CN210893151U - Underground wire point suspension device - Google Patents
Underground wire point suspension device Download PDFInfo
- Publication number
- CN210893151U CN210893151U CN201922230928.XU CN201922230928U CN210893151U CN 210893151 U CN210893151 U CN 210893151U CN 201922230928 U CN201922230928 U CN 201922230928U CN 210893151 U CN210893151 U CN 210893151U
- Authority
- CN
- China
- Prior art keywords
- plumb
- line
- plumb bob
- connector
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a downhole conducting wire point suspension device, which comprises a fixed plate arranged on a tunnel top plate, a first plumb line, a wire connector, a second plumb line and a plumb ball; be equipped with on the fixed plate and fix the through-hole that corresponds in the wire point position of tunnel roof, the one end of first plumb bob line is passed the through-hole and is tied a knot and fix on the fixed plate, and the other end passes through the connector and connects the second plumb bob line, the second plumb bob is hung the one end of establishing and keeping away from first plumb bob line at the connector to the book, the second plumb bob line is kept away from the one end of connector and is connected the plumb bob, the tensile strength of first plumb bob line is greater than the intensity after the second plumb bob line fifty percent discount. The utility model has the advantages of, this linkage can improve wiring efficiency greatly to need not ascend a height the operation, greatly reduced the potential safety hazard that former high altitude wiring brought.
Description
Technical Field
The utility model relates to a wire point hangs technical field, specifically is a wire point linkage in pit.
Background
With the development of society and the increase of population, people have higher and higher demands on mineral resources, roads and traffic. In these projects, for example, mining, excavation of roadways in subway construction, and tunnel penetration, the method is applied to control of the measurement of the wire in the measurement, so as to determine the construction direction.
At present, the traditional method for arranging measurement control points in mines is to arrange measurement lead point marks on a stable top plate of a mine roadway, and a plumb ball line is adopted to hang a plumb ball, so that construction and instrument point centering are facilitated, and meanwhile, underground personnel walking and equipment operation can be prevented from damaging the measurement lead points. In actual production process, because the particularity of production environment in the pit, consider the safety and the protection wire point of passing pedestrian, consequently current linkage can not use high strength tensile plumb bob line to hang plumb bob, avoid cutting the pedestrian or receive the brute force to pull and cause the wire point to damage, but adopt the lower plumb bob line of intensity to hang plumb bob and lead to passing haulage vehicle in the pit, often will hang plumb bob line to tear apart, need two people's cooperation to ascend a height wiring after tearing apart at least, not only wiring inefficiency, there is high altitude construction's potential safety hazard still.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem that will solve lies in: the underground wire point suspension device improves wiring efficiency and reduces potential safety hazards, and solves the problems that an existing suspension device is low in wiring efficiency and has potential safety hazards of high-altitude operation.
In order to solve the technical problem, the utility model provides a following technical scheme:
a downhole wire point suspension device comprises a fixing plate, a first plumb-sphere line, a wire connector, a second plumb-sphere line and a plumb-sphere, wherein the fixing plate is arranged on a roadway top plate; the fixing plate is provided with a through hole corresponding to the position of a lead wire fixed on a roadway top plate, one end of the first plumb ball wire penetrates through the through hole to be knotted and fixed on the fixing plate, the other end of the first plumb ball wire is connected with the second plumb ball wire through the wire connector, the second plumb ball wire is folded and hung at one end of the wire connector far away from the first plumb ball wire, one end of the second plumb ball wire far away from the wire connector is connected with the plumb ball, the tensile strength of the first plumb ball wire is greater than that of the second plumb ball wire after being folded, the suspension wire is divided into two parts through the arrangement of the wire connector, and the tensile strength of the first plumb ball wire is greater than that of the second plumb ball wire after being folded, the wire broken when the suspension device is stressed excessively is always the second plumb ball wire, so that the first plumb ball wire connected with the fixing plate is ensured not to be broken, and the first plumb ball, need not follow the threading on the fixed plate again, first plumb bob line hangs on the fixed plate with the connector moreover, and the staff can not touch, does not influence staff's work, as long as hang new second plumb bob line through a bracing piece when measuring next time and establish on the connector can, improve wiring efficiency greatly to need not the operation of ascending a height, greatly reduced the potential safety hazard that former high altitude wiring brought.
Preferably, the connector is the lifting hook, the connector includes rings and crotch, rings are fixed in the crotch upper end, the one end that the fixed plate was kept away from to first plumb bob line is connected with rings, second plumb bob line is hung and is established on the crotch.
Preferably, the one end that the crotch is close to rings articulates there is the separation blade that is used for closing the crotch open end, still be fixed with reset spring between the angle end that separation blade and crotch formed, the one end butt that rings were kept away from to the separation blade is on the inner wall of crotch tip, prevents to hang the second plumb line of establishing on the crotch and drops from the crotch.
Preferably, the return spring is always in a compressed state.
Preferably, the diameter of the through hole is 2 mm.
Preferably, the first plumb line is a nylon line.
Preferably, the second plumb line is cotton.
Preferably, the surface of the wire connector is further coated with a rust-proof corrosion-resistant layer, so that the wire connector is prevented from rusting and corroding, and the service life of the suspension device is prolonged.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the suspension line is divided into two parts by the arrangement of the wire connector, and because the tensile strength of the first plumb-sphere line is greater than the strength of the first plumb-sphere line after the second plumb-sphere line is folded, the broken line of the suspension device is always the second plumb-sphere line when the stress is too large, the first plumb-sphere line connected with the fixed plate can not be broken, the first plumb-sphere line is always on the same vertical line with the wire point without threading from the fixed plate again, and the first plumb-sphere line and the wire connector are hung on the fixed plate, the worker can not touch the suspension line, the work of the worker is not influenced, as long as the new second plumb-sphere line is hung on the wire connector through a support rod when the next measurement is carried out, the wiring efficiency is greatly improved, the climbing operation is not needed, and the potential safety hazard caused by the original high-altitude wiring is greatly reduced.
2. Through separation blade and reset spring's setting, prevent to hang the second plumb-sphere line of establishing on the crotch and drop from the crotch.
3. The anti-rust and anti-corrosion layer is coated on the surface of the wire connector, so that the wire connector is prevented from rusting and being corroded, and the service life of the suspension device is prolonged.
Drawings
Fig. 1 is a schematic structural view of a downhole conducting wire point suspension device according to an embodiment of the present invention.
Detailed Description
In order to facilitate the understanding of the technical solutions of the present invention by those skilled in the art, the technical solutions of the present invention will now be further described with reference to the drawings attached to the specification.
In this application, unless expressly stated or limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can include, for example, fixed connections, removable connections, or integral parts; the connection can be mechanical connection, electrical connection or communication; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
In this application, unless explicitly stated or limited otherwise, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implying any number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present application, "a plurality" means two or more unless specifically limited otherwise.
Referring to fig. 1, the embodiment discloses a downhole wire point suspension device, which comprises a fixing plate 1 installed on a roadway roof, a first plumb line 2, a wire connector 3, a second plumb line 4 and a plumb ball 5; a through hole 11 corresponding to the position of a lead wire fixed on a roadway top plate is formed in the fixing plate 1, one end of the first plumb sphere wire 2 penetrates through the through hole 11 to be knotted and fixed on the fixing plate 1, the other end of the first plumb sphere wire 2 is connected with a second plumb sphere wire 4 through a wire connector 3, the second plumb sphere wire 4 is hung in a folded manner at one end, away from the first plumb sphere wire 2, of the wire connector 3, one end, away from the wire connector 3, of the second plumb sphere wire 4 is connected with a plumb sphere 5, the tensile strength of the first plumb sphere wire 2 is greater than that of the second plumb sphere wire 4 after being folded, in the embodiment, the first plumb sphere wire 2 is a nylon wire, and the second plumb; through the setting of connector 3, make this suspension wire divide into two parts, and because the tensile strength of first plumb-sphere line 2 is greater than the intensity behind the fifty percent discount of second plumb-sphere line 4, the line that breaks when this linkage is atress too big is second plumb-sphere line 4 all the time, guarantee like this that first plumb-sphere line 2 of being connected with fixed plate 1 can not break, guaranteed that first plumb-sphere line 2 is always on same vertical line with the wire point, need not follow fixed plate 1 threading again, and first plumb-sphere line 2 hangs on fixed plate 1 with connector 3, the staff can not touch, do not influence staff's work, as long as when measuring next time with new second plumb-sphere line 4 hang through a bracing piece establish on connector 3 can, greatly improve wiring efficiency, and need not ascend a height the operation, greatly reduced the potential safety hazard that former high altitude wiring brought.
Specifically, connector 3 is the lifting hook, connector 3 includes rings 31 and crotch 32, rings 31 are fixed in crotch 32 upper end, the one end that fixed plate 1 was kept away from to first plumb bob line 2 is connected with rings 31, second plumb bob line 4 is hung and is established on crotch 32.
Further, the one end that crotch 32 is close to rings 31 articulates there is the separation blade 33 that is used for sealing crotch 32 open end, still be fixed with reset spring 34 between the angle end that separation blade and crotch formed, reset spring 34 is in compression state all the time, separation blade 33 keeps away from rings 31 one end butt on the inner wall of crotch 32 tip, guarantees that separation blade 33 can only rotate in crotch 32 inboard to automatic re-setting under reset spring 34's effect prevents to hang and to drop from crotch 32 at second plumb line 4 on establishing crotch 32.
Still further, the surface of the wire connector 3 is also coated with an antirust and corrosion-resistant layer, so that the wire connector 3 is prevented from rusting and being corroded due to the particularity of the underground production environment, and the service life of the suspension device is prolonged.
Still further, the diameter of the through hole is 2 mm.
The working principle of the embodiment is as follows: because the tensile strength of the first plumb-sphere wire 2 is greater than the strength of the second plumb-sphere wire 4 after being folded and the wire connector 3 is arranged, the suspension wire is divided into two parts, when the suspension device is stressed too much, the broken wire is always the second plumb-sphere wire 4, so that the first plumb-sphere wire 2 connected with the fixed plate 1 cannot be broken, the first plumb-sphere wire 2 is always on the same vertical line with the wire, the wire does not need to be threaded from the fixed plate 1 again, the first plumb-sphere wire 2 and the wire connector 3 are hung on the fixed plate 1, a worker cannot touch the wire and the work of the worker is not influenced, as long as a new second plumb-sphere wire 4 is hung on the baffle plate 33 through a support rod during the next measurement, then the second plumb-sphere wire 4 is pulled downwards slightly, so that the baffle plate 33 rotates on the hook 32, and the second plumb-sphere wire 4 falls and is hung on the hook 32, and the baffle 33 automatically resets under the action of the reset spring 34, so that the second plumb-ball line 4 is prevented from falling off from the hook 32, and the second plumb-ball line 4 is quickly hung on the wire connector 3, thereby greatly improving the wiring efficiency, avoiding the climbing operation and greatly reducing the potential safety hazard caused by the original high-altitude wiring.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
The above embodiments only show the embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments, and for those skilled in the art, a plurality of modifications and improvements can be made without departing from the concept of the present invention, and these modifications and improvements all belong to the protection scope of the present invention.
Claims (8)
1. A downhole conducting wire point suspension device is characterized in that: the device comprises a fixing plate, a first plumb-sphere line, a wire connector, a second plumb-sphere line and a plumb-sphere, wherein the fixing plate is arranged on a roadway top plate; be equipped with on the fixed plate and fix the through-hole that corresponds in the wire point position of tunnel roof, the one end of first plumb bob line is passed the through-hole and is tied a knot and fix on the fixed plate, and the other end passes through the connector and connects the second plumb bob line, the second plumb bob is hung the one end of establishing and keeping away from first plumb bob line at the connector to the book, the second plumb bob line is kept away from the one end of connector and is connected the plumb bob, the tensile strength of first plumb bob line is greater than the intensity after the second plumb bob line fifty percent discount.
2. A downhole wireline point suspension device according to claim 1, wherein: the connector is the lifting hook, the connector includes rings and crotch, rings are fixed in the crotch upper end, the one end that the fixed plate was kept away from to first plumb bob line is connected with rings, the second plumb bob line is hung and is established on the crotch.
3. A downhole wireline point suspension device according to claim 2, wherein: the one end that the crotch is close to rings articulates there is the separation blade that is used for sealing the crotch open end, still be fixed with reset spring between the angle end that separation blade and crotch formed, the one end butt that rings were kept away from to the separation blade is on the inner wall of crotch tip.
4. A downhole wireline point suspension device according to claim 3, wherein: the return spring is always in a compressed state.
5. A downhole wireline point suspension device according to claim 1, wherein: the diameter of the through hole is 2 mm.
6. A downhole wireline point suspension device according to claim 1, wherein: the first plumb line is a nylon line.
7. A downhole wireline point suspension device according to claim 1, wherein: the second plumb line is cotton thread.
8. A downhole wireline point suspension device according to claim 1, wherein: and the surface of the wire connector is also coated with an antirust and corrosion-resistant layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922230928.XU CN210893151U (en) | 2019-12-12 | 2019-12-12 | Underground wire point suspension device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922230928.XU CN210893151U (en) | 2019-12-12 | 2019-12-12 | Underground wire point suspension device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210893151U true CN210893151U (en) | 2020-06-30 |
Family
ID=71341056
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922230928.XU Active CN210893151U (en) | 2019-12-12 | 2019-12-12 | Underground wire point suspension device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210893151U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112556664A (en) * | 2020-10-26 | 2021-03-26 | 中国华冶科工集团有限公司 | Center line calibration method for underground linear roadway |
-
2019
- 2019-12-12 CN CN201922230928.XU patent/CN210893151U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112556664A (en) * | 2020-10-26 | 2021-03-26 | 中国华冶科工集团有限公司 | Center line calibration method for underground linear roadway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210893151U (en) | Underground wire point suspension device | |
CN101831913A (en) | Method for jacking steel casting of bored pile by using jacks | |
CN200992685Y (en) | Sleeve-regulating hot-cast anchor cable | |
CN107246012A (en) | A kind of obstacle cleaning plant in the peg hole based on impact drill | |
CN102593624A (en) | Special grounding wire for power transmission line | |
CN209277837U (en) | A kind of flexible cable inclinometer detector fishing device based on low-resistance | |
CN208736425U (en) | Improved underworkings top plate measures control point device | |
CN107461215A (en) | A kind of back timber formula anchor cable constant-resistance structure and its installation method | |
CN209055103U (en) | A kind of subgrade settlement monitoring device being convenient for changing level meter | |
CN110158588B (en) | Internal inclined root key type anchor cable and grouting method for anchor holes | |
CN108879474B (en) | Bridging following bucket pulley and method for hanging and taking following bucket pulley on overhead line | |
CN105464111A (en) | Root key type anchor cable and method for grouting in anchor holes | |
CN202022671U (en) | Soft attaching structure of tower crane | |
CN211008536U (en) | Fishing device | |
CN204667214U (en) | A kind of Starch Level control device for the quick grouting process in goaf | |
CN103806850B (en) | Separate type workover rig and using method thereof | |
CN209146688U (en) | Manual capstan winch type monitoring sensor lifting device | |
CN109256726B (en) | Cable laying method for vertically laying pipeline | |
CN204346416U (en) | A kind of remote protected seam dilatational strain amount determining device | |
CN206887960U (en) | A kind of obstacle cleaning plant in the peg hole based on impact drill | |
CN109372460A (en) | Flexible cable inclinometer detector fishing device and its Refloatation method based on low-resistance | |
CN105297721A (en) | Limit shearing resistance superposition type anchor rope and method for grouting anchor hole | |
CN220853578U (en) | Portable ore pressure observation and measurement pile | |
CN206625140U (en) | A kind of long hoist cable of suspension bridge changes rope device | |
CN106245530A (en) | A kind of universal rod body CABLEWAY ERECTION SYSTEM removes engineering method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |