CN207193941U - A kind of civil engineering groundwork bracing means - Google Patents

A kind of civil engineering groundwork bracing means Download PDF

Info

Publication number
CN207193941U
CN207193941U CN201720950532.0U CN201720950532U CN207193941U CN 207193941 U CN207193941 U CN 207193941U CN 201720950532 U CN201720950532 U CN 201720950532U CN 207193941 U CN207193941 U CN 207193941U
Authority
CN
China
Prior art keywords
frame
guide ring
substrate
support
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720950532.0U
Other languages
Chinese (zh)
Inventor
王东波
葛军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720950532.0U priority Critical patent/CN207193941U/en
Application granted granted Critical
Publication of CN207193941U publication Critical patent/CN207193941U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of civil engineering groundwork bracing means,Including the first frame and the second frame,First frame and the second frame are vertically arranged,The bottom of first frame and the second frame is respectively connected with first substrate,The side of the first substrate is provided with second substrate,The first guide ring is provided between first frame and the second frame,Second guide ring and the 3rd guide ring,First guide ring,The inside of second guide ring and the 3rd guide ring is equipped with through hole,The first circular arc chamfering is equipped with the top of the through hole,Running through in the through hole has compacting post,The top and bottom of the compacting post are equipped with the second circular arc chamfering,Bottom between first frame and the second frame is additionally provided with bottom plate,Thickening plate is additionally provided with the top of the bottom plate,The bottom plate is positioned at the underface of compacting post,The first hoisting ring is additionally provided with left and right sides of the bottom plate,The top of the compacting post is provided with the second hoisting ring,It is adapted to be widely popularized.

Description

A kind of civil engineering groundwork bracing means
Technical field
Technical field of civil engineering is the utility model is related to, specially a kind of civil engineering groundwork bracing means.
Background technology
The purpose of civil engineering is required for forming human being's production or life, function is good and the space of Comfortable attractive and Passage.It is both the needs in terms of material, also there is the demand of symbol spirit aspect.With the development of society, engineering structure is more next More maximize, complicate, high-rise building, extra-large bridge, huge dam, complicated subway system continue to bring out, and meet people Life requirement, while also develop into the symbol of social strength.The root problem that civil engineering needs to solve is the peace of engineering Entirely, structure is enable to resist various natural or artificial active force.Any one engineering structure will bear own wt, and The effect of working load and wind-force is born, humidity change can also produce power effect to civil engineering structure.In earthquake territory, building work Journey structure, which is also contemplated that, resists geological process.In addition, the influence of the artificial action to civil engineering such as blast, vibration can not neglect Slightly.The final realization of civil engineering is to build the required engineering project of society successfully, is put to use.There is optimal design also not It is enough, it is also necessary to which that blueprint is come true.Therefore need study how to utilize existing material equipment condition, pass through effective technology Approach and organizing means are constructed.
Foundation-reinforcing device has a very extensive application in civil engineering construction, civil engineering of the prior art Base bracing means has significant limitation, and structure is relatively fixed, it has not been convenient to assembly and disassembly, it is difficult to meet the needs of people.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering groundwork bracing means, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of civil engineering groundwork bracing means, bag The first frame and the second frame are included, first frame and the second frame are vertically arranged, first frame and the second frame Bottom be respectively connected with first substrate, the side of the first substrate is provided with second substrate, first frame and the second frame Between be provided with the first guide ring, the second guide ring and the 3rd guide ring, first guide ring, the second guide ring and the 3rd are oriented to The left and right sides of ring is connected to the first frame and the second frame by first support, second support and the 3rd support respectively, described The inside of first guide ring, the second guide ring and the 3rd guide ring is equipped with through hole, and the first circle is equipped with the top of the through hole Arc chamfering, through there is a compacting post in the through hole, the top and bottom of the compacting post are equipped with the second circular arc chamfering, and described the Bottom between one frame and the second frame is additionally provided with bottom plate, and thickening plate is additionally provided with the top of the bottom plate, and the bottom plate is located at The underface of post is tamped, the first hoisting ring is additionally provided with left and right sides of the bottom plate, the top of the compacting post is provided with second Suspension ring.
Preferably, first frame and the second frame are each perpendicular to first substrate, the first substrate be respectively welded in First frame and the second frame.
Preferably, the second substrate welds between first substrate, the first substrate and second substrate.
Preferably, the spacing distance between first guide ring, the second guide ring and the 3rd guide ring is identical, and described One guide ring, the second guide ring and the 3rd guide ring are set gradually from top to bottom.
Preferably, the first support, second support and the 3rd support be bolted to connection to the first frame and Second frame.
Preferably, first hoisting ring is threadedly connected to bottom plate, and second hoisting ring is threadedly connected to compacting post.
Preferably, the first support, second support and the 3rd support are respectively welded in the first guide ring, the second guide ring With the 3rd guide ring, and junction is provided with reinforcement.
Compared with prior art, the beneficial effects of the utility model are:A kind of civil engineering groundwork of the utility model is reinforced Device, structure is novel, easy to operate, and bottom plate is placed at the ground to need reinforcement first, bottom plate is being located at compacting post just Lower section, then sling using lifting appliance by the second hoisting ring by post is tamped, according to being actually needed, select suitable lifting high Degree, avoid the bottom for tamping post from departing from the first guide ring, then put down compacting post, compacting post is under gravity under freedom Fall, and finally impinge upon on bottom plate, repeat, most foundation stabilization, compacting at last, improve the bearing capacity of ground, be easy into The follow-up upper strata of row is built, and thickening plate, service life length, first support, second support and the 3rd are additionally provided with the top of bottom plate Frame is bolted to connection to the first frame and the second frame, convenient to lead the first guide ring, the second guide ring and the 3rd Transport is disassembled to ring, saves floor space, by setting the first circular arc chamfering and the second circular arc chamfering, reduces and hits damage Wound, has very high practicality, greatly improves a kind of use feature of civil engineering groundwork bracing means, ensure that it makes With effect and utilization benefit, it is adapted to be widely popularized.
Brief description of the drawings
Fig. 1 is a kind of structural representation of civil engineering groundwork bracing means of the utility model;
Fig. 2 is a kind of internal structure schematic diagram of civil engineering groundwork bracing means of the utility model;
Fig. 3 is a kind of partial top structural representation of civil engineering groundwork bracing means of the utility model.
In figure:1 first frame, 2 second frames, 3 first substrates, 4 second substrates, 5 first guide rings, 6 second guide rings, 7 the 3rd guide rings, 8 first supports, 9 second supports, 10 the 3rd supports, 11 reinforcements, 12 bolts, 13 first circular arc chamferings, 14 First circular arc chamfering, 15 compacting posts, 16 second circular arc chamferings, 17 bottom plates, 18 thickening plates, 19 first hoisting rings, 20 second liftings Ring.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of civil engineering groundwork bracing means, including First frame 1 and the second frame 2, the frame 2 of the first frame 1 and second are vertically arranged, the machine of the first frame 1 and second The bottom of frame 2 is respectively connected with first substrate 3, and the side of the first substrate 3 is provided with second substrate 4, first frame 1 and The first guide ring 5, the second guide ring 6 and the 3rd guide ring 7 are provided between two frames 2, first guide ring 5, second is oriented to The left and right sides of the guide ring 7 of ring 6 and the 3rd is connected to the first machine by first support 8, the support 10 of second support 9 and the 3rd respectively The frame 2 of frame 1 and second, the inside of first guide ring 5, the second guide ring 6 and the 3rd guide ring 7 are equipped with through hole 13, institute The top for stating through hole 13 is equipped with the first circular arc chamfering 14, and running through in the through hole 13 has compacting post 15, the compacting post 15 Top and bottom are equipped with the second circular arc chamfering 16, and the bottom between the frame 2 of the first frame 1 and second is additionally provided with bottom plate 17, the top of the bottom plate 17 is additionally provided with thickening plate 18, and the bottom plate 17 is located at the underface of compacting post 15, the bottom plate 17 The left and right sides is additionally provided with the first hoisting ring 19, and the top of the compacting post 15 is provided with the second hoisting ring 20, the He of the first frame 1 Second frame 2 is each perpendicular to first substrate 3, and the first substrate 3 is respectively welded in the first frame 1 and the second frame 2, and described Two substrates 4 weld between first substrate 3, the first substrate 3 and second substrate 4, first guide ring 5, second Spacing distance between the guide ring 7 of guide ring 6 and the 3rd is identical, and first guide ring 5, the second guide ring 6 and the 3rd are oriented to Ring 7 is set gradually from top to bottom, and the first support 8, the support 10 of second support 9 and the 3rd are fixedly attached to by bolt 12 First frame 1 and the second frame 2, first hoisting ring 19 are threadedly connected to bottom plate 17, and the screw thread of the second hoisting ring 20 connects Compacting post 15 is connected to, the first support 8, the support 10 of second support 9 and the 3rd are respectively welded and led in the first guide ring 5, second To the guide ring 7 of ring 6 and the 3rd, and junction is provided with reinforcement 11.
Operation principle:A kind of civil engineering groundwork bracing means of the utility model, in use, being first placed on bottom plate 17 At the ground to need reinforcement, bottom plate 17 is set then to pass through the second hoisting ring using lifting appliance positioned at the underface of compacting post 15 20 sling compacting post 15, according to being actually needed, select suitable sling height, avoid the bottom for tamping post 15 from departing from first and lead To ring 5, then compacting post 15 is put down, tamps the free-falling under gravity of post 15, and finally impinged upon on bottom plate 17, weight Multiple operation, most foundation stabilization, compacting at last, improve the bearing capacity of ground, are convenient for follow-up upper strata construction, bottom plate 17 Top is additionally provided with thickening plate 18, and service life length, first support 8, the support 10 of second support 9 and the 3rd are fixed by bolt 12 The first frame 1 and the second frame 2 are connected to, it is convenient to disassemble the first guide ring 5, the second guide ring 6 and the 3rd guide ring 7 Transport, floor space is saved, by setting the first circular arc chamfering 14 and the second circular arc chamfering 16, reduce impact damage, have very High practicality.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of civil engineering groundwork bracing means, including the first frame (1) and the second frame (2), it is characterised in that:Described One frame (1) and the second frame (2) are vertically arranged, and the bottom of first frame (1) and the second frame (2) is respectively connected with One substrate (3), the side of the first substrate (3) are provided with second substrate (4), first frame (1) and the second frame (2) it Between be provided with the first guide ring (5), the second guide ring (6) and the 3rd guide ring (7), first guide ring (5), the second guide ring (6) and the 3rd guide ring (7) the left and right sides respectively pass through first support (8), second support (9) and the 3rd support (10) connect To the first frame (1) and the second frame (2), first guide ring (5), the second guide ring (6) and the 3rd guide ring (7) it is interior Portion is equipped with through hole (13), and the first circular arc chamfering (14) is equipped with the top of the through hole (13), is run through in the through hole (13) There is compacting post (15), the top and bottom of the compacting post (15) are equipped with the second circular arc chamfering (16), first frame (1) And the second bottom between frame (2) is additionally provided with bottom plate (17), thickening plate (18) is additionally provided with the top of the bottom plate (17), it is described Bottom plate (17) is additionally provided with the first hoisting ring (19), institute at left and right sides of the underface of compacting post (15), the bottom plate (17) The top for stating compacting post (15) is provided with the second hoisting ring (20).
A kind of 2. civil engineering groundwork bracing means according to claim 1, it is characterised in that:First frame (1) First substrate (3) is each perpendicular to the second frame (2), the first substrate (3) is respectively welded in the first frame (1) and the second machine Frame (2).
A kind of 3. civil engineering groundwork bracing means according to claim 1, it is characterised in that:The second substrate (4) Perpendicular to first substrate (3), welded between the first substrate (3) and second substrate (4).
A kind of 4. civil engineering groundwork bracing means according to claim 1, it is characterised in that:First guide ring (5) spacing distance, between the second guide ring (6) and the 3rd guide ring (7) is identical, and first guide ring (5), second are oriented to Ring (6) and the 3rd guide ring (7) are set gradually from top to bottom.
A kind of 5. civil engineering groundwork bracing means according to claim 1, it is characterised in that:The first support (8), Second support (9) and the 3rd support (10) are fixedly attached to the first frame (1) and the second frame (2) by bolt (12).
A kind of 6. civil engineering groundwork bracing means according to claim 1, it is characterised in that:First hoisting ring (19) bottom plate (17) is threadedly connected to, second hoisting ring (20) is threadedly connected to compacting post (15).
A kind of 7. civil engineering groundwork bracing means according to claim 1, it is characterised in that:The first support (8), Second support (9) and the 3rd support (10) are respectively welded in the first guide ring (5), the second guide ring (6) and the 3rd guide ring (7), and junction is provided with reinforcement (11).
CN201720950532.0U 2017-08-01 2017-08-01 A kind of civil engineering groundwork bracing means Expired - Fee Related CN207193941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720950532.0U CN207193941U (en) 2017-08-01 2017-08-01 A kind of civil engineering groundwork bracing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720950532.0U CN207193941U (en) 2017-08-01 2017-08-01 A kind of civil engineering groundwork bracing means

Publications (1)

Publication Number Publication Date
CN207193941U true CN207193941U (en) 2018-04-06

Family

ID=61799734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720950532.0U Expired - Fee Related CN207193941U (en) 2017-08-01 2017-08-01 A kind of civil engineering groundwork bracing means

Country Status (1)

Country Link
CN (1) CN207193941U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111945703A (en) * 2020-08-19 2020-11-17 福建省燕城建设工程有限公司 Drainage structure for foundation stabilization and drainage method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111945703A (en) * 2020-08-19 2020-11-17 福建省燕城建设工程有限公司 Drainage structure for foundation stabilization and drainage method thereof
CN111945703B (en) * 2020-08-19 2021-10-19 福建省燕城建设工程有限公司 Drainage structure for foundation stabilization and drainage method thereof

Similar Documents

Publication Publication Date Title
CN102505846B (en) Steel pipe column bearing table girder connection construction method
CN102797643A (en) Wind power generation tower device
CN203255892U (en) Heightened gantry type crane
CN203066090U (en) Assembled bracing structure for steel sheet piling cofferdam construction
CN207193941U (en) A kind of civil engineering groundwork bracing means
CN110656723B (en) Rail support for sliding construction of cylindrical arch shell roof
CN104060836B (en) The lifting installation method of high curved surface rack
CN202785387U (en) Indoor cantilever crane
CN205187695U (en) Steel construction has hoisted gallows
CN201722700U (en) Infrastructure of tower crane
CN204455845U (en) A kind of large-scale assembling drilling platform
CN202001787U (en) Detachable ground anchor of tower crane
CN207452736U (en) Hoop bearing device
CN207176719U (en) Steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch
CN105350814A (en) Power transmission tower
CN206245482U (en) A kind of super high steel structure mega-frame building structure
CN206476671U (en) Attachment device of tower crane
CN101289849B (en) Large-scale combined dynamic compaction machinery
CN204877804U (en) Fixing base and use wind power generation set of this fixing base
CN205776900U (en) A kind of encased steel plate wall column quick-assembling structure
CN205953383U (en) Desulfurizing tower flip -chip crane boom
CN210848979U (en) Special bracket for high-altitude on-site welding of bracket
CN204876754U (en) Narrow ji gangguanta's of four posts connected node is assembled to modularization
CN109505304A (en) A kind of permafrost soil area assembled type base for power transmission line iron tower prefab-form
CN203795817U (en) Multifunctional reinforcement tying platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180406

Termination date: 20180801

CF01 Termination of patent right due to non-payment of annual fee