CN203979647U CN201420427528.2U CN201420427528U CN203979647U CN 203979647 U CN203979647 U CN 203979647U CN 201420427528 U CN201420427528 U CN 201420427528U CN 203979647 U CN203979647 U CN 203979647U
Authority
CN
China
Prior art keywords
beam track
upper strata
poling
framework upper
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420427528.2U
Other languages
Chinese (zh)
Inventor
叶凌
王万民
刘锋勋
董利波
杨毅
石宝军
谭新河
刘鹏
刘元
苟明跃
章海彬
张玉柱
李朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum First Construction Corp
Original Assignee
China Petroleum First Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum First Construction Corp filed Critical China Petroleum First Construction Corp
Priority to CN201420427528.2U priority Critical patent/CN203979647U/en
Application granted granted Critical
Publication of CN203979647U publication Critical patent/CN203979647U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

This patent has been introduced a kind of detachable recycling guide rail pipe perforator, comprises i-beam track, bolt suspension rod, channel steel support frame, combination cucurbit, and channel steel support frame is arranged on the upper position of framework upper strata crossbeam, and two ends arrange bolt hole; I-beam track is arranged at the bottom of framework upper strata crossbeam, is " ten " font and arranges, top flange two side position processing sets up bolts hole with framework upper strata crossbeam; Bolt suspension rod connects as one channel steel support frame and i-beam track; The suspension hook on chain block top is connected with poling dolly shackle plate, and bottom suspension hook connects steel pipe to be worn by lifting rope; The roller of poling dolly rolls on top, i-beam track lower flange.This patent preparation process is simple, fabricating cost is low, using scope is wide, can conveniently remove lifting; Can reduce work on the spot amount, increase work efficiency; Can reuse, be suitable for various piping lane pipelines and install, reduce labor intensity, reduce the cost of lifting construction.

Description

A kind of detachable recycling guide rail pipe perforator
Technical field
The utility model relates to a kind of large-scale piping lane pipe installation technology, particularly a kind of detachable recycling guide rail pipe perforator.
Background technique
In recent years, domestic refining and petrochemical processing units scale constantly increases, and engineering construction difficulty also increases thereupon; In refining and petrochemical processing units construction project, device has been carried out to functional subregion setting, between zones of different, connect by piping lane, piping lane also constantly presents the features such as highly high, length is large, piping layout is intensive, and how the pipeline on piping lane is mounted for difficult point and the emphasis in engineering construction.
According to traditional construction process, as used carrying roller pipe perforator to carry out pipeline installation, can only carry out single pipe installation, installation efficiency is low, and the surface anticorrosion layer of meeting heavy damage pipeline in installation process, causes the construction that repeats of pipeline corrosion protection, less economical; If use the instruments such as crane, chain block to take the method for dragging by force, pipeline is in place from piping lane side, there is the shortcomings such as inefficiency, mechanical one-shift waste is serious, security risk is large.
Consider from Security, convenience and the Economy of poling construction, study a kind of novel pipeline poling mode, to meet the needs according to engineering construction.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of detachable recycling guide rail pipe perforator, utilizes this pipe perforator, can realize fast the installment work of a large amount of pipelines of piping lane.
In order to realize the object solving the problems of the technologies described above, the utility model has adopted following technological scheme:
Detachable recycling guide rail pipe perforator of the present utility model, can be used for piping lane or large-scale framework delivering pipe, is arranged on the crossbeam of framework upper strata, carries out the installment work of pipeline on bottom crossbeam; Pipe perforator comprises i-beam track, bolt suspension rod, channel steel support frame, pulls combination cucurbit, and channel steel support frame is arranged on the upper position of framework upper strata crossbeam, and channel steel support frame two ends are processing sets up bolt hole respectively; I-beam track and framework upper strata crossbeam are " ten " font to be arranged, i-beam track is arranged at the bottom of framework upper strata crossbeam, with the i-beam track top flange two side position processing sets up bolts hole of framework upper strata crossbeam contact position; Bolt suspension rod connects the bolt hole of channel-section steel supporting frame two ends and i-beam track top flange by screw rod and nut, channel steel support frame and i-beam track are connected as one.
The suspension hook on chain block top is connected with the shackle plate that poling dolly carries, and the suspension hook of chain block bottom is connected with steel pipe to be worn by lifting rope.
The roller of poling dolly rolls on top, i-beam track lower flange, thereby realizes the movement of poling dolly on i-beam track.
Concrete, described poling dolly is made up of two rollers, two roller bearings, two vertical connecting plates, a coupling shaft and a shackle plate, two rollers are on top, roller is connected to vertical connecting plate by poling roller bearing respectively, two vertical connecting plates link together by coupling shaft, and shackle plate is positioned on coupling shaft.
Concrete, described chain block is the finished product cucurbit of the prior art of lifting use.Chain block is as the assistant tool of poling construction.
Guide rail pipe perforator is arranged at the bottom of framework upper strata crossbeam, the supporting member of construction using framework upper strata crossbeam as poling.
Principle and the process of installing are as follows:
(1) after connecting between guide rail and crossbeam, combination cucurbit is installed in i-beam track, and endways thrust baffle is set, prevent from combining cucurbit landing.
(2) hang jack in combination cucurbit bottom, utilize jack binding, adjust material height, convenient transport.
(3) this piping lane pipeline in place after, can combination cucurbit, i-beam track etc. dismounting, move on to next piping lane and continue construction.
By adopting technique scheme, the utlity model has following beneficial effect:
The one of this patent can reuse guide rail pipe perforator, has that preparation process is simple, fabricating cost is low, using scope is wide, utilization efficiency is high and the advantage such as reusable; Can conveniently remove lifting; Operator safety, fast construction; Reduce work on the spot amount, improved working efficiency rate; Guide rail pipe perforator can reuse, and is suitable for various piping lane pipelines and installs, and has reduced labor intensity, has reduced the cost of lifting construction.
Brief description of the drawings
Fig. 1 is the front view that detachably reuses guide rail pipe perforator.
In figure, 1-channel steel support frame, 2-framework upper strata crossbeam, 3-bolt suspension rod, 4-i-beam track, 5-combination cucurbit roller, 6-combination cucurbit roller bearing, the vertical connecting plate of 7-combination cucurbit, 8-combination cucurbit coupling shaft, 9-combination cucurbit shackle plate, 10-chain block, 11-lifting rope, 12-steel pipe to be worn.
Embodiment
Below in conjunction with accompanying drawing, this patent is further explained.But the protection domain of this patent is not limited to concrete mode of execution.
Embodiment 1
A kind of detachable recycling guide rail pipe perforator, for the piping lane pipeline with framework, is arranged on the crossbeam of framework upper strata, carries out the installment work of pipeline on bottom crossbeam; Comprise that i-beam track, bolt suspension rod, channel steel support frame, combination cucurbit, channel steel support frame are arranged on the upper position of framework upper strata crossbeam, channel steel support frame two ends are processing sets up bolt hole respectively; I-beam track and framework upper strata crossbeam are " ten " font to be arranged, i-beam track is arranged at the bottom of framework upper strata crossbeam, with the i-beam track top flange two side position processing sets up bolts hole of framework upper strata crossbeam contact position; Bolt suspension rod connects the bolt hole of channel-section steel supporting frame two ends and i-beam track top flange by screw rod and nut, channel steel support frame and i-beam track are connected as one; Poling dolly is arranged on i-beam track beam, then the suspension hook on chain block top is connected with the shackle plate of poling dolly, the suspension hook of chain block bottom is connected with steel pipe to be worn by lifting rope.
When use, utilize bolt suspension rod and channel steel support frame i-beam track to be fixed on to the bottom of framework upper strata crossbeam, poling dolly is arranged on the top, lower flange of i-beam track, completes the mobile working of poling dolly by the roller of poling dolly in the rolling on top, i-beam track lower flange; Use the assistant tool of chain block as poling construction, the suspension hook on chain block top is connected with the shackle plate that poling dolly carries, and the suspension hook of chain block bottom is connected with steel pipe to be worn by lifting rope.
In the Process Piping Construction of certain large-scale piping lane in construction site, the technological scheme that adopts the present invention to describe, after piping lane main body construction, carry out poling work, first carry out the installation of channel steel support part, carry out subsequently the installation of i-beam track, then carried out the installation of small rail car,, chain block has been connected with poling dolly meanwhile, carry out after no load test, started formal poling work.This technological scheme efficiency of construction is high, and safe operation process is reliable, and has obtained good economic benefit.

Claims (3)

1. a detachable recycling guide rail pipe perforator, for the piping lane pipeline with framework, is arranged on the crossbeam of framework upper strata, carries out the installment work of pipeline on bottom crossbeam; It is characterized in that: guide rail pipe perforator comprises combination cucurbit, i-beam track, bolt suspension rod, channel steel support frame, chain block, and channel steel support frame is arranged on the upper position of framework upper strata crossbeam, and channel steel support frame two ends are processing sets up bolt hole respectively; I-beam track and framework upper strata crossbeam are " ten " font to be arranged, i-beam track is arranged at the bottom of framework upper strata crossbeam, with the i-beam track top flange two side position processing sets up bolts hole of framework upper strata crossbeam contact position; Bolt suspension rod connects the bolt hole of channel-section steel supporting frame two ends and i-beam track top flange by screw rod and nut, channel steel support frame and i-beam track are connected as one;
The suspension hook on chain block top is connected with the shackle plate that poling dolly carries, and the suspension hook of chain block bottom is connected with steel pipe to be worn by lifting rope;
The roller of poling dolly rolls on top, i-beam track lower flange, thereby realizes the movement of poling dolly on i-beam track.
2. detachably reuse according to claim 1 guide rail pipe perforator, it is characterized in that: guide rail pipe perforator is arranged at the bottom of framework upper strata crossbeam, the supporting member of construction using framework upper strata crossbeam as poling.
3. detachably reuse according to claim 1 guide rail pipe perforator, it is characterized in that: described poling dolly is made up of two rollers, two roller bearings, two vertical connecting plates, a coupling shaft and a shackle plate, two rollers are on top, roller is connected to vertical connecting plate by poling roller bearing respectively, two vertical connecting plates link together by coupling shaft, and shackle plate is positioned on coupling shaft.
CN201420427528.2U 2014-07-31 2014-07-31 A kind of detachable recycling guide rail pipe perforator Expired - Lifetime CN203979647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420427528.2U CN203979647U (en) 2014-07-31 2014-07-31 A kind of detachable recycling guide rail pipe perforator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420427528.2U CN203979647U (en) 2014-07-31 2014-07-31 A kind of detachable recycling guide rail pipe perforator

Publications (1)

Publication Number Publication Date
CN203979647U true CN203979647U (en) 2014-12-03

Family

ID=51977089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420427528.2U Expired - Lifetime CN203979647U (en) 2014-07-31 2014-07-31 A kind of detachable recycling guide rail pipe perforator

Country Status (1)

Country Link
CN (1) CN203979647U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453233A (en) * 2014-12-29 2015-03-25 中国海洋石油总公司 Lossless pipe penetration construction process
CN105715866A (en) * 2016-04-21 2016-06-29 中国化学工程第三建设有限公司 Dual-team circulation pipe penetrating device of multilayered pipe gallery pipe penetrating device and construction method for dual-team circulation pipe penetrating device
CN105736828A (en) * 2016-04-18 2016-07-06 太原融盛科技有限公司 Safety rope device for pipe connection
CN107738986A (en) * 2017-11-23 2018-02-27 国家电网公司 Complete non-maintaining simple and easy hoisting system manually
CN109896440A (en) * 2019-04-12 2019-06-18 中铁隧道股份有限公司 Equipment for removing shield tunnel inner orbit
CN111457155A (en) * 2020-04-22 2020-07-28 中石化第十建设有限公司 Suspension progressive pipe penetrating device and method
CN112499473A (en) * 2020-11-07 2021-03-16 广东韶钢工程技术有限公司 Supporting and hanging device for installation and maintenance of electric hoist equipment and using method thereof
CN113464725A (en) * 2021-08-03 2021-10-01 中石化第十建设有限公司 Pipe jacking device and method for pipe gallery pipeline

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453233A (en) * 2014-12-29 2015-03-25 中国海洋石油总公司 Lossless pipe penetration construction process
CN105736828A (en) * 2016-04-18 2016-07-06 太原融盛科技有限公司 Safety rope device for pipe connection
CN105715866A (en) * 2016-04-21 2016-06-29 中国化学工程第三建设有限公司 Dual-team circulation pipe penetrating device of multilayered pipe gallery pipe penetrating device and construction method for dual-team circulation pipe penetrating device
CN105715866B (en) * 2016-04-21 2018-01-23 中国化学工程第三建设有限公司 A kind of multilayer piping lane pipe perforator Straight Run group circulation pipe lining device and its construction method
CN107738986A (en) * 2017-11-23 2018-02-27 国家电网公司 Complete non-maintaining simple and easy hoisting system manually
CN107738986B (en) * 2017-11-23 2024-04-05 国家电网公司 Full-manual maintenance-free simple hoisting system
CN109896440A (en) * 2019-04-12 2019-06-18 中铁隧道股份有限公司 Equipment for removing shield tunnel inner orbit
CN111457155A (en) * 2020-04-22 2020-07-28 中石化第十建设有限公司 Suspension progressive pipe penetrating device and method
CN111457155B (en) * 2020-04-22 2021-11-05 中石化第十建设有限公司 Suspension progressive pipe penetrating device and method
CN112499473A (en) * 2020-11-07 2021-03-16 广东韶钢工程技术有限公司 Supporting and hanging device for installation and maintenance of electric hoist equipment and using method thereof
CN113464725A (en) * 2021-08-03 2021-10-01 中石化第十建设有限公司 Pipe jacking device and method for pipe gallery pipeline

Similar Documents

Publication Publication Date Title
CN203979647U (en) A kind of detachable recycling guide rail pipe perforator
CN105071604B (en) Replace the device and method of vibrating motor
CN101880006B (en) Roll-on device and method for large fixed type rotary crane
CN103669215A (en) Vertical-horizontal overall-sliding type side mold of fulcrum-few support
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN203782592U (en) Movable hanging basket operation device for high-altitude maintenance of bridge
CN202344201U (en) Device for disassembling catcher of looping coiling block
CN204266228U (en) Deep foundation ditch large area concrete side wall movable stencil
CN201330120Y (en) Mobile assembled gantry crane
CN108275579B (en) Quick dismantling device for pipeline in tunnel
CN205998874U (en) A kind of Slag treatment baffle-box quick-replaceable special purpose device
CN205399232U (en) Artifical bridging device of combination steel construction
CN205063366U (en) Portal displacement device
CN103287986A (en) Curtain board transport lifting device and method for mounting curtain board by using device
CN101537982A (en) Underground orbital transfer hydraulic crane truck
CN202644407U (en) Demoulding device for bottom plate bracket of capping beam constructed by hoop method
CN204906129U (en) Change vibrating motor's device
CN202296886U (en) Hoisting device for installing oversized radial gate of hydropower station
CN207846233U (en) A kind of holder transverse direction integral translation device
CN204265216U (en) Large-scale component lifting special balancing suspender
CN203782579U (en) Anti-pull dismantling device of large-span supporting system
CN205774648U (en) A kind of desulfurizing iron device for removing slag
CN204212071U (en) A kind of pier stud anchor structure
CN105926455B (en) A kind of bottom die of box-beam overall pulling down method
CN108975171A (en) A kind of accurate attaching/detaching apparatus of segmentation and application method of heating furnace water beam and column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141203