CN208803380U - Anchoring ring and pier shaft anchor ear drop system - Google Patents

Anchoring ring and pier shaft anchor ear drop system Download PDF

Info

Publication number
CN208803380U
CN208803380U CN201821374880.9U CN201821374880U CN208803380U CN 208803380 U CN208803380 U CN 208803380U CN 201821374880 U CN201821374880 U CN 201821374880U CN 208803380 U CN208803380 U CN 208803380U
Authority
CN
China
Prior art keywords
ring
anchoring
semi
pier shaft
anchor ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821374880.9U
Other languages
Chinese (zh)
Inventor
敖长江
高树青
刘书明
张凡
刘斌
马明磊
禚锦鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN201821374880.9U priority Critical patent/CN208803380U/en
Application granted granted Critical
Publication of CN208803380U publication Critical patent/CN208803380U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses anchoring rings and pier shaft anchor ear to drop system, anchoring ring includes left anchoring semi-ring, right anchoring semi-ring and suspension centre component, left anchoring semi-ring and right anchoring semi-ring fasten the hoop anchoring lumen to be formed for embracing folder pier shaft, left anchoring semi-ring and right anchoring semi-ring two ends are also respectively provided with ear projection, and the location hole for installing high-strength bolt is offered in ear projection;Suspension centre component has two groups and is centrally positioned in the lateral surface of left anchoring semi-ring and right anchoring semi-ring respectively.The assembly of anchoring lumen section is dimensioned slightly smaller than pier shaft sectional dimension, can firmly be embraced pier shaft by anchoring ring.To prevent anchoring ring and pier shaft in fastener cycle from rotating, it is provided with rubber spacer on the inside of left anchoring semi-ring and right anchoring semi-ring, rubber spacer can protect pier shaft surface, effectively prevent scratching, while increasing the frictional force between anchoring ring pier shaft.

Description

Anchoring ring and pier shaft anchor ear drop system
Technical field
The utility model relates to pier shaft anchor ear construction field, especially anchoring rings and pier shaft anchor ear to drop system.
Background technique
Economy rapid development, greatly drives mountain road to build, and raft support method by conditions such as basis, height due to being limited System, is unable to satisfy bridge construction requirement under complicated landform, so Hold Hoop method construction bridges top is more and more, is embraced by setting Hoop provides fulcrum using anchor ear frictional force, performs bridge superstructure.
After construction, bring is that related accessory such as anchor ear removes problem in construction therewith.Existing scheme generallys use Crane suspension is removed, and existing main problem is: first, when anchor ear top is stopped by beam body, crane can not stretch large arm and be It removes and supporting point is provided;Second, when encountering anchor ear dismounting in mountain area with a varied topography, space is limited, and big machinery cannot be introduced into, Cause construction inconvenience, constructional difficulties;Third, Lack of support when anchor ear is removed;4th, Demolition Construction is at high cost;5th, anchor ear When dismounting, stability is poor.
Utility model content
The purpose of the utility model is to provide anchoring rings and pier shaft anchor ear to drop system, to solve the dismounting of mountain construction anchor ear Difficulty, dead load is big, construction is inconvenient, mechanical work is difficult, anchor ear Demolition Construction safety coefficient is low, pier shaft destructible pollutes Etc. technical problems.
To achieve the above objectives, the present invention adopts the following technical solutions:
On the one hand the utility model provides anchoring ring, the anchoring ring includes left anchoring semi-ring 1, right anchoring semi-ring 2 and hangs Point component, left anchoring semi-ring 1 and right anchoring semi-ring 2 fasten the hoop anchoring lumen formed for embracing folder pier shaft, left anchoring semi-ring 1 It is also respectively provided with ear projection with right 2 two ends of anchoring semi-ring, the location hole for installing bolt is offered in ear projection;
The suspension centre component has two groups and is centrally positioned in the lateral surface of left anchoring semi-ring 1 and right anchoring semi-ring 2 respectively.
Further, suspension centre component includes left bracket 3, right bracket 4, pin shaft 5 and the fixed pulley 6 being suspended on pin shaft 5, a left side Bracket 3 is U-shaped, and left bracket 3 includes first level stiffener 31 and the first vertical central plate 32, the first level stiffener 31 There are two pieces and parallel interval is arranged, the first vertical central plate 32 is arranged between two pieces of first level stiffeners 31;
Right bracket 4 is U-shaped, and right bracket 4 includes the second sash plate 41 and the second vertical central plate 42, second water Flat stiffener 41 has two pieces and parallel interval to be arranged, the second vertical setting of central plate 42 two piece of second sash plate 41 it Between;
The center of first vertical central plate 32 and the second vertical central plate 42 is provided with for through pin shaft 5 Hole;
The extension of first vertical central plate 32 and the second vertical interval of central plate 42 setting and gap length and fixed pulley 6 Hook width is adapted.
Further, left anchoring semi-ring 1 and right 2 central symmetry of anchoring semi-ring;Between left anchoring semi-ring 1 and right anchoring semi-ring 2 By the way that the bolt being inserted between two ear projections connects.
Further, rubber spacer is provided on the inside of left anchoring semi-ring 1 and right anchoring semi-ring 2.
Further, the steel plate production that left bracket 3 and right bracket 4 are all made of with a thickness of 20mm.
Further, assembly size in anchoring lumen section is less than pier shaft sectional dimension.
On the other hand the utility model provides the pier shaft anchor ear containing anchoring ring and drops system, including anchoring ring, the first steel Cord 9, the second wirerope 10, snap ring 11 and hoist engine 7,
The anchoring ring is arranged above pier shaft anchor ear 8;
Hoist engine 7 has two and is symmetricly set on anchoring ring two sides corresponding position, and 7 bottom of hoist engine is fixed on ground simultaneously Counterweight is set or is anchored using earth anchor;
One end of first wirerope 9 is connect with the hoist engine 7 being placed on the ground, and 9 other end of the first wirerope is around fixed It is connect after pulley 6 with snap ring 11;Second wirerope, 10 one end is connect with snap ring 11,10 other end of the second wirerope and pier shaft anchor ear Lifting point connection on 8.
Further, the quantity of the second wirerope 10 and the quantity of lifting point are adapted.
The beneficial effects of the utility model are embodied in:
1, anchoring ring provided by the utility model and pier shaft anchor ear drop system, and simple structure, material is common, are easy to add Work.This method drops that Demolition Construction is safe and orderly, can successfully cope with the anchor ear of various complicated landform environment, mechanical execution difficulty It removes, while saving manpower and machine cost, improve construction efficiency under the premise of guaranteeing construction quality, more importantly protecting It has demonstrate,proved pier shaft and has not been destroyed pollution.
2, anchoring ring provided by the utility model and pier shaft anchor ear drop system, and the assembly of anchoring lumen section is dimensioned slightly smaller than Pier shaft sectional dimension can firmly be embraced pier shaft by anchoring ring.To prevent anchoring ring and pier shaft in fastener cycle from occurring to turn It is dynamic, it is provided with rubber spacer on the inside of left anchoring semi-ring and right anchoring semi-ring, rubber spacer can protect pier shaft surface, effectively prevent It scratches, while increasing the frictional force between anchoring ring pier shaft.Simulation test is carried out before formal construction, guarantees construction safety.
3, anchoring ring is ingenious in design, and anchoring ring two sides are all provided with the suspension centre component for hanging with fixed pulley, avoids wirerope sliding Dynamic cutting suspension centre, reduces security risk.
4, multiple lifting points are provided on pier shaft anchor ear, the two sides of pier shaft anchor ear dismantle, land simultaneously, ensure that whole Construction safety.
Other features and advantages of the utility model will illustrate in the following description, and partly from specification It becomes apparent, or is understood and implementing the utility model.The main purpose and further advantage of the utility model can lead to Specifically noted scheme in specification, claims is crossed to be achieved and obtained.
Detailed description of the invention
The utility model is described in more detail with reference to the accompanying drawing.
Fig. 1 is anchoring ring plan view.
Fig. 2 is anchoring ring side view.
Fig. 3 is suspension centre component structure diagram.
Fig. 4 is the first wirerope and the second wirerope connection schematic diagram.
Fig. 5 is to drop construction drawing.
Fig. 6 is plank schematic view of the mounting position.
Fig. 7 is the pier shaft anchor ear bottom view being inserted into after plank.
Appended drawing reference: the left anchoring semi-ring of 1-, the right anchoring semi-ring of 2-, the left bracket of 3-, 31- first level stiffener, 32- First vertical central plate, the right bracket of 4-, the second sash of 41- plate, the vertical central plate of 42- second, 5- pin shaft, 6- are slided surely Wheel, 7- hoist engine, 8- pier shaft anchor ear, the first wirerope of 9-, the second wirerope of 10-, 11- snap ring, 12- plank, 13- timber wedge.
Specific embodiment
The technical solution of the utility model is described in detail by the following examples, embodiment below is only exemplary , it is only capable of for explanation and illustration the technical solution of the utility model, and cannot be construed to technical solutions of the utility model Limitation.
In order to facilitate the Demolition Construction of mountain area overpass pier shaft anchor ear 8, topography below the pier shaft of mountain area overpass is overcome to rise To lie prostrate larger, top is with box beam, and heavy-duty machinery disengaging is difficult, the construction problem in no crane operation space, and the one of the utility model A aspect provides anchoring ring, and the anchoring ring includes left anchoring semi-ring 1, right anchoring semi-ring 2 and suspension centre component.Left anchoring semi-ring 1 The hoop anchoring lumen formed for embracing folder pier shaft, left anchoring semi-ring 1 and right 2 both ends of anchoring semi-ring are fastened with right anchoring semi-ring 2 Head is also respectively provided with ear projection, and the location hole of the high-strength bolt for installing M20,10.9S grades is offered in ear projection.Specific ginseng See Fig. 1.
As shown in Figures 2 and 3, the suspension centre component has two groups and is centrally positioned in left anchoring semi-ring 1 and right anchor respectively Gu the lateral surface of semi-ring 2.Specifically, suspension centre component includes left bracket 3, right bracket 4, the round steel pin shaft 5 of diameter 40mm and outstanding Hang over the fixed pulley 6 on pin shaft 5.Wherein, left bracket 3 is U-shaped, and left bracket 3 includes that first level stiffener 31 and first are vertical Central plate 32, the first level stiffener 31 have two pieces and are spaced setting, and the first vertical central plate 32 setting is at two pieces the Between one sash plate 31;Right bracket 4 is U-shaped, and right bracket 4 includes the second sash plate 41 and the second vertical central plate 42, the second sash plate 41 has two pieces and is spaced setting, and the second vertical setting of central plate 42 is in two piece of second level Between stiffener 41.The center of first vertical central plate 32 and the second vertical central plate 42 is provided with for through pin shaft 5 hole, bore dia 42mm, pin shaft 5 can use the round steel of 40mm, and the both ends of round steel exceed the first vertical plate, the respectively The two vertical at least 70mm of central plate 42.First vertical central plate 32 and the second vertical interval of central plate 42 setting and gap length It is adapted with the hook width of fixed pulley 6.Left and right bracket 4 makes using with a thickness of the steel plate of 20mm.Left and right bracket 4 and left anchor Gu welt weld all around between semi-ring 1, right anchoring semi-ring 2, weldering is high to be not less than 8mm, or can add and do spacer pin.
Construction explanation: first, above-mentioned anchoring ring can be welded using with the steel plate of 8 same thickness of pier shaft anchor ear to be removed It forms, can guarantee that anchoring ring has enough rigidity in this way, side will not occur deformation when in use, it is ensured that rubbing surface effectively plays Effect.Second, the two sides of anchoring ring are all provided with the suspension centre component for hanging with fixed pulley 6, avoid steel cable sliding from cutting suspension centre, subtract Few security risk.The rubber spacer of 5mm is provided on the inside of left anchoring semi-ring 1 and right anchoring semi-ring 2 with increasing friction force.Pass through knot Structure Force Calculation reduces dead load, facilitates construction while guaranteeing to provide enough bearing capacities for anchor ear dismounting.
As shown in figure 5, on the other hand the utility model provides the pier shaft anchor ear 8 containing above-mentioned anchoring ring drops system, wrap Anchoring ring, the first wirerope 9, the second wirerope 10, snap ring 11 and two hoist engines 7 are included, the anchoring ring setting is embraced in pier shaft 8 top of hoop;The left anchoring semi-ring 1 of anchoring ring can be aligned with the seam crossing of pier shaft anchor ear 8 with right anchoring 2 seam crossing of semi-ring and set It sets.
One end of first wirerope 9 is connect with the hoist engine 7 being placed on the ground, and 9 other end of the first wirerope is around fixed It is connect after pulley 6 with snap ring 11;Second wirerope, 10 one end is connect with snap ring 11, and the lifting point on one end and pier shaft anchor ear 8 connects It connects.The quantity of second wirerope 10 and the quantity of lifting point are adapted.When Specific construction, patch weldering is enclosed at 8 suspension centre of pier shaft anchor ear Welding steel plate prevents from deforming at suspension centre.Second wirerope 10 can be set according to lifting point quantity original on pier shaft anchor ear 8.It is several One end of a second wirerope 10 is connect with snap ring 11.The two sides of pier shaft anchor ear 8 dismantle, land simultaneously, ensure that whole Construction safety.
Specific step is as follows for construction method:
Step 1, processing and fabricating assembly anchoring ring;Left anchoring semi-ring 1, right anchoring semi-ring 2 are made of Q235 steel plate, thick Degree is 12mm, is highly 160mm.Before use, also needing to check that fixed pulley 6 ensures that Anti-hook releasing device works normally.
Step 2, anchor ear disassembly belong to the biggish part-to-item project of risk, and therefore, anchoring ring must unload before Fall simulation test;Levelling of the land is selected, transport easily has constructed to finish and carried out dropping simulation test at pier stud, will dismantle pier Body anchor ear 8 is installed on pier shaft lower part from the ground at 1m, and anchoring ring, which is mounted on, has dismantled 8 top appropriate location of pier shaft anchor ear.Simulation On-site actual situations are dismantled.
Step 3 sets up bracket as pier shaft anchor ear 8 by code requirement and dismantles platform, the appropriate position above pier shaft anchor ear 8 Set installation anchoring ring;Cushioning 5mm rubber pad is tight as required using Electric torque wrench with increasing friction force between anchoring ring and pier shaft Fixing bolt, it is 82.2KN that high-strength bolt offer, which axially fastens power P,.Certainly, under different execution conditions, the size of power is axially fastened It is different.Stiffening plate is welded on original suspension centre of pier shaft anchor ear.
Hoist engine 7 is fixed on ground and counterweight is arranged or is anchored using earth anchor, prevents from rolling up during dropping by step 4 Raise the displacement of machine 7;
Step 5 installs the first wirerope 9 and the second wirerope 10;First wirerope 9 and the second wirerope 10 and snap ring 11 connections.
Note: the installation number of the second wirerope 10 can be identical as the lifting point quantity on pier shaft anchor ear 8 or passing through Cross the quantity of the second wirerope of appropriate adjustment 10 after calculating.Installation settings mode as shown in Figure 4 can be used: that is, pier shaft is embraced 8 sides are bound round there are four lifting point, have mounted three second wirerope 10 on snap ring 11, the second wirerope 10 positioned at middle part is close 8 side of pier shaft anchor ear separates two shorter third wirerope, mounts lifting point respectively.When being arranged in this way, need to guarantee pier shaft Identical, uniform force is arranged in 8 two sides of anchor ear, can smoothly complete 8 two sides of pier shaft anchor ear while drop.
Step 6, branch dismantle the high-strength bolt on pier shaft anchor ear 8;Specifically: first, it is high to unclamp 8 middle part of pier shaft anchor ear Strength bolt (not directly removes), then free end high-strength bolt, and alternately, the stress release to pier shaft anchor ear 8 finishes Afterwards, high-strength bolt is removed;Second, the flange of pier shaft anchor ear 8 distinguishes the thick cork wedge 13 that inserting thickness is 70mm up and down, soft Timber wedge 13 gos deep into template 20mm, and for expanding anchor ear spacing, convenient for falling, flange installs stay bolt, and bolt should be fastened suitably Timber wedge 13 is clamped, is shaken during preventing anchor ear from dropping and timber wedge 13 is fallen.
Step 7, installation buffering cork;Ship type plank 12 is inserted into pier shaft anchor ear 8 and pier shaft gap;Wherein, plank 12 For thickness 20mm, length 500mm, width 200mm;Plank 12 is pine or cypress.Each two of every side, as under pier shaft anchor ear Sliding rail when falling prevents anchor ear and pier shaft friction damage from polluting pier shaft.12 installation site of cork sheet is as shown in Fig. 6,7.
Step 8 removes the steel pipe column of support pier shaft anchor ear 8, tenses the first wirerope 9 connecting with hoist engine 7, makes steel Tubing string and anchor ear are detached from, and steel pipe column is cut and disassembled in merogenesis;
Step 9 drops pier shaft anchor ear 8 by hoist engine 7, and ensure pier during dropping after steel pipe column is dismantled The two sides of body anchor ear 8 are synchronous to fall, until anchor ear drops down onto ground, removes connection bolt, anchor ear is hoisted to storage point by truck-mounted crane;
Step 10 removes and recycles anchoring ring.
It is to be noted that the steel pipe column in step 8 is only to play a supporting role when starting to do pier shaft anchor ear 8 Structure.The steel pipe column can also be not provided with.
Anchoring ring provided by the utility model and pier shaft anchor ear drop system, and simple structure, material is common, easy to process, The anchor ear that can be coped under various complicated environmental conditions is removed, while saving manpower and machine cost, is guaranteeing construction quality Under the premise of improve construction efficiency.
The foregoing is merely the preferable specific embodiment of the utility model, but the protection scope of the utility model not office Be limited to this, variation that anyone skilled in the art is expected within the technical scope disclosed by the utility model or Replacement, should be covered within the scope of the utility model.

Claims (7)

1. anchoring ring, it is characterised in that: the anchoring ring includes left anchoring semi-ring (1), right anchoring semi-ring (2) and suspension centre component, Left anchoring semi-ring (1) and right anchoring semi-ring (2) fasten the hoop anchoring lumen formed for embracing folder pier shaft, left anchoring semi-ring (1) It is also respectively provided with ear projection with right anchoring semi-ring (2) two ends, the location hole for installing bolt is offered in ear projection;
The suspension centre component has two groups and is centrally positioned in the lateral surface of left anchoring semi-ring (1) and right anchoring semi-ring (2) respectively.
2. anchoring ring as described in claim 1, which is characterized in that suspension centre component includes left bracket (3), right bracket (4), pin shaft (5) and the fixed pulley (6) that is suspended on pin shaft (5), left bracket (3) is U-shaped, and left bracket (3) includes first level stiffener (31) and the first vertical central plate (32), the first level stiffener (31) have two pieces and parallel interval setting, and first is perpendicular It is arranged between two pieces of first level stiffeners (31) to central plate (32);
Right bracket (4) is U-shaped, and right bracket (4) includes the second sash plate (41) and the second vertical central plate (42), and described the Two sash plates (41) have two pieces and parallel interval is arranged, and the second vertical central plate (42) setting adds in two piece of second level Between strength plate (41);
The center of first vertical central plate (32) and the second vertical central plate (42) is provided with for through pin shaft (5) Hole;
First vertical central plate (32) and the second vertical central plate (42) interval setting and gap length and fixed pulley (6) Width is linked up with to be adapted.
3. anchoring ring as described in claim 1 or 2, which is characterized in that in left anchoring semi-ring (1) and right anchoring semi-ring (2) The heart is symmetrical;Between left anchoring semi-ring (1) and right anchoring semi-ring (2) by the way that the bolt being inserted between two ear projections connect.
4. anchoring ring as described in claim 1, which is characterized in that be arranged on the inside of left anchoring semi-ring (1) and right anchoring semi-ring (2) There is rubber spacer.
5. anchoring ring as described in claim 1, which is characterized in that assembly size in anchoring lumen section is less than pier shaft section ruler It is very little.
6. dropping system containing the pier shaft anchor ear of anchoring ring as described in claim any one of 1-5, which is characterized in that including anchoring Ring, the first wirerope (9), the second wirerope (10), snap ring (11) and hoist engine (7),
The anchoring ring setting is above pier shaft anchor ear (8);
Hoist engine (7) has two and is symmetricly set on anchoring ring two sides corresponding position, and hoist engine (7) bottom is fixed on ground simultaneously Counterweight is set or is anchored using earth anchor;
One end of first wirerope (9) is connect with the hoist engine (7) being placed on the ground, and the first wirerope (9) other end bypasses Fixed pulley (6) is connect with snap ring (11) afterwards;Second wirerope (10) one end is connect with snap ring (11), and the second wirerope (10) is another End is connect with the lifting point on pier shaft anchor ear (8).
7. the pier shaft anchor ear containing anchoring ring drops system as claimed in claim 6, which is characterized in that the second wirerope (10) Quantity and lifting point quantity be adapted.
CN201821374880.9U 2018-08-24 2018-08-24 Anchoring ring and pier shaft anchor ear drop system Expired - Fee Related CN208803380U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821374880.9U CN208803380U (en) 2018-08-24 2018-08-24 Anchoring ring and pier shaft anchor ear drop system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821374880.9U CN208803380U (en) 2018-08-24 2018-08-24 Anchoring ring and pier shaft anchor ear drop system

Publications (1)

Publication Number Publication Date
CN208803380U true CN208803380U (en) 2019-04-30

Family

ID=66236430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821374880.9U Expired - Fee Related CN208803380U (en) 2018-08-24 2018-08-24 Anchoring ring and pier shaft anchor ear drop system

Country Status (1)

Country Link
CN (1) CN208803380U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867399A (en) * 2018-08-24 2018-11-23 中国建筑土木建设有限公司 Anchoring ring, pier shaft anchor ear drop system and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867399A (en) * 2018-08-24 2018-11-23 中国建筑土木建设有限公司 Anchoring ring, pier shaft anchor ear drop system and its construction method

Similar Documents

Publication Publication Date Title
CN106978784B (en) A kind of Long span highway suspension bridge Demolition Construction method
CN206521197U (en) A kind of adjustable balance hoisting beam
CN103982045B (en) A kind of roofing latticed shell structure is encorbelmented construction method of installation without support
CN202416183U (en) Bent cap collar-clamp type cast support
CN201635020U (en) Bridge floor dismantling crane for large and medium concrete bridges
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN110374008A (en) A method of the erection of cable-stayed bridge steel truss is carried out in marine environment
CN207362717U (en) A kind of device replaced for main rope of suspension bridge cord clip
CN108680326B (en) A kind of submarine pipeline junk shock simulation experiment method
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN208803380U (en) Anchoring ring and pier shaft anchor ear drop system
CN115724331A (en) Prefabricated box girder hoisting device and rapid construction method
CN102486051B (en) Manual demolishing method of large-area spherical net rack
CN208171554U (en) A kind of submarine pipeline junk shock simulation experiment system
CN207161885U (en) A kind of supporting structure for being used on the downside of bridge lay gas pipeline
CN108867399A (en) Anchoring ring, pier shaft anchor ear drop system and its construction method
CN102226497B (en) Manufacturing method of large rubber rolling curtain sealed dry-type gas holder
CN212561206U (en) Quick positioning and mounting device for plate type rubber support
CN206308702U (en) A kind of portable basis of derrick crane
CN206376513U (en) Pin-connected panel nacelle device
CN202881854U (en) Support bracket for bridge construction
CN114033147B (en) Construction method for disassembling and modifying I-shaped steel of overhanging scaffold in hoistway
CN205742089U (en) A kind of anchor ear support means
CN106245531A (en) Steel structural bridge installation method is hung under bilateral derrick type