Pipe truss installation string-up safety channel device Download PDFInfo
- Publication number
- CN210888133U CN210888133U CN201921734529.0U CN201921734529U CN210888133U CN 210888133 U CN210888133 U CN 210888133U CN 201921734529 U CN201921734529 U CN 201921734529U CN 210888133 U CN210888133 U CN 210888133U
- Authority
- CN
- China
- Prior art keywords
- pipe truss
- steel
- carrier plate
- last quarter
- channel device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a pipe truss installation safety channel device of winding up relates to steel industry factory building pipe truss structural installation technical field. This pipe truss installation string safety channel device, including the pipe truss, the pipe truss includes three pipe truss last quarter mobile jib, and the both ends of three pipe truss last quarter mobile jib all connect through pipe truss last quarter web member, and the pipe truss last quarter web member upper berth that is located the top is equipped with steel formula building carrier plate, the both sides at steel formula building carrier plate top all are provided with the pole setting, are located steel formula building carrier plate and are provided with wire rope with between two adjacent pole settings with one side, the top of steel formula building carrier plate is provided with the springboard. The pipe truss is provided with the winding safety channel device, and through the improvement of the structure, the mounting and dismounting are convenient and fast, the device can be used repeatedly, and the device can be used as a temporary operating platform, provides safe and comfortable working conditions for high-altitude operation, and is convenient for a user to use while the working efficiency is improved.
Description
Technical Field
The utility model relates to a steel industry factory building pipe truss structure installation technical field specifically is a pipe truss installs last string safe passage device.
Background
In some constructions of the existing steel-making industrial factory buildings adopting the pipe truss structure, the pipe truss structure is formed by welding steel pipes, so that operating personnel cannot walk on the pipe truss structure on the ground and cannot perform roof support and purlin installation operation on the truss structure.
The traditional method adopts the wood springboard to be laid on the web members of the pipe truss, and the distance between the web members is larger than the length (generally 5m) of the springboard, so that the end of the springboard interface is suspended, the dangerousness is high, and the safety construction on site is not facilitated.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a string escape way device in pipe truss installation has solved traditional method and has adopted the wooden springboard to lay on the web member of pipe truss, because the interval of web member is greater than the length of springboard (generally at 5m), leads to springboard interface end unsettled, and is dangerous big, is unfavorable for the problem of the safe construction at scene.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a pipe truss installation string safety channel device, includes the pipe truss, the pipe truss includes three pipe truss last string mobile jib, and the both ends of three pipe truss last string mobile jib all connect through pipe truss last string web member, and the pipe truss last string web member upper berth that is located the top is equipped with steel formula building carrier plate, the both sides at steel formula building carrier plate top all are provided with the pole setting, are located steel formula building carrier plate and are provided with wire rope with between two adjacent pole settings with one side, the top of steel formula building carrier plate is provided with the springboard.
Preferably, the specification of the steel type floor bearing plate is 1mm in thickness, 1600mm in width and YX51-240-720 steel plate.
Preferably, the height of the vertical rod is 1.2m, and an angle of ∠ 75 degrees is adoptedThe steel and the upper chord web member of the pipe truss are firmly welded, a round hole is formed in the top of the upright rod, the steel wire rope penetrates into the round hole, and the specification of the steel wire rope is
Preferably, the wood springboard is transversely laid, and a 10# iron wire is used for firmly binding the wood springboard with the upper chord main rod of the pipe truss.
(III) advantageous effects
The utility model provides a pipe truss installation safety channel device of winding up. The method has the following beneficial effects: the pipe truss is provided with the winding safety channel device, and through the improvement of the structure, the mounting and dismounting are convenient and fast, the device can be used repeatedly, and the device can be used as a temporary operating platform, provides safe and comfortable working conditions for high-altitude operation, and is convenient for a user to use while the working efficiency is improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic cross-sectional view at 1-1 of the present invention.
In the figure: 1. a pipe truss; 2. a steel deck; 3. a pipe truss upper chord web member; 4. erecting a rod; 5. a wire rope; 6. a wood springboard; 7. the pipe truss is equipped with a main chord rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a pipe truss installation string-up safe passage device comprises a pipe truss 1, wherein the pipe truss 1 comprises three pipe truss string-up main rods 7, two ends of the three pipe truss string-up main rods 7 are connected through pipe truss string-up web members 3 and are locatedA steel type floor bearing plate 2 is laid on the upper chord web member 3 of the upper pipe truss, the specification of the steel type floor bearing plate 2 is a steel plate with the thickness of 1mm, the width of 1600mm and the model of YX51-240 plus 720, both sides of the top of the steel type floor bearing plate 2 are provided with upright posts 4, the height of the upright posts 4 is 1.2m, ∠ 75 angle steel is adopted to be firmly welded with the upper chord web member 3 of the pipe truss, the top of the upright posts 4 is provided with a round hole, a steel wire rope 5 penetrates into the round hole, and the specification of the steel wire rope 5 is that the steel wire rope 5Be located steel type building carrier plate 2 and be provided with wire rope 5 with being provided with between two adjacent pole settings 4 with one side, the top of steel type building carrier plate 2 is provided with wooden springboard 6, and wooden springboard 6 transversely lays to it is firm with the ligature of pipe truss last quarter mobile jib 7 with 10# iron wire.
To sum up, the pipe truss is provided with the upper chord safe channel device, and through the improvement of the structure, the pipe truss is convenient and quick to mount and dismount and can be repeatedly used, and the pipe truss is used as a temporary operating platform, so that safe and comfortable working conditions are provided for high-altitude operation, and the use of a user is facilitated while the working efficiency is improved.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a pipe truss installation last quarter escape way device which characterized in that: including pipe truss (1), pipe truss (1) includes three pipe truss last quarter mobile jib (7), and the both ends of three pipe truss last quarter mobile jib (7) all connect through pipe truss last quarter web member (3), and pipe truss last quarter web member (3) upper berth that is located the top is equipped with steel formula building carrier plate (2), the both sides at steel formula building carrier plate (2) top all are provided with pole setting (4), are located steel formula building carrier plate (2) and are provided with wire rope (5) with between two adjacent pole settings (4) with one side, the top of steel formula building carrier plate (2) is provided with springboard (6).
2. The pipe truss installation wind safety channel device of claim 1, wherein: the specification of the steel type floor bearing plate (2) is a steel plate with the thickness of 1mm, the width of 1600mm and the model of YX 51-240-720.
3. The pipe truss installation upper chord safety channel device according to claim 1, wherein the height of the vertical rod (4) is 1.2m, ∠ 75 angle steel is adopted to be firmly welded with the pipe truss upper chord web member (3), a round hole is formed in the top of the vertical rod (4), the steel wire rope (5) penetrates into the round hole, and the specification of the steel wire rope (5) is that
4. The pipe truss installation wind safety channel device of claim 1, wherein: the wood springboard (6) is transversely laid, and the wood springboard (6) is firmly bound with the upper chord main rod (7) of the pipe truss by using a 10# iron wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921734529.0U CN210888133U (en) | 2019-10-16 | 2019-10-16 | Pipe truss installation string-up safety channel device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921734529.0U CN210888133U (en) | 2019-10-16 | 2019-10-16 | Pipe truss installation string-up safety channel device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210888133U true CN210888133U (en) | 2020-06-30 |
Family
ID=71318447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921734529.0U Active CN210888133U (en) | 2019-10-16 | 2019-10-16 | Pipe truss installation string-up safety channel device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210888133U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227733A (en) * | 2020-10-30 | 2021-01-15 | 中冶建工集团重庆钢结构有限公司 | Installation method of three-way pipe truss |
-
2019
- 2019-10-16 CN CN201921734529.0U patent/CN210888133U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227733A (en) * | 2020-10-30 | 2021-01-15 | 中冶建工集团重庆钢结构有限公司 | Installation method of three-way pipe truss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN107327068B (en) | Steel structure truss string system roof ceiling structure and construction method thereof | |
CN203441073U (en) | Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column | |
CN210888133U (en) | Pipe truss installation string-up safety channel device | |
CN205314519U (en) | High altitude operation platform based on truss | |
CN201598833U (en) | Fully-assembled steel construction platform with adjustable size | |
KR20110014341A (en) | Tower ctane wall bracing with a safety fence | |
CN202214974U (en) | 5.8 m ultrahigh external climbing frame | |
CN212054063U (en) | Novel high-voltage line protection device | |
CN219034022U (en) | Light open cut arch support | |
CN210368974U (en) | A simple and easy instrument that is used for precipitation well sand-free pipe to install | |
CN107795133B (en) | Integral protective frame platform and construction method thereof | |
CN117005664A (en) | Electric translation type hanging basket | |
CN214995799U (en) | Tool type wall hanging cantilever frame | |
CN115492404A (en) | Rapid paving method for roof purlines of factory building | |
CN212773371U (en) | Limited space steel construction daylighting top cable work platform | |
CN104727538B (en) | Scaffold device for plant roof reinforcement and maintenance and scaffold erecting method | |
CN112942778A (en) | Overhanging type double-row scaffold and construction method thereof | |
CN113550550A (en) | Overhanging unit type scaffold convenient to assemble and disassemble | |
CN207048158U (en) | Steel construction truss string structure system roof system ceiling structure | |
CN206110693U (en) | Protection device for prevent that factory building concrete block from falling | |
CN206987720U (en) | A kind of double shield cage cat ladders | |
CN202788017U (en) | Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings | |
CN108978926B (en) | Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet | |
CN207812978U (en) | A kind of heavy grade Sloping roof concreting job platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |