CN202881854U - Support bracket for bridge construction - Google Patents

Support bracket for bridge construction Download PDF

Info

Publication number
CN202881854U
CN202881854U CN2012205253987U CN201220525398U CN202881854U CN 202881854 U CN202881854 U CN 202881854U CN 2012205253987 U CN2012205253987 U CN 2012205253987U CN 201220525398 U CN201220525398 U CN 201220525398U CN 202881854 U CN202881854 U CN 202881854U
Authority
CN
China
Prior art keywords
split bolt
strength split
bridge construction
bearing plate
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012205253987U
Other languages
Chinese (zh)
Inventor
梁国栋
郭长春
方长远
麦研
陈刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd filed Critical No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Priority to CN2012205253987U priority Critical patent/CN202881854U/en
Application granted granted Critical
Publication of CN202881854U publication Critical patent/CN202881854U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model provides a support bracket for bridge construction. The support bracket for bridge construction is mounted on a bridge pier. The support bracket for bridge construction comprises an upper high-strength split bolt, a lower high-strength split bolt, an upper hinged support plate, a lower hinged support plate, a top chord and an inclined stay bar, wherein the upper high-strength split bolt and the lower high-strength split bolt are horizontally arranged and are fixedly connected in the bridge pier, the upper hinged support plate is fixedly connected with the tail end of the upper high-strength split bolt, the lower hinged support plate is fixedly connected with the tail end of the lower high-strength split bolt, and the hinged support plate, the top chord, the inclined stay bar and the lower hinged support plate are sequentially connected with one another in a hinged mode. According to the support bracket for bridge construction, intervals are convenient to adjust, and the support bracket for bridge construction is suitable for different bridge types, strong in universality and revolving, suitable for construction of high-density continuous beams, and thus construction cost is saved, working efficiency is improved, and security risks of constructions are reduced.

Description

Supporting bracket of bridge construction
Technical field
The utility model relates to a kind of carriage, relates in particular to a kind of supporting bracket of bridge construction.
Background technology
With the transportation development, bridge construction comprises that river bridge, land bridge are more and more.Bridge pier is the basis of building in bridge construction.Usually, attached pier carriage construction is adopted in highway, No. 0 piece construction of Railway Bridges And Piers, and pre-buried large block plate in the present pier of conventional bracket is with shelf bracket monolithic hoisted in position and pre-embedded steel slab welding after assembly welding is finished under the bridge.But there is following problem in conventional bracket in work progress: high-altitude vertical welding, weldquality are difficult to guarantee, have potential safety hazard; Weld seam is long, the overhead welding workload is large, the carriage installation period is long; Need to use during dismounting gas welding with carriage by cutting off on the pre-embedded steel slab, remove difficulty, and serious through the shelf bracket damage after the gas welding cutting, should not repeatedly use, turnover property is poor, the carriage input amount is large; After carriage is removed, realize that pre-buried large block plate is difficult to process, affect the bridge pier presentation quality.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the utility model provides a kind of supporting bracket of bridge construction, be installed on bridge pier, described supporting bracket of bridge construction comprises high-strength split bolt, lower high-strength split bolt, upper free bearing plate, lower free bearing plate, upper chord, hound, described high-strength split bolt, lower high-strength split bolt is horizontally disposed with and is fixedly connected in described bridge pier, described high-strength split bolt, lower high-strength split bolt connects described bridge pier, described upper free bearing plate is fixedly connected on the end of described high-strength split bolt, lower free bearing plate is fixedly connected on the end of described lower high-strength split bolt, described upper free bearing plate, upper chord, hound, lower free bearing plate is hinged successively.
Further improvement of the utility model is that described lower high-strength split bolt and upper high-strength split bolt are parallel to each other.
Further improvement of the utility model is that described lower high-strength split bolt is arranged under the described high-strength split bolt.
Further improvement of the utility model is that described upper chord adopts the Q235 steel.
Further improvement of the utility model is that described hound adopts the Q235 steel.
Further improvement of the utility model is that described upper free bearing plate adopts the Q345 steel.
Further improvement of the utility model is that described lower free bearing plate adopts the Q345 steel.
Compared to prior art, the upper free bearing plate of supporting bracket of bridge construction of the present utility model, lower free bearing plate adopt carbon dioxide gas arc welding, and the second-order weld weldquality is good.Upper free bearing plate, lower free bearing plate adopt high-strength split bolt to wearing bolt, and elastic deformation is effective.After carriage was removed, the presentation quality of bridge pier was good.Supporting bracket of bridge construction of the present utility model is convenient to adjust spacing, is applicable to different beam types, and versatility, turnover property are strong, are applicable to the high density Construction of continuous beam, save construction cost, improve operating efficiency, reduce construction safety risk.
Description of drawings
Fig. 1 is the structural representation of the utility model supporting bracket of bridge construction.
The specific embodiment
Below in conjunction with description of drawings and the specific embodiment the utility model is further specified.
See also Fig. 1, the utility model provides a kind of supporting bracket of bridge construction 10, comprises free bearing plate 11, lower free bearing plate 13, upper chord 15, hound 17, upper high-strength split bolt 18, lower high-strength split bolt 19.Described supporting bracket of bridge construction 10 is installed on bridge pier 20, described high-strength split bolt 18, lower high-strength split bolt 19 are horizontally disposed with and are fixedly connected in the described bridge pier 20, and described high-strength split bolt 18, lower high-strength split bolt 19 connect described bridge pier 20.Described lower high-strength split bolt 19 is parallel to each other with upper high-strength split bolt 18, and in the present embodiment, described lower high-strength split bolt 19 is arranged under the described high-strength split bolt 18.
Upper free bearing plate 11 is fixedly connected on the end of described high-strength split bolt 18, and lower free bearing plate 13 is fixedly connected on the end of described lower high-strength split bolt 19.Upper free bearing plate 11, upper chord 15, hound 17, lower free bearing plate 13 are hinged successively.Described upper chord 15 is horizontally disposed with, and described hound 17 is inclined relative to horizontal.Described supporting bracket of bridge construction 10 also is provided with steel pin, and described upper chord 15 is articulated in described upper free bearing plate 11 by steel pin, and described hound 17 is articulated in described lower free bearing plate 13 by steel pin, and described upper chord 15 is articulated in described hound 17 by steel pin.In the present embodiment, upper chord 15, hound 17 adopt the Q235 steel.Upper free bearing plate 11, lower free bearing plate 13 adopt the Q345 steel.In the present embodiment, all parts is undertaken hinged by steel pin, is understandable that, also can be by other means between all parts or device carry out hingedly, do not repeat them here.
Supporting bracket of bridge construction 10 of the present utility model can be at the bridge pier 20 interior preformed holes that high-strength split bolt is set.For guaranteeing that the preformed hole position accurately is not subjected to the impact off normal in the concreting process, need at bridge pier 20 interior installation locating racks, preformed hole adopts pvc pipe.The upper free bearing plate 11 of supporting bracket of bridge construction 10 of the present utility model, lower free bearing plate 13 adopt carbon dioxide gas arc welding, and the second-order weld weldquality is good.Upper free bearing plate 11, lower free bearing plate 13 adopt high-strength split bolt to wearing bolt, and elastic deformation is effective.After carriage is removed, can be with the reserving hole channel mud jacking, the presentation quality of bridge pier 20 is good.Supporting bracket of bridge construction 10 of the present utility model is convenient to adjust spacing, is applicable to different beam types, and versatility, turnover property are strong, are applicable to the high density Construction of continuous beam, save construction cost, improve operating efficiency, reduce construction safety risk.
Above content is in conjunction with concrete preferred embodiment further detailed description of the utility model, can not assert that implementation of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, can also make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.

Claims (7)

1. supporting bracket of bridge construction, be installed on bridge pier, it is characterized in that: described supporting bracket of bridge construction comprises high-strength split bolt, lower high-strength split bolt, upper free bearing plate, lower free bearing plate, upper chord, hound, described high-strength split bolt, lower high-strength split bolt is horizontally disposed with and is fixedly connected in the described bridge pier, described high-strength split bolt, lower high-strength split bolt connects described bridge pier, described upper free bearing plate is fixedly connected on the end of described high-strength split bolt, lower free bearing plate is fixedly connected on the end of described lower high-strength split bolt, described upper free bearing plate, upper chord, hound, lower free bearing plate is hinged successively.
2. described supporting bracket of bridge construction according to claim 1, it is characterized in that: described lower high-strength split bolt and upper high-strength split bolt are parallel to each other.
3. described supporting bracket of bridge construction according to claim 1, it is characterized in that: described lower high-strength split bolt is arranged under the described high-strength split bolt.
4. described supporting bracket of bridge construction according to claim 1, it is characterized in that: described upper chord adopts the Q235 steel.
5. described supporting bracket of bridge construction according to claim 1, it is characterized in that: described hound adopts the Q235 steel.
6. described supporting bracket of bridge construction according to claim 1, it is characterized in that: described upper free bearing plate adopts the Q345 steel.
7. described supporting bracket of bridge construction according to claim 1, it is characterized in that: described lower free bearing plate adopts the Q345 steel.
CN2012205253987U 2012-10-15 2012-10-15 Support bracket for bridge construction Expired - Fee Related CN202881854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012205253987U CN202881854U (en) 2012-10-15 2012-10-15 Support bracket for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012205253987U CN202881854U (en) 2012-10-15 2012-10-15 Support bracket for bridge construction

Publications (1)

Publication Number Publication Date
CN202881854U true CN202881854U (en) 2013-04-17

Family

ID=48073295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012205253987U Expired - Fee Related CN202881854U (en) 2012-10-15 2012-10-15 Support bracket for bridge construction

Country Status (1)

Country Link
CN (1) CN202881854U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696373A (en) * 2013-11-01 2014-04-02 中铁十七局集团第二工程有限公司 Construction method for adjustable triangular bracket
CN105178197A (en) * 2015-09-30 2015-12-23 杭州萧宏建设集团有限公司 Support frame for bearing formworks of initial blocks of bridge box girder and initial block construction method
CN113430945A (en) * 2021-07-01 2021-09-24 广西路桥工程集团有限公司 Design method of assembly type bracket, bracket and construction method of bridge 0# block

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696373A (en) * 2013-11-01 2014-04-02 中铁十七局集团第二工程有限公司 Construction method for adjustable triangular bracket
CN105178197A (en) * 2015-09-30 2015-12-23 杭州萧宏建设集团有限公司 Support frame for bearing formworks of initial blocks of bridge box girder and initial block construction method
CN113430945A (en) * 2021-07-01 2021-09-24 广西路桥工程集团有限公司 Design method of assembly type bracket, bracket and construction method of bridge 0# block

Similar Documents

Publication Publication Date Title
CN103452053B (en) The antidumping bracing means of Single column pier bridge
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN104070316B (en) A kind of assembled group of welded H section steel is to device and using method thereof
CN202881854U (en) Support bracket for bridge construction
CN202131563U (en) Combined gate type bridge pier for one-step suspension in position of steel crossbeam
CN203403373U (en) Antidumping reinforcing device of single-column pier bridge
CN105544406A (en) Sliding-type Bailey beam dismantling device and dismantling method thereof
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN110512517B (en) Bridge engineering construction platform
CN205529923U (en) Sliding device of demolising of beiLei beam
CN111608086A (en) Lateral flat top construction structure and method for steel-concrete composite beam
CN103669218A (en) Novel steel and concrete combined section steel box girder block and assembling and splicing method thereof
CN204753390U (en) Bridge construction support bracket
CN204059206U (en) A kind of bridge construction Support bracket
CN206503348U (en) The support system of one discharge plate buckle type scaffold door opening position bracket
CN202688878U (en) Box-shaped slide beam
CN106522531A (en) Ring lock scaffold opening portion bracket supporting system
CN204644878U (en) A kind of transom pier steel truss girder lifting construction device
CN203256622U (en) Supporting bracket for bridge construction
CN210134353U (en) Bracket type hoop bracket for bent cap construction
CN206667082U (en) A kind of steel box-girder splice plate more changing device
CN206581682U (en) A kind of interim transition structure in jacking framed bridge steel column for contacting net basis
CN203452008U (en) Supporting device for bridge
CN202390090U (en) Temporary crown block bumper post convenient to disassemble and assemble
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20191015

CF01 Termination of patent right due to non-payment of annual fee