CN211114734U - Regularization pier construction operation platform that can have enough to meet need and use - Google Patents

Regularization pier construction operation platform that can have enough to meet need and use Download PDF

Info

Publication number
CN211114734U
CN211114734U CN201921840168.8U CN201921840168U CN211114734U CN 211114734 U CN211114734 U CN 211114734U CN 201921840168 U CN201921840168 U CN 201921840168U CN 211114734 U CN211114734 U CN 211114734U
Authority
CN
China
Prior art keywords
section steel
horizontal channel
construction
welding
pier construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921840168.8U
Other languages
Chinese (zh)
Inventor
石邱饶
王成录
代志广
刘磊
谢明康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Investment And Construction Co ltd
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
Guizhou Investment And Construction Co ltd
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Investment And Construction Co ltd, China Construction Fourth Engineering Division Corp Ltd filed Critical Guizhou Investment And Construction Co ltd
Priority to CN201921840168.8U priority Critical patent/CN211114734U/en
Application granted granted Critical
Publication of CN211114734U publication Critical patent/CN211114734U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pier construction operation platform that regularization can have enough to meet need use, include and form the cube frame by the welding of a set of stand and the horizontal channel-section steel in a set of outside, the welding has a set of bracing piece on the inboard horizontal channel-section steel that just is located the outside of cube frame, the welding has the inboard horizontal channel-section steel parallel with the horizontal channel-section steel in the outside at the other end of bracing piece, and the horizontal channel-section steel of adjacent inboard end to end forms the rectangle frame, is equipped with the decorative pattern steel sheet and forms the passageway on the bracing piece upper berth, has the protection network. The utility model discloses compare with current scaffold platform, except can wholly lifting by crane fixedly by segmental, also can reuse, material source is extensive moreover, and the low price can not only realize each process flow fast, more can effectively accelerate the construction speed, greatly improves the efficiency of construction, reduces construction cost, ensures construction safety.

Description

Regularization pier construction operation platform that can have enough to meet need and use
Technical Field
The utility model relates to a bridge pier construction operation platform that regularization can have enough to meet need and use belongs to construction technical field.
Background
When rectangle pier stud construction, the scaffold is often set up to the steel pipe support that traditional construction adopted, and this kind of operation platform sets up the progress slowly, along with the high rising of pier stud, platform stability reduces, and factor of safety is little, has very big potential safety hazard to the operating personnel. Moreover, the platform can not be reused, and can be detached after being used up, so that the material running period is too long, the capital consumption is high, and the construction is difficult in a specific place, therefore, the traditional rectangular pier column construction platform is in urgent need of improvement.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides an install simple, safe and reliable and can improve the regularization of efficiency of construction and can have enough to meet the need pier construction operation platform who uses to overcome not enough among the prior art.
The technical scheme of the utility model is realized like this: the utility model provides a regularization pier construction operation platform that can have enough to meet need use, includes and forms the cube frame by the welding of a set of stand and a set of outside horizontal channel-section steel, and the welding has a set of bracing piece on the cube frame inboard just is located the outside horizontal channel-section steel, and the welding has the inboard horizontal channel-section steel parallel with the outside horizontal channel-section steel at the other end of bracing piece, and the end to end of the adjacent inboard horizontal channel-section steel forms the rectangle frame, is equipped with the decorative pattern steel sheet and forms the passageway on the bracing piece upper berth, has the.
Furthermore, a cross brace is fixedly connected between the adjacent upright columns.
Further, a vertical hinged door is arranged on the protective net.
Furthermore, through holes are formed in corners of the cubic frame from top to bottom, and crawling ladders are fixedly mounted in the through holes.
Since the technical scheme is used, the utility model has the advantages that: the utility model discloses compare with current scaffold platform, except can wholly lifting by crane fixedly by segmental, also can reuse, material source is extensive moreover, and the low price can not only realize each process flow fast, more can effectively accelerate the construction speed, greatly improves the efficiency of construction, reduces construction cost, ensures construction safety.
Drawings
Fig. 1 is a front view of the structure diagram of the present invention;
FIG. 2 is a side view of FIG. 1;
fig. 3 is a top view of fig. 1.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a: referring to fig. 1-3, a bridge pier construction operation platform that regularization can have enough to meet need use, include and form the cube frame by the welding of a set of stand 1 and a set of outside horizontal channel-section steel 2, the welding has a set of bracing piece 4 on the cube frame inboard just is located the outside horizontal channel-section steel 2, the welding has the inboard horizontal channel-section steel 5 parallel with the outside horizontal channel-section steel 2 at the other end of bracing piece 4, and adjacent inboard horizontal channel-section steel 5 end to end forms the rectangle frame, it is equipped with decorative pattern steel sheet 6 and forms the passageway to lay on bracing piece 4, there is protection network 8 at every layer of passageway outside fixed.
In order to improve the stability of the platform, a cross brace 3 is fixedly connected between the adjacent upright posts 1.
In order to facilitate the entrance and exit of people or materials on each layer of aisle, a vertical hinged door 10 is arranged on the protective net 8.
In order to facilitate the construction of constructors entering corresponding passageways, through holes 7 are formed in corners of the cubic frame from top to bottom, and crawling ladders 9 are fixedly mounted in the through holes 7.
During construction, the bridge pier is required to be guaranteed to be located in a rectangular frame surrounded by the transverse channel steel 5 on the inner side, so that a constructor can stand on a passageway to construct the bridge pier, and the passageway can be provided with a plurality of layers according to the height of the bridge pier so as to meet the construction of the bridge pier with different heights. Therefore, the utility model discloses compare with current scaffold platform, except can the segmentation whole lifting by crane fixedly, can also reuse, material source is extensive moreover, and the low price can not only realize each process flow fast, more can effectively accelerate construction speed, greatly improves the efficiency of construction, reduces construction cost, ensures construction safety.

Claims (4)

1. The utility model provides a bridge pier construction operation platform that regularization can have enough to meet need use, includes and forms cube frame, its characterized in that by a set of stand (1) and a set of outside horizontal channel-section steel (2) welding: the novel rectangular frame is characterized in that a group of supporting rods (4) are welded on the inner side of the cubic frame and located on the outer side transverse channel steel (2), the inner side transverse channel steel (5) parallel to the outer side transverse channel steel (2) is welded at the other end of each supporting rod (4), the adjacent inner side transverse channel steel (5) are connected end to form a rectangular frame, a patterned steel plate (6) is laid on each supporting rod (4) to form a passageway, and a protective net (8) is fixedly mounted on the outer side of each passageway.
2. The finalized pier construction operating platform capable of being recycled according to claim 1, which is characterized in that: a scissor brace (3) is fixedly connected between the adjacent upright posts (1).
3. The finalized pier construction operating platform capable of being recycled according to claim 1, which is characterized in that: the protective net (8) is provided with a vertical hinged door (10).
4. The finalized pier construction operating platform capable of being recycled according to claim 1, which is characterized in that: through holes (7) are formed in corners of the cubic frame from top to bottom, and crawling ladders (9) are fixedly mounted in the through holes (7).
CN201921840168.8U 2019-10-30 2019-10-30 Regularization pier construction operation platform that can have enough to meet need and use Expired - Fee Related CN211114734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921840168.8U CN211114734U (en) 2019-10-30 2019-10-30 Regularization pier construction operation platform that can have enough to meet need and use

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921840168.8U CN211114734U (en) 2019-10-30 2019-10-30 Regularization pier construction operation platform that can have enough to meet need and use

Publications (1)

Publication Number Publication Date
CN211114734U true CN211114734U (en) 2020-07-28

Family

ID=71701221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921840168.8U Expired - Fee Related CN211114734U (en) 2019-10-30 2019-10-30 Regularization pier construction operation platform that can have enough to meet need and use

Country Status (1)

Country Link
CN (1) CN211114734U (en)

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN207142717U (en) Small-sized hanging device
CN201665992U (en) Whole lifting platform of large steel net frame
CN216476193U (en) Portable steel member installation operation platform of modularization
CN211114734U (en) Regularization pier construction operation platform that can have enough to meet need and use
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN207047702U (en) A kind of bridge construction scaoffold
CN108625292B (en) Template assembling platform of prefabricated stand column
CN207063484U (en) Movable operating platform for corridor construction
CN213509519U (en) Regularization formula elevartor shaft handling frame structure
CN203257070U (en) Slippage frame operating platform for gallery daylighting roof curtain wall installation
CN213328707U (en) Thin-wall pier high-altitude operation combined platform
CN213979843U (en) Prefabricated staircase safety operation platform of assembled structure
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN211257769U (en) Truss bridging based on attached lifting platform
CN207348787U (en) One kind maintenance cat ladder platform
CN209066247U (en) A kind of good multi-functional all-hydraulic moving trestle of protective performance
CN206800974U (en) Lower-hanging type outer wall moving cantilever operation frame
CN2780969Y (en) Combined escending ladder
CN203820389U (en) Rail bound aisle stacking crane
CN106401157A (en) Movable operation platform and high-altitude construction method
CN207392840U (en) A kind of steel structure frame in vertical lifting public transport garage
CN206940369U (en) A kind of dock wall hydraulic pressure maintenance platform
CN208310162U (en) Movable operating platform system
CN201391222Y (en) Simple crawling ladder used in ship subsection shelving construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728