CN210973581U - Building construction hoist and mount frame - Google Patents

Building construction hoist and mount frame Download PDF

Info

Publication number
CN210973581U
CN210973581U CN201922183830.3U CN201922183830U CN210973581U CN 210973581 U CN210973581 U CN 210973581U CN 201922183830 U CN201922183830 U CN 201922183830U CN 210973581 U CN210973581 U CN 210973581U
Authority
CN
China
Prior art keywords
frame
hoist
guardrail
pulley
mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922183830.3U
Other languages
Chinese (zh)
Inventor
冯胜荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guojian Engineering Group Co Ltd
Original Assignee
Shandong Guojian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Guojian Engineering Group Co Ltd filed Critical Shandong Guojian Engineering Group Co Ltd
Priority to CN201922183830.3U priority Critical patent/CN210973581U/en
Application granted granted Critical
Publication of CN210973581U publication Critical patent/CN210973581U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building construction hoist and mount frame, including cargo platform and hoist and mount guardrail, hoist and mount guardrail fixed welding is at cargo platform's up end, through set up the bundling subassembly on cargo platform, and the bundling subassembly is provided with the rope fixed block, elasticity rope and locking ring, tie up fixedly building material through the elasticity rope, make in the hoist and mount process, building material can not the landing cargo platform, make constructor's safety below ensured, and set up the blotter below the channel steel piece, make the hoist and mount frame can have fine buffering effect when falling to the ground, mechanical component to hoist and mount frame has fine guard action; set up two sets of hoisting assemblies in the frame main part, and install two sets of loose pulley assembly on every hoisting assembly for at the in-process of lifting by crane, hoist and mount frame can not rock, and is more stable, safer.

Description

Building construction hoist and mount frame
Technical Field
The utility model relates to an equipment technical field for the construction specifically is a construction hoist and mount frame.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like.
Need hoist building material in the building work progress, traditional hoist and mount frame has fixed insecure to building material, and the buffering effect is poor, and hoist and mount frame rocks the scheduling problem easily among the lift process, brings the potential safety hazard to the work progress.
To the problem, the utility model provides a construction hoist and mount frame.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction hoist and mount frame, including cargo platform and hoist and mount guardrail, the fixed welding of hoist and mount guardrail is at cargo platform's up end, and is fixed firm to building material, and the buffering is effectual, and hoist and mount frame is difficult for rocking among the hoisting process to the problem among the background art has been solved.
In order to achieve the above object, the utility model provides a following technical scheme: a hoisting frame for building construction comprises a carrying platform and hoisting guardrails, wherein the hoisting guardrails are fixedly welded on the upper end face of the carrying platform, the carrying platform is provided with a channel steel block, bundling assemblies and buffer cushions, the bundling assemblies are fixedly installed on the upper end face of the channel steel block, the bundling assemblies are arranged in two groups, the two groups of bundling assemblies are fixedly arranged at two ends of the upper end face of the channel steel block, and the buffer cushions are fixedly arranged on the lower end face of the channel steel block;
the lifting guardrail is provided with a guardrail frame, lifting components and a guardrail door plate, the guardrail frame comprises a frame body and a grid net, the grid net is fixedly installed on the frame body, the lifting components are arranged in two groups, the lifting components are fixedly welded at the upper end of the guardrail frame, and the guardrail door plate is clamped and installed on one side of the guardrail frame.
Preferably, the channel steel block is provided with a positioning hole and a door plate fixing groove, the positioning hole is formed in two sides of the upper end face of the channel steel block, and the door plate fixing groove is formed in one end of the upper end face of the channel steel block.
Preferably, the strapping assembly comprises a rope fixing block, an elastic rope and a locking ring, the rope fixing block is fixedly welded on the upper end face of the channel steel block, one end of the elastic rope is fixedly connected with the rope fixing block, and the other end of the elastic rope is locked through the locking ring.
Preferably, the frame main body is provided with a door plate clamping groove and a positioning column, the door plate clamping groove is formed in one end of the frame main body, and the positioning column is fixedly arranged on the lower end face of the frame main body and matched with the positioning hole.
Preferably, the hoisting assembly comprises a pulley assembly fixing frame and two sets of pulley assemblies, the pulley assembly fixing frame is fixedly welded at the upper end of the frame main body, and the two sets of pulley assemblies are respectively and fixedly installed on two sides of the upper end of the pulley assembly fixing frame.
Preferably, the pulley assembly comprises a pulley fixing block, a needle roller bearing and a pulley, the needle roller bearing is installed inside the pulley fixing block, two ends of the pulley are movably connected with the needle roller bearing, and the pulley fixing block, the needle roller bearing and the pulley form the whole pulley assembly.
Preferably, the guardrail door plant is provided with hand-pulling groove and magnet, and the hand-pulling groove is seted up in the below on guardrail door plant surface, and magnet sets up the both sides in guardrail door plant inside.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. this construction hoist and mount frame ties up the subassembly through setting up on cargo platform, and tie up the subassembly and be provided with the rope fixed block, elastic rope and locking ring, tie up fixedly building material through elastic rope, make in the hoist and mount process, building material can not the landing cargo platform, make the constructor's of below safety obtain the guarantee, and set up the blotter in the below of channel steel piece, make the hoist and mount frame can have fine buffering effect when falling to the ground, mechanical component to hoist and mount frame has fine guard action.
2. This construction hoist and mount frame is through at objective platform up end fixed weld hoist and mount guardrail to install the grid net on hoist and mount guardrail, make to play better anti-falling effect to the building material on the objective platform, set up two sets of hoisting components simultaneously, and install two sets of loose pulley assembly on every hoisting component of group, make at the in-process of lifting by crane, hoist and mount frame can not rock, and is more stable, safer.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of the loading platform of the present invention;
fig. 3 is a schematic view of the structure of the lifting guardrail of the utility model;
fig. 4 is a schematic structural view of the pulley assembly of the present invention;
fig. 5 is a schematic view of the structure of the guardrail door plate of the present invention.
In the figure: 1. a carrier platform; 11. a channel steel block; 111. positioning holes; 112. a door panel fixing groove; 12. a strapping assembly; 121. a rope fixing block; 122. an elastic cord; 123. locking a ring; 13. a cushion pad; 2. hoisting the guardrail; 21. a guardrail frame; 211. a frame body; 2111. a door panel clamping groove; 2112. a positioning column; 212. a grid net; 22. hoisting the assembly; 221. a pulley component fixing frame; 222. a sheave assembly; 2221. a pulley fixing block; 2222. a needle bearing; 2223. a pulley; 23. a guardrail door panel; 231. a hand-pulled groove; 232. and a magnet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, a hoisting frame for building construction comprises a carrying platform 1 and hoisting guardrails 2, wherein the hoisting guardrails 2 are fixedly welded on the upper end surface of the carrying platform 1.
The object carrying platform 1 is provided with a groove steel block 11, a bundling assembly 12 and a buffer cushion 13, the groove steel block 11 is provided with a positioning hole 111 and a door plate fixing groove 112, the positioning hole 111 is arranged at two sides of the upper end face of the groove steel block 11, the door plate fixing groove 112 is arranged at one end of the upper end face of the groove steel block 11, the bundling assembly 12 is fixedly arranged at the upper end face of the groove steel block 11, the bundling assembly 12 is provided with two groups, the two groups of bundling assemblies 12 are fixedly arranged at two ends of the upper end face of the groove steel block 11, the bundling assembly 12 comprises a rope fixing block 121, an elastic rope 122 and a locking ring 123, the rope fixing block 121 is fixedly welded at the upper end face of the groove steel block 11, one end of the elastic rope 122 is fixedly connected with the rope fixing block 121, the other end of the elastic rope is locked by the locking ring 123, the buffer cushion, Elastic rope 122 and locking ring 123 tie up fixedly building material through elastic rope 122 for in hoist and mount process, building material can not the landing cargo platform 1, make the constructor's of below safety obtain the guarantee, and set up blotter 13 in the below of channel steel piece 11, make the hoist and mount frame can have fine buffering effect when falling to the ground, have fine guard action to the mechanical element of hoist and mount frame.
The hoisting guardrail 2 is provided with a guardrail frame 21, hoisting components 22 and guardrail door plates 23, the guardrail frame 21 comprises a frame main body 211 and a grid net 212, the grid net 212 is fixedly arranged on the frame main body 211, the frame main body 211 is provided with door plate clamping grooves 2111 and positioning columns 2112, the door plate clamping grooves 2111 are arranged at one end of the frame main body 211, the positioning columns 2112 are fixedly arranged on the lower end face of the frame main body 211 and matched with the positioning holes 111, the hoisting components 22 are arranged in two groups, the two groups of hoisting components 22 are fixedly welded at the upper end of the guardrail frame 21, the hoisting components 22 comprise pulley component fixing frames 221 and pulley components 222, the pulley component fixing frames 221 are fixedly welded at the upper end of the frame main body 211, the pulley components 222 are arranged in two groups, the two groups of pulley components 222 are respectively and fixedly arranged at two sides of the upper end of the pulley component fixing frames 221, the, pulley fixed block 2221's internally mounted has bearing 2222, pulley 2223's both ends and bearing 2222 swing joint, pulley fixed block 2221, bearing 2222 and pulley 2223 constitute pulley assembly 222 wholly, guardrail door plant 23 block is installed in one side of guardrail frame 21, guardrail door plant 23 is provided with hand-pulling groove 231 and magnet 232, hand-pulling groove 231 sets up in the below on guardrail door plant 23 surface, magnet 232 sets up the both sides in guardrail door plant 23 inside, through fixed welding hoist and mount guardrail 2 in objective platform 1 up end, and install grid net 212 on hoist and mount guardrail 2, make to play the better effect of preventing dropping to the building material on objective platform 1, set up two sets of hoist and mount subassemblies 22 simultaneously, and install two sets of pulley assembly 222 on every hoist and mount subassembly 22, make in the lift-up process, the hoist and mount frame can not rock, and is more stable, and is safer.
In summary, the following steps: the utility model provides a building construction hoisting frame, including cargo platform 1 and hoisting guardrail 2, hoisting guardrail 2 fixed welding is at the up end of cargo platform 1, through set up tying up subassembly 12 on cargo platform 1, and tying up subassembly 12 and be provided with rope fixed block 121, elasticity rope 122 and locking ring 123, tie up fixedly building material through elasticity rope 122, make in the hoisting process, building material can not slide down cargo platform 1, make the constructor's of below safety be ensured, and set up blotter 13 below channel block 11, make the hoisting frame can have fine buffering effect when falling to the ground, have fine guard action to the mechanical component of hoisting frame; through at objective platform 1 up end fixed weld hoist and mount guardrail 2 to install grid net 212 on hoist and mount guardrail 2, make to play better anti-drop effect to the building material on objective platform 1, set up two sets of lifting units 22 simultaneously, and install two sets of loose pulley assembly 222 on every group lifting unit 22, make at the in-process of lifting by crane, the hoist and mount frame can not rock, and is more stable, and is safer.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a construction hoist and mount frame, includes cargo platform (1) and hoist and mount guardrail (2), hoist and mount guardrail (2) fixed welding is at the up end of cargo platform (1), its characterized in that: the loading platform (1) is provided with a groove steel block (11), bundling assemblies (12) and buffer cushions (13), the bundling assemblies (12) are fixedly installed on the upper end face of the groove steel block (11), the bundling assemblies (12) are arranged in two groups, the two groups of bundling assemblies (12) are fixedly arranged at two ends of the upper end face of the groove steel block (11), and the buffer cushions (13) are fixedly arranged on the lower end face of the groove steel block (11);
hoist and mount guardrail (2) are provided with guardrail frame (21), hoist and mount subassembly (22) and guardrail door plant (23), and guardrail frame (21) is including frame main part (211) and grid net (212), and grid net (212) fixed mounting is on frame main part (211), and hoist and mount subassembly (22) set up two sets ofly, two sets of hoist and mount subassembly (22) fixed welding in the upper end of guardrail frame (21), and one side at guardrail frame (21) is installed in guardrail door plant (23) block.
2. The construction sling frame as defined in claim 1, wherein: the steel channel block (11) is provided with a positioning hole (111) and a door panel fixing groove (112), the positioning hole (111) is formed in two sides of the upper end face of the steel channel block (11), and the door panel fixing groove (112) is formed in one end of the upper end face of the steel channel block (11).
3. The construction sling frame as defined in claim 1, wherein: the bundling assembly (12) comprises a rope fixing block (121), an elastic rope (122) and a locking ring (123), the rope fixing block (121) is fixedly welded to the upper end face of the groove steel block (11), one end of the elastic rope (122) is fixedly connected with the rope fixing block (121), and the other end of the elastic rope (122) is locked through the locking ring (123).
4. The construction sling frame as defined in claim 1, wherein: the frame main body (211) is provided with a door plate clamping groove (2111) and a positioning column (2112), the door plate clamping groove (2111) is formed in one end of the frame main body (211), and the positioning column (2112) is fixedly arranged on the lower end face of the frame main body (211) and matched with the positioning hole (111).
5. The construction sling frame as defined in claim 1, wherein: the hoisting assembly (22) comprises pulley assembly fixing frames (221) and pulley assemblies (222), the pulley assembly fixing frames (221) are fixedly welded at the upper end of the frame main body (211), the two sets of pulley assemblies (222) are arranged, and the two sets of pulley assemblies (222) are respectively and fixedly installed on two sides of the upper end of the pulley assembly fixing frame (221).
6. The construction sling frame as defined in claim 5, wherein: the pulley assembly (222) comprises a pulley fixing block (2221), needle bearings (2222) and a pulley (2223), the needle bearings (2222) are mounted inside the pulley fixing block (2221), two ends of the pulley (2223) are movably connected with the needle bearings (2222), and the pulley fixing block (2221), the needle bearings (2222) and the pulley (2223) form the whole pulley assembly (222).
7. The construction sling frame as defined in claim 1, wherein: guardrail door plant (23) are provided with hand groove (231) and magnet (232), and hand groove (231) are seted up in guardrail door plant (23) surface's below, and magnet (232) set up in the inside both sides of guardrail door plant (23).
CN201922183830.3U 2019-12-09 2019-12-09 Building construction hoist and mount frame Expired - Fee Related CN210973581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922183830.3U CN210973581U (en) 2019-12-09 2019-12-09 Building construction hoist and mount frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922183830.3U CN210973581U (en) 2019-12-09 2019-12-09 Building construction hoist and mount frame

Publications (1)

Publication Number Publication Date
CN210973581U true CN210973581U (en) 2020-07-10

Family

ID=71444771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922183830.3U Expired - Fee Related CN210973581U (en) 2019-12-09 2019-12-09 Building construction hoist and mount frame

Country Status (1)

Country Link
CN (1) CN210973581U (en)

Similar Documents

Publication Publication Date Title
CN206233102U (en) A kind of packaged type faces side operation work platform
CN108425516B (en) Safety protection shed for construction site
CN210973581U (en) Building construction hoist and mount frame
CN204418629U (en) Integrated form climbs frame
CN205575409U (en) Unpowered self-propelled cable bearing device of large-span cable crane
CN205936398U (en) Public road bridge roof beam construction drilling platform
CN206034459U (en) A adjustable support assembly for subway foundation pit's support system
CN207277197U (en) A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever
CN205875168U (en) A prevent structure of falling for foundation ditch steel shotcrete
CN215978520U (en) Feeding and discharging platform for building
CN205369044U (en) Integration prestressing force stretch -draw frame construction
CN212475866U (en) Prevent gantry crane that hoist cable rocked
CN212105333U (en) Overlook station for forestry
CN204325938U (en) A kind of column foot hinge of large span arch bridge erection without scaffolding pylon
CN209482687U (en) A kind of Super High exterior frame column construction operation platform
CN208803380U (en) Anchor ring and pier body hoop unloading system
CN207193941U (en) A kind of civil engineering groundwork bracing means
CN220926024U (en) High-rise building floor hoisting assembly
CN202296886U (en) Hoisting device for installing oversized radial gate of hydropower station
CN216974227U (en) Gantry stirrup platform of unloading
CN216914331U (en) Precast beam jack adjustment and stretch-draw protector
CN218619797U (en) Steel construction section bar lifting device
CN210127664U (en) Detachable safety device for steel structure installation in building construction
CN215592381U (en) Liftable support for construction engineering construction
CN214326971U (en) Tower crane convenient to climb and high in safety

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200710

Termination date: 20201209

CF01 Termination of patent right due to non-payment of annual fee