CN210885037U - Tower crane fixing structure - Google Patents

Tower crane fixing structure Download PDF

Info

Publication number
CN210885037U
CN210885037U CN201921592191.XU CN201921592191U CN210885037U CN 210885037 U CN210885037 U CN 210885037U CN 201921592191 U CN201921592191 U CN 201921592191U CN 210885037 U CN210885037 U CN 210885037U
Authority
CN
China
Prior art keywords
tower crane
installation
main body
traction
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921592191.XU
Other languages
Chinese (zh)
Inventor
徐沈磊
张莉
高久亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Fushili Precision Machinery Co ltd
Original Assignee
Hangzhou Fushili Precision Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Fushili Precision Machinery Co ltd filed Critical Hangzhou Fushili Precision Machinery Co ltd
Priority to CN201921592191.XU priority Critical patent/CN210885037U/en
Application granted granted Critical
Publication of CN210885037U publication Critical patent/CN210885037U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a tower crane fixing structure, which comprises a tower crane installation main body, an installation base, a ground surface, a foundation and a reinforced concrete column, wherein the installation base is embedded into the top of the ground surface, the foundation is arranged at the bottom of the installation base, the tower crane installation main body is arranged at the center of the top of the installation base, the top of the installation base is close to the two sides of the tower crane installation main body and is fixedly installed at the top of the foundation through the reinforced concrete column, the assembly columns are arranged around the top of the tower crane installation main body, the whole device has simple structure and good fixed installation stability, the four corners of a hanger standard section are conveniently fixed on the ground surface in a traction manner, the force application point is increased, the tower crane is prevented from toppling, and when the tower crane is too high, the tower crane can be firmly fixed with the, and the stability and the practicability are higher, and certain popularization value is realized.

Description

Tower crane fixing structure
Technical Field
The utility model relates to a construction technical field specifically is a tower crane fixed knot constructs.
Background
The tower crane is the most commonly used hoisting equipment on the building site, also called tower crane, with the extension (height) of a section by section (called "standard section" for short), be used for hanging the raw and other materials of construction such as reinforcing bar, wooden stupefied, concrete, steel pipe of construction usefulness, the tower crane is also the essential hoisting equipment on the building site, current tower crane has not enough stably on fixed mounting structure, do not possess when the tower crane is too high to pull fixed tower crane that causes easily to topple over to the gallows standard section, fixed mounting is inconvenient between the gallows standard section, consequently needs a tower crane fixed knot to construct and makes improvement to above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a tower crane fixed knot constructs to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a tower crane fixing structure comprises a tower crane installation main body, an installation base, a terrace surface, a foundation and a reinforced concrete column, wherein the installation base is embedded into the top of the terrace surface, the foundation is arranged at the bottom of the installation base, the tower crane installation main body is installed at the center of the top of the installation base, the top of the installation base is fixedly installed at the top of the foundation through the reinforced concrete column close to the two sides of the tower crane installation main body, assembling columns are arranged around the top of the tower crane installation main body, a hanging frame standard knot is installed at the top of the tower crane installation main body through an assembling column sleeve, connecting columns are arranged around the top of the hanging frame standard knot, traction seats are arranged at the two sides of the hanging frame standard knot, a ground traction rod is installed on each traction seat, and the bottom of the ground traction rod is fixedly installed on the, the tower crane installation main part all installs the cat ladder and protects the cage with the inside of gallows standard festival, the left side center department of tower crane installation main part and gallows standard festival all is equipped with the wall traction frame.
Preferably, four groups of splicing columns are arranged, and the splicing columns are installed in a size matching mode with the installation sleeve.
Preferably, the two sides of the top of the mounting base are provided with mounting grooves matched with the reinforced concrete columns for mounting.
Preferably, four groups of traction seats and four groups of ground traction rods are arranged, and the traction seats and the ground traction rods are fixedly installed through bolts.
Preferably, four groups of mounting sleeves and connecting columns are arranged, and the mounting sleeves and the connecting columns are mounted in a size matching mode.
Preferably, the ladder stand protection cage is of a semi-cylindrical structure.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, inside the installation base embedding terrace face through setting up, the ground that lies in installation base bottom in through the terrace face bears the load influence of tower crane installation main part superstructure, the installation fluting of seting up matching reinforced concrete column installation through the top both sides of installation base simultaneously squeezes into reinforced concrete column and is connected with the ground, the reinforced concrete column of both sides carries out the centre gripping to the tower crane installation main part on the installation base and supports fixedly, guarantee the installation stability of tower crane installation main part, the hoist and mount of convenient follow-up tower crane are used.
2. The utility model discloses in, through the column of assembling that sets up and installation sleeve suit connection tower crane installation main part in the tower crane standard festival, the inboard bottom installation sleeve that increases the tower crane standard festival can be established to the cover through connecting piece fixed mounting, spliced pole on the tower crane standard festival, increases in proper order and assembles the tower crane standard festival, simple structure and easy to assemble.
3. The utility model discloses in, the cooperation through the traction seat that sets up and ground traction lever and ground connecting piece is used, is convenient for pull the four corners of gallows standard festival and is fixed in the terrace face, increases the impetus, prevents that the tower crane from empting, when the tower crane was too high simultaneously, can firmly fix with building outer wall face through the wall traction frame, increases structural stability and facilitates the use.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a schematic structural view of a standard section of the hanger of the present invention;
fig. 3 is a top view of the ladder stand cage of the present invention.
In the figure: the method comprises the following steps of 1-tower crane installation main body, 101-assembly column, 2-installation base, 3-terrace surface, 4-foundation, 5-reinforced concrete column, 6-hanger standard knot, 7-traction seat, 8-ground traction rod, 9-ground connecting piece, 10-wall surface traction frame, 11-installation sleeve, 12-connection column and 13-ladder stand protection cage.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a tower crane fixing structure comprises a tower crane installation main body 1, an installation base 2, a floor surface 3, a foundation 4 and a reinforced concrete column 5, wherein the installation base 2 is embedded in the top of the floor surface 3, installation grooves matched with the installation of the reinforced concrete column 5 are formed in two sides of the top of the installation base 2, the foundation 4 is arranged at the bottom of the installation base 2, the tower crane installation main body 1 is installed in the center of the top of the installation base 2, the two sides of the top of the installation base 2 close to the tower crane installation main body 1 are fixedly installed on the top of the foundation 4 through the reinforced concrete column 5, the installation base 2 is embedded into the floor surface 3, the foundation 4 inside the floor surface 3 and positioned at the bottom of the installation base 2 bears the load influence of the upper structure of the tower crane installation main body 1, and the reinforced concrete column 5 is driven into the foundation 4 through the installation grooves formed in two sides of the top of the, the reinforced concrete columns 5 on two sides are used for clamping, supporting and fixing the tower crane installation main body 1 on the installation base 2, the installation stability of the tower crane installation main body 1 is ensured, and the subsequent tower crane is convenient to hoist and use, the assembling columns 101 are arranged on the periphery of the top of the tower crane installation main body 1, the assembling columns 101 are arranged in four groups in total, the assembling columns 101 and the installation sleeves 11 are installed in a size matching mode, the top of the tower crane installation main body 1 is sleeved with the installation sleeves 11 through the assembling columns 101 to be provided with the hanger standard sections 6, the connecting columns 12 are arranged on the periphery of the top of the hanger standard sections 6, the installation sleeves 11 and the connecting columns 12 are arranged in four groups, the installation sleeves 11 and the connecting columns 12 are installed in a size matching mode, the tower crane installation main body 1 is sleeved on the tower crane standard sections 6 through the assembling columns 101 and the installation sleeves 11, meanwhile, the inner sides are, the assembled tower crane standard knot is sequentially added, the structure is simple, the installation is convenient, the two sides of the hanger standard knot 6 are provided with the traction seats 7, the traction seats 7 are provided with the ground traction rods 8, the traction seats 7 and the ground traction rods 8 are respectively provided with four groups, in addition, the traction seats 7 and the ground traction rods 8 are fixedly installed through bolts, the bottom parts of the ground traction rods 8 are fixedly installed on the terrace surface 3 through the ground connecting piece 9, the tower crane installation main body 1 and the hanger standard knot 6 are respectively internally provided with the ladder stand protection cage 13, the ladder stand protection cage 13 is of a semi-cylindrical structure, the left center parts of the tower crane installation main body 1 and the hanger standard knot 6 are respectively provided with the wall surface traction frame 10, the four corners of the hanger standard knot 6 are conveniently fixed on the traction terrace surface 3 through the matching use of the traction seats 7, the ground traction rods 8 and the ground connecting piece 9, the force, can firmly fix with the building outer wall through wall traction frame 10, increase structural stability and facilitate the use, the overall device simple structure, fixed mounting stability is good, be convenient for pull the four corners of gallows standard festival and be fixed in the terrace face, increase the impetus, prevent that the tower crane from empting, when the tower crane is too high simultaneously, can firmly fix stable structure with the building outer wall through wall traction frame, the gallows standard festival conveniently increases the installation, and stability and practicality are higher, have certain spreading value.
The utility model discloses work flow: when in use, the installation base 2 is embedded into the ground surface 3, the load influence of the upper structure of the tower crane installation main body 1 is borne by the foundation 4 which is positioned at the bottom of the installation base 2 and positioned in the ground surface 3, meanwhile, the reinforced concrete columns 5 are driven into the installation grooves matched with the installation of the reinforced concrete columns 5 and arranged at the two sides of the top of the installation base 2 to be connected with the foundation 4, the reinforced concrete columns 5 at the two sides are used for clamping, supporting and fixing the tower crane installation main body 1 on the installation base 2, the installation stability of the tower crane installation main body 1 is ensured, the subsequent tower crane is convenient to hoist and use, the tower crane installation main body 1 is sleeved and connected with the tower crane standard section 6 through the assembling columns 101 and the installation sleeve 11, meanwhile, the inner side of the tower crane standard section 6 is fixedly installed through the connecting piece, the connecting column 12 on the tower crane, through the cooperation use of traction seat 7 and ground traction lever 8 and ground connecting piece 9, be convenient for pull the four corners of gallows standard festival 6 and be fixed in terrace face 3, increase the impetus, prevent that the tower crane from empting, when the tower crane is too high simultaneously, can firmly be fixed with the building outer wall face through wall traction frame 10, the whole device simple structure, fixed mounting stability is good, be convenient for pull the four corners of gallows standard festival and be fixed in the terrace face, increase the impetus, prevent that the tower crane from empting, when the tower crane is too high simultaneously, can firmly fixed knot construct with the building outer wall face through wall traction frame, the gallows standard festival conveniently increases the installation, and stability and practicality are higher, certain spreading value has.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a tower crane fixed knot constructs, includes tower crane installation main part (1), installation base (2), terrace surface (3) and ground (4) and reinforced concrete column (5), its characterized in that: the tower crane is characterized in that an installation base (2) is installed in the top of the ground surface (3) in an embedded mode, the bottom of the installation base (2) is provided with a foundation (4), a tower crane installation main body (1) is installed at the center of the top of the installation base (2), the two sides of the top of the installation base (2) close to the tower crane installation main body (1) are fixedly installed at the top of the foundation (4) through reinforced concrete columns (5), assembling columns (101) are arranged on the periphery of the top of the tower crane installation main body (1), an installation sleeve (11) is sleeved on the top of the tower crane installation main body (1) through the assembling columns (101) to install a hanger standard section (6), connecting columns (12) are arranged on the periphery of the top of the hanger standard section (6), traction seats (7) are arranged on the two sides of the hanger standard section (6), and ground traction, the bottom of ground traction lever (8) is through ground connecting piece (9) fixed mounting in terrace face (3), cat ladder protection cage (13) are all installed to the inside of tower crane installation main part (1) and gallows standard festival (6), tower crane installation main part (1) all is equipped with wall traction frame (10) with the left side center department of gallows standard festival (6).
2. The tower crane fixing structure of claim 1, wherein: the assembling columns (101) are provided with four groups, and the assembling columns (101) are installed in a size matching mode with the installation sleeve (11).
3. The tower crane fixing structure of claim 1, wherein: and mounting grooves matched with the reinforced concrete columns (5) are formed in two sides of the top of the mounting base (2).
4. The tower crane fixing structure of claim 1, wherein: four groups of traction seats (7) and ground traction rods (8) are arranged, and the traction seats (7) and the ground traction rods (8) are fixedly installed through bolts.
5. The tower crane fixing structure of claim 1, wherein: the installation sleeve (11) and the connecting column (12) are provided with four groups, and the installation sleeve (11) and the connecting column (12) are installed in a size matching mode.
6. The tower crane fixing structure of claim 1, wherein: the ladder stand protection cage (13) is of a semi-cylindrical structure.
CN201921592191.XU 2019-09-24 2019-09-24 Tower crane fixing structure Expired - Fee Related CN210885037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921592191.XU CN210885037U (en) 2019-09-24 2019-09-24 Tower crane fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921592191.XU CN210885037U (en) 2019-09-24 2019-09-24 Tower crane fixing structure

Publications (1)

Publication Number Publication Date
CN210885037U true CN210885037U (en) 2020-06-30

Family

ID=71337983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921592191.XU Expired - Fee Related CN210885037U (en) 2019-09-24 2019-09-24 Tower crane fixing structure

Country Status (1)

Country Link
CN (1) CN210885037U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627226A (en) * 2020-12-29 2021-04-09 成祖伟 Tower crane foundation structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627226A (en) * 2020-12-29 2021-04-09 成祖伟 Tower crane foundation structure
CN112627226B (en) * 2020-12-29 2022-11-25 江苏群星矿用机械有限公司 Tower crane foundation structure

Similar Documents

Publication Publication Date Title
WO2017016369A1 (en) Tower crane for assembling power transmission tower
CN210885037U (en) Tower crane fixing structure
CN207827674U (en) A kind of special cage of building block pile
CN104818995A (en) Method for assembling confined concrete arch frames
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN211874074U (en) Internal suspension holding rod
CN211255165U (en) Assembled water pump fixing device
CN205242891U (en) Prefabricated hollow staircase
CN210622441U (en) Combined self-supporting rod for emergency repair of medium and low voltage distribution network
CN210622440U (en) Traction wire structure for emergency repair of medium-low voltage distribution network
CN209780229U (en) Jacking platform system of integrated tower crane
CN113387281A (en) Alternate conversion attachment system of externally attached tower crane and construction method
CN111335357A (en) Pipe gallery formwork supporting system and construction method thereof
CN215484487U (en) Skeleton convenient to install for assembly type structure
CN220909293U (en) Novel cement wire drawing disc
CN207436475U (en) Building engineering construction builder's jack device
CN218375659U (en) Assembled pylon
CN216444884U (en) Hoisting device for mounting shock insulation support
CN205134205U (en) Arched bridge erects to change and promotes with promoting pylon structure
CN218090403U (en) Precast concrete curb transport mounting tool
CN220434391U (en) Precast concrete base
CN216974096U (en) Movable full scaffold for curve cast-in-place tunnel
CN217782808U (en) Hanging basket support for installing tower crown structure of building
CN212689545U (en) Corner pole setting device for lifting aluminum alloy climbing frame
CN218492703U (en) Support-free layered assembly type steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200630