CN210947644U - Scaffold for ceiling installation - Google Patents

Scaffold for ceiling installation Download PDF

Info

Publication number
CN210947644U
CN210947644U CN201921873978.3U CN201921873978U CN210947644U CN 210947644 U CN210947644 U CN 210947644U CN 201921873978 U CN201921873978 U CN 201921873978U CN 210947644 U CN210947644 U CN 210947644U
Authority
CN
China
Prior art keywords
column
fixing device
scaffold
wall
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921873978.3U
Other languages
Chinese (zh)
Inventor
刘正良
史炉生
高双方
陈云霞
陈新霞
李伟峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quanqi Construction Development Co ltd
Original Assignee
Quanqi Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanqi Construction Development Co ltd filed Critical Quanqi Construction Development Co ltd
Priority to CN201921873978.3U priority Critical patent/CN210947644U/en
Application granted granted Critical
Publication of CN210947644U publication Critical patent/CN210947644U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold frame is used in furred ceiling installation, the lower extreme surface of main tributary dagger is provided with the base, the upper end surface of main tributary dagger is provided with the connector, the outer wall of main tributary dagger is provided with fixing device No. one, one side surface of a fixing device is provided with the enhancement post No. one, one side surface of an enhancement post is provided with fixing device No. two, No. two fixing device's rear end surface is provided with the enhancement post No. two, the outer wall of No. two enhancement posts is provided with stair, the upper end surface of an enhancement post is provided with the abrasion pad. A scaffold frame is used in furred ceiling installation, be equipped with fixing device and base No. one, fixing device can install the enhancement post and make the scaffold frame more stable, the base can also be with main tributary stay chucking, the area of contact on increase and ground stabilizes whole scaffold frame, brings better use prospect.

Description

Scaffold for ceiling installation
Technical Field
The utility model relates to a scaffold technical field, in particular to scaffold is used in furred ceiling installation.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out, and is divided into an outer scaffold and an inner scaffold according to the erected position, and the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; divide into pole setting formula scaffold, bridge type scaffold, gate-type scaffold, suspension type scaffold, hanging scaffold, choose formula scaffold, climb formula scaffold according to the configuration form, present development is different day by month, and the high building is pulled out the ground and is played, and the use of scaffold is more and more, and along with the continuous development of science and technology, people are also more and more high to the manufacturing process requirement of scaffold.
The existing scaffold has certain defects in use, firstly, the scaffold is not stable enough in installation, is not beneficial to people to use, and in addition, the scaffold is inconvenient for workers to lift up and down, so that certain adverse effects are brought to the use process of people.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a scaffold frame is used in furred ceiling installation, possess advantages such as stability is good, convenient from top to bottom, expansibility is strong, can effectively solve the problem in the background art.
(II) technical scheme
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a scaffold frame is used in furred ceiling installation, includes the main tributary dagger, the lower extreme surface of main tributary dagger is provided with the base, the upper end surface of main tributary dagger is provided with the connector, the outer wall of main tributary dagger is provided with fixing device No. one, one side surface of fixing device is provided with the enhancement post No. one, one side surface of enhancement post is provided with fixing device No. two, No. two fixing device's rear end surface is provided with the enhancement post No. two, the outer wall of No. two enhancement posts is provided with stair, the upper end surface of enhancement post is provided with the abrasion pad, the upper end surface of abrasion pad is provided with the working plate.
Preferably, a fixing device includes sleeve, fixed orifices, spliced pole, installing port and spacing post, the fixed orifices has been seted up to telescopic front end surface, one side surface of fixed orifices is provided with the spliced pole, the installing port has been seted up to the front end surface of spliced pole, the front end surface of installing port is provided with spacing post.
Preferably, the base includes bottom plate, inner prop, spring, marble, buffer layer and outer tube, the inside of inner prop is provided with spring and marble, the marble is located one side of spring, the outer wall of inner prop is provided with the buffer layer, the outer wall of buffer layer is provided with the outer tube, the lower extreme surface of outer tube is provided with the bottom plate.
Preferably, be provided with the hexagon socket head cap screw between sleeve and the spliced pole, the telescopic outer wall passes through hexagon socket head cap screw fixed connection with one side surface of spliced pole, be provided with the powerful glue between installing port and the spacing post, the front end surface of installing port passes through powerful glue fixed connection with the rear end surface of spacing post.
Preferably, the upper end surface of bottom plate and the lower extreme surface of outer tube and interior post are welded connection, be provided with the double faced adhesive tape between buffer layer and the bottom plate, the lower extreme surface of buffer layer and the upper end surface of bottom plate pass through double faced adhesive tape fixed connection, be provided with movable groove between interior post and the spring, the inside of interior post and the outer wall of spring pass through movable groove and be swing joint, be provided with lubricating grease between spring and the marble, one side surface that one side surface of spring passes through lubricating grease and marble is swing joint.
Preferably, a clamping groove is formed between the second reinforcing column and the stair, the outer surface of the upper end of the second reinforcing column is detachably connected with the outer surface of one side of the stair through the clamping groove, a mounting hole is formed between the main supporting column and the connector, and the outer wall of the main supporting column is detachably connected with the inner wall of the connector through the mounting hole.
(III) advantageous effects
Compared with the prior art, the utility model provides a scaffold frame is used in furred ceiling installation possesses following beneficial effect:
1. this scaffold frame is used in furred ceiling installation, fixing device through setting up No. one, a fixing device includes the sleeve, the fixed orifices, the spliced pole, installing port and spacing post, the sleeve is installed on the outer wall of main tributary dagger, fixed screw is installed in the fixed orifices, adjust fixed screw alright with the position of adjusting a fixing device, it can install the enhancement post to be provided with the installing port on the spliced pole, spacing post in the spliced pole can prevent that the enhancement post from droing and bringing danger, under the in service behavior of difference, adjust the work that a fixing device position just can adapt to co-altitude not, thereby people's use has been made things convenient for.
2. This scaffold frame is used in furred ceiling installation, base and working plate through setting up, the base includes the bottom plate, the inner prop, a spring, the marble, buffer layer and outer tube, the bottom plate can increase the area of contact with ground and make the stability more of scaffold frame for the square, be provided with spring and marble on the inner prop, spring shrink resets and can make the marble motion install and remove the main tributary dagger, facilitate the use, the buffer layer can provide the buffering when installing the main tributary dagger, thereby reduce the damage of bottom plate, the outer tube can wrap up the main tributary dagger, prevent that the main tributary dagger from empting, whole scaffold frame for the furred ceiling installation simple structure, high durability and convenient operation, the effect of use is better for the.
Drawings
Fig. 1 is the utility model relates to a scaffold's overall structure schematic diagram is used in furred ceiling installation.
Fig. 2 is the utility model relates to a partial structure schematic diagram of scaffold frame is used in furred ceiling installation.
Fig. 3 is the utility model relates to a No. one fixing device's in scaffold frame for furred ceiling installation structural schematic diagram.
Fig. 4 is the utility model relates to a structural schematic of base in scaffold frame for furred ceiling installation.
In the figure: 1. a main support column; 2. a first fixing device; 201. a sleeve; 202. a fixing hole; 203. connecting columns; 204. an installation port; 205. a limiting column; 3. a connector; 4. a first reinforcing column; 5. a working plate; 6. a base; 601. a base plate; 602. an inner column; 603. a spring; 604. a marble; 605. a buffer layer; 606. an outer tube; 7. a staircase; 8. a wear pad; 9. a second fixing device; 10. and a second reinforcing column.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a scaffold for installing a suspended ceiling comprises a main support column 1, a base 6 is arranged on the outer surface of the lower end of the main support column 1, a connector 3 is arranged on the outer surface of the upper end of the main support column 1, a fixing device 2 is arranged on the outer wall of the main support column 1, a reinforcing column 4 is arranged on the outer surface of one side of the fixing device 2, a fixing device 9 is arranged on the outer surface of one side of the reinforcing column 4, a reinforcing column 10 is arranged on the outer surface of the rear end of the fixing device 9, a stair 7 is arranged on the outer wall of the reinforcing column 10, a wear-resistant pad 8 is arranged on the outer surface of the upper end of the reinforcing column 4, a working plate 5 is arranged on the outer surface of the upper end of the wear-resistant pad 8, the working plate 5 is made of aluminum alloy, and.
Further, fixing device 2 includes sleeve 201, fixed orifices 202, spliced pole 203, installing port 204 and spacing post 205, fixed orifices 202 have been seted up to the front end surface of sleeve 201, one side surface of fixed orifices 202 is provided with spliced pole 203, installing port 204 has been seted up to the front end surface of spliced pole 203, the front end surface of installing port 204 is provided with spacing post 205, fixed orifices 202 can install the height that fixed screw adjusted fixing device 2 No. one, be favorable to adjusting the height of working plate 5 as required.
Further, the base 6 comprises a bottom plate 601, an inner column 602, a spring 603, a marble 604, a buffer layer 605 and an outer tube 606, the spring 603 and the marble 604 are arranged inside the inner column 602, the marble 604 is located on one side of the spring 603, the buffer layer 605 is arranged on the outer wall of the inner column 602, the outer tube 606 is arranged on the outer wall of the buffer layer 605, the bottom plate 601 is arranged on the outer surface of the lower end of the outer tube 606, and the buffer layer 605 can provide buffering when the main supporting column 1 is installed, so that damage to the bottom plate 601 is reduced.
Further, be provided with the hexagon socket head cap screw between sleeve 201 and the spliced pole 203, the outer wall of sleeve 201 passes through hexagon socket head cap screw fixed connection with one side surface of spliced pole 203, be provided with the powerful glue between installing port 204 and the spacing post 205, the front end surface of installing port 204 and the rear end surface of spacing post 205 pass through the powerful glue fixed connection, spacing post 205 can make spliced pole 203 more stable with being connected of enhancement post, be favorable to the safe in utilization of scaffold frame.
Further, the outer surface of the upper end of the bottom plate 601 and the outer surface of the lower end of the outer tube 606 and the inner column 602 are both in welded connection, a double-faced adhesive tape is arranged between the buffer layer 605 and the bottom plate 601, the outer surface of the lower end of the buffer layer 605 and the outer surface of the upper end of the bottom plate 601 are fixedly connected through the double-faced adhesive tape, a movable groove is arranged between the inner column 602 and the spring 603, the inner portion of the inner column 602 and the outer wall of the spring 603 are movably connected through the movable groove, lubricating grease is arranged between the spring 603 and the marble 604, the outer surface of one side of the spring 603 is movably connected with the outer surface of one side of the marble 604 through the lubricating grease, the spring 603 can be contracted and.
Further, be provided with the draw-in groove between No. two enhancement posts 10 and stair 7, the upper end surface of No. two enhancement posts 10 is connected for dismantling through the draw-in groove and one side surface of stair 7, is provided with the mounting hole between main tributary dagger 1 and the connector 3, and the outer wall of main tributary dagger 1 passes through the mounting hole with the inner wall of connector 3 to be connected for dismantling, and main tributary dagger 1 can be continuously installed at the top to connector 3, is favorable to heightening the scaffold and makes things convenient for people to use.
The working principle is as follows: firstly, a base 6 is placed on the ground, the base 6 comprises a bottom plate 601, an inner column 602, a spring 603, a marble 604, a buffer layer 605 and an outer tube 606, the bottom plate 601 is square and can increase the contact area with the ground to enable the scaffold to be more stable, the inner column 602 is provided with the spring 603 and the marble 604, the spring 603 contracts and resets to enable the marble 604 to move to install, disassemble and assemble the main support column 1, the use is convenient, the buffer layer 605 can provide buffer when the main support column 1 is installed, so that the damage of the bottom plate 601 is reduced, the outer tube 606 can wrap the main support column 1 to prevent the main support column 1 from toppling over, then the main support column 1 is installed on the base 6, a fixing device 2 and a connector 3 are installed on the outer wall of the main support column 1, the fixing device 2 comprises a sleeve 201, a fixing hole 202, a connecting column 203, an installation port 204 and a limiting column 205, the sleeve 201 is installed on the outer wall, install the fixed screw at fixed orifices 202, adjust the fixed screw alright with the position of adjusting fixing device 2 No. one, it can install the enhancement post to be provided with installing port 204 on the spliced pole 203, spacing post 205 in the spliced pole 203 can prevent to strengthen the post and drop and bring danger, under the in service behavior of difference, adjust the work that fixing device 2 positions just can adapt to not co-altitude, thereby made things convenient for people's use, the post is strengthened in installation behind the installed fixing device, then install working plate 5 and stair 7 on strengthening the post, the convenient scaffold frame about stair 7, working plate 5 makes things convenient for people to stand work, scaffold frame simple structure is used in the installation of whole furred ceiling, high durability and convenient operation, the effect of use is better for the conventional mode.
It is noted that, herein, relational terms such as first and second (a, b, etc.) and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a scaffold frame is used in furred ceiling installation, includes main support column (1), its characterized in that: the outer surface of the lower end of the main support column (1) is provided with a base (6), the outer surface of the upper end of the main support column (1) is provided with a connector (3), the outer wall of the main support column (1) is provided with a fixing device (2), the outer surface of one side of the fixing device (2) is provided with a reinforcing column (4), the outer surface of one side of the reinforcing column (4) is provided with a fixing device (9), the outer surface of the rear end of the fixing device (9) is provided with a reinforcing column (10), the outer wall of the reinforcing column (10) is provided with a stair (7), the outer surface of the upper end of the reinforcing column (4) is provided with a wear-resistant pad (8), and the outer surface of the upper end of the wear-resistant pad (8) is provided with a working plate (5).
2. A scaffold for installing a ceiling according to claim 1, wherein: a fixing device (2) includes sleeve (201), fixed orifices (202), spliced pole (203), installing port (204) and spacing post (205), fixed orifices (202) have been seted up to the front end surface of sleeve (201), one side surface of fixed orifices (202) is provided with spliced pole (203), installing port (204) have been seted up to the front end surface of spliced pole (203), the front end surface of installing port (204) is provided with spacing post (205).
3. A scaffold for installing a ceiling according to claim 1, wherein: the base (6) comprises a bottom plate (601), an inner column (602), a spring (603), marbles (604), a buffer layer (605) and an outer tube (606), wherein the spring (603) and the marbles (604) are arranged inside the inner column (602), the marbles (604) are located on one side of the spring (603), the buffer layer (605) is arranged on the outer wall of the inner column (602), the outer tube (606) is arranged on the outer wall of the buffer layer (605), and the bottom plate (601) is arranged on the outer surface of the lower end of the outer tube (606).
4. A scaffold for installing a ceiling according to claim 2, wherein: be provided with the hexagon socket head cap screw between sleeve (201) and spliced pole (203), the outer wall of sleeve (201) passes through hexagon socket head cap screw fixed connection with one side surface of spliced pole (203), be provided with the powerful glue between installing port (204) and spacing post (205), the front end surface of installing port (204) passes through the powerful glue fixed connection with the rear end surface of spacing post (205).
5. A scaffold for installing a ceiling according to claim 3, wherein: the outer surface of the upper end of the bottom plate (601) is in welded connection with the outer surface of the lower end of the outer tube (606) and the outer surface of the lower end of the inner column (602), a double-faced adhesive tape is arranged between the buffer layer (605) and the bottom plate (601), the outer surface of the lower end of the buffer layer (605) is fixedly connected with the outer surface of the upper end of the bottom plate (601) through the double-faced adhesive tape, a movable groove is formed between the inner column (602) and the spring (603), the inner portion of the inner column (602) is movably connected with the outer wall of the spring (603) through the movable groove, lubricating grease is arranged between the spring (603) and the marble (604), and the outer surface of one side of the spring (603) is movably connected with the.
6. A scaffold for installing a ceiling according to claim 1, wherein: a clamping groove is formed between the second reinforcing column (10) and the stair (7), the outer surface of the upper end of the second reinforcing column (10) is detachably connected with the outer surface of one side of the stair (7) through the clamping groove, a mounting hole is formed between the main supporting column (1) and the connector (3), and the outer wall of the main supporting column (1) is detachably connected with the inner wall of the connector (3) through the mounting hole.
CN201921873978.3U 2019-10-31 2019-10-31 Scaffold for ceiling installation Active CN210947644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921873978.3U CN210947644U (en) 2019-10-31 2019-10-31 Scaffold for ceiling installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921873978.3U CN210947644U (en) 2019-10-31 2019-10-31 Scaffold for ceiling installation

Publications (1)

Publication Number Publication Date
CN210947644U true CN210947644U (en) 2020-07-07

Family

ID=71388955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921873978.3U Active CN210947644U (en) 2019-10-31 2019-10-31 Scaffold for ceiling installation

Country Status (1)

Country Link
CN (1) CN210947644U (en)

Similar Documents

Publication Publication Date Title
CN110094049B (en) Quick early-dismantling support for constructional engineering
CN214195539U (en) Disc buckle type template support
CN211548713U (en) A suspension type scaffold frame for square chimney
CN210947644U (en) Scaffold for ceiling installation
CN213626572U (en) Tool type external cantilever operation platform
CN105520681B (en) Flexion-extension formula folding arm window cleaning equipment
CN208039790U (en) A kind of movable type scaffold bracket for overhead construction of building engineering
CN215670916U (en) Scaffold for adjusting height of bearing platform in constructional engineering
CN112211384B (en) Scaffold for building site
CN210396108U (en) Supporting mechanism for quickly mounting and dismounting concrete formwork
CN211622567U (en) Scaffold for building
CN2531035Y (en) Telescopic steel pipe strut
CN210885037U (en) Tower crane fixing structure
CN113089994A (en) Lighting well operation platform of high-rise building and construction method thereof
CN208763385U (en) A kind of architectural engineering scaffold
CN112360130A (en) Splicing type adjustable anti-falling scaffold for construction of overhead building layer
CN211396530U (en) Detachable lifting platform special for stair construction
CN214402640U (en) Installation mechanism of steel frame for building
CN216809670U (en) Water conservancy construction protector for building
CN215254365U (en) Movable steel structure scaffold convenient to disassemble and assemble
CN204418715U (en) A kind of removable operating platform of encorbelmenting
CN221053148U (en) Reinforced structure that scaffold frame used
CN218375092U (en) Good scaffold frame of stability
CN213061740U (en) Auxiliary foot rest for continuous steel structure bridge cantilever construction
CN215443196U (en) Building wall curtain wall installation location construction equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 215000 Room 601, building 12, jundi Business Plaza, No. 3, Weihua Road, Suzhou Industrial Park, Jiangsu Province

Patentee after: Quanqi Construction Development Co.,Ltd.

Address before: 215000 room 506, building 1, xingdonghuan business building, No. 1508, Donghuan Road, Suzhou Industrial Park, Jiangsu Province

Patentee before: Quanqi Construction Development Co.,Ltd.

CP02 Change in the address of a patent holder