CN103806850B - Separate type workover rig and using method thereof - Google Patents

Separate type workover rig and using method thereof Download PDF

Info

Publication number
CN103806850B
CN103806850B CN201410037305.XA CN201410037305A CN103806850B CN 103806850 B CN103806850 B CN 103806850B CN 201410037305 A CN201410037305 A CN 201410037305A CN 103806850 B CN103806850 B CN 103806850B
Authority
CN
China
Prior art keywords
derrick
support body
hold
tightly
joint derrick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410037305.XA
Other languages
Chinese (zh)
Other versions
CN103806850A (en
Inventor
景佩明
王新河
张军
张仕见
马勇军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Xibu Drilling Engineering Co Ltd
Original Assignee
CNPC Xibu Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Xibu Drilling Engineering Co Ltd filed Critical CNPC Xibu Drilling Engineering Co Ltd
Priority to CN201410037305.XA priority Critical patent/CN103806850B/en
Publication of CN103806850A publication Critical patent/CN103806850A/en
Application granted granted Critical
Publication of CN103806850B publication Critical patent/CN103806850B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

<b>the present invention relates to workover rig device technique field, be a kind of separate type workover rig and using method, this separate type workover rig</b><b>including upper joint derrick, lower joint derrick, derrick base, extending cylinder, on-vehicle host, derrick bracket;Upper joint derrick is sleeved in lower joint derrick, upper joint derrick and be installed with guy wire respectively on lower joint derrick.The present invention is capable of the most economical maximizing the benefits of device, reduce production cost, not only meet the oil test operation demand to lifting means, also save substantial amounts of lifting and cost of transportation, and, avoid the idle of well maintenance vehicle, save the maintenance cost to idle well maintenance vehicle, effectively reduce production cost, during installation, at utmost realize mechanization, not only save manpower, reduce production cost, and can effectively reduce operating risk, simultaneously, the present invention is capable of the broken torsion of steel wire rope by dead line anchor, it is effectively reduced the consumption of steel wire rope, and hook load reading is more accurate.</b>

Description

Separate type workover rig and using method thereof
Technical field
The present invention relates to workover rig device technique field, be a kind of separate type workover rig and using method thereof.
Background technology
At present in the workover treatment of oil test operation, company needs substantial amounts of expense to be used for fixing derrick to stand up and transport every year, costly, if all adopting current well maintenance vehicle as lifting means from now on, feature according to oil test operation, the vehicular well maintenance vehicle having 4/5 is left unused, and needs the maintenance cost costed a lot of money.
In the prior art, the derrick of sectional needs fragmented transport to well site, need to transport with on crane lifting to flat car, behind well site, first segmentation crane is unloaded down, carry out being assembled into one after derrick, integral vertical gets up again, then need to realize erecting or putting down of derrick with two large-scale cranes, causes cost of transportation high.
The derrick of sectional is in transport and stands up and belongs to high-risk operations content category in process, need equipment and the personnel of auxiliary many, particularly there is well site staff in the process of standing up and hang, with high-altitude, the unsafe factor that thing intersects, cause installation cost high, dangerous big.
Current workover rig is when carrying out promoting operation, common practice is to be fixed on derrick leg by dead line anchor, adopting mechanical tensile forces meter to read hook load, but could realize the broken steel wire rope section of turning round of steel wire rope damage if this mode exists installation period length, need to extract whole steel wire rope out when steel wire twists, whole spooling such as scraps at the defect.
Summary of the invention
The invention provides a kind of separate type workover rig and using method thereof, overcome the deficiency of above-mentioned prior art, it can effectively solve current workover rig derrick transport and installation needs fragmented transport, installs to cause and transport the problem that installation cost is high, installation risk is big, maintenance cost is high, and the current workover rig of solution cannot realize steel wire rope and break the problem that torsion causes steel wire rope waste serious when carrying out promoting operation further.
One of technical scheme is realized by following measures: a kind of separate type workover rig, including upper joint derrick, lower joint derrick, derrick base, extending cylinder, on-vehicle host, derrick bracket;Upper joint derrick is sleeved in lower joint derrick, upper joint derrick and lower joint derrick are installed with guy wire respectively, upper joint derrick is provided with floating device, the lower end of lower joint derrick is hinged on derrick base, the body of lower joint derrick and extending cylinder is fixedly installed togather, and the piston rod of upper joint derrick and extending cylinder is fixedly installed togather;Derrick bracket includes support body, bracket raising cylinder, the front arm distinguishing L-shaped curved shape and rear arm;Together with the bottom of support body links with the right-hand member of on-vehicle host, bracket raising cylinder is fixedly mounted in on-vehicle host, the piston rod of bracket raising cylinder and support body are fixedly installed togather, hydraulic control power set it are installed with on the left of the upper end of support body, on the left of the support body of corresponding hydraulic control power set, front end is installed with front mounting seat, on the left of the support body of corresponding hydraulic control power set, rear end is installed with rear mounting seat, front mounting seat and rear mounting seat are respectively articulated with relatively rotate and can hold lower joint derrick tightly, rotate in opposite directions and can unclamp the front arm of lower joint derrick and rear arm, the power output shaft of hydraulic control power set is hinged with the left end of front arm and rear arm respectively.
Further optimization and/or improvements to foregoing invention technical scheme one of are presented herein below:
Above-mentioned separate type workover rig also includes dead line anchor and steel wire rope, dead line anchor is fixedly mounted on derrick base, on-vehicle host is provided with working rig winch and single-chip microcomputer, the one ends wound of steel wire rope is on working rig winch, it is fixed on dead line anchor after the other end pile warp floating device of steel wire rope, having sensor on dead line anchor, the signal output part of sensor and the signal input part of single-chip microcomputer are electrically connected by wire.
The sensor is pulling force sensor.
Above-mentioned floating device includes overhead traveling crane and hook, overhead traveling crane is fixedly mounted on the upper end of joint derrick, being installed with dead line sheave on overhead traveling crane, the one ends wound of steel wire rope, on working rig winch, is fixed on dead line anchor after the other end pile warp dead line sheave of steel wire rope and hook.
Above-mentioned hydraulic control power set hold tightly before including hydraulic cylinder and after hold hydraulic cylinder tightly, front and rear on the left of the upper end of support body hold tightly before being installed with respectively hydraulic cylinder and after hold hydraulic cylinder tightly, hold front end on the left of the support body of hydraulic cylinder before correspondence tightly and be installed with front mounting seat, hold rear end on the left of the support body of hydraulic cylinder after correspondence tightly and be installed with rear mounting seat, front hold tightly hydraulic cylinder and after to hold the piston rod of hydraulic cylinder tightly hinged with the left end of front arm and rear arm respectively.
The two of technical scheme are realized by following measures: the using method of a kind of separate type workover rig, when needs carry out hauling operation, control hydraulic control power set and make front arm and rear arm hold lower joint derrick tightly;When needs carry out standing up operation, the piston rod first controlling bracket raising cylinder stretches out, and then risen by the piston rod supporting frame of bracket raising cylinder, when support body acts the angle rising to needs, stop hoisting support body, then passing through control hydraulic control power set makes front arm and rear arm part unclamp lower joint derrick, continue the support body that hoists, derrick base is made to be snapped down to ground, until lower joint derrick is in operating angle, after the guy wire of lower joint derrick is drawn, the piston rod controlling extending cylinder stretches out, after upper joint derrick is risen to working depth, most post-tensioning is the upper guy wire saving derrick well;When needs carry out promoting operation, first making working rig winch rotate, the load of floating device is delivered on dead line anchor by boom hoist cable, all the time pinch sensors, the pressure signal that sensor produces, by wire and on-vehicle host socket connection, realizes load on single-chip microcomputer and shows;When needs carry out folding and unfolding operation, first receive the guy wire of upper joint derrick, then the piston rod controlled on extending cylinder is regained, upper joint derrick is fallen after rise to lower joint derrick, then receives the guy wire falling down joint derrick, control hydraulic control power set and make front arm and rear arm hold lower joint derrick tightly, lower joint derrick and support body is made to be close to, then receiving the guy wire falling down joint derrick, the piston rod finally controlling bracket raising cylinder is regained, and makes support body and lower joint derrick and upper joint derrick slowly drop back into on-vehicle host.
Be presented herein below to foregoing invention technical scheme two further optimization and/or improvements:
Above-mentioned when needs carry out standing up operation, when support body rise rise to be 70 degree with horizontal sextant angle time, stop hoisting support body.
The present invention is capable of the most economical maximizing the benefits of device, reduce production cost, not only meet the oil test operation demand to lifting means, also save substantial amounts of lifting and cost of transportation, and, avoid the idle of well maintenance vehicle, save the maintenance cost to idle well maintenance vehicle, effectively reduce production cost, during installation, at utmost realize mechanization, not only save manpower, reduce production cost, and can effectively reduce operating risk, simultaneously, the present invention is capable of the broken torsion of steel wire rope by dead line anchor, it is effectively reduced the consumption of steel wire rope, and hook load reading is more accurate.
Accompanying drawing explanation
Main TV structure schematic diagram when accompanying drawing 1 is hauling operation state of the present invention.
Main TV structure schematic diagram when accompanying drawing 2 stands up operation for the present invention or promotes job state.
Accompanying drawing 3 is the structure for amplifying schematic diagram at A place in accompanying drawing 2.
Accompanying drawing 4 when using for the present invention front arm and rear arm hold the vertical view structure for amplifying schematic diagram of lower joint derrick tightly.
Accompanying drawing 5 when using for the present invention front arm and rear arm unclamp the vertical view structure for amplifying schematic diagram of lower joint derrick.
Accompanying drawing 6 is the structure for amplifying schematic diagram at B place in accompanying drawing 2.
Coding in accompanying drawing is respectively as follows: 1 for upper joint derrick, and 2 is lower joint derrick, and 3 is guy wire, and 4 is derrick base, 5 is extending cylinder, and 6 is support body, and 7 is on-vehicle host, and 8 is bracket raising cylinder, 9 is front arm, and 10 is rear arm, and 11 is front mounting seat, 12 is rear mounting seat, and 13 is dead line anchor, and 14 is steel wire rope, 15 is working rig winch, and 16 is sensor, and 17 is overhead traveling crane, 18 is hook, and 19 for front holding hydraulic cylinder tightly, 20 be after hold hydraulic cylinder tightly.
Detailed description of the invention
The present invention, not by the restriction of following embodiment, can determine specific embodiment according to technical scheme and practical situation.
In the present invention, for the ease of describing, the Butut mode that the description of the relative position relation of each parts is all according to Figure of description 2 is described, as: the position relationship of upper and lower, left and right etc. is based on what the Butut direction of Figure of description was determined.
Below in conjunction with embodiment and accompanying drawing, the invention will be further described:
Embodiment 1, as shown in accompanying drawing 1,2,3,4,5,6, this separate type workover rig includes joint derrick 1, lower joint derrick 2, derrick base 4, extending cylinder 5, on-vehicle host 7, derrick bracket;Upper joint derrick 1 is sleeved in lower joint derrick 2, upper joint derrick 1 and lower joint derrick 2 are installed with guy wire 3 respectively, upper joint derrick 1 is provided with floating device, the lower end of lower joint derrick 2 is hinged on derrick base 4, the body of lower joint derrick 2 and extending cylinder 5 is fixedly installed togather, and the piston rod of upper joint derrick 1 and extending cylinder 5 is fixedly installed togather;Derrick bracket includes support body 6, bracket raising cylinder 8, the front arm 9 distinguishing L-shaped curved shape and rear arm 10;Together with the bottom of support body 6 links with the right-hand member of on-vehicle host 7, bracket raising cylinder 8 is fixedly mounted in on-vehicle host 7, the piston rod of bracket raising cylinder 8 and support body 6 are fixedly installed togather, hydraulic control power set it are installed with on the left of the upper end of support body 6, on the left of the support body 6 of corresponding hydraulic control power set, front end is installed with front mounting seat 11, on the left of the support body 6 of corresponding hydraulic control power set, rear end is installed with rear mounting seat 12, front mounting seat 11 and rear mounting seat 12 are respectively articulated with relatively rotate and can hold lower joint derrick 2 tightly, rotate front arm 9 and the rear arm 10 that can unclamp lower joint derrick 2 in opposite directions, the power output shaft of hydraulic control power set is hinged with the left end of front arm 9 and rear arm 10 respectively.Adopt the present invention, upper joint derrick 1 and lower joint derrick 2 can be installed together, and separate with on-vehicle host 7, when forming separate type workover rig, transport or installation, it is connected with on-vehicle host 7 by derrick bracket, when not carrying out workover treatment, on-vehicle host 7 can be separated with upper joint derrick 1 and lower joint derrick 2, facilitate on-vehicle host 7 to realize other purposes, it is achieved the most economical maximizing the benefits of device;Derrick bracket in the present invention can coordinate with multi-section derrick, derrick can be erected, can also separate with derrick and go roping again and stand up other derricks, can also complete to put operation under coordinating with derrick, so both can meet the oil test operation demand to lifting means, it is also possible to save substantial amounts of lifting and cost of transportation, and, the idle of well maintenance vehicle on-vehicle host 7 can be prevented effectively from, save the maintenance cost to idle well maintenance vehicle on-vehicle host 7, effectively reduce production cost.
Embodiment 2, preferred as embodiment 1, as shown in accompanying drawing 1,2,3,4,5, this separate type workover rig also includes dead line anchor 13 and steel wire rope 14, dead line anchor 13 is fixedly mounted on derrick base 4, on-vehicle host 7 is provided with working rig winch 15 and single-chip microcomputer, the one ends wound of steel wire rope 14 is on working rig winch 15, it is fixed on dead line anchor 13 after the other end pile warp floating device of steel wire rope 14, having sensor 16 on dead line anchor 13, the signal output part of sensor 16 and the signal input part of single-chip microcomputer are electrically connected by wire.One end of steel wire rope 14 after pile warp dead line sheave is called dead line end, dead line end is provided with hydraulic pressure weight indicator, the other end of the steel wire rope 14 being wrapped on working rig winch 15 is called live line end, the dead line end of steel wire rope 14 is fixed on dead line anchor 13, dead line anchor 13 is fixed on derrick base 4, hydraulic pressure weight indicator is adopted to read hook load, and the present invention is capable of by dead line anchor 13, and steel wire rope 14 is broken to be turned round, and hook load reading is more accurate, a number of steel wire rope 14 is reserved at dead line anchor 13, when the live line end steel wire rope 14 of steel wire rope 14 damages, broken parts can be clipped, unclamp dead line anchor 13, concede reserved steel wire rope 14, so can be effectively reduced the consumption of steel wire rope 14.
Adopt the present invention can save formation testing class 3 people 4 hours when every workover rig derrick is installed, 0.5 coil cord (about saving 200 meters) saved every year by every derrick, amount to 5400 meters (about save 13t, 160,000 yuan), reduce and stand up derrick number of times 20 times (50t crane 5 people 1 day, about save 500,000 yuan).
Embodiment 3, preferred as embodiment 2, as required, sensor 16 is pulling force sensor.Under the cooperation of pulling force sensor and hydraulic pressure weight indicator, hook load reading is more accurate.
Embodiment 4, preferred as embodiment 2 and embodiment 3, as shown in accompanying drawing 1,2, floating device includes overhead traveling crane 17 and hook 18, overhead traveling crane 17 is fixedly mounted on the upper end of joint derrick 1, being installed with dead line sheave on overhead traveling crane 17, the one ends wound of steel wire rope 14, on working rig winch 15, is fixed on dead line anchor 13 after the other end pile warp dead line sheave of steel wire rope 14 and hook 18.
Embodiment 5, as embodiment 1, embodiment 2, embodiment 3 and embodiment 4 preferred, such as accompanying drawing 1, 2, 3, shown in 4, hydraulic control power set hold tightly before including hydraulic cylinder 19 and after hold hydraulic cylinder 20 tightly, front and rear on the left of the upper end of support body 6 hold tightly before being installed with respectively hydraulic cylinder 19 and after hold hydraulic cylinder 20 tightly, hold front end on the left of the support body 6 of hydraulic cylinder 19 before correspondence tightly and be installed with front mounting seat 11, hold rear end on the left of the support body 6 of hydraulic cylinder 20 after correspondence tightly and be installed with rear mounting seat 12, before hold tightly hydraulic cylinder 19 and after to hold the piston rod of hydraulic cylinder 20 tightly hinged with the left end of front arm 9 and rear arm 10 respectively.When needs make front arm 9 and rear arm 10 hold lower joint derrick 2 tightly, hold tightly forward hydraulic cylinder 19 and after hold tightly in the cylinder body of hydraulic cylinder 20 and inject hydraulic oil, promotion piston rod stretches out, and then promote front arm 9 and rear arm 10 to relatively rotate, when needs make front arm 9 and rear arm 10 unclamp lower joint derrick 2, hold tightly before release hydraulic cylinder 19 and after hold the hydraulic oil in hydraulic cylinder 20 cylinder body tightly, now piston rod is regained, and then pulls front arm 9 and rear arm 10 to rotate in opposite directions.
Embodiment 6, the using method of this separate type workover rig: when needs carry out hauling operation, control hydraulic control power set and make front arm 9 and rear arm 10 hold lower joint derrick 2 tightly;When needs carry out standing up operation, the piston rod first controlling bracket raising cylinder 8 stretches out, and then risen by the piston rod supporting frame 6 of bracket raising cylinder 8, when 6 angles rising to needs of support body, stop hoisting support body 6, then passing through control hydraulic control power set makes front arm 9 and rear arm 10 part unclamp lower joint derrick 2, continue the support body 6 that hoists, derrick base 4 is made to be snapped down to ground, until lower joint derrick 2 is in operating angle, after the guy wire 3 of lower joint derrick 2 is drawn, the piston rod controlling extending cylinder 5 stretches out, after upper joint derrick 1 is risen to working depth, most post-tensioning is the upper guy wire 3 saving derrick 1 well;When needs carry out promoting operation, working rig winch 15 is first made to rotate, the load of floating device is delivered on dead line anchor 13 by boom hoist cable 14, all the time pinch sensors 16, the pressure signal that sensor 16 produces, by wire and on-vehicle host 7 socket connection, realizes load on single-chip microcomputer and shows;When needs carry out folding and unfolding operation, first receive the guy wire 3 of upper joint derrick 1, then the piston rod controlled on extending cylinder 5 is regained, upper joint derrick 1 is fallen after rise to lower joint derrick 2, then the guy wire 3 falling down joint derrick 2 is received, controlling hydraulic control power set makes front arm 9 and rear arm 10 hold lower joint derrick 2 tightly, lower joint derrick 2 and support body 6 is made to be close to, then the guy wire 3 falling down joint derrick 2 is received, the piston rod finally controlling bracket raising cylinder 8 is regained, and makes support body 6 and lower joint derrick 2 and upper joint derrick 1 slowly drop back into on-vehicle host 7.
Embodiment 7, preferred as embodiment 6, when needs carry out standing up operation, when support body rise rise to be 70 degree with horizontal sextant angle time, stop hoisting support body.
Upper joint derrick 1 and lower joint derrick 2 can be separated by the present invention with on-vehicle host 7, form separate type workover rig, when transport or installation, it is connected with on-vehicle host 7 by derrick bracket, when not carrying out workover treatment, it is possible to on-vehicle host 7 is separated with upper joint derrick 1 and lower joint derrick 2, facilitates on-vehicle host 7 to realize other purposes, realize the most economical maximizing the benefits of device, reduce production cost;Derrick bracket in the present invention can coordinate with multi-section derrick, derrick can be erected, can also separate with derrick and go roping again and stand up other derricks, can also complete to put operation in cooperation with derrick, so both can meet the oil test operation demand to lifting means, substantial amounts of lifting and cost of transportation can also be saved, and, avoid the idle of well maintenance vehicle, save the maintenance cost to idle well maintenance vehicle, effectively reduce production cost, during installation, at utmost realize mechanization, not only save manpower, reduce production cost, and can effectively reduce operating risk.Simultaneously, the present invention is capable of the broken torsion of steel wire rope 14 by dead line anchor 13, and hook load reading is more accurate, a number of steel wire rope 14 is reserved at dead line anchor 13, when the live line end steel wire rope 14 of steel wire rope 14 damages, it is possible to broken parts is clipped, unclamps dead line anchor 13, concede reserved steel wire rope 14, so can be effectively reduced the consumption of steel wire rope 14.Adopt the present invention can save formation testing class 3 people 4 hours when every workover rig derrick is installed, 0.5 coil cord (about saving 200 meters) saved every year by every derrick, amount to 5400 meters (about save 13t, 160,000 yuan), reduce and stand up derrick number of times 20 times (50t crane 5 people 1 day, about save 500,000 yuan).
Above technical characteristic constitutes embodiments of the invention, and it has stronger adaptability and implementation result, can increase and decrease non-essential technical characteristic according to actual needs, meet the demand of different situations.

Claims (11)

1. the using method of a separate type workover rig, it is characterised in that when needs carry out hauling operation, controls hydraulic control power set and makes front arm and rear arm hold lower joint derrick tightly;When needs carry out standing up operation, the piston rod first controlling bracket raising cylinder stretches out, and then risen by the piston rod supporting frame of bracket raising cylinder, when support body acts the angle rising to needs, stop hoisting support body, then passing through control hydraulic control power set makes front arm and rear arm part unclamp lower joint derrick, continue the support body that hoists, derrick base is made to be snapped down to ground, until lower joint derrick is in operating angle, after the guy wire of lower joint derrick is drawn, the piston rod controlling extending cylinder stretches out, after upper joint derrick is risen to working depth, most post-tensioning is the upper guy wire saving derrick well;When needs carry out promoting operation, first making working rig winch rotate, the load of floating device is delivered on dead line anchor by boom hoist cable, all the time pinch sensors, the pressure signal that sensor produces, by wire and on-vehicle host socket connection, realizes load on single-chip microcomputer and shows;When needs carry out folding and unfolding operation, first receive the guy wire of upper joint derrick, then the piston rod controlled on extending cylinder is regained, upper joint derrick is fallen after rise to lower joint derrick, then receives the guy wire falling down joint derrick, control hydraulic control power set and make front arm and rear arm hold lower joint derrick tightly, lower joint derrick and support body is made to be close to, then receiving the guy wire falling down joint derrick, the piston rod finally controlling bracket raising cylinder is regained, and makes support body and lower joint derrick and upper joint derrick slowly drop back into on-vehicle host.
2. the using method of separate type workover rig according to claim 1, it is characterised in that described separate type workover rig includes joint derrick, lower joint derrick, derrick base, extending cylinder, on-vehicle host, derrick bracket;Upper joint derrick is sleeved in lower joint derrick, upper joint derrick and lower joint derrick are installed with guy wire respectively, upper joint derrick is provided with floating device, the lower end of lower joint derrick is hinged on derrick base, the body of lower joint derrick and extending cylinder is fixedly installed togather, and the piston rod of upper joint derrick and extending cylinder is fixedly installed togather;Derrick bracket includes support body, bracket raising cylinder, the front arm distinguishing L-shaped curved shape and rear arm;Together with the bottom of support body links with the right-hand member of on-vehicle host, bracket raising cylinder is fixedly mounted in on-vehicle host, the piston rod of bracket raising cylinder and support body are fixedly installed togather, hydraulic control power set it are installed with on the left of the upper end of support body, on the left of the support body of corresponding hydraulic control power set, front end is installed with front mounting seat, on the left of the support body of corresponding hydraulic control power set, rear end is installed with rear mounting seat, front mounting seat and rear mounting seat are respectively articulated with relatively rotate and can hold lower joint derrick tightly, rotate in opposite directions and can unclamp the front arm of lower joint derrick and rear arm, the power output shaft of hydraulic control power set is hinged with the left end of front arm and rear arm respectively.
3. the using method of separate type workover rig according to claim 2, characterized by further comprising dead line anchor and steel wire rope, dead line anchor is fixedly mounted on derrick base, on-vehicle host is provided with working rig winch and single-chip microcomputer, the one ends wound of steel wire rope is on working rig winch, it is fixed on dead line anchor after the other end pile warp floating device of steel wire rope, having sensor on dead line anchor, the signal output part of sensor and the signal input part of single-chip microcomputer are electrically connected by wire.
4. the using method of separate type workover rig according to claim 3, it is characterised in that sensor is pulling force sensor.
5. the using method of the separate type workover rig according to claim 3 or 4, it is characterized in that floating device includes overhead traveling crane and hook, overhead traveling crane is fixedly mounted on the upper end of joint derrick, overhead traveling crane is installed with dead line sheave, the one ends wound of steel wire rope, on working rig winch, is fixed on dead line anchor after the other end pile warp dead line sheave of steel wire rope and hook.
6. the using method of the separate type workover rig according to Claims 2 or 3 or 4, it is characterized in that hydraulic control power set hold tightly before including hydraulic cylinder and after hold hydraulic cylinder tightly, front and rear on the left of the upper end of support body hold tightly before being installed with respectively hydraulic cylinder and after hold hydraulic cylinder tightly, hold front end on the left of the support body of hydraulic cylinder before correspondence tightly and be installed with front mounting seat, hold rear end on the left of the support body of hydraulic cylinder after correspondence tightly and be installed with rear mounting seat, front hold tightly hydraulic cylinder and after to hold the piston rod of hydraulic cylinder tightly hinged with the left end of front arm and rear arm respectively.
7. the using method of separate type workover rig according to claim 5, it is characterized in that hydraulic control power set hold tightly before including hydraulic cylinder and after hold hydraulic cylinder tightly, front and rear on the left of the upper end of support body hold tightly before being installed with respectively hydraulic cylinder and after hold hydraulic cylinder tightly, hold front end on the left of the support body of hydraulic cylinder before correspondence tightly and be installed with front mounting seat, hold rear end on the left of the support body of hydraulic cylinder after correspondence tightly and be installed with rear mounting seat, front hold tightly hydraulic cylinder and after to hold the piston rod of hydraulic cylinder tightly hinged with the left end of front arm and rear arm respectively.
8. the using method of the separate type workover rig according to claim 1 or 2 or 3 or 4, it is characterised in that when needs carry out standing up operation, when support body rise rise to be 70 degree with horizontal sextant angle time, stop hoisting support body.
9. the using method of separate type workover rig according to claim 5, it is characterised in that when needs carry out standing up operation, when support body rise rise to be 70 degree with horizontal sextant angle time, stop hoisting support body.
10. the using method of separate type workover rig according to claim 6, it is characterised in that when needs carry out standing up operation, when support body rise rise to be 70 degree with horizontal sextant angle time, stop hoisting support body.
11. the using method of separate type workover rig according to claim 7, it is characterised in that when needs carry out standing up operation, when support body rise rise to be 70 degree with horizontal sextant angle time, stop hoisting support body.
CN201410037305.XA 2014-01-26 2014-01-26 Separate type workover rig and using method thereof Active CN103806850B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410037305.XA CN103806850B (en) 2014-01-26 2014-01-26 Separate type workover rig and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410037305.XA CN103806850B (en) 2014-01-26 2014-01-26 Separate type workover rig and using method thereof

Publications (2)

Publication Number Publication Date
CN103806850A CN103806850A (en) 2014-05-21
CN103806850B true CN103806850B (en) 2016-07-06

Family

ID=50704179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410037305.XA Active CN103806850B (en) 2014-01-26 2014-01-26 Separate type workover rig and using method thereof

Country Status (1)

Country Link
CN (1) CN103806850B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476769A (en) * 2017-10-10 2017-12-15 烟台杰瑞石油装备技术有限公司 A kind of all-hydraulic intelligent workover rig
CN112031668A (en) * 2020-09-02 2020-12-04 中国石油天然气集团有限公司 Workover rig vertical derrick structure assembly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1169627A (en) * 1982-01-08 1984-06-26 Ernest M. Futros Drilling rig mast apparatus
EP0548900A2 (en) * 1991-12-24 1993-06-30 SOILMEC S.p.A. Hydraulic drilling machine of telescopic tower type with a rod stowing and handling system
CN202187713U (en) * 2011-07-08 2012-04-11 中原总机石油设备有限公司 Wheel hoist tractor
CN202531055U (en) * 2012-03-31 2012-11-14 中国石油集团渤海石油装备制造有限公司 Integrated type vehicle-mounted workover rig capable of operating with pressure
CN203308404U (en) * 2013-06-28 2013-11-27 通化石油化工机械制造有限责任公司 Compound derrick intelligent formation testing well repairing vehicle
CN203716876U (en) * 2014-01-26 2014-07-16 中国石油集团西部钻探工程有限公司 Separating type workover rig

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1169627A (en) * 1982-01-08 1984-06-26 Ernest M. Futros Drilling rig mast apparatus
EP0548900A2 (en) * 1991-12-24 1993-06-30 SOILMEC S.p.A. Hydraulic drilling machine of telescopic tower type with a rod stowing and handling system
CN202187713U (en) * 2011-07-08 2012-04-11 中原总机石油设备有限公司 Wheel hoist tractor
CN202531055U (en) * 2012-03-31 2012-11-14 中国石油集团渤海石油装备制造有限公司 Integrated type vehicle-mounted workover rig capable of operating with pressure
CN203308404U (en) * 2013-06-28 2013-11-27 通化石油化工机械制造有限责任公司 Compound derrick intelligent formation testing well repairing vehicle
CN203716876U (en) * 2014-01-26 2014-07-16 中国石油集团西部钻探工程有限公司 Separating type workover rig

Also Published As

Publication number Publication date
CN103806850A (en) 2014-05-21

Similar Documents

Publication Publication Date Title
CN103613031B (en) Voltage transformer simple and easy hoisting device
CN105858435A (en) Technology for hoisting strip-shaped inclined steel structures in place through single crane
CN202187601U (en) Single-twisting-grinder double-pole iron tower erecting device of high-voltage power transmission line
CN106081926A (en) Harbour Radix Saposhnikoviae crane with mechanical arm gripping device
CN102910532B (en) Method for butting and hoisting large box type derricks in air
CN205011284U (en) A simple and easy hoisting apparatus for rack high altitude is in bulk
CN103806850B (en) Separate type workover rig and using method thereof
CN102381641A (en) Crane auxiliary arm mounting equipment and crane auxiliary arm mounting method
CN101831913A (en) Method for jacking steel casting of bored pile by using jacks
CN203716876U (en) Separating type workover rig
CN104234636B (en) Jack-up unit derrick installation method
CN103556812A (en) Installation structure of attached lifting scaffold electric hoist
CN202322105U (en) Crane and device for installing auxiliary boom of crane
CN107381351A (en) The loop wheel machine special cart of secondary spring hooking device is installed
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN203959697U (en) The equalizing bar of hoisting platform truss
CN105645275A (en) Cable hoisting crane and construction method thereof
CN207078930U (en) A kind of hoisting device for row pipeline
CN201756422U (en) Two-head-suspension tower crane
CN101537977A (en) Pulling cable wind rope for through type jack
CN209618679U (en) Claw and boom hoisting
CN102344090A (en) Double-head suspension tower crane
CN208843629U (en) A kind of crane upper mechanism is from dismantling device and crane
CN201376843Y (en) Guyrope of center hole jack
CN208948729U (en) A kind of architectural engineering lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191008

Address after: No. 6, liupukang, Xicheng District, Beijing 100120

Co-patentee after: CNPC Xibu Drilling Engineering Company Limited

Patentee after: PetroChina Natural Gas Group Co., Ltd.

Address before: 834000 the Xinjiang Uygur Autonomous Region Karamay Friendship Road No. 115 joint office building oil testing company

Patentee before: CNPC Xibu Drilling Engineering Company Limited

TR01 Transfer of patent right