CN108978926B - Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet - Google Patents

Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet Download PDF

Info

Publication number
CN108978926B
CN108978926B CN201710399623.4A CN201710399623A CN108978926B CN 108978926 B CN108978926 B CN 108978926B CN 201710399623 A CN201710399623 A CN 201710399623A CN 108978926 B CN108978926 B CN 108978926B
Authority
CN
China
Prior art keywords
steel sheet
profiled steel
steel
profiled
rectangular frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710399623.4A
Other languages
Chinese (zh)
Other versions
CN108978926A (en
Inventor
李志红
刘贵斌
董健
汪从
梁广远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710399623.4A priority Critical patent/CN108978926B/en
Publication of CN108978926A publication Critical patent/CN108978926A/en
Application granted granted Critical
Publication of CN108978926B publication Critical patent/CN108978926B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Building Environments (AREA)

Abstract

The method for installing the profiled steel sheet on the inner side of the double-layer profiled steel sheet composite heat-insulation wall body is characterized by comprising the following steps of: a. manufacturing an operation platform, b, manufacturing a lifting clamp, and c, installing an inner profiled steel sheet by using the operation platform. The installation method of the inner profiled steel sheet of the double-layer profiled steel sheet composite heat-insulation wall body has the advantages that the operation platform device is simple in structure and convenient to manufacture, the installation engineering quality of the inner profiled steel sheet is greatly improved, the safety risk of installation personnel is reduced, high-altitude installation by using a scaffold is avoided, the scaffold does not need to be repeatedly disassembled, the installation personnel can operate on the platform more stably, the installation efficiency is greatly improved, the labor waste is reduced, and the labor cost is reduced.

Description

method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet
Technical Field
The invention relates to a house wall of a steel structure factory, in particular to a method for installing a profiled steel sheet on the inner side of a double-layer profiled steel sheet composite heat-insulation wall.
Background
The steel structure factory building roof enclosure structure generally adopts a profiled steel sheet composite heat-insulating wall body, and has the structural characteristics that: on the construction site, profiled steel sheets are respectively fixed on the inner side and the outer side of the structural wall beam, a heat insulation material is paved in the middle of the profiled steel sheets, the heat insulation material is glass wool coiled felt, the coiled felt is provided with a veneer, the veneer faces indoors, the heat insulation layer is fixed between a purline and the outer profiled steel sheets, a waterproof and breathable layer is arranged on the outer side according to engineering requirements, and the inner wall plate is usually made of profiled steel sheets.
the installation of the inner profiled steel sheet of the composite heat-insulating wall body is carried out by erecting a scaffold on the ground in a conventional method, and when the inner profiled steel sheet is installed by using the scaffold, the activity of an operator is limited, the scaffold needs to be climbed to move up and down, the installation efficiency is low, safety risks exist, the scaffold erecting process is complicated, the scaffold needs to be continuously dismantled and re-erected when the position is moved, and a large amount of labor is wasted.
therefore, the installation of the profiled steel sheet on the inner side of the known composite thermal insulation wall body has various inconveniences and problems.
Disclosure of Invention
The invention aims to provide a method for installing a profiled steel sheet on the inner side of a double-layer profiled steel sheet composite heat-insulating wall body, which is convenient to construct, safe and reliable.
In order to achieve the purpose, the technical solution of the invention is as follows:
The method for installing the profiled steel sheet on the inner side of the double-layer profiled steel sheet composite heat-insulation wall body is characterized by comprising the following steps of:
a. manufacturing an operating platform, comprising the following steps:
(1) processing an operating platform, namely welding a rectangular frame by using a rectangular pipe, wherein the length of the operating platform is determined according to the distance between two adjacent steel columns on the same axis of a steel structure, is slightly smaller than the distance between the two adjacent steel columns, and has the width of 600 mm;
(2) Welding a plurality of rectangular pipe secondary beams in the middle of the rectangular frame at equal intervals, wherein two secondary beams at two ends of the rectangular frame are used for installing a lifting motor;
(3) Welding an upright column at the center of each of the four sides of the rectangular frame and perpendicular to the plane of the rectangular frame;
(4) The top ends of two upright posts on the long side of the rectangular frame and four corners of the rectangular frame are welded and fixed by using 4 80X40X2mm rectangular tubes as 1 st inclined strut, the top ends of the upright posts on the two short sides respectively use 1 80X40X2mm rectangular tube as a 2 nd inclined strut, the 2 nd inclined strut is connected with two corresponding corners of the rectangular frame, and the two 2 nd inclined struts are respectively positioned on two sides of the central line of the rectangular frame along the length direction;
(5) a fixed pulley is welded on one side, opposite to the No. 2 inclined strut, of the top end of the upright column on each short edge of the rectangular frame to serve as a steel wire rope pulley;
(6) Two ends of the operating platform are respectively provided with and fixed with a lifting motor; a fixed wood springboard is laid on the surface of the operation platform, so that operators can conveniently stand for work;
b. Manufacturing lifting clamp
Processing 2 lifting clamps by using 16mm thick steel plates, using two 7-shaped steel plates which are oppositely arranged, wherein one ends of the two steel plates are movably connected by using a pin shaft, arranging a through hole above the pin shaft, providing a steel wire rope to sequentially pass through the through hole and then fixing the steel wire rope by using a steel wire rope clamp as a sling, and the other end of the 7-shaped steel plate can be hooked on a lower flange plate of the section steel beam;
c. Installing inside profiled steel sheet by using operating platform
When the inboard profiled sheet of installation composite insulation wall, be connected 2 lifting jig respectively with the wire rope on 2 lifting motor, in order to keep the platform stable, wear out the back with lifting jig wire rope from the leading wheel earlier, at last with 2 lifting jig card on the shaped steel roof beam in the middle of two adjacent steel columns the lower flange board, when inboard profiled sheet installation, the installer stands on operation platform, use 2 lifting motor to promote operation platform to suitable height and install inboard profiled sheet to structure wall roof beam, accomplish the installation of inboard profiled sheet.
the installation method of the double-layer profiled steel sheet composite thermal insulation wall inner profiled steel sheet can be further realized by adopting the following technical measures.
The method of the preceding, wherein the material specification of the rectangular tube is 80X40X2mm rectangular tube.
the method, wherein the material specification of the secondary beam is 80X40X2mm rectangular tube.
The method, wherein the material specification of the upright is 80X40X2mm rectangular tube with length of 700 mm.
after the technical scheme is adopted, the installation method of the double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet has the following advantages:
1. the operation platform device has simple structure and convenient manufacture;
2. the quality of the installation engineering of the inner profiled steel sheet is greatly improved, and the safety risk of installation personnel is reduced;
3. avoided using the scaffold to carry out the high altitude installation, not needing repeatedly to dismantle the scaffold, installer operates more steadily on the platform to improve the installation effectiveness greatly, reduced extravagant manual work, reduced the cost of labor.
drawings
FIG. 1 is a schematic structural diagram of an operating platform according to an embodiment of the present invention;
FIG. 2 is an enlarged view of the portion P in FIG. 1;
FIG. 3 is a schematic view of an operating platform with a lift motor and a work ramp according to an embodiment of the present invention;
FIG. 4 is a schematic structural view of a stone tongs according to an embodiment of the present invention;
Fig. 5 is a schematic view of the operation platform for installing the inner profiled steel sheet according to the embodiment of the invention.
In the figure: 1 operation platform, 2 rectangular frame, 3 secondary beam, 4 motors, 5 stands, 6 1 st bracing, 7 nd bracing, 8 wire rope pulleys, 9 springboards, 10 anchor clamps, 11 inboard profiled steel sheet, 12 steel columns, 13 shaped steel roof beams, 14 structure wall roof beams.
Detailed Description
the present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The invention discloses a method for installing a profiled steel sheet on the inner side of a double-layer profiled steel sheet composite heat-insulation wall body, which comprises the following steps:
a. Manufacturing an operating platform, comprising the following steps:
(1) The operating platform 1 is processed, firstly, 80X40X2 rectangular pipes are welded into a rectangular frame 2, the length of the operating platform is determined according to the distance between two adjacent steel columns on the same axis of a steel structure, the length of the operating platform is slightly smaller than the distance between the two adjacent steel columns, and the width of the operating platform is 600 mm.
Referring to fig. 1 and 2, fig. 1 is a schematic structural view of an operation platform according to an embodiment of the present invention, and fig. 2 is an enlarged view of a portion P in fig. 1.
(2) 6 80X40X2 rectangular pipe secondary beams 3 are welded in the middle of the rectangular frame at equal intervals, wherein the two secondary beams 3 at the outermost sides are close to the two ends of the rectangular frame 2 so as to be convenient for installing the lifting motor 4.
(3) And 5, welding a 700mm long 80X40X2 rectangular pipe upright post 5 in the center of four sides of the rectangular frame and perpendicular to the plane of the rectangular frame.
(4) the top ends of two upright posts 5 on the long side are connected with four corners of a rectangular frame 2 by using 4 80X40X2 rectangular tubes as long inclined struts 6, the top ends of upright posts 5 on the two short sides are respectively connected with two opposite corners of the rectangular frame by using 1 80X40X2 rectangular tube as short inclined struts 7, and the two short inclined struts 7 are respectively positioned on two sides of the central line of the rectangular frame along the length direction.
(5) And a fixed pulley is welded on one side of the top end of the upright post 5 on each short edge relative to the short inclined strut 7 to serve as a steel wire pulley 8.
(6) Two ends of the operating platform are respectively provided with and fixed with a lifting motor 4; a fixed wood springboard 9 is laid on the surface of the operation platform, so that operators can conveniently stand for work; fig. 3 is a schematic diagram of an operation platform for installing a lifting motor and a working springboard according to an embodiment of the invention.
b. Manufacturing lifting clamp
2 lifting clamps 10 are processed by using 16mm thick steel plates, two 7-shaped steel plates are used and are arranged oppositely, one ends of the two steel plates are movably connected by a pin shaft, a through hole is arranged above the pin shaft, a steel wire rope is provided and sequentially passes through the through hole and then is fixed by a steel wire rope clamp to be used as a sling, and the other ends of the 7-shaped steel plates can be hooked on a lower flange plate of a section steel beam; fig. 4 is a schematic structural view of a lifting clamp according to an embodiment of the present invention.
c. installing inside profiled steel sheet by using operating platform
Fig. 5 is a schematic view of the operation platform for installing the inner profiled steel sheet according to the embodiment of the invention. When installing inboard profiled sheet 11 of compound insulation wall, be connected 2 hoisting jig 10 respectively with the wire rope on 2 electric hoist 4, in order to keep the platform stable, wear out earlier hoisting jig 10 with hoisting jig 10 after leading wheel 8, at last with 2 hoisting jig 10 cards on the lower flange board of shaped steel roof beam 13 in the middle of two adjacent steel columns 12, when inboard profiled sheet 11 is installed, the installer stands on operation platform 1, use 2 electric hoist 4 to promote operation platform 1 to suitable height and install inboard profiled sheet 11 to structure wall roof beam 14, accomplish the installation of inboard profiled sheet.
the method for installing the profiled steel sheets on the inner side of the double-layer profiled steel sheet composite heat-insulation wall body has the advantages that the scaffold is prevented from being used for high-altitude installation, installation personnel can operate more stably on a platform, and the installation quality is greatly improved. The scaffold is prevented from being used for high-altitude installation, installers are prevented from climbing the scaffold continuously, the installers operate on the platform more stably, and safety risks of the installers are reduced. The scaffold is prevented from being used for high-altitude installation, the scaffold does not need to be repeatedly disassembled, and the installer can operate more stably on the platform, so that the installation efficiency is greatly improved, the waste of labor is reduced, and the labor cost is reduced.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (4)

1. the method for installing the profiled steel sheet on the inner side of the double-layer profiled steel sheet composite heat-insulation wall body is characterized by comprising the following steps of:
a. Manufacturing an operating platform, comprising the following steps:
(1) processing an operating platform, namely welding a rectangular frame by using a rectangular pipe, wherein the length of the operating platform is determined according to the distance between two adjacent steel columns on the same axis of a steel structure, is slightly smaller than the distance between the two adjacent steel columns, and has the width of 600 mm;
(2) Welding a plurality of rectangular pipe secondary beams in the middle of the rectangular frame at equal intervals, wherein two secondary beams at two ends of the rectangular frame are used for installing a lifting motor;
(3) Welding an upright column at the center of each of the four sides of the rectangular frame and perpendicular to the plane of the rectangular frame;
(4) the top ends of two upright posts on the long side of the rectangular frame and four corners of the rectangular frame are welded and fixed by using 4 80X40X2mm rectangular tubes as 1 st inclined strut, the top ends of the upright posts on the two short sides respectively use 1 80X40X2mm rectangular tube as a 2 nd inclined strut, the 2 nd inclined strut is connected with two corresponding corners of the rectangular frame, and the two 2 nd inclined struts are respectively positioned on two sides of the central line of the rectangular frame along the length direction;
(5) A fixed pulley is welded on one side, opposite to the No. 2 inclined strut, of the top end of the upright column on each short edge of the rectangular frame to serve as a steel wire rope pulley;
(6) Two ends of the operating platform are respectively provided with and fixed with a lifting motor; a fixed wood springboard is laid on the surface of the operation platform, so that operators can conveniently stand for work;
b. manufacturing lifting clamp
Processing 2 lifting clamps by using 16mm thick steel plates, using two 7-shaped steel plates which are oppositely arranged, wherein one ends of the two steel plates are movably connected by using a pin shaft, arranging a through hole above the pin shaft, providing a steel wire rope to sequentially pass through the through hole and then fixing the steel wire rope by using a steel wire rope clamp as a sling, and the other end of the 7-shaped steel plate can be hooked on a lower flange plate of the section steel beam;
c. Installing inside profiled steel sheet by using operating platform
When the inboard profiled sheet of installation composite insulation wall, be connected 2 lifting jig respectively with the wire rope on 2 lifting motor, in order to keep the platform stable, wear out the back with lifting jig wire rope from the leading wheel earlier, at last with 2 lifting jig card on the shaped steel roof beam in the middle of two adjacent steel columns the lower flange board, when inboard profiled sheet installation, the installer stands on operation platform, use 2 lifting motor to promote operation platform to suitable height and install inboard profiled sheet to structure wall roof beam, accomplish the installation of inboard profiled sheet.
2. The method for installing double-layer profiled steel sheet composite thermal insulation wall inner profiled steel sheet according to claim 1, wherein the material specification of the rectangular pipe is 80X40X2mm rectangular pipe.
3. The method for installing double-layer profiled steel sheet composite thermal insulation wall inner profiled steel sheet as claimed in claim 1, wherein the material specification of the secondary beam is 80X40X2mm rectangular tube.
4. the method for installing the profiled steel sheets on the inner side of the double-layer profiled steel sheet composite thermal insulation wall body as claimed in claim 1, wherein the material specification of the upright column is 80X40X2mm rectangular tube with the length of 700 mm.
CN201710399623.4A 2017-05-31 2017-05-31 Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet Active CN108978926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710399623.4A CN108978926B (en) 2017-05-31 2017-05-31 Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710399623.4A CN108978926B (en) 2017-05-31 2017-05-31 Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet

Publications (2)

Publication Number Publication Date
CN108978926A CN108978926A (en) 2018-12-11
CN108978926B true CN108978926B (en) 2019-12-17

Family

ID=64502229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710399623.4A Active CN108978926B (en) 2017-05-31 2017-05-31 Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet

Country Status (1)

Country Link
CN (1) CN108978926B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112696065A (en) * 2020-12-22 2021-04-23 中国电建集团江西省水电工程局有限公司 Construction process of overlong profiled steel sheet enclosure structure of tall and large factory building

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084301A (en) * 1994-06-16 1996-01-09 Shimizu Corp Construction method of exterior wall panel using ropeway and device thereof
CN101619603B (en) * 2009-07-21 2011-05-18 上海市第一建筑有限公司 Method for hoisting grid structure and constructing roofing enclosure
CN201635379U (en) * 2009-12-16 2010-11-17 中国二十冶集团有限公司 Safety platform for installation and construction of roof contour plate hang ceiling
CN102296728A (en) * 2011-06-20 2011-12-28 南通建筑工程总承包有限公司 Double-steel plate structure shear wall and construction method thereof
CN102398848A (en) * 2011-07-01 2012-04-04 中建钢构有限公司 Lifting tool of profiled steel sheet
CN104179342A (en) * 2014-08-11 2014-12-03 广西壮族自治区冶金建设公司 Hanging cage and construction method thereof for mounting profiled steel sheets on steel structural workshop wall surface
CN205604737U (en) * 2016-04-13 2016-09-28 杭州泽通建筑节能新材料有限公司 Light slat integral hoisting system

Also Published As

Publication number Publication date
CN108978926A (en) 2018-12-11

Similar Documents

Publication Publication Date Title
CN201417657Y (en) Installation device of indoor transformer
CN104179342A (en) Hanging cage and construction method thereof for mounting profiled steel sheets on steel structural workshop wall surface
CN108978926B (en) Method for installing double-layer profiled steel sheet composite heat-insulation wall inner-side profiled steel sheet
CN109057309B (en) Suspension type operating platform and assembling and disassembling method thereof
CN210084736U (en) A portable lifting hook for installation of people's air defense door
CN113137102B (en) Assembled garage roof house structure and installation method thereof
CN104499659B (en) Portable bed board Apparatus and method for
CN111910934B (en) Lifting appliance for mounting color steel plates on outer wall surface of single-layer industrial factory building and construction method
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN216866034U (en) Large-area high-altitude grid structure aluminum grid ceiling construction device
CN113123560B (en) Layer-by-layer inverted mounting structure and construction method for ultra-large pipe well chimney
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN213204913U (en) Modular prefabricated staircase operation platform
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN212249076U (en) Large-scale space bending steel pipe truss aerial work operation platform
CN211775082U (en) Jig frame for large-span pipe truss
CN210888133U (en) Pipe truss installation string-up safety channel device
CN211712490U (en) Pipeline well pipeline hoisting device
CN114033189A (en) Large-area high-altitude grid structure aluminum grid ceiling construction device and construction method
CN211714403U (en) Installation device of modularization metal eaves mouth component
CN204357024U (en) Portable bed board equipment
CN208604911U (en) A kind of novel suspention beam bracket
CN207513201U (en) A kind of roofing cornices installation mobile device
CN112357743A (en) Manufacturing method of simple hoisting tool for purlines of factory building roof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant