the revolving support on the slide rail, moving to the outer side, hoisting to the ground, hoisting a new revolving support onto the slide rail, dragging to an installation position, and installing. The dismounting method provided by the invention is convenient to operate, is safe and reliable, and is used to save labor and time.
Description
Technical field
The present invention relates to a kind of floating crane revolving support dismounting method.
Background technology
At present, the maintenance method is supported in revolution for crane barge, with top rotating part complete removal, then revolution is supported and maintained, because the weight of rotating part all parts is large, the dismounting slinger makes comparisons heavy, the not only waste of manpower of this kind method, financial resources, material resources, and also the lifting meeting causes certain distortion to member.
Summary of the invention
The objective of the invention is provides a kind of easy to operate, time saving and energy saving, safe and reliable floating crane revolving support dismounting method in order to overcome above deficiency.
Purpose of the present invention is achieved through the following technical solutions: a kind of floating crane revolving support dismounting method, may further comprise the steps: at first carry out the preparation before removing: jib is placed on the jib shelf, to turn round anchor and put down, the anti-piece of carving that inclines between structure and the revolution support lower railway in front portion will be carved tightly; Then remove cylinder inner cable, connection pipe: will draw the cable that is installed on the centre collector ring from reversing chassis and remove, and from cylinder revolution bracing frame, all move in the reversing chassis center crossbeam cable fag end fixing, then with asbeston etc. with the protection of cable parcel, prevent damage in the construction; Connection pipe in the centre collector ring is pulled down, first connection pipe and reversing chassis junction are cut open during dismounting, must not injure the reversing chassis mother metal when cutting open, after cutting open connection pipe and plunging joint tie bolt are removed, then connection pipe is placed on the centre collector ring support and fixes, with protective cloth with centre collector ring parcel protection (as shown in Figure 1); Remove inclined ladder, roller and rolling wheel support, roller and rolling wheel support are positioned on lower railway corresponding to reversing chassis front and back support rail beam gap, then winching to the appointed place also notes protecting, support replacing complete rear whole recoveries (as shown in Figure 2) until revolution, inclined ladder is removed, and supports until revolution and changes complete rear recovery (as shown in Figure 3); Build the slide rail platform, build technique platform and slide rail (as shown in Figure 4) at the fixed part cylinder; To turn round and support jacking, shift out: remove the bolt (as shown in Figure 5) that is connected between the bolt that is connected between oil groove on the revolution bracing frame, outside race bearing and the reversing chassis, revolution bracing frame and the turntable, after disassembling bolts between outside race bearing and the center shaft connecting panel is complete, with jack the outside race bearing is ejected (as shown in Figure 6) from the center shaft connecting panel; Old revolution support is drawn on the slide rail, moves on to the outside, then be lifted into ground (as shown in Figure 7); To newly turn round support and be lifted on the slide rail, be drawn to the installation site, be in place (as shown in Figure 8).
The present invention compared with prior art has the following advantages:
By the method floating crane revolving support is removed, greatly saved human and material resources, financial resources, and saved the valuable time.
Description of drawings:
Current colector supporting structure schematic diagram centered by Fig. 1;
Fig. 2 is for removing the structural representation of roller and rolling wheel support;
Fig. 3 is for removing the structural representation of inclined ladder;
Fig. 4 is slide rail platform structure schematic diagram;
Fig. 5 is for removing the structural representation of oil groove, bolt;
Fig. 6 is the structural representation that jack ejects the outside race bearing;
Fig. 7 supports the structural representation that is lifted into ground for revolution;
Fig. 8 supports for new revolution and installs to the bit architecture schematic diagram;
Number in the figure: 1-connection pipe, 2-centre collector ring, 3-slide rail platform, the old revolution of 4-are supported, 5-newly turns round support.
The specific embodiment:
In order to deepen the understanding of the present invention, the invention will be further described below in conjunction with embodiment, and this embodiment only is used for explaining the present invention, does not consist of the restriction to protection domain of the present invention.
A kind of specific embodiment of unit assembling method of large-size gantry crane of the present invention may further comprise the steps:
Preparation before at first removing is placed into jib on the jib shelf, will turn round anchor and put down, and the anti-piece of carving that inclines between structure and the revolution support lower railway in front portion is carved tightly; Remove again cylinder inner cable, connection pipe 1 etc., to draw the cable that is installed on the centre collector ring 2 from reversing chassis removes, and from cylinder revolution bracing frame, all move in the reversing chassis center crossbeam cable fag end fixing, then with asbeston etc. with the protection of cable parcel, prevent damage in the construction; Connection pipe 1 in the centre collector ring 2 is pulled down, first connection pipe and reversing chassis junction are cut open during dismounting, must not injure the reversing chassis mother metal when cutting open; After cutting open connection pipe and plunging joint tie bolt are removed; Then connection pipe is placed on the centre collector ring support and fixes; With protective cloth the centre collector ring parcel is protected; Remove again inclined ladder, roller and rolling wheel support, remove roller and rolling wheel support on lower railway corresponding to reversing chassis front and back support rail beam gap, then winch to the appointed place and also note protecting, support the complete rear whole recoveries of replacing until revolution; Inclined ladder is removed, and supports until revolution and changes complete rear recovery; Build slide rail platform 3, build technique platform and slide rail at the fixed part cylinder; To turn round and support jacking, shift out: remove first the bolt that is connected between the bolt that is connected between oil groove on the revolution bracing frame, outside race bearing and the reversing chassis, revolution bracing frame and the turntable; After disassembling bolts between outside race bearing and the center shaft connecting panel is complete, with jack the outside race bearing is ejected from the center shaft connecting panel; Again old revolution is supported 4 and be drawn on the slide rail, move on to the outside, then be lifted into ground; To newly turn round support 5 and be lifted on the slide rail, be drawn to the installation site, be in place.
Use this method to carry out floating crane revolving support and not only saved a large amount of human and material resources, financial resources, and avoided the distortion of member.
Claims (1)
1. floating crane revolving support dismounting method is characterized in that: may further comprise the steps:
Prepare before A, the dismounting:
A, jib is placed on the jib shelf;
B, will turn round anchor and put down;
C, the piece of carving that front portion counter incline structure and revolution are supported between the lower railway are carved tightly;
B, dismounting cylinder inner cable, connection pipe:
A, will draw the cable that is installed on the centre collector ring from reversing chassis and remove, and the cable fag end is all moved in the reversing chassis center crossbeam from cylinder revolution bracing frame fixing, then with asbeston with the protection of cable parcel, prevent damage in the construction;
B, the connection pipe in the centre collector ring (1) is pulled down, first connection pipe (1) and reversing chassis junction are cut open during dismounting, must not injure the reversing chassis mother metal when cutting open; After cutting open connection pipe (1) and plunging joint tie bolt are removed, then connection pipe is placed on centre collector ring (2) support and fixes;
C, with protective cloth with centre collector ring (2) parcel protection;
C, dismounting inclined ladder, roller and rolling wheel support:
A, dismounting roller and rolling wheel support, described roller and rolling wheel support are positioned on lower railway corresponding to reversing chassis front and back support rail beam gap, then winch to the appointed place and also note protecting, until the complete rear whole recoveries of revolution support replacing;
B, inclined ladder is removed, supported until revolution and change complete rear recovery;
D, build slide rail platform (3), build technique platform and slide rail at the fixed part cylinder;
E, will turn round and support jacking, shift out:
A, remove the bolt that is connected between the bolt that is connected between oil groove on the revolution bracing frame, outside race bearing and the reversing chassis, revolution bracing frame and the turntable;
After disassembling bolts between b, outside race bearing and the center shaft connecting panel is complete, with jack the outside race bearing is ejected from the center shaft connecting panel;
C, (4) are supported in old revolution be drawn on the slide rail, move on to the outside, then be lifted into ground;
D, will newly turn round support (5) and be lifted on the slide rail, be drawn to the installation site, be in place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110250871 CN102311057B (en) | 2011-08-29 | 2011-08-29 | Floating crane revolving support dismounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110250871 CN102311057B (en) | 2011-08-29 | 2011-08-29 | Floating crane revolving support dismounting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102311057A CN102311057A (en) | 2012-01-11 |
CN102311057B true CN102311057B (en) | 2013-04-17 |
Family
ID=45424678
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110250871 Active CN102311057B (en) | 2011-08-29 | 2011-08-29 | Floating crane revolving support dismounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102311057B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103410104B (en) * | 2013-08-29 | 2015-10-28 | 上海市机械施工集团有限公司 | The bearing replacement method and apparatus of overhead road of city |
CN103615469B (en) * | 2013-12-03 | 2016-08-17 | 上海振华重工(集团)股份有限公司 | The method for dismounting of huge revolving bearing |
CN105252255B (en) * | 2015-09-10 | 2017-08-01 | 中国葛洲坝集团机械船舶有限公司 | A kind of method that floating crane floating bearing is changed with jacking apparatus |
CN113104742B (en) * | 2021-04-14 | 2023-05-09 | 长沙三远钢结构有限公司 | Steel structure tower crane for construction of building bridge road |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2338680C1 (en) * | 2007-04-16 | 2008-11-20 | Государственное образовательное учреждение высшего профессионального образования Марийский государственный технический университет | Support-rotating device |
CN101607679A (en) * | 2009-07-16 | 2009-12-23 | 上海振华重工(集团)股份有限公司 | The roller elastic track slewing supporting device that is used for ultra-large type full circle swinging hoisting crane |
-
2011
- 2011-08-29 CN CN 201110250871 patent/CN102311057B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2338680C1 (en) * | 2007-04-16 | 2008-11-20 | Государственное образовательное учреждение высшего профессионального образования Марийский государственный технический университет | Support-rotating device |
CN101607679A (en) * | 2009-07-16 | 2009-12-23 | 上海振华重工(集团)股份有限公司 | The roller elastic track slewing supporting device that is used for ultra-large type full circle swinging hoisting crane |
Non-Patent Citations (6)
Title |
---|
张大国.转柱式门机回转下支承轴承更换工艺及施工组织.《港口装卸》.2011,(第1期),第23-25页. |
用顶升法更换浮式起重机回转支承轴承;蒋祖光;《港口装卸》;20110430(第2期);第22-23页 * |
用顶升法更换门机的下支承轴承;范广澄;《港口装卸》;19990228(第1期);第14-16页 * |
范广澄.用顶升法更换门机的下支承轴承.《港口装卸》.1999,(第1期),第14-16页. |
蒋祖光.用顶升法更换浮式起重机回转支承轴承.《港口装卸》.2011,(第2期),第22-23页. |
转柱式门机回转下支承轴承更换工艺及施工组织;张大国;《港口装卸》;20110228(第1期);第23-25页 * |
Also Published As
Publication number | Publication date |
---|---|
CN102311057A (en) | 2012-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108756909B (en) | A kind of construction method of small space shield machine dismantling | |
CN105127707B (en) | Method for disassembling earth pressure balance shield machine in tunnel | |
CN101672011B (en) | Steel tube arch rib vertical lifting method | |
CN102155237B (en) | Device for exchanging tail brush during shield tunneling, and construction method of device | |
CN102311057B (en) | Floating crane revolving support dismounting method | |
CN102464273B (en) | Offshore fan installing platform and fan integral installation rotary holding and lifting mechanism | |
CN105149922A (en) | Dismounting device for dismounting components of shield tunneling machine in tunnel and application of dismounting device | |
JP2004512244A (en) | How to put a crane on a windmill | |
CN203064994U (en) | Lifting device for disassembling negative ring segments | |
CN101880006B (en) | Roll-on device and method for large fixed type rotary crane | |
CN109184756B (en) | Device and method for removing negative ring duct piece in shield tunneling channel | |
CN112031791B (en) | Disassembling method of shield machine in limited space | |
CN111472797A (en) | Implementation method for detaching TBM in hole | |
CN112265616A (en) | Propeller disassembling method, propeller installing method and propeller disassembling tool | |
CN102486051B (en) | Manual demolishing method of large-area spherical net rack | |
CN103243932A (en) | Structure for detaching inner climbing tower crane through roof crane and construction method thereof | |
CN202530775U (en) | Structure for dismounting inner climbing tower crane by using roof crane | |
CN110145317A (en) | A kind of technique on shield machine's station-crossing construction method | |
CN203006789U (en) | Auxiliary hoisting tool for on-site maintenance of wind turbine generator | |
CN202812462U (en) | Detachable intermediate relaying jacking station hydraulic cylinder steel support | |
CN107161851B (en) | A kind of gantry slag bucket device and method for completing automatic clinker-removing by self gravitation effect | |
CN201924941U (en) | Hoisting device for reinforced concrete pipe segment | |
CN219900984U (en) | Device for dismounting bearing and shaft of small wheel | |
CN203782579U (en) | Anti-pull dismantling device of large-span supporting system | |
CN203113351U (en) | Structure for detaching support in foundation pit rapidly and conveniently |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170227 Address after: The 226000 farm of Jiangsu province Nantong Development Zone Riverview Road No. 1 Patentee after: Nantong Zhenhua Heavy Equipment Manufacturing Co., Ltd. Address before: Jiangsu Zhenhua 226000 city of Nantong Province Economic and Technological Development Zone Nantong Road No. 1 Patentee before: Shanghai Zhenhua Heavy Industry Group (Nantong) Co., Ltd. |