CN211198411U - Hanging material carrying device for building construction - Google Patents
Hanging material carrying device for building construction Download PDFInfo
- Publication number
- CN211198411U CN211198411U CN201922187575.XU CN201922187575U CN211198411U CN 211198411 U CN211198411 U CN 211198411U CN 201922187575 U CN201922187575 U CN 201922187575U CN 211198411 U CN211198411 U CN 211198411U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- fixed frame
- fixed
- backup pad
- supporting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a construction technical field just discloses a material handling device hangs for construction, including fixed support plate, the equal fixedly connected with universal wheel in four corners of fixed support plate lower surface, the platform is placed to the left side fixedly connected with of fixed support plate upper surface, it has the bearing to peg graft at the middle part on fixed support plate upper surface right side, it has the connecting rod to peg graft in the inside of bearing. This hanging material handling device for construction, through first backup pad, slider, slide rail, fixed frame, bearing, connecting rod, assistor, operating handle and hydraulic stem cooperation, strengthened the effect of hanging material transport for the construction process has improved the speed of hanging material transport, the effectual time that hangs the material transport that has reduced places platform, fixed frame, locating pin, second backup pad and wiring motor cooperation, has improved and has only carried a set of transport mode, has improved holistic efficiency of construction.
Description
Technical Field
The utility model relates to a construction technical field specifically is a material handling device hangs for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and a carrying device is needed when carrying the hanging materials during construction; the carrying device on the market at present needs frequent moving position and height change when in use; the carrying device in the prior art has poor carrying effect of the hanging material.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building construction is with hanging material handling device has solved prior art's handling device, hangs the poor problem of effect of material transport.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a lifting material carrying device for building construction comprises a fixed supporting plate, universal wheels are fixedly connected to four corners of the lower surface of the fixed supporting plate, a placing table is fixedly connected to the left side of the upper surface of the fixed supporting plate, bearings are inserted into the middle of the right side of the upper surface of the fixed supporting plate, connecting rods are inserted into the bearings, an auxiliary device is fixedly connected to the middle of the right side of the upper surface of the fixed supporting plate, a fixed frame is fixedly connected to the top end of each connecting rod, positioning pins are inserted into the front side and the rear side of the inner bottom side wall of the fixed frame, the bottom ends of the two groups of positioning pins are respectively inserted into the front side and the rear side of the upper surface of the fixed supporting plate, a hydraulic cylinder is fixedly connected to the inner bottom side wall of the fixed frame, a hydraulic pump is fixedly connected to the left side of the upper surface of the hydraulic, the output end of the hydraulic pump is fixedly connected with a discharge pipe, the middle part of the outer surface of the discharge pipe is inserted with the middle part of the upper surface of the fixed frame, the right side of the upper surface of the fixed frame is fixedly connected with a hydraulic rod, the front bottom of the hydraulic rod is fixedly connected with the discharge pipe, the left side of the upper surface of the fixed frame is fixedly connected with an operating handle, the top end of the hydraulic rod is fixedly connected with a first supporting plate, the front bottom and the back bottom of the first supporting plate are both fixedly connected with sliding blocks, sliding rails are arranged inside the two groups of sliding blocks, the bottom ends of the two groups of sliding rails are both fixedly connected with the upper surface of the fixed frame, the top of the left side surface of the first supporting plate is fixedly connected with a second supporting plate, the upper surface of the second supporting plate is fixedly connected with a rope winding motor, the middle part of first backup pad upper surface fixedly connected with puts up the rope ware, the bottom of wiring is provided with hangs the material case.
Preferably, the slide block is a T-shaped slide block, the slide rail is a T-shaped slide rail, and the slide block is slidably connected with the slide rail.
Preferably, the outer surface of the operating handle is provided with a wrapping layer, and the outer surface of the wrapping layer is provided with anti-skid convex particles.
Preferably, the inner diameter of the bearing is matched with the outer diameter of the connecting rod, and the size of the suction pipe is matched with that of the discharge pipe.
Preferably, the winding rope is made of phosphatized coated steel wires, and the assistor is made of forty-five steel.
Preferably, the upper surface of the assistor is provided with a circular groove, and a plurality of groups of circular balls are arranged in the circular groove.
(III) advantageous effects
Compared with the prior art, the utility model provides a material handling device hangs for construction possesses following beneficial effect:
1. this hanging material handling device for construction, through first backup pad, slider, slide rail, fixed frame, bearing, connecting rod, assistor, operating handle and hydraulic stem cooperation, strengthened the effect of hanging material transport for the construction process has improved the speed of hanging material transport, the effectual time that hangs the material transport that has reduced places platform, fixed frame, locating pin, second backup pad and wiring motor cooperation, has improved and has only carried a set of transport mode, has improved holistic efficiency of construction.
2. This hanging material handling device for construction through universal wheel, fixed support plate and the cooperation of first backup pad, has strengthened holistic fixed stay effect, has improved holistic mobility, has saved greatly and has hung the required time of material transport.
Drawings
Fig. 1 and 2 are schematic structural views of the present invention;
fig. 3 is a schematic view of the structure vertical cut of the utility model.
In the figure: 1. fixing the support plate; 2. a universal wheel; 3. a placing table; 4. a bearing; 5. a connecting rod; 6. an assist device; 7. a fixing frame; 8. positioning pins; 9. a hydraulic cylinder; 10. a hydraulic pump; 11. a suction tube; 12. a discharge pipe; 13. a hydraulic lever; 14. an operating handle; 15. a first support plate; 16. a slider; 17. a slide rail; 18. a second support plate; 19. a rope winding motor; 20. a rope winding shaft; 21. rope winding; 22. a rope hanger; 23. and (5) hanging the material box.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a hoisting material carrying device for building construction comprises a fixed supporting plate 1, universal wheels 2 are fixedly connected to four corners of the lower surface of the fixed supporting plate 1, the universal wheels 2, the fixed supporting plate 1 and a first supporting plate 15 are matched, the integral fixed supporting effect is enhanced, the integral maneuverability is improved, the time required by carrying the hoisting material is greatly saved, a placing table 3 is fixedly connected to the left side of the upper surface of the fixed supporting plate 1, the placing table 3, a fixed frame 7, a positioning pin 8, a second supporting plate 18 and a rope winding motor 19 are matched, the carrying mode that only one group can be carried is improved, the integral construction efficiency is improved, a bearing 4 is inserted in the middle of the right side of the upper surface of the fixed supporting plate 1, a connecting rod 5 is inserted in the bearing 4, an auxiliary device 6 is fixedly connected to the middle of the upper surface of the fixed supporting plate 1, and a fixed frame 7 is fixedly, the front side and the rear side of the inner bottom side wall of the fixed frame 7 are respectively inserted with a positioning pin 8, the bottom ends of the two groups of positioning pins 8 are respectively inserted with the front side and the rear side of the upper surface of the fixed support plate 1, the inner bottom side wall of the fixed frame 7 is fixedly connected with a hydraulic cylinder 9, the left side of the upper surface of the hydraulic cylinder 9 is fixedly connected with a hydraulic pump 10, the input end of the hydraulic pump 10 is fixedly connected with a suction pipe 11, the middle part of the outer surface of the suction pipe 11 is inserted with the left side of the upper surface of the hydraulic cylinder 9, the output end of the hydraulic pump 10 is fixedly connected with a discharge pipe 12, the middle part of the outer surface of the discharge pipe 12 is inserted with the middle part of the upper surface of the fixed frame 7, the right side of the upper surface of the fixed frame 7 is fixedly connected with a hydraulic rod 13, the, the top end of the hydraulic rod 13 is fixedly connected with a first supporting plate 15, the first supporting plate 15, a sliding block 16, a sliding rail 17, a fixed frame 7, a bearing 4, a connecting rod 5, an assistor 6, an operating handle 14 and the hydraulic rod 13 are matched, the carrying effect of a hanging material is enhanced, the construction process is accelerated, the carrying speed of the hanging material is improved, and the carrying time of the hanging material is effectively reduced, the sliding blocks 16 are fixedly connected with the bottoms of the front surface and the back surface of the first supporting plate 15, the sliding rails 17 are arranged inside two groups of sliding blocks 16, the bottom ends of the two groups of sliding rails 17 are fixedly connected with the upper surface of the fixed frame 7, a second supporting plate 18 is fixedly connected with the top of the left side surface of the first supporting plate 15, a rope winding motor 19 is fixedly connected with the upper surface of the second supporting plate 18, a rope winding shaft 20 is sleeved on the output end of the rope winding motor 19, a rope 21 is arranged on the, the bottom end of the rope 21 is provided with a hanging material box 23.
The utility model discloses in, for operating procedure is more smooth, therefore slider 16 is T shape slider, and slide rail 17 is T shape slide rail, slider 16 and slide rail 17 sliding connection, have strengthened the fluency of step.
The utility model discloses in, in order to prevent to skid when using to be provided with the parcel layer at the surface of operating handle 14, the surface of parcel layer is provided with anti-skidding convex grain, has increased operating handle 14's surface friction.
The utility model discloses in, for better cooperation between spare part, consequently make the internal diameter of bearing 4 and the external diameter looks adaptation of connecting rod 5, the size of suction tube 11 and the size looks adaptation of discharge tube 12, furthest's performance spare part's effect.
The utility model discloses in, in order to prolong the life of spare part to choose for use wiring 21 to form for the preparation of bonderizing coating steel wire, assistor 6 forms for the preparation of forty-five steel, makes spare part more durable.
The utility model discloses in, in order to strengthen the rotatory smoothness nature of fixed frame 7, consequently offered the circular recess at the upper surface of assistor 6, the inside of circular recess is provided with the circular ball of multiunit, makes holistic function more smooth.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When the device is used, the fixed support plate 1 is moved to a preset position through the universal wheel 2, the hydraulic pump 10 and the rope winding motor 19 are controlled to be started, the output end of the hydraulic pump 10 transmits hydraulic pressure to the hydraulic rod 13 through the suction pipe 11 and the discharge pipe 12, the hydraulic rod 13 drives the first support plate 15 to move up and down, the first support plate 15 moves up and down to drive the slide block 16 to move up and down along the slide rail 17, the stop is realized when the height is adjusted to the preset height, the output end of the rope winding motor 19 rotates to drive the rope winding shaft 20 to rotate, the rope winding shaft 20 rotates to drive the rope winding 21 to move up and down, the rope winding 21 moves up and down to the preset position, the hanging material box 23 is tied up by the bottom end of the rope winding 21, the positioning pin 8 is pulled out, the operation handle 14 is operated to rotate the fixed frame 7 by eighty degrees clockwise, the rope winding motor 19 is controlled to drop, the positioning pin 8 penetrates through the fixing frame 7 and is inserted into the fixing support plate 1, the rope winding motor 19 is controlled to be started, the output end of the rope winding motor 19 rotates to drive the rope winding shaft 20 to rotate, the rope winding shaft 20 rotates to drive the rope winding 21 to move up and down, the rope winding 21 stops when moving up and down to a preset position, and the bottom end of the rope winding 21 is used for binding a group of hanging material boxes 23 again.
To sum up, this hanging material handling device for construction through first backup pad 15, slider 16, slide rail 17, fixed frame 7, bearing 4, connecting rod 5, assistor 6, operating handle 14 and hydraulic stem 13 cooperation, has strengthened the effect of hanging material transport for the construction process, improved the speed of hanging material transport, the effectual time that reduces the hanging material transport, place platform 3, fixed frame 7, locating pin 8, second backup pad 18 and wiring motor 19 cooperation, improved and can only carry a set of transport mode, improved holistic efficiency of construction.
This hanging material handling device for construction through universal wheel 2, fixed support plate 1 and the cooperation of first backup pad 15, has strengthened holistic fixed stay effect, has improved holistic mobility, has saved the required time of hanging material transport greatly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a material handling device hangs for construction, includes fixed support board (1), its characterized in that: the four corners of the lower surface of the fixed supporting plate (1) are fixedly connected with universal wheels (2), the left side of the upper surface of the fixed supporting plate (1) is fixedly connected with a placing table (3), the middle part of the right side of the upper surface of the fixed supporting plate (1) is spliced with a bearing (4), the inside of the bearing (4) is spliced with a connecting rod (5), the middle part of the right side of the upper surface of the fixed supporting plate (1) is fixedly connected with an auxiliary device (6), the top end of the connecting rod (5) is fixedly connected with a fixed frame (7), the front side and the rear side of the inner bottom side wall of the fixed frame (7) are respectively spliced with positioning pins (8), the bottom ends of the two groups of positioning pins (8) are respectively spliced with the front side and the rear side of the upper surface of the fixed supporting plate (1), the inner bottom side wall of the fixed frame (7), the utility model discloses a hydraulic pump, including hydraulic pump (10), the input fixedly connected with of hydraulic pump (10) inhales pipe (11), inhale the middle part of pipe (11) surface and peg graft with the left side of pneumatic cylinder (9) upper surface, the output fixedly connected with discharge pipe (12) of hydraulic pump (10), the middle part of discharge pipe (12) surface is pegged graft with the middle part of fixed frame (7) upper surface, the right side fixedly connected with hydraulic stem (13) of fixed frame (7) upper surface, the positive bottom and discharge pipe (12) fixed connection of hydraulic stem (13), the left side fixedly connected with operating handle (14) of fixed frame (7) upper surface, the top fixedly connected with first backup pad (15) of hydraulic stem (13), the equal fixedly connected with slider (16) in bottom at the front of first backup pad (15) and the back, two sets of the inside of slider (16) is provided with slide rail (, two sets of the bottom of slide rail (17) all is connected with the last fixed surface of fixed frame (7), the top fixedly connected with second backup pad (18) of first backup pad (15) left surface, the last fixed surface of second backup pad (18) is connected with wiring motor (19), wiring axle (20) have been cup jointed to the output of wiring motor (19), the surface of wiring axle (20) is provided with wiring (21), the middle part fixedly connected with of first backup pad (15) upper surface puts up rope ware (22), the bottom of wiring (21) is provided with hangs material case (23).
2. The hoist carrying device for building construction according to claim 1, characterized in that: the sliding block (16) is a T-shaped sliding block, the sliding rail (17) is a T-shaped sliding rail, and the sliding block (16) is connected with the sliding rail (17) in a sliding mode.
3. The hoist carrying device for building construction according to claim 1, characterized in that: the outer surface of the operating handle (14) is provided with a wrapping layer, and the outer surface of the wrapping layer is provided with anti-skid convex particles.
4. The hoist carrying device for building construction according to claim 1, characterized in that: the inner diameter of the bearing (4) is matched with the outer diameter of the connecting rod (5), and the size of the suction pipe (11) is matched with the size of the discharge pipe (12).
5. The hoist carrying device for building construction according to claim 1, characterized in that: the winding rope (21) is made of phosphatized coating steel wire, and the assistor (6) is made of forty-five steel.
6. The hoist carrying device for building construction according to claim 1, characterized in that: the upper surface of the assistor (6) is provided with a circular groove, and a plurality of groups of circular balls are arranged in the circular groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922187575.XU CN211198411U (en) | 2019-12-09 | 2019-12-09 | Hanging material carrying device for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922187575.XU CN211198411U (en) | 2019-12-09 | 2019-12-09 | Hanging material carrying device for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211198411U true CN211198411U (en) | 2020-08-07 |
Family
ID=71861106
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922187575.XU Expired - Fee Related CN211198411U (en) | 2019-12-09 | 2019-12-09 | Hanging material carrying device for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211198411U (en) |
-
2019
- 2019-12-09 CN CN201922187575.XU patent/CN211198411U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209396575U (en) | Hollow brick automatically unloads base machine | |
CN211281100U (en) | Textile fabric conveyer | |
CN110616903B (en) | Building wall body upset robot, transit system | |
CN207436459U (en) | Pressure-bearing floor covering layers machine | |
CN211198411U (en) | Hanging material carrying device for building construction | |
CN214081447U (en) | Novel cable drum transfer robot | |
CN212425137U (en) | Concrete block hoist device | |
CN109017928A (en) | Trolley is used in a kind of transport of clothes | |
CN108360863A (en) | A kind of solid battery truck garage | |
CN112392235A (en) | Intelligent construction equipment of architectural decoration engineering | |
CN218371504U (en) | Lifting device for glass production | |
CN206110628U (en) | Portable lift | |
CN211971567U (en) | Hoist device for logistics storage | |
CN214218064U (en) | Equipment convenient for carrying cable reel | |
CN205772880U (en) | A kind of hanging balancing formula hoist crab | |
CN205555535U (en) | Empty can unloads a jar machine | |
CN107458905A (en) | A kind of sleeve automatic carriage | |
CN104495694B (en) | A kind of material carrier | |
CN211197788U (en) | Push plate device for composite floor production | |
CN218133003U (en) | Gluing device convenient for material taking and used for processing hollow glass | |
CN218231730U (en) | Lifting mechanism with stable stroke for stacker | |
CN211920599U (en) | Conveying power assisting device for boxing | |
CN212556372U (en) | Carrier with raising and lowering functions | |
CN214001766U (en) | PLC control assembly line handling device | |
CN210236444U (en) | Feed stacking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200807 Termination date: 20201209 |