CN206245482U - A kind of super high steel structure mega-frame building structure - Google Patents

A kind of super high steel structure mega-frame building structure Download PDF

Info

Publication number
CN206245482U
CN206245482U CN201621257169.6U CN201621257169U CN206245482U CN 206245482 U CN206245482 U CN 206245482U CN 201621257169 U CN201621257169 U CN 201621257169U CN 206245482 U CN206245482 U CN 206245482U
Authority
CN
China
Prior art keywords
mega
steel
post
huge
super high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621257169.6U
Other languages
Chinese (zh)
Inventor
丁洁民
赵昕
丁鲲
马壮
何荣
杨悦
方葆益
丁国
项远辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architecture Design and Research Institute of Tongji University Group Co Ltd
Original Assignee
Architecture Design and Research Institute of Tongji University Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architecture Design and Research Institute of Tongji University Group Co Ltd filed Critical Architecture Design and Research Institute of Tongji University Group Co Ltd
Priority to CN201621257169.6U priority Critical patent/CN206245482U/en
Application granted granted Critical
Publication of CN206245482U publication Critical patent/CN206245482U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model is related to a kind of super high steel structure mega-frame building structure, the building structure includes main structure and the secondary structure being arranged in main structure, main structure includes Core Walls Structure and the steel construction mega-frame being arranged on outside Core Walls Structure, the steel construction mega-frame includes that multiple is laid in the huge post outside Core Walls Structure and the annulus truss that multiple huge posts link together, huge post is the huge post of concrete filled steel tube, and secondary structure includes multiple superstructures being arranged in main structure and the gravity post being arranged between two adjacent superstructures.Compared with prior art, two grades of mega-frame building structure that the utility model is engaged using main structure with secondary structure, reduce the consumption of the quantity, the section of gravity post and steel of huge post, reduce cost, with enough wind resistance and anti-seismic performance, both overall weight had been reduced, while reducing the influence of huge post and other structural elements to building function, had also had the advantages that flexible arrangement, speed of application were fast.

Description

A kind of super high steel structure mega-frame building structure
Technical field
The utility model belongs to super-high building structure technical field, is related to a kind of super high steel structure mega-frame to build Structure.
Background technology
In recent years, continuing to develop with executive information systems, traditional lateral resisting structure form (such as framework knot Structure, frame shear wall structure etc.) cannot meet that modern high-rise building is multi-functional, comprehensive purposes space requirement, seek The lateral resisting structure form looked for novelty turns into one of project planner's problem of interest.
At present, it is Frame-Shear wall using more extensive super-high building structure, wherein, framework is arranged on core The periphery of heart cylinder, is made up of many huge posts, and overall structure is supported, and to improve the anti-side rigidity of structure, its material is most It is the mixing of armored concrete or steel and armored concrete, and needs to be reinforced with the use of substantial amounts of combined member, carries The resistance lateral load and gravity laod ability of structure high.But, in order to ensure enough wind resistance and anti-seismic performances, the structure is past Toward needing to use more huge post, and make the periphery that it is dispersed in Core Walls Structure, not only to cause that overall weight is larger, and need consumption Take great deal of steel, it is relatively costly, also reduce the efficiency of construction.
Utility model content
The purpose of this utility model is exactly a kind of wind resistance to be provided for the defect for overcoming above-mentioned prior art to exist and is resisted The super high steel structure mega-frame building structure that shock stability is good, steel using amount is low and speed of application is fast.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of super high steel structure mega-frame building structure, the building structure includes main structure and is arranged on main structure On secondary structure, described main structure includes Core Walls Structure and the steel construction mega-frame being arranged on outside Core Walls Structure, the steel knot Structure mega-frame includes that multiple is laid in the huge post outside Core Walls Structure and the annulus truss that multiple huge posts link together, institute The huge post stated is the huge post of concrete filled steel tube, and described secondary structure includes multiple superstructures being arranged in main structure and is arranged on phase Gravity post between two adjacent superstructures.Described superstructure is horizontally disposed, and multiple superstructures are vertically laid in master In structure.Superstructure runs through Core Walls Structure, and stretches out, and huge post and Core Walls Structure are linked together.
Used as preferred technical scheme, described gravity post is arranged between two adjacent superstructures and is located in Core Walls Structure Portion.
Used as preferred technical scheme, the quantity of described huge post is 4-12, described huge post undertake lateral load with And the overall gravity laod of steel construction mega-frame.
Used as preferred technical scheme, described huge post vertically gradually levels off to Core Walls Structure, i.e. steel from down to up Structure mega-frame is integrally conical.The diameter of described Core Walls Structure is vertically gradually reduced from down to up.Described ring Band truss is horizontally disposed, and described annulus truss is regular polygon annulus truss, and described huge post is arranged on just polygon At each angle of shape annulus truss, to play the anti-side rigidity of huge post to greatest extent.
Described annulus truss is provided with multiple altogether, and positioned at the mechanical floor or refuge story of high-rise building, and occupy 1-2 layers The height in building.The steel construction mega-frame that annulus truss is constituted with huge post can resist lateral load, and undertake simultaneously adjacent The load that gravity post between two annulus truss is passed over, afterwards annulus truss load is transferred to huge post.
The huge post of described concrete filled steel tube includes steel pipe, the concrete being arranged in steel pipe and is arranged on adding in steel pipe Strength structure.
Described steel pipe is rectangular steel tube.
Described reinforcing structure includes that orthogonal intersection is laid in dividing plate in rectangular steel tube, described dividing plate with it is square The inwall of steel pipe is connected.The inside of rectangular steel tube is divided into multiple regions by described dividing plate.
Described reinforcing structure also includes the stiffener 9 being arranged on dividing plate 8 and rectangular steel tube inwall.
As preferred technical scheme, in each region inside rectangular steel tube, on the inwall of dividing plate and rectangular steel tube It is provided with stiffener.
Semi-girder truss is provided between described Core Walls Structure and huge post.Semi-girder truss can coordinate Core Walls Structure and steel construction is huge Deformation between framework, is mainly used in resisting lateral load.
Used as preferred technical scheme, described semi-girder truss is provided with multiple altogether, and is located at identical building with annulus truss Layer.
Gravity beam is provided with described superstructure, the gravity beam is connected with gravity post.
Used as preferred technical scheme, the equal subregion of described gravity beam and gravity post is set, two adjacent annulus truss Between be a section, separate between each section, the top or bottom of each section are provided with deformation release device, in case Only Load concentration aggregation, has a negative impact to building structure.Gravity beam and gravity post only undertake the gravity laod in this section.
Described Core Walls Structure is provided with bracing members.The bracing members can improve the anti-side rigidity of Core Walls Structure.
Used as preferred technical scheme, described Core Walls Structure is steel Core Walls Structure, and described gravity post is that steel column or steel pipe are mixed Solidifying earth pillar.Core Walls Structure can undertake lateral load, and undertake the gravity laod in the range of Core Walls Structure simultaneously.
In the utility model, the steel construction mega-frame that annulus truss is constituted with huge post can resist lateral load, and together When undertake the load that the gravity post between two adjacent annulus truss is passed over, be transferred to for load huge by annulus truss afterwards Post.Core Walls Structure can undertake lateral load, and undertake the gravity laod in the range of Core Walls Structure simultaneously.Gravity beam and gravity post only hold Gravity laod in load this section.
Compared with prior art, the utility model has the characteristics that:
1) two grades of mega-frame building structure being engaged with secondary structure using main structure, reduce quantity, the weight of huge post The section of power post and the consumption of steel, and then cost is reduced, not only with enough wind resistance and anti-seismic performance, simultaneously because huge Post quantity is few, has both reduced overall weight, while reducing the influence of huge post and other structural elements to building function, is applicable In the super high rise building and superelevation structures of more than 500m, the structure side of super high steel structure generally existing is effectively being solved While to Rigidity, the steel using amount of structure can be significantly reduced;
2) steel structure system is used, building structure flexible arrangement, speed of application is fast, and construction industries degree is high, situ wet Operation is few.
Brief description of the drawings
Fig. 1 is the overall structure diagram of building structure in embodiment;
Fig. 2 is the horizontal profile structure schematic diagram of building structure in embodiment;
Fig. 3 is the horizontal profile structure schematic diagram of the huge post of concrete filled steel tube in embodiment;
Description of symbols in figure:
1-Core Walls Structure, 2-huge post, 3-annulus truss, 4-superstructure, 5-gravity post, 6-steel pipe, 7-concrete, 8- Dividing plate, 9-stiffener, 10-semi-girder truss, 11-gravity beam.
Specific embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with the utility model Implemented premised on technical scheme, given detailed implementation method and specific operating process, but guarantor of the present utility model Shield scope is not limited to following embodiments.
Embodiment:
A kind of super high steel structure mega-frame building structure as shown in Figure 1, the building structure include main structure and The secondary structure in main structure is arranged on, as shown in Fig. 2 main structure includes Core Walls Structure 1 and the steel knot being arranged on outside Core Walls Structure 1 Structure mega-frame, the steel construction mega-frame includes that multiple is laid in the huge post 2 outside Core Walls Structure 1 and connects multiple huge posts 2 The annulus truss 3 being connected together, Core Walls Structure 1 is provided with bracing members, and huge post 2 is the huge post of concrete filled steel tube, Core Walls Structure 1 and huge post 2 Between be provided with semi-girder truss 10.Secondary structure includes multiple superstructures 4 being arranged in main structure and is arranged on two adjacent buildings Gravity post 5 between lid 4.Gravity beam 11 is provided with superstructure 4, the gravity beam 11 is connected with gravity post 5.
As shown in figure 3, the huge post of concrete filled steel tube includes steel pipe 6, the concrete seven being arranged in steel pipe 6 and is arranged on steel Reinforcing structure in pipe 6.Steel pipe 6 is rectangular steel tube.Reinforcing structure include it is orthogonal intersection be laid in rectangular steel tube every Plate 8, dividing plate 8 is connected with the inwall of rectangular steel tube.Reinforcing structure also includes being arranged on putting more energy on dividing plate 8 and rectangular steel tube inwall Plate 9.
In this building structure, the steel construction mega-frame that annulus truss 3 is constituted with huge post 2 can resist lateral load, and The load that the gravity post 5 between two adjacent annulus truss 3 is passed over is undertaken simultaneously, annulus truss 3 passes load afterwards It is handed to huge post 2.Core Walls Structure 1 can undertake lateral load, and undertake the gravity laod in the range of Core Walls Structure 1 simultaneously.Gravity beam 11 It is a section between two adjacent annulus truss 3 and the equal subregion of gravity post 5 is set, gravity beam 11 and gravity post 5 only undertake Gravity laod in this section.
The above-mentioned description to embodiment is to be understood that and use practicality for ease of those skilled in the art It is new.Person skilled in the art obviously can easily make various modifications to these embodiments, and illustrating herein General Principle be applied in other embodiment without by performing creative labour.Therefore, the utility model is not limited to above-mentioned Embodiment, those skilled in the art according to announcement of the present utility model, do not depart from improvement that the utility model category made and Modification all should be within protection domain of the present utility model.

Claims (8)

1. a kind of super high steel structure mega-frame building structure, it is characterised in that the building structure includes main structure and sets The secondary structure in main structure is put, described main structure includes Core Walls Structure (1) and is arranged on the outside steel construction of Core Walls Structure (1) Mega-frame, the steel construction mega-frame is laid in the outside huge post (2) of Core Walls Structure (1) and by multiple huge posts including multiple (2) the annulus truss (3) for linking together, described huge post (2) is the huge post of concrete filled steel tube, and described secondary structure includes multiple The superstructure (4) being arranged in main structure and the gravity post (5) being arranged between two adjacent superstructures (4).
2. a kind of super high steel structure mega-frame building structure according to claim 1, it is characterised in that described steel The huge post of pipe concrete includes steel pipe (6), the concrete (7) being arranged in steel pipe (6) and the knot of putting more energy into being arranged in steel pipe (6) Structure.
3. a kind of super high steel structure mega-frame building structure according to claim 2, it is characterised in that described steel Pipe (6) is rectangular steel tube.
4. a kind of super high steel structure mega-frame building structure according to claim 3, it is characterised in that described adds Strength structure includes that orthogonal intersection is laid in dividing plate (8) in rectangular steel tube, the inwall phase of the dividing plate (8) and rectangular steel tube Even.
5. a kind of super high steel structure mega-frame building structure according to claim 4, it is characterised in that described adds Strength structure also includes the stiffener (9) being arranged on dividing plate (8) and rectangular steel tube inwall.
6. a kind of super high steel structure mega-frame building structure according to any one of claim 1 to 5, its feature exists In being provided with semi-girder truss (10) between described Core Walls Structure (1) and huge post (2).
7. a kind of super high steel structure mega-frame building structure according to any one of claim 1 to 5, its feature exists In, gravity beam (11) is provided with described superstructure (4), the gravity beam (11) is connected with gravity post (5).
8. a kind of super high steel structure mega-frame building structure according to any one of claim 1 to 5, its feature exists In described Core Walls Structure (1) is provided with bracing members.
CN201621257169.6U 2016-11-23 2016-11-23 A kind of super high steel structure mega-frame building structure Active CN206245482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621257169.6U CN206245482U (en) 2016-11-23 2016-11-23 A kind of super high steel structure mega-frame building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621257169.6U CN206245482U (en) 2016-11-23 2016-11-23 A kind of super high steel structure mega-frame building structure

Publications (1)

Publication Number Publication Date
CN206245482U true CN206245482U (en) 2017-06-13

Family

ID=59001553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621257169.6U Active CN206245482U (en) 2016-11-23 2016-11-23 A kind of super high steel structure mega-frame building structure

Country Status (1)

Country Link
CN (1) CN206245482U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836495A (en) * 2016-11-23 2017-06-13 同济大学建筑设计研究院(集团)有限公司 A kind of super high steel structure mega-frame building structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836495A (en) * 2016-11-23 2017-06-13 同济大学建筑设计研究院(集团)有限公司 A kind of super high steel structure mega-frame building structure

Similar Documents

Publication Publication Date Title
CN106836495A (en) A kind of super high steel structure mega-frame building structure
CN102704595B (en) Shear wall with 'profile steel column-steel beam-steel support' embedded between steel tube concrete columns and manufacturing method
CN104674941A (en) Tubular structure system capable of restoring functions
CN102979179B (en) The pipe-reinforced concrete superimposed frame structure system of a kind of steel
CN105484152B (en) A kind of bridge pier of additional mild steel damper and cushion cap attachment structure
CN103774767B (en) Combined type high-rise structure energy dissipation and shock absorption enhancement layer
CN102704598A (en) Composite shear wall with concrete-filled steel tube frames and double steel plates with concealed bracings and construction method thereof
CN109162356A (en) A kind of assembling type steel structure exempts from casting concrete building structure
CN102704593A (en) Steel tube reinforced concrete composite column-steel beam-lattice steel support shear wall and manufacturing method
CN109898415A (en) Cylinder bridge tower in the cylinder of spatial mixing rope net suspension bridge with parabola arch tower cap
CN103603434B (en) A kind of concrete filled steel tube coupled column is to the transition node of reinforced column
CN107060096A (en) Cellular boundling arranges the Super High turret structure system of hexagon cylinder
CN206581147U (en) The support system constructed for bridge long-cantilever capping beam
CN105926809A (en) Reinforced constraint steel plate energy dissipation wall
CN206245482U (en) A kind of super high steel structure mega-frame building structure
CN202990101U (en) Steel-tube-reinforced-concrete overlapped frame structure system
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN208563560U (en) The structural system of flatbed super high-rise building
CN204491826U (en) Can restore funcitons tube structure system
CN203569700U (en) Transition node from concrete filled steel tube combination column to reinforced concrete column
CN208152256U (en) A kind of repair type super high rise structure
CN205955008U (en) Basement roof arch without beam pile cap node that is all -trans
CN108331172A (en) A kind of conversion beam of the unidirectional diagonal brace of setting
CN207761056U (en) A kind of connecting structure of beam column nodes based on steel reinforced concrete
CN207177382U (en) A kind of I fonts inclined strut support cooling stack with suspension cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant