CN211246730U - Building engineering construction waste treatment device - Google Patents

Building engineering construction waste treatment device Download PDF

Info

Publication number
CN211246730U
CN211246730U CN201921982998.4U CN201921982998U CN211246730U CN 211246730 U CN211246730 U CN 211246730U CN 201921982998 U CN201921982998 U CN 201921982998U CN 211246730 U CN211246730 U CN 211246730U
Authority
CN
China
Prior art keywords
box
fixedly connected
handle
construction waste
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921982998.4U
Other languages
Chinese (zh)
Inventor
王甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN201921982998.4U priority Critical patent/CN211246730U/en
Application granted granted Critical
Publication of CN211246730U publication Critical patent/CN211246730U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model belongs to the technical field of the waste material treatment facility, especially, be a building engineering construction waste material processing apparatus, handle the box and handle the box on including down, on handle the upper end that the box set up and handle the box under, on handle the inside wall fixedly connected with baffle of box, one side of baffle rotates respectively through the pivot pole and is connected with from the roller and the main roller that rolls, on handle one side fixed mounting of box and have the motor, handle the case under the diapire fixedly connected with of box down, hold the inside wall fixedly connected with electric putter of case down. The utility model discloses a set up from rolling roller and main rolling roller, main rolling roller rolls the waste material under the effect of motor, and the rethread sets up the stripper plate, makes the stripper plate cooperate the sawtooth piece to carry out the regrinding to the waste material under electric putter's promotion to make the waste material handle more thoroughly, the waste material in later stage that has also been convenient comes out.

Description

Building engineering construction waste treatment device
Technical Field
The utility model relates to a waste treatment equipment technical field specifically is a building engineering construction waste processing apparatus.
Background
The construction waste refers to dregs, spoil, waste materials, residual mud and other wastes generated in the process of construction, laying or dismantling and repairing of various buildings, structures, pipe networks and the like of construction units or personal teams, and therefore the wastes need to be treated and collected.
However, the existing construction waste treatment device has the following problems:
1. the existing construction waste treatment device collects and packs the construction waste only through simple smashing treatment, so that the treatment is not thorough enough, and small parts of large-particle waste can still appear, so that secondary treatment is caused, and time and labor are wasted;
2. the existing construction waste treatment device is used for treating construction waste, often does not treat dust and is scattered in the outside air, so that air pollution is caused, and the environmental protection is not facilitated.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering construction waste processing apparatus has solved current building waste processing apparatus and has handled thoroughly inadequately and not have better dust collector's problem.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering construction waste processing apparatus, includes down handles the box and goes up the processing box, go up the upper end that the processing box set up under the processing box, go up the inside wall fixedly connected with baffle of processing the box, one side of baffle rotates respectively through the pivot pole and is connected with from the roller of rolling and main roller of rolling, one side fixed mounting who goes up the processing box has the motor, hold the case under the diapire fixedly connected with of processing the box down, the inside wall fixedly connected with electric putter of holding the case down, electric putter's output fixedly connected with stripper plate, one side fixed mounting of stripper plate has sawtooth block, one side fixedly connected with L type card strip piece of processing the box down, sliding connection has the sealing door between the L type card strip piece, one side fixedly connected with pulling handle of sealing door.
As a preferred technical scheme of the utility model, go up the upper end one side of handling the box and seted up the ventilation hole, the inner wall fixedly connected with mount in ventilation hole, one side fixedly connected with exhaust fan of mount, go up the inside wall fixedly connected with filter screen of handling the box, go up the horizontal fixedly connected with chute pole of inside wall of handling the box, the inner wall sliding connection of chute pole has the ash collecting box.
As a preferred technical scheme of the utility model, one side of going up the processing box is provided with the switch door, the upper end fixedly connected with feed inlet of going up the processing box, the setting and the mutual adaptation of ash-collecting box of switch door.
As an optimal technical scheme of the utility model, the inside wall fixedly connected with of going up the processing box links up the pole, the one end of linking the pole and one side fixed connection of baffle, the junction threaded connection who handles box and last processing box down has the fixed screw.
As a preferred technical scheme of the utility model, the output of motor and the pivot pole fixed connection of main roller one end of rolling, it is the symmetry form setting with main roller to roll from rolling the roller.
As the utility model discloses an optimized technical scheme, electric putter's quantity that sets up is two, and mutual symmetry sets up, the bin outlet has been seted up to one side of handling the box down, and with the mutual adaptation of sealing a door.
(III) advantageous effects
Compared with the prior art, the utility model provides a building engineering construction waste processing apparatus possesses following beneficial effect:
1. this building engineering construction waste treatment device rolls the roller through setting up from rolling the roller and mainly rolling the roller, and the main roller that rolls the waste material under the effect of motor, and the rethread sets up the stripper plate, makes the stripper plate carry out the regrinding to the waste material in the sawtooth piece of cooperating under electric putter's promotion to make the waste material treatment more thorough, also convenient the waste material in later stage comes out.
2. This building engineering construction waste processing apparatus, through setting up the ventilation hole, the ventilation hole is cooperating the exhaust fan and is being discharged the gas of inside, and the rethread sets up filter screen and dust collecting box for the dust is kept apart, and then can not discharge to the air in, leads to the pollution of air.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the linkage structure of the slave rolling roller and the master rolling roller of the present invention;
fig. 3 is a schematic view of a part of an enlarged structure at a in fig. 1 according to the present invention.
In the figure: 1. a lower treatment box body; 2. loading the treatment box body; 3. a guide plate; 4. from the milling roll; 5. a main rolling roller; 6. an electric motor; 7. a lower containing box; 8. an electric push rod; 9. a pressing plate; 10. a sawtooth block; 11. an L-shaped card bar block; 12. sealing the door; 13. pulling the handle; 14. a vent hole; 15. a fixed mount; 16. an exhaust fan; 17. a filter screen; 18. a chute rod; 19. a dust collecting box; 20. opening and closing the door; 21. a feed inlet; 22. a connecting rod; 23. and fixing the screw.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a building engineering construction waste processing apparatus, including lower processing box 1 and last processing box 2, it sets up the upper end of processing box 1 under to go up processing box 2, go up inside wall fixedly connected with baffle 3 of processing box 2, one side of baffle 3 is rotated respectively through the pivot pole and is connected with from rolling roller 4 and main rolling roller 5, one side fixed mounting who goes up processing box 2 has motor 6, hold case 7 under the diapire fixedly connected with of lower processing box 1, hold case 7's inside wall fixedly connected with electric putter 8 down, electric putter 8's output fixedly connected with stripper plate 9, one side fixed mounting of stripper plate 9 has sawtooth block 10, one side fixedly connected with L type card strip piece 11 of lower processing box 1, sliding connection has sealing door 12 between L type card strip piece 11, one side fixedly connected with pulling handle 13 of sealing door 12.
In this embodiment, motor 6 is started, make motor 6 drive main roller 5 and produce rotatoryly, then pour building waste into through feed inlet 21, then under the direction of baffle 3 to from between roller 4 and the main roller 5, it is smashed to be rolled from roller 4 and main roller 5 afterwards, roll the inside that the crushing waste material can fall to holding case 7 down, start electric putter 8 afterwards, make electric putter 8 promote stripper plate 9 and remove left, and then make sawtooth block 10 extrude the crushing once more to the waste material after smashing, thereby reach more efficient processing, all the back that finishes, pulling handle 13, make sealing door 12 slide at the inner wall of L type card strip piece 11 and pull open, thereby restart electric putter 8, make stripper plate 9 release the waste material of handling well.
Specifically, a vent 14 is formed in one side of the upper end of the upper processing box 2, a fixing frame 15 is fixedly connected to the inner wall of the vent 14, an exhaust fan 16 is fixedly connected to one side of the fixing frame 15, a filter screen 17 is fixedly connected to the inner side wall of the upper processing box 2, a sliding groove rod 18 is transversely and fixedly connected to the inner side wall of the upper processing box 2, and a dust collecting box 19 is slidably connected to the inner wall of the sliding groove rod 18.
In this embodiment, open exhaust fan 16, exhaust fan 16 can be discharged the inside air that flows of lower processing box 1 and last processing box 2, and inside air can take the dust at first to filter through filter screen 17, and in filter screen 17's long-term filtration, filter screen 17 surface accumulation surplus dust can fall to the inside of dust collecting box 19 to reach and hold the effect.
Specifically, one side of the upper treatment box body 2 is provided with a switch door 20, the upper end of the upper treatment box body 2 is fixedly connected with a feed inlet 21, and the switch door 20 is matched with the ash collecting box 19.
In this embodiment, the switch door 20 is opened to make the dust collecting box 19 slide out through the cooperation of the chute rod 18, and then the dust inside the dust collecting box 19 is cleaned, and the feeding port 21 is better to feed materials into the downward processing box 1 and the upper processing box 2.
Specifically, the inner side wall of the upper treatment box 2 is fixedly connected with a joint rod 22, one end of the joint rod 22 is fixedly connected with one side of the guide plate 3, and a joint of the lower treatment box 1 and the upper treatment box 2 is in threaded connection with a fixing screw 23.
In this embodiment, when whole equipment need clear up, can pass through the split of set screw 23 with handling box 1 down and last processing box 2, and then reach the clearance, guarantee the cleanliness factor of equipment.
Specifically, the output end of the motor 6 is fixedly connected with the rotating shaft rod at one end of the main rolling roller 5, and the auxiliary rolling roller 4 and the main rolling roller 5 are symmetrically arranged.
In this embodiment, motor 6's output and the pivot pole fixed connection of main roller 5 one end for motor 6 can be better with power transmission for main roller 5, and then obtain crushing.
Specifically, electric putter 8 sets up quantity for two, and mutual symmetry sets up, and the bin outlet has been seted up to one side of handling box 1 down, and with the mutual adaptation of sealing 12.
In this embodiment, electric putter 8 sets up quantity for two for stripper plate 9 obtains more stable promotion, thereby reaches better regrinding effect, and the design of bin outlet is then for better row material.
The utility model discloses a theory of operation and use flow: starting the motor 6, driving the main rolling roller 5 to rotate by the motor 6, then pouring the construction waste through the feeding port 21, then leading the construction waste to be between the rolling roller 4 and the main rolling roller 5 under the guidance of the guide plate 3, then rolling and crushing the construction waste by the rolling roller 4 and the main rolling roller 5, enabling the rolled and crushed construction waste to fall into the lower containing box 7, then starting the electric push rod 8, enabling the electric push rod 8 to push the extrusion plate 9 to move leftwards, further enabling the sawtooth block 10 to extrude and crush the crushed construction waste again, thereby achieving more efficient treatment, after all the treatment is finished, pulling the pulling handle 13, enabling the sealing door 12 to slide and pull open on the inner wall of the L-shaped clamping strip block 11, further starting the electric push rod 8 again, enabling the extrusion plate 9 to push out the treated construction waste, in the whole equipment operation process, always starting the fan 16, and discharging the flowing air inside the lower treatment box 1 and the upper treatment box 2 by the fan 16, and inside air can take the dust at first to filter through filter screen 17, in filter screen 17's long-term filtration, filter screen 17 surface accumulation surplus dust can fall to the inside of ash collecting box 19, thereby reach and hold the effect, equipment shut down back, can open switch door 20, make ash collecting box 19 pass through the cooperation roll-off of spout pole 18, and then clear up the inside dust of ash collecting box 19, when whole equipment needs to be cleared up, can pass through the split of set screw 23 with lower processing box 1 and last processing box 2, and then reach the clearance.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a building engineering construction waste processing apparatus, includes down handles box (1) and goes up and handle box (2), go up and handle box (2) and set up the upper end of handling box (1) under, its characterized in that: the inner side wall of the upper processing box body (2) is fixedly connected with a guide plate (3), one side of the guide plate (3) is respectively and rotatably connected with a secondary rolling roller (4) and a main rolling roller (5) through a rotating shaft rod, a motor (6) is fixedly arranged on one side of the upper treatment box body (2), a lower containing box (7) is fixedly connected with the bottom wall of the lower treatment box body (1), the inner side wall of the lower containing box (7) is fixedly connected with an electric push rod (8), the output end of the electric push rod (8) is fixedly connected with an extrusion plate (9), one side of the extrusion plate (9) is fixedly provided with a sawtooth block (10), one side of the lower processing box body (1) is fixedly connected with an L-shaped clamping strip block (11), a sealing door (12) is connected between the L-shaped clamping strip blocks (11) in a sliding mode, and a pulling handle (13) is fixedly connected to one side of the sealing door (12).
2. The construction engineering and construction waste disposal device according to claim 1, wherein: go up the upper end one side of handling box (2) and seted up ventilation hole (14), the inner wall fixedly connected with mount (15) of ventilation hole (14), one side fixedly connected with exhaust fan (16) of mount (15), go up the inside wall fixedly connected with filter screen (17) of handling box (2), go up the horizontal fixedly connected with chute pole (18) of inside wall of handling box (2), the inner wall sliding connection of chute pole (18) has album ash box (19).
3. The construction engineering and construction waste disposal device according to claim 1, wherein: one side of the upper treatment box body (2) is provided with a switch door (20), the upper end of the upper treatment box body (2) is fixedly connected with a feed inlet (21), and the switch door (20) is arranged to be matched with the ash collecting box (19).
4. The construction engineering and construction waste disposal device according to claim 1, wherein: go up the inside wall fixedly connected with of handling box (2) and join pole (22), the one end of joining pole (22) and one side fixed connection of baffle (3), the junction threaded connection of handling box (1) and last handling box (2) has set screw (23) down.
5. The construction engineering and construction waste disposal device according to claim 1, wherein: the output of motor (6) and the pivot pole fixed connection of main roller (5) one end of rolling, it sets up to be the symmetry form with main roller (5) from rolling roller (4).
6. The construction engineering and construction waste disposal device according to claim 1, wherein: the number of the electric push rods (8) is two, the electric push rods are symmetrically arranged, a discharge hole is formed in one side of the lower processing box body (1), and the electric push rods and the sealing door (12) are matched with each other.
CN201921982998.4U 2019-11-15 2019-11-15 Building engineering construction waste treatment device Expired - Fee Related CN211246730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921982998.4U CN211246730U (en) 2019-11-15 2019-11-15 Building engineering construction waste treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921982998.4U CN211246730U (en) 2019-11-15 2019-11-15 Building engineering construction waste treatment device

Publications (1)

Publication Number Publication Date
CN211246730U true CN211246730U (en) 2020-08-14

Family

ID=71988175

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921982998.4U Expired - Fee Related CN211246730U (en) 2019-11-15 2019-11-15 Building engineering construction waste treatment device

Country Status (1)

Country Link
CN (1) CN211246730U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112547278A (en) * 2020-11-12 2021-03-26 温州宇途机械科技有限公司 Mechanical construction waste multiple crushing device
CN114939322A (en) * 2021-02-10 2022-08-26 燕龙基(徐州)再生资源利用有限公司 Waste glass retrieves and uses dust collection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112547278A (en) * 2020-11-12 2021-03-26 温州宇途机械科技有限公司 Mechanical construction waste multiple crushing device
CN114939322A (en) * 2021-02-10 2022-08-26 燕龙基(徐州)再生资源利用有限公司 Waste glass retrieves and uses dust collection device

Similar Documents

Publication Publication Date Title
CN211246730U (en) Building engineering construction waste treatment device
CN111514967A (en) Processing apparatus is used in preparation of municipal administration rubbish regeneration insulating brick
CN110918175A (en) Construction waste treatment device
CN212493385U (en) Recovery unit for construction waste treatment
CN108940493A (en) A kind of solid waste high-effective classifying processing equipment
CN209205400U (en) A kind of grinding device of construction waste
CN215140749U (en) Construction waste treatment equipment
CN110882783A (en) Waste timber fragmentation treatment device with dust removal function
CN216936205U (en) Anti-pollution reducing mechanism for building refuse treatment
CN213161827U (en) Building rubbish classification equipment
CN214327340U (en) Sewage discharge device for constructional engineering
CN212663300U (en) Comprehensive garbage treatment stirring device of industrial garbage treatment plant
CN211802393U (en) Waste battery sorting device
CN208512697U (en) A kind of construction waste crushing device
CN113148497A (en) Household garbage cleaning and transporting equipment for compressing garbage and using method
CN218134014U (en) Improved generation domestic waste flash evaporation mineralization treater box
CN212120825U (en) Intelligent manufacturing waste treatment device
CN212663859U (en) Domestic garbage treatment device
CN220027152U (en) Smashing device for concrete recycling
CN219631418U (en) Solid waste environmental protection treatment facility
CN209985466U (en) Building rubbish is with categorised recovery unit
CN219051624U (en) House building engineering construction garbage disposal device
CN218810993U (en) Sewage treatment equipment
CN218459745U (en) Breaker of building rubbish processing
CN220532589U (en) Waste material treatment equipment for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200814

CF01 Termination of patent right due to non-payment of annual fee