CN102344090A - Double-head suspension tower crane - Google Patents
Double-head suspension tower crane Download PDFInfo
- Publication number
- CN102344090A CN102344090A CN2010102414681A CN201010241468A CN102344090A CN 102344090 A CN102344090 A CN 102344090A CN 2010102414681 A CN2010102414681 A CN 2010102414681A CN 201010241468 A CN201010241468 A CN 201010241468A CN 102344090 A CN102344090 A CN 102344090A
- Authority
- CN
- China
- Prior art keywords
- crane
- tower
- crane arm
- crane boom
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The invention discloses a double-head suspension tower crane, which is used for building, water conservancy, electricity, highways, stations, docks, petrifaction, nuclear power stations and other construction sites. The tower crane in the prior art is only provided with one crane boom and one head suspension, so the hoisting efficiency is not high. The observation front side of a cab [16] is parallel to a rotation tower body [9], the cab [16] is installed on an upper base [8], a lifting mechanism [11] which is installed on a crane boom [12] is arranged at the right side of the rotation tower body [9], the crane boom is arranged at the left side of the rotation tower body [9] of the tower crane, one end of a crane boom short drag rod [13] is obliquely arranged on the crane boom, the other end of the crane boom short drag rod [13] is obliquely arranged in the middle of a tower plate, and one end of a crane boom long drag rod [14] is obliquely arranged on the crane boom. Compared with the acknowledged technology, the hoisting efficiency of the tower crane is improved by one time.
Description
One, technical field
Two tower crane formula hoisting crane that use in building sites such as the present invention is used to build, water conservancy, electric power, highway, station, harbour, petrochemical industry, nuclear station.
Two, background technology
Existing technological tower crane has only one of a crane arm to hang, and lifting efficient is not high.
Three, summary of the invention
1. the objective of the invention is to design a kind of two tower crane formula hoisting crane; Tower crane removes equilibrium arm and balance arm brace, and a cover crane arm is installed again, a cover crane arm long draw, a cover crane arm short rod.All there is crane arm on the right side, the slewing tower left side of tower crane.
2. two tower crane formula hoisting crane is characterized in that: there is crane arm on the slewing tower left side of tower crane; Crane arm short rod one end is oblique on crane arm, and crane arm short rod one end is oblique in the middle of column plate, and crane arm long draw one end is oblique on crane arm; Crane arm long draw one end is oblique in the middle of column plate; The root of crane arm has lifting mechanism, and two on the pulley of tower head plate is symmetrical, and driver's cab is observed positive parallel with slewing tower apart.Driver's cab is installed, Yi Bian allow on the crane arm advertising panel is installed on upper bracket.The electrical apparatus control circuit of two tower crane formula hoisting crane is used known electrical apparatus control circuit, and the slewing tower right side also has lifting mechanism, luffing mechanism, suspension hook, the load-carrying dolly installed on the crane arm to be equal to that installed device is the same model and specification on the crane arm on the left side.The installation method of two tower crane formula hoisting crane have with, install the pinnacle of a pagoda after, the slewing tower height is about 22m; Will become splayed to fix with two steel cable wind ropes on the slewing tower, brake swing type mechanism, crane arm installs back (following installation is all pressed existing regulation and installed) by existing standard; Lifting mechanism is installed again; At the crane arm that steel cable wind rope opposite is installed, install with the crane arm of crane lifting, with rising mechanism's pull-up respectively; Crane arm short rod, crane arm long draw are installed, after crane arm, crane arm pull bar install.Steel cable wind rope the crane arm here is installed again, and with rising mechanism's pull-up respectively, crane arm short rod, crane arm long draw are installed, after crane arm, crane arm pull bar install.Dismantle the steel cable wind rope.Unclamp slewing gear brake.After hanging by existing standard mode, test run, examination, use by safety supervision approval back.
3. the present invention compares with known technology, and tower crane lifting efficient doubles, and practices thrift 30% manufacturing cost, practices thrift a body of the tower, practices thrift a basic expense, practices thrift 15% transportation volume.
Four, description of drawings
Accompanying drawing 1 of the present invention is a front view, and accompanying drawing 2 of the present invention is a planar view.
Five, the specific embodiment
Describe in conjunction with accompanying drawing 1,2: foundation for tower crane as prescribed is at the scene built, and base section [3] is upward installed (following installation all has by existing regulation installation) by existing regulation at foundation for tower crane [1], with the fastening base section of nut [2] [3]; Upward installation code joint [4] is with the secondary fastening standard knot [4] of high strength bolt for base section [3], and standard knot [4] is gone up undersetting [7] is installed, the following stock [6] of installing of undersetting [7]; Undersetting is equipped with pivoting support on [7], and upper bracket [8] is installed on the pivoting support, goes up at upper bracket [8] driver's cab [16] is installed; Go up installation slewing tower [9] at upper bracket [8]; Slewing tower [9] go up to be installed pinnacle of a pagoda [10], install pinnacle of a pagoda [10] after, slewing tower [9] height is about 22m; To become splayed to fix with two steel cable wind ropes on the slewing tower [2], brake swing type mechanism.Go up installation lifting mechanism [11], luffing mechanism, load-carrying dolly at crane arm [12].The crane arm [12] on steel cable wind rope opposite is installed; With crane lifting crane arm [12], the otic placode hole of crane arm links to each other with the otic placode hole of bearing pin with slewing tower [2], with rising mechanism [11] pull-up respectively; Crane arm short rod [13], crane arm long draw [14] are installed; The suspension centre hole of crane arm links to each other with the otic placode hole of pull bar with bearing pin, and the otic placode hole of pull bar links to each other with the hole of tower head plate, after crane arm, crane arm pull bar install.Steel cable wind rope the crane arm here is installed again.After connecting into an integral body to crane arm [12] earlier, lifting mechanism [11], luffing mechanism, load-carrying dolly are installed at crane arm [12].Crane arm [12] with crane lifting; With rising mechanism [11] pull-up respectively, crane arm short rod [13], crane arm long draw [14] are installed, and the suspension centre hole of crane arm links to each other with the otic placode hole of pull bar with bearing pin; The otic placode hole of pull bar links to each other with the hole of tower head plate, after crane arm rises, the weighing arm pull bar installs.Also to install the suspension hook on both sides.Allow on the crane arm advertising panel is installed on one side.Dismantle the steel cable wind rope.Unclamp slewing gear brake.After hanging by existing standard mode, test run, examination, use by safety supervision approval back.
Claims (1)
1. two tower crane formula hoisting crane, driver's cab [16] are observed positive and slewing tower [9] at a distance of parallel, go up installation driver's cab [16] at upper bracket [8]; Slewing tower [9] right side also has a crane arm [12] to go up the lifting mechanism of installing [11]; It is characterized in that: there is crane arm on the slewing tower of tower crane [9] left side, and crane arm short rod [13] one ends are oblique on crane arm, and crane arm short rod [13] one ends are oblique in the middle of column plate; Crane arm long draw [14] one ends are oblique on crane arm; Crane arm long draw [14] one ends are oblique in the middle of column plate, and the root of crane arm [12] has lifting mechanism [11], [15] two on the both sides pulley of tower head plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102414681A CN102344090A (en) | 2010-07-27 | 2010-07-27 | Double-head suspension tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102414681A CN102344090A (en) | 2010-07-27 | 2010-07-27 | Double-head suspension tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102344090A true CN102344090A (en) | 2012-02-08 |
Family
ID=45543225
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102414681A Pending CN102344090A (en) | 2010-07-27 | 2010-07-27 | Double-head suspension tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102344090A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103213907A (en) * | 2013-04-27 | 2013-07-24 | 中联重科股份有限公司 | Tower-type crane |
CN106185637A (en) * | 2016-08-18 | 2016-12-07 | 无锡石油化工起重机有限公司 | Tower crane OPS with advertisement peg |
CN108190761A (en) * | 2018-03-08 | 2018-06-22 | 浙江虎霸建设机械有限公司 | A kind of derrick crane |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2273750A1 (en) * | 1974-06-07 | 1976-01-02 | Grandi Rene | Travelling crane with multiple winches - has equal-length opposite jibs slewing on telescopic tower |
CN2292782Y (en) * | 1996-08-23 | 1998-09-30 | 建设部长沙建设机械研究院 | Tower type dual-purpose machine for hoisting and distributing concrete |
US20030183594A1 (en) * | 2002-03-26 | 2003-10-02 | Manuel Torres Martinez | Crane for the assembly of wind turbines and assembly procedure |
CN1666948A (en) * | 2005-01-21 | 2005-09-14 | 魏纯玉 | Inside climbing tower crane with multi-hook and deep well winch |
CN2858608Y (en) * | 2006-01-06 | 2007-01-17 | 广东省建筑机械厂 | Folding dual-horizontal-arm self-rising crane |
CN201351091Y (en) * | 2009-02-20 | 2009-11-25 | 浙江省建设机械集团有限公司 | Double-rocker pole |
CN201756422U (en) * | 2010-07-27 | 2011-03-09 | 周杨 | Two-head-suspension tower crane |
-
2010
- 2010-07-27 CN CN2010102414681A patent/CN102344090A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2273750A1 (en) * | 1974-06-07 | 1976-01-02 | Grandi Rene | Travelling crane with multiple winches - has equal-length opposite jibs slewing on telescopic tower |
CN2292782Y (en) * | 1996-08-23 | 1998-09-30 | 建设部长沙建设机械研究院 | Tower type dual-purpose machine for hoisting and distributing concrete |
US20030183594A1 (en) * | 2002-03-26 | 2003-10-02 | Manuel Torres Martinez | Crane for the assembly of wind turbines and assembly procedure |
CN1666948A (en) * | 2005-01-21 | 2005-09-14 | 魏纯玉 | Inside climbing tower crane with multi-hook and deep well winch |
CN2858608Y (en) * | 2006-01-06 | 2007-01-17 | 广东省建筑机械厂 | Folding dual-horizontal-arm self-rising crane |
CN201351091Y (en) * | 2009-02-20 | 2009-11-25 | 浙江省建设机械集团有限公司 | Double-rocker pole |
CN201756422U (en) * | 2010-07-27 | 2011-03-09 | 周杨 | Two-head-suspension tower crane |
Non-Patent Citations (1)
Title |
---|
孙在鲁: "《塔式起重机应用技术》", 30 June 2003, 中国建材工业出版社 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103213907A (en) * | 2013-04-27 | 2013-07-24 | 中联重科股份有限公司 | Tower-type crane |
CN103213907B (en) * | 2013-04-27 | 2015-04-01 | 中联重科股份有限公司 | Tower-type crane |
CN106185637A (en) * | 2016-08-18 | 2016-12-07 | 无锡石油化工起重机有限公司 | Tower crane OPS with advertisement peg |
CN108190761A (en) * | 2018-03-08 | 2018-06-22 | 浙江虎霸建设机械有限公司 | A kind of derrick crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201381166Y (en) | Hanging-point adjustable transverse hanging beam | |
CN103613031B (en) | Voltage transformer simple and easy hoisting device | |
CN202358849U (en) | Small-size suspension crane | |
CN101539478B (en) | Tester for testing multifunctional vane | |
CN205387439U (en) | Mast hoisting accessory | |
CN102992203B (en) | Simple hoisting device for steel structure bridge installation | |
CN101660295B (en) | Hoisting method of arch bridge arch rib or beam body along bridge direction | |
CN201756422U (en) | Two-head-suspension tower crane | |
CN201334306Y (en) | Hoisting machine for upright post member | |
CN102344090A (en) | Double-head suspension tower crane | |
CN202390116U (en) | High-intensity small-tonnage hoist | |
CN201762035U (en) | Simple crane movable arm | |
CN201778531U (en) | Fixing base of auxiliary embraced bar | |
CN202967922U (en) | Simple hoisting device for mounting steel structural bridge | |
CN203461720U (en) | Simple cantilever hoisting machine | |
CN203289011U (en) | Tension cross arm hoisting device | |
CN201762053U (en) | Simple automatic derrick | |
CN202829361U (en) | Small-size hoisting machine | |
CN202465078U (en) | Hoisting mechanism of crane | |
CN201397252Y (en) | Multifunctional blade testing desk | |
CN103806850B (en) | Separate type workover rig and using method thereof | |
CN203716876U (en) | Separating type workover rig | |
CN102030272A (en) | Building equipment hoisting device | |
CN207030776U (en) | One kind lifting stirring erecting device | |
CN201142537Y (en) | Large span cable bridge rack installation mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120208 |